Attachment_4-_Seward_insulation_specs_8_JUN_18.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Replace Boilers/Water Tanks/Heaters/ Seward Alaska Federal contract opportunity
- Solicitation number
- W912D0-18-Q-0039
About this file
Attachment 4- Seward insulation specs 8 JUN 18
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912D0-18-Q-0039__SEW-0002,3,4__SF_1442_Solicitation__Amendment_001_Repalce_Boilers_and_Water_Tank_Heaters_Install_28__Aug_18.pdf | ||
| SEW_00002_7J,SEW_00003_7J,SEW_00004_7J__Bid_questions_and_answers.docx | DOCX document | |
| W912D0-18-Q-0039__SEW-0002,3,4__SF_1442_Solicitation_Repalce_Boilers_and_Water_Tank_Heaters_Install_9_Aug_18.pdf | ||
| Attachment_3-_Seward_hot_water_tank_specs_8_JUN_18.xlsx | XLSX spreadsheet | |
| Attachment_1-SEW-00002,3,4-7J_-_SOW_5_Jun_18.pdf | ||
| Attachment_5-_Construction_Wage_Rate_AK_3_Aug_18.pdf | ||
| Attachment_2-_Seward_boiler_specs_8_JUN_18.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Material Type | Fiber Glass, Loose Fill |
| Conforms to: | ASTM C 764 Type 1 (pneumatic application) |
| Conforms to: | Dept of Energy material standards |
| Passes Requirements of: | ASTM E 136, non-combustable |
| Flame spread | 5 |
| R-Value | 38 |
| Minimum Weight/sq ft (lbs) | 0.836 |
| Mimimum Thickness (in) | 14.75 |
File details come from the government source that posted it.