SF30 W912CN26QA030.pdf
PDF 4 MB Posted
- Attached to
- SVC Barrier Mobilization for 4th of July
- Solicitation number
- W912CN-26-Q-A030
About this file
This is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract issued by the U.S. Army Corps of Engineers, Fort Shafter, Hawaii on June 5, 2026.
The amendment modifies solicitation W912CN26QA030 and updates contract documents to incorporate post-responses to RFI and PWS updates. Specific changes include: adding barrier specifications paragraph 3.1; updating operational hours to correct Saturday dates from only July 11th to both July 4th and July 11th; including POC directive in paragraph 3.3; and correcting verbiage in sections 4.1 and 4.2. The contract document attachments table has been reorganized with the original Performance Work Statement (PWS) deleted and replaced with a revised PWS dated June 5, 2026. A new RFI Response document dated June 5, 2026 has been added as an attachment. Supporting Technical Documentation (TE1) and Wage Determination (WD 2015-5689) remain as contract attachments. The display order of TE1 changed from position 2 to 3, and WD 2015-5689 changed from position 3 to 4. All modifications are incorporated by reference with the same force and effect as if included in full text. The amendment was signed by the Contracting Officer Angela McColor on June 5, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS rev 06-05-2026.pdf | ||
| RFI RESPONSE.pdf | ||
| SF 1449 W912CN26QA030 CONFORMED.pdf | ||
| SF1449 W912CN26QA030.pdf | ||
| WD 2015-5689.pdf | ||
| PWS.pdf | ||
| TE1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
List of Contract Documents, Exhibits, or Attachments
The attachments table has changed from:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 PWS Performance Work Statement 01 Jun 2026 Attach ment
No
0002 TE1 Supporting Technical Documentation
01 Jun 2026 Attach ment
No
0003 WD 2015-5689 Wage Determination 01 Jun 2026 Attach ment
No
To:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0004 PWS rev 06- 05-2026
Performance Work Statement 05 Jun 2026 Attach ment
No
0005 RFI
RESPONSE
RFI RESPONSE 05 Jun 2026 Attach ment
No
0002 TE1 Supporting Technical Documentation
01 Jun 2026 Attach ment
No
0003 WD 2015-5689 Wage Determination 01 Jun 2026 Attach ment
No
The following contract documents were added:
PWS rev 06-05-2026
RFI RESPONSE
The following contract documents were modified:
W912CN26QA0300001
TE1
INFORMATION FROM TO
Contract Document Display Order
2 3
WD 2015-5689
INFORMATION FROM TO
Contract Document Display Order
3 4
The following contract documents were deleted:
PWS
Miscellaneous text in this section has been modified to:
The attachments listed in this The attachments listed in this Section are incorporated by reference and made part of this contract with the same force and effect as if included in full textSection are incorporated by reference and made part of this contract with the same force and effect as if included in full text.
The attachments listed in this Section are incorporated by reference and made part of this contract with the same force and effect as if included in full text.
W912CN26QA0300001
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0001 |
| EffDate: 05 JUN 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W912CN |
| AdmCode: |
| IssuedBy: 0413 AQ HQ RCO-HI |
KO DIRECTORATE OF CONTRACTING, 536 PALM CIRCLE DR BLDG T 122
FORT SHAFTER, HI 96858-5025
UNITED STATES
MARIA OLIPAS, EMAIL: MARIA.D.OLIPAS.CIV@ARMY.MIL TELEPHONE: (808) 787-8825
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912CN26QA030 |
| SolDate: 01 JUN 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this amendment is post responses to RFI's and PWS updates as follows: |
1. Add barrier specs paragraph 3.1
2. Update paragraph 1.7.2. Hours of Operation to correct Saturday dates from only July 11th to both July 4th and July 11th.
3. Update paragraph 3.3. to include POC directive.
4. Update section 4.1 and 4.2 to correct verbiage.
| ContNameTitle: |
| CoNameTitle: ANGELA MCCOLOR |
| ContDate: |
| CODate: 05 JUN 2026 |
File details come from the government source that posted it. Updated .