Text version

SEW-00002-7J, SEW-000003-7J, SEW-00004-7J Questions and Answers

Date: 27 Aug 18

1. Can you give us the square footage of the attics for the blow in insulation?

Answer: Floor/site plan view (.pdf) for bldgs 200, 300, and 500 attached to this amendment of the solicitation.

2. Is the intent of this solicitation to replace the boilers with new and replace the water heaters with water storage tanks? It appears in bldg 400 that the new systems were tied into existing piping, pumps, venting, etc. Is that the intent for these 3 bldgs?

Answer: Solicitation includes heat exchanger and new hot water storage tanks.

3. I have a few questions regarding the removal and replacement of 5 boiler and 2 water heaters along with additional insulation at the Seward Rec Camp. What is the square footage of the attic space needing additional insulation?

Answer: See answer 1 above.

4. Will the building be occupied while the boilers and water heaters are being replaced? If the rooms are occupied are there limited hours in the day for work to be done?

Answer: The buildings will be unoccupied.

5. With this project bidding on Tuesday and we are still waiting on answers to our questions, will this bid be extended?

Answer: Contracting Officer is extending the bid submission deadline.

6. Do you have the name of the distributor for the specified boilers?

Answer: No

7. Will you allow a substitute for the specified boiler?

Answer: Any commercially available boiler and/or water storage tank is acceptable provided it meets the function, capability, and salient features of the specifications.

8. What is the square footage for the building (for calculating insulation costs)?

Answer: See answer 1 above