Attachment 0001 - RFC Log Government Responses 07-28-26.pdf

PDF 77 KB Posted

Attached to
Elevator Preventive Maintenance and Major Repairs Services
Solicitation number
W912CN-26-Q-A031
Issued by

About this file

This is a Request for Clarifications (RFC) document containing 24 contractor questions and government responses regarding a federal contract solicitation for elevator maintenance and inspection services.

The solicitation requires contractors to provide monthly preventive maintenance on all elevator units listed in Technical Exhibits 1-6, with frequency specified as monthly for all units. Key personnel requirements include a Project Manager who must hold a valid Elevator Mechanic License in the State of Hawaii and a valid Qualified Elevator Inspector certificate issued by the National Association of Elevator Safety Authorities (OSHA). All contractors and subcontractors must achieve a minimum CMMC Level 1 certification. The technical acceptability evaluation is based on an Acceptable/Unacceptable standard, with relevant work experience evaluated on technical acceptability considering similar size, scope, and complexity of submitted projects. Past performance is not an evaluation factor but will be reviewed as part of the Contracting Officer's responsibility determination under FAR Part 9. The submission must include five documents: a Technical Acceptability Narrative (not to exceed 10 pages with 12-point font, incorporating at least 2 relevant work experience examples), Contractor & Key Personnel Certifications (excluded from page limit), Technical Approach & Management Plan (no page limit), Monthly Baseline Preventive Maintenance Schedule, and Baseline Annual Testing Schedule. Cover pages and tables of contents do not count toward the 10-page limitation, and tables may not utilize font smaller than 12-point. The documents should be submitted in the order they appear in the solicitation. There was no extension granted to the offeror due date of 03-AUG-26 1600 HST, and Solicitation Amendment 0001 provided the updated Work Experience Reference Sheet (Attachment 0001) and revised SF1449 form without the "DRAFT" watermark.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section Referenced in Question Contractor Question Government Response

1 Addendum to Section M (Solicitation doc

pg. 91-92)

Section M - Factors for Award states "The government will evaluate offers and make an award decision considering technical acceptability, price, and other information available to the

Government including past performance information obtained from CPARS or other sources", however it then states "Past performance is not an evaluation factor but will be reviewed as part of the Contracting Officer's responsibility determination under

FAR Part 9". Will the government confirm that Past Performance is

NOT an evaluation factor and will only be used IAW FAR Subpart

9.1 to determine responsibility of the firm AFTER evaluation and prior to award?

Past Performance is not an evaluation factor but will be reviewed as part of the Contracting Officer's responsibility determination under

FAR Part 9.

Prior to award, the Government reserves the right to conduct a responsibility determination in accordance with FAR Subpart 9.1. As part of this determination, the Government may review past performance information for the apparent successful offeror from sources such as CPARS and the Supplier Performance Risk System

(SPRS) to assess performance risk. An offeror without a record of relevant past performance will not be evaluated favorably or unfavorably.

2 Certifications Requesting confirmation if the contractor and all subcontractors must have a minimum of CMMC Level 1.

Yes.

3 Addendum to Section L (Solicitation doc

pg. 85)

2a. Contractor and Key Personnel Certifications. In reference to

PWS Section 8.2.1.1, will the government confirm if the Project

Manager is also required to hold a valid Elevator Mechanic License in the State of Hawiaii and a valid Qualified Elevator Inspector certificate issued by the National Association of Elevator Safety

Authorities, OSHA.

Yes.

4 Addendum to Section L (Solicitation doc

pg. 85-86)

The solicitation instructs Offerors to submit at least two relevant work experience examples using Attachment 0001 – Work

Experience Reference Sheet. However, no Work Experience

Reference Sheet appears to be included with the solicitation. Please provide the referenced attachment or clarify the intended format for submitting the required Relevant Work Experience.

Solicitation Amendment 0001 has included the prior missing

Attachment 0001 - Relevant Work Experience Reference Sheet.

5 Addendum to Section L (Solicitation doc

pg. 92) & PWS Section 2.1.11.1.1

Factor 1 - Technical Acceptability Section, a. Contractor & Key

Personnel Certifications states that offerors must provide copies of verifiable professional certifications, such as CET and NEIEP for all proposed key personnel and field technicians, however in PWS

Section 2.1.11.1.1 Project Manager, it states the requirements of the PM is a baccaleaureate degree from an accredited college or university, or five (5) years of experience. Please confirm that only.

Contractor & Key Personnel- People executing work (hands on) need appropriate certification(s). If the PM is performing work (hands on) to the equipment, they need appropriate certification(s). If the PM is not involved in the work to the equipment (hands on), they do at minimum, need the requirements of PWS Section 2.1.11.1.1.

6 Solicitation 2a, 2b The RFQ identifies Sections 2.a (Contractor and Key Personnel

Certifications) and 2.b (Technical Approach and Management Plan) as excluded from the 10-page narrative limitation. Please confirm whether these excluded sections are to be submitted as separate attachments or incorporated into the Technical Acceptability submission following the 10-page narrative.

Per the ADDENDUM TO SECTION L (INSTRUCTIONS TO OFFERORS FAR

52.212-1), 2. Technical Acceptability Submission, the submission must include the following items:

2. Technical Acceptability Narrative (not to exceed 10-pages)

2.a. Contractor & Key Personnel Certifications

(2.a. is not counted against the 10-page limit)

2.b. Technical Approach & Management Plan

2.c. Relevant Work Experience (at least 2 examples)

Offerors shall submit five (5) documents:

Per instruction of SECTION L

1) 2.Technical Acceptability Narrative (not to exceed 10-pages, which

2.c. is incorported into).

2) 2.a. Contractor & Key Personnel Certifications

3) 2.b. Technical Approach & Management Plan

Per instruction of the PWS

PWS 8.2.1 Monthly Baseline Preventive Maintenance Schedule and

PWS 8.3 Baseline Annual Testing Schedule

7 Solicitation 2a, 2b Please confirm that only the Relevant Work Experience narrative is subject to the 10-page limitation and that the excluded Sections 2.a and 2.b may be of any reasonable length

Per the ADDENDUM TO SECTION L (INSTRUCTIONS TO OFFERORS FAR

52.212-1), 2. Technical Acceptability Submission, 2.a Contractor & Key

Personnel Certifications is excluded from the 10-page limit of the

Technical Acceptability Narrative.

8 Solicitation Please confirm whether a cover page and table of contents count toward the 10-page limitation.

Per the ADDENDUM TO SECTION L (INSTRUCTIONS TO OFFERORS FAR

52.212-1), 2. Technical Acceptability Submission, 2.a is excluded from the 10 page limit.

Request For Clarifications (RFC)

9 Solicitation The solicitation requires submission of Attachment 0001, Work

Experience Reference Sheet, while also requesting a narrative describing relevant work experience. Please confirm whether

Attachment 0001 is intended to replace the narrative or whether both the completed attachment and a narrative discussion are required.

Per the ADDENDUM TO SECTION L (INSTRUCTIONS TO OFFERORS FAR

52.212-1), 2. Technical Acceptability Submission, the submission must include the following items:

2. Technical Acceptability Narrative (not to exceed 10-pages)

2.a. Contractor & Key Personnel Certifications

(2.a. is not counted against the 10-page limit)

2.b. Technical Approach & Management Plan

2.c. Relevant Work Experience (at least 2 examples)

Offerors shall submit five (5) documents:

Per instruction of SECTION L

1) 2.Technical Acceptability Narrative (not to exceed 10-pages, which

2.c. is incorported into).

2) 2.a. Contractor & Key Personnel Certifications

3) 2.b. Technical Approach & Management Plan

Per instruction of the PWS

PWS 8.2.1 Monthly Baseline Preventive Maintenance Schedule and

PWS 8.3 Baseline Annual Testing Schedule

10 Solicitation If both the completed Attachment 0001 and a narrative are required, please confirm whether the completed Attachment 0001 counts toward the 10-page limitation.

Per the ADDENDUM TO SECTION L (INSTRUCTIONS TO OFFERORS FAR

52.212-1), 2. Technical Acceptability Submission, the submission must include the following items:

2. Technical Acceptability Narrative (not to exceed 10-pages)

2.a. Contractor & Key Personnel Certifications

(2.a. is not counted against the 10-page limit)

2.b. Technical Approach & Management Plan

2.c. Relevant Work Experience (at least 2 examples)

Offerors shall submit five (5) documents:

Per instruction of SECTION L

1) 2.Technical Acceptability Narrative (not to exceed 10-pages, which

2.c. is incorported into).

2) 2.a. Contractor & Key Personnel Certifications

3) 2.b. Technical Approach & Management Plan

Per instruction of the PWS

PWS 8.2.1 Monthly Baseline Preventive Maintenance Schedule and

PWS 8.3 Baseline Annual Testing Schedule

11 Solicitation Please confirm whether the Baseline Preventive Maintenance

Schedule and Baseline Annual Testing Schedule are considered part of the excluded Technical Approach and Management Plan or whether they are separate attachments.

PWS 8.2.1 Monthly Baseline Preventive Maintenance Schedule and

PWS 8.3 Baseline Annual Testing Schedule are not part of the

Technical Approach and Management Plan and are separate attachments.

12 Solicitation Please confirm whether there is a page limitation applicable to the

Technical Approach and Management Plan, including the Baseline

Preventive Maintenance Schedule and Baseline Annual Testing

Schedule.

No page limit to the Technical Approach and Management Plan, Baseline Preventive Maintenance Schedule, and Baseline Annual

Testing Schedule.

13 Solicitation Please confirm whether resumes, licenses, certifications, and other supporting documentation required under Section 2.a are excluded from all page limitations.

Per the ADDENDUM TO SECTION L (INSTRUCTIONS TO OFFERORS FAR

52.212-1), 2. Technical Acceptability Submission, the submission must include the following items; (Sections

2.a is not count against the 10-page limit for the narrative portion)

2.a. Contractor & Key Personnel Certifications: Offerors must submit documentation demonstrating the company possesses all required certifications. Provide resumes and copies of current, valid certifications for the proposed Project Manager and all key technicians, demonstrating compliance with the requirements of PWS Paragraphs

2.5.4.1 and 8.2.1.1 (e.g., valid Elevator Mechanic License in the State of

Hawaii, valid Qualified Elevator Inspector certificate issued by the

National Association of Elevator Safety Authorities, OSHA).

(2.a. is not counted against the 10-page limit)

14 Solicitation Please confirm whether tables may utilize a font size smaller than

12-point provided they remain legible.

Per the ADDENDUM TO SECTION L (INSTRUCTIONS TO OFFERORS FAR

52.212-1), 2. Technical Acceptability Submission: The Offeror shall submit, as part of its quote, a technical acceptability narrative not to exceed 10 pages with 12-point font.

15 Solicitation Please identify which required attachments, if any, count toward the 10-page limitation.

Per the ADDENDUM TO SECTION L (INSTRUCTIONS TO OFFERORS FAR

52.212-1), 2. Technical Acceptability Submission, the submission must include the following items:

2. Technical Acceptability Narrative (not to exceed 10-pages)

2.a. Contractor & Key Personnel Certifications

(2.a. is not counted against the 10-page limit)

2.b. Technical Approach & Management Plan

2.c. Relevant Work Experience (at least 2 examples)

Offerors shall submit five (5) documents:

Per instruction of SECTION L

1) 2.Technical Acceptability Narrative (not to exceed 10-pages, which

2.c. is incorported into).

2) 2.a. Contractor & Key Personnel Certifications

3) 2.b. Technical Approach & Management Plan

Per instruction of the PWS

PWS 8.2.1 Monthly Baseline Preventive Maintenance Schedule and

PWS 8.3 Baseline Annual Testing Schedule

2.c. Relevant Work Experience (at least 2 examples) would be the only attachment that counts towards the 10-page limitation as it's incorporated into the Technical Acceptability Narrative.

16 Solicitation The solicitation indicates that Technical Acceptability is evaluated on an Acceptable/Unacceptable basis while Relevant Work

Experience is included within the Technical Acceptability submission. Please confirm whether Relevant Work Experience is evaluated solely for technical acceptability or whether the

Government will comparatively assess the similarity, scope, magnitude, and complexity of submitted projects.

Relevant Work Experience will be evaluated on technical acceptability based on similar size, scope and complexity.

17 Solicitation Please provide the intended order of the Technical Acceptability submission (e.g., narrative, certifications, technical approach, schedules, attachments) or confirm that Offerors may organize the submission in any logical manner provided all required information is included.

Per the ADDENDUM TO SECTION L (INSTRUCTIONS TO OFFERORS FAR

52.212-1), 2. Technical Acceptability Submission, the submission must include the following items:

2. Technical Acceptability Narrative (not to exceed 10-pages)

2.a. Contractor & Key Personnel Certifications

(2.a. is not counted against the 10-page limit)

2.b. Technical Approach & Management Plan

2.c. Relevant Work Experience (at least 2 examples)

Offerors shall submit five (5) documents:

Per instruction of SECTION L

1) 2.Technical Acceptability Narrative (not to exceed 10-pages, which

2.c. is incorported into).

2) 2.a. Contractor & Key Personnel Certifications

3) 2.b. Technical Approach & Management Plan

Per instruction of the PWS

PWS 8.2.1 Monthly Baseline Preventive Maintenance Schedule and

PWS 8.3 Baseline Annual Testing Schedule

Order of documents submitted shall follow the order in which they appear in the solicitation.

18 Solicitation The solicitation excludes Sections 2.a (Contractor and Key

Personnel Certifications) and 2.b (Technical Approach and

Management Plan) from the 10-page limitation; however, it does not identify any section that is subject to the 10-page limitation other than the Relevant Work Experience narrative. Please clarify exactly which portions of the Technical Acceptability submission are intended to count toward the 10-page limitation.

Per the ADDENDUM TO SECTION L (INSTRUCTIONS TO OFFERORS FAR

52.212-1), 2. Technical Acceptability Submission, the submission must include the following items:

2. Technical Acceptability Narrative (not to exceed 10-pages)

2.a. Contractor & Key Personnel Certifications

(2.a. is not counted against the 10-page limit)

2.b. Technical Approach & Management Plan

2.c. Relevant Work Experience (at least 2 examples)

Offerors shall submit five (5) documents:

Per instruction of SECTION L

1) 2.Technical Acceptability Narrative (not to exceed 10-pages, which

2.c. is incorported into).

2) 2.a. Contractor & Key Personnel Certifications

3) 2.b. Technical Approach & Management Plan

Per instruction of the PWS

PWS 8.2.1 Monthly Baseline Preventive Maintenance Schedule and

PWS 8.3 Baseline Annual Testing Schedule

2.c. Relevant Work Experience (at least 2 examples) would be the only attachment that counts towards the 10-page limitation as it's incorporated into the Technical Acceptability Narrative.

19 Solicitation The solicitation contains several ambiguities affecting proposal preparation, including the organization of the Technical

Acceptability submission, applicable page limitations, required attachments, certifications, schedules, and the required Relevant

Work Experience narrative. Because responses to these questions may materially affect how Offerors prepare their quotations, and the period between the question due date and the quotation due date is only one week, will the Government extend the quotation due date by at least one week following the release of responses to questions to allow Offerors sufficient time to incorporate the

Government's clarifications into their proposals?

ADDENDUM TO SECTION L (INSTRUCTIONS TO OFFERORS FAR 52.212-

1) provides interested offerors with instruction in section 2.Technical

Acceptability Submission, applicable page limitations, required attachments, 2.a. Contractor & Key Personnel Certifications, 2.b.

Technical Approach & Management Plan , and the 2.c. Relevant Work

Experience.

There is NO EXTENSION to the 03-AUL-26 1600 HST Offeror Due Date.

20 General I just wanted to clarify the maintenance frequency. After reading through the contract. I didn’t notice any specifications regarding monthly maintenance. Can you please clarify if monthly maintenance on all units are required? In reading this this paragraph below, it doesn’t specify monthly maintenance. So if I was to bid this with this current language I would not bid it with monthly maintenance. It will need to specify monthly maintenance.

Frequency of Preventive Maintenance is to be Montly; applicable to

ALL units listed in referenced Technical Exhibits (TE) 1 thru 6, as mentioned in PWS Section 8.2.

Updates to PWS Section 8.2, 8.2.1, 8.2.2, 8.2.3, 8.2.4 titles.

8.2 Monthly Preventive Maintenance (PM)

8.2.1 Monthly Preventive Maintenance Schedule

8.2.2 Monthly Preventive Maintenance/Inspection and Minor

Repairs (Hydraulic/Traction Elevators and Lifts)

8.2.3 Monthly Preventive Maintenance Requirements

8.2.4 Monthly Preventive Maintenance Report

21 General While reviewing the bid documents, I noticed that the attached

Standard Form 1449 contains a "DRAFT" watermark. Would it be acceptable for us to complete and submit the form as provided, or would you prefer that we use a version without the watermark?

Solicitation Amendment 0001 has an updated SF1449 without the

DRAFT watermark for interested vendors to submit their offers. Please submit offer on Amended Solicitation document - W912CN26QA031

Solicitation Amendment 0001 28JUL2026.

22 General Are we to use SF1449? It currently shows the Draft. Please advise. Solicitation Amendment 0001 has an updated SF1449 without the

DRAFT watermark for interested vendors to submit their offers. Please submit offer on Amended Solicitation document - W912CN26QA031

Solicitation Amendment 0001 28JUL2026.

23 General Is it possible to get a copy of the most recent bid results for this portfolio?

No. We will not be distributing past bid results to interested vendors.

24 General Could you please clarify the criteria that distinguishes a minor repair, which is included under the Preventive Maintenance and

Service Call CLINs, from a major repair under CLIN 0008?

Could you please identify the Government's criteria for determining when a repair requires a separate proposal and Task Order?

PWS 8.2 Monthly Preventive Maintenance CLINs are to conducted based on the vendors suggested schedule.

PWS 8.5 Urgent/Routine Call CLINs are for Services Call outside of the

Monthly Preventive Maintenance schedule. PWS 8.6 is the similar to

PWS 8.5 with Emergency response times.

PWS 8.5 "If repair work goes beyond a routine service call..." the call then gets elevated to PWS 8.7. PWS 8.7 criteria applies when work is beyond the scope of PWS 8.2 and/or 8.5.