J05 TE 4 UPH Barracks Elevators Test Dates 04-JUN-25.pdf
PDF 113 KB Posted
- Solicitation number
- W912CN-26-Q-A031
About this file
This is a technical exhibit listing barracks elevators across three military installations with their inspection test dates and requirements.
The document inventories 40 total elevators distributed across Fort Shafter (4 elevators), Schofield Barracks (34 elevators), and Helemano Military Reservation (2 elevators). The elevator inventory comprises 38 traction-type elevators and 2 hydraulic elevators, with capacities ranging from 2,500 to 5,000 pounds and serving 4 to 8 floors. Manufacturers include Schindler, Kone, ThyssenKrupp, Montgomery, Dover, and Canton. Testing requirements specify a 5-year inspection cycle for traction elevators and a 3-year cycle for hydraulic elevators, effective June 1, 2026. Historical test dates range from January 2016 through July 2020, with corresponding test due dates extending through July 2025. Notable elevators requiring attention include B-2077 at Schofield Barracks (Dover, 2,500 lb) with a test due date of March 1, 2021, and multiple elevators at Schofield Barracks (B-2450, B-2451, and others) with test due dates in 2021 and 2023.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT #4
LIST OF UPH BARRACKS ELEVATORS W/TEST DATES
LOCATION
& BLDG NO.
TYPE CAPACITY MAKE FLOORS DATE OF
TEST
REMARKS
TEST DUE
FORT
SHAFTER (FS)
B-502 (Bks) TRACTION 3,000 SCHINDLER 8 07/28/2015 07/28/2020 B-503A (Bks) TRACTION 3,000 KONE 8 07/29/2015 07/29/2020 B-517 (Bks) TRACTION 4,500 SCHINDLER 6 02/14/2020 02/14/2025 B-517 (Bks) TRACTION 4,500 SCHINDLER 6 02/14/2020 02/14/2025
TYPE CAPACITY MAKE FLOORS DATE OF
TEST
REMARKS
TEST DUE
SCHOFIELD
BARRACKS
(SB)
B-662 (Bks) HYDRO 3,500 CANTON 5 08/16/2017 08/16/2020 B-662 (Bks) HYDRO 3,500 CANTON 5 08/16/2017 08/16/2020 B-774 (Bks) TRACTION 5,000 THYSSENKRUPP 5 02/12/2020 02/12/2025 B-774 (Bks) TRACTION 3,500 THYSSENKRUPP 5 02/12/2020 02/12/2025 B-777 (Bks) TRACTION 3,500 KONE 5 02/11/2020 02/11/2025 B-777 (Bks) TRACTION 5,000 KONE 5 02/11/2020 02/11/2025 B-778 (Bks) TRACTION 3,500 KONE 5 02/10/2020 02/10/2025 B-778 (Bks) TRACTION 5,000 KONE 5 02/10/2020 02/10/2025 B-783 (Bks) TRACTION 5,000 THYSSENKRUPP 5 07/22/2020 07/22/2025 B-783 (Bks) TRACTION 3,500 THYSSENKRUPP 5 07/22/2020 07/22/2025 B-884 (Bks) TRACTION 3,000 MONTGOMERY 5 08/22/2018 08/22/2023 B-884 (Bks) TRACTION 3,000 MONTGOMERY 5 08/22/2018 08/22/2023 B-885 (Bks) TRACTION 3,500 KONE 5 08/23/2018 08/23/2023 B-885 (Bks) TRACTION 3,500 KONE 5 08/23/2018 08/23/2023 B-1020 (Bks) TRACTION 2,500 SCHINDLER 6 07/20/2018 07/20/2023 B-1020 (Bks) TRACTION 2,500 SCHINDLER 6 07/20/2018 07/20/2023 B-1024 (Bks) TRACTION 3,500 SCHINDLER 6 07/20/2018 07/20/2023 B-1024 (Bks) TRACTION 3,500 SCHINDLER 6 07/20/2018 07/20/2023 B-2075 (Bks) TRACTION 2,500 DOVER 5 08/24/2018 08/24/2023 B-2076 (Bks) TRACTION 3,000 MONTGOMERY 5 08/24/2018 08/24/2023 B-2076 (Bks) TRACTION 3,000 MONTGOMERY 5 08/24/2018 08/24/2023 B-2077 (Bks) TRACTION 2,500 DOVER 5 03/01/2018 03/01/2021 B-2081 (Bks) TRACTION 5,000 MONTGOMERY 4 07/21/2020 07/21/2025 B-2081 (Bks) TRACTION 3,500 MONTGOMERY 4 07/21/2020 07/21/2025 B-2083 (Bks) TRACTION 5,000 MONTGOMERY 6 08/21/2018 08/21/2023 B-2083 (Bks) TRACTION 3,500 MONTGOMERY 6 08/21/2018 08/21/2023 B-2450 (Bks) TRACTION 3,500 SCHINDLER 5 01/31/2016 01/31/2021 B-2450 (Bks) TRACTION 3,500 SCHINDLER 5 01/31/2016 01/31/2021 B-2451 (Bks) TRACTION 3,500 SCHINDLER 5 01/31/2016 01/31/2021 B-2451 (Bks) TRACTION 3,500 SCHINDLER 5 01/31/2016 01/31/2021
TECHNICAL EXHIBIT #4
LIST OF UPH BARRACKS ELEVATORS W/TEST DATES
TYPE CAPACITY MAKE FLOORS DATE OF
TEST
REMARKS
TEST DUE
HELEMANO
MIL RES
(HMR)
B-315 (Bks) TRACTION 3,500 SCHINDLER 4 04/12/2019 04/12/2024 B-315 (Bks) TRACTION 3,500 SCHINDLER 4 04/12/2019 04/12/2024
UPH BARRACKS ELEVATORS TOTAL
ELEVATOR TYPE QUANTITY
TRACTION 38
HYDRO 2
TOTAL 40
Hydro – 3 years Traction – 5 years
Effective 01 June 2026
File details come from the government source that posted it. Updated .