Amendment 0001 Responses to Questions to Combined Synopsis_Solicitation.pdf
PDF 421 KB Posted
- Solicitation number
- W912CL-20-Q-0300
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 REV Attachment 3_Incorporated Clauses effective 082820.doc | DOC document | |
| REV Attachment 1_Pricing Schedule 082820 .doc | DOC document | |
| Amentment 0002 Combo Synopsis_Solicitation 082820.doc | DOC document | |
| Amendment 0002 - Responses to Questions 085820 .pdf | ||
| Attachment 3_Incorporated Clauses effective 081020.doc | DOC document | |
| Combo Synopsis_Solicitation.doc | DOC document | |
| Attachment 1_Pricing Schedule 081320 .doc | DOC document | |
| Attachment 5_References.doc | DOC document | |
| Attachment 2_MASC PWS _FinalV 081320.docx | DOCX document | |
| Attachment 4_Service Contract ACt WD 2015_5254.pdf | ||
| Attachment 6_Unescorted Access Request v8.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number Amendment 0001 - W912CL-20-Q-0300
Responses to Questions 24 August 2020
Important Contractor is required to sign this document and return 1 copy to the issuing office with its Quote by signing the document at the end of this page.
Line Reference Questions Response
1 Attachment 1 –
Pricing
Schedule
Item No 0006 – 1 JOB - Upgrade Software/Hardware
The contractor shall update the Windows operating platform and INTELLI-SITE OSSI operating system which is listed in the PWS.
FFP
Upgrade Software/Hardware
FOB: Destination
Should this line item (Item No 0006) include the yearly software maintenance cost for the (Open Options Access Control and Qugnify Ocularis CCTV software maintenance)?
This is a yearly cost that it may be beneficial to include in the service contract for automatic renewals. Should we include the yearly software maintenance costs of the security systems in this line item, or is this for labor only for the hardware and software?
The cost associated with CLIN 0006 is for the upgrade of the 1st floor base computer and operating system. The current system is operating on antiquated windows and
INTELLI-SITE OSSI software and needs to be updated with current operating software. The current CCTV software operates on a different system and is not connected to the MASC system or contract. Currently we are not asking for annual software maintenance and are asking only for the system upgrade, labor, software and hardware.
2 Combo Synopsis
Solicitation
Questions Due 12:00 PM CDT 21 Aug, Due to the current COVID19 and Civil Unrest issues creating significant issues, would the Government consider an extension for the proposal submission in order to allow for the vendor to submit a quality quote ?
Quotes are expected to be submitted on 31 Aug 20. The current contract will expire on 25 Sep 20 and any delay with awarding the follow-on contract will create serious security issues.
3 PWS Para 1.4.
Scope of Work
Upgrade the 1st floor control registration station and the backup slave station with current Window and
INTELLI-SITE OSSI software/hardware. 2)
After all upgrades are completed, the contractor will provide diagnostics, trouble shooting, preventive maintenance, and repair/replacement of the software/hardware and doors
Perform Quarterly Preventive maintenance checks and services of access control electronic security system hardware, devices and components, circuit board panels, power supply, electric strike locking devices, electronic motion sensor devices, biometric readers w/number key pad, computer hardware and software applications and conduit as required:
In order to allow for the best quote possible, will the
Government allow the Vendor to conduct the Upgrade and the
PM tasks simultaneously?
No, the requirements due to time and manpower would be need to be conducted at separate times. The PM tasks are detailed and have impacts on ARSOUTH personnel due to requirements for escorting and overseeing of the task.
4 PWS Para 1.4.
Scope of Work
Upgrade the 1st floor control registration station and the backup slave station with current Window and
INTELLI-SITE OSSI software/hardware. 2)
After all upgrades are completed, the contractor will provide diagnostics, trouble shooting, preventive maintenance, and repair/replacement of the software/hardware and doors
Perform Quarterly Preventive maintenance checks and services of access control electronic security system hardware, devices and components, circuit board panels, power supply, electric strike locking devices, electronic motion sensor devices, biometric readers w/number key pad, computer hardware and software applications and conduit as required:
Could the Government provide some historical data on how many of the 9 biometric/proximity card readers, 65 door sensors, 10 proximity/pin card readers, 2 biometric enrollment readers, 31 circuit board panels, 2 central control registration stations, 1 Backup Slave Station, 1 Uninterrupted Power Supply
(UPS) and 20 Altronix power supply have had mainfulctions in the past 12 months. This historical data will allow the vendor to create a more accurate budget quote for the work required for the PM phase of the requirement.
There are more than 9 biometric/proximity card readers.
Refer to PWS paragraph 1.2 for the number of biometric/ proximity card readers. During the last 12 months there has been 6 recorded issues with the MASC system. Each of the issues effected different components of the system but all were resolved within reasonable time frames.
Normally we see hardware on doors failing more often, due to use, than software issues. Software issues have happened in the last year and due to the system not being network a contractor was called to conduct emergency repairs.
Name and title of Signer (Type or print)
Contractor/Offeror DATE SIGNED
(Signature of person authorized to sign)
File details come from the government source that posted it. Updated .