This is an Invitation for Bids (IFB) issued by Army Contracting Command - Detroit Arsenal for a firm-fixed-price contract with 100% option to procure Special Purpose Electrical Cable Assembly (NSN 6150-01-260-2747, Part Number 9385014). The solicitation is a total small business set-aside in accordance with FAR Part 19. The IFB closing date is August 13, 2026, at 13:00 local time (Warren, MI), with virtual bid opening scheduled for August 17, 2026, at 13:00 local time. Bids must be submitted electronically via email to Richard Hall (Contract Specialist) and Elizabeth Levine Welhouse (Contracting Officer). All bids are valid for a minimum of 120 calendar days, and late submissions, modifications, and withdrawals are governed by FAR 52.214-7.

The contract consists of three contract line items (CLINs): CLIN 0001AA for First Article Test Report (1 lot, 150 calendar days after award), CLIN 0002AA for Production Quantity (330 each, 300 calendar days with FAT or 120 calendar days without FAT), and CLIN 0003AA for Unexercised Option Quantity (330 each, 100 calendar days after award). Pricing is firm-fixed-price on a unit basis. Inspection and acceptance occur at origin for production items and at destination for the First Article Test Report. Delivery is FOB Destination to Army General Supply Central Receiving Point in Anniston, Alabama. The solicitation requires mandatory completion of representations, certifications, and fill-ins, including NAICS code 335999 registration, acknowledgment of IFB amendments, delivery schedule specifications, and Section K certifications regarding arms control treaties and tax matters. A Technical Data Package (TDP) with export control restrictions (Distribution Code "D") is available on SAM.gov and requires DD Form 2345 certification for access. Bidders must access the TDP prior to submission or face bid rejection. Questions must be submitted by July 31, 2026, at 13:00 local time. Additional requirements include ISO 9001:2015 QMS compliance, OPSEC and Anti-Terrorism training for contractor employees, packaging per MIL-STD-2073-1 with Military Level B packing, compliance with CUI guidelines, and submission of data requirements per Contract Data Requirements List (CDRLs) for Engineering Change Proposals, Requests for Variance, and Notices of Revision.

View the file

Other files

File Type Posted
Q and A.xlsx XLSX spreadsheet
Q and A.xlsx XLSX spreadsheet
Q and A.xlsx XLSX spreadsheet
First-Article-Waiver-Worksheet.pdf PDF
TACOM OPSEC Plan.pdf PDF
Attach A -- CUI 2024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W912CH-26-B-0014 X 2026JUL14

1 signed

2026AUG13

DOA4

2026JUL14 SEE SCHEDULE

W912CH

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

RICHARD HALL

(571)588-9119

CCTA-APS-C

RICHARD.G.HALL64.CIV@ARMY.MIL

1 62

X 1

X 6 X 11

X 14 X 16 X 20

X 22

X 24

X 25

X 41

X 42

X 56

X 61

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: RICHARD HALL

Buyer Office Symbol/Telephone Number: CCTA-APS-C/(571)588-9119

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Weapon System: GEMMS,XM128, antitank mine dispenser M57

*** End of Narrative A0000 ***

A.1. DESCRIPTION OF ACTION

A.1.1 This Invitation for Bids (IFB) is intended to result in the award of a firm-fixed-price (FFP) contract with 100% option for the

Special Purpose Electrical Cable Assembly, National Stock Number (NSN): 6150-01-260-2747, Part Number: 9385014.

A.1.2 This IFB is a total small business set-aside in accordance with Revolutionary FAR Overhaul (RFO) 19.104-1.

A.1.3 There is a Technical Data Package (TDP) associated with this procurement. The TDP is distribution code "D", which limits access to

Department of War (DoW) and U.S. DoW contractors only. Please see Section C.1. TDP Information for instructions on how to access this data. BIDDERS MUST ACCESS THE TDP PRIOR TO SUBMITTING A BID OR THE BID SUBMISSION WILL BE REJECTED.

A.1.4 Bidders are advised to carefully read and understand this entire IFB, including Sections L and M, prior to submitting a bid for evaluation. The Government will evaluate bids without discussions/negotiations and does not assume the duty to search for data to cure problems it finds in any bid. Therefore, all information necessary for the review and evaluation of a bid is to be contained within the bid submission.

A.1.5 Bidders must complete all necessary fill-ins and representations throughout this IFB, including but not limited to:

(1) STANDARD FORM 33 (IFB COVER PAGE);

(2) SECTION B: The unit prices and dollar amounts requested for CLIN 0001AA: First Article Test Report, CLIN 0002AA: Production

Quantity and CLIN 0003AA: Unexercised Option Quantity;

(3) SECTION E: E.1. Inspection and Acceptance Points - Origin;

(4) SECTION F: F.1. Time of Delivery

(5) SECTION K: RFO 52.209-13 - Violation of Arms Control Treaties or Agreements - Certification;

(6) SECTION K: RFO 52.225-18 - Place of Manufacture; and

(7) SECTION K: RFO 52.229-11 - Tax on Certain Foreign Procurements - Notice and Representation

Failure to complete all required fill-ins and representations may result in the rejection of a bid.

A.1.6 Bidders shall acknowledge receipt of all IFB amendments by the date and time indicated for receipt of bids. If this IFB is amended, all terms and conditions not modified remain unchanged. Please see Section A.4. Acknowledgement of Amendments and RFO 52.214-3:

Amendments to IFBs for additional information.

A.1.7 Bid opening will be held with all Bidders and shall commence on 17 August 2026 at 13:00 at local time (Warren, MI). Due to security protocols at the Detroit Arsenal, bid opening will be held virtually. Bidder attendance at this event is not required. The

Government will provide a Microsoft Teams link, teleconference number, and passcode prior to bid opening. Please contact the following personnel via email, after IFB close and a minimum 24 hours prior to bid opening, to receive this information:

Richard Hall

CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

2 62

W912CH-26-B-0014

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

EMAIL: Richard.G.Hall64.civ@army.mil

-and-

Elizabeth Levine Welhouse

CONTRACTING OFFICER, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

EMAIL: Elizabeth.L.levinewelhouse.civ@army.mil

A.2. IFB STRUCTURE

A.2.1 NAICS. The Government will utilize North American Industry Classification System (NAICS) code 335999 "All Other Miscellaneous

Electrical Equipment and Component Manufacturing for this procurement. Failure to register via the System for Award Management (SAM) website for this NAICS, prior to submitting a bid in response to this IFB, may preclude your firm from receiving an award. Bidders should be aware of how U.S. small business concerns are defined in RFO Part 19, RFO DFARS Part 219, and 13 CFR 121 Small Business Size

Regulations. Bidders are advised to review 13 CFR 121.103, "How does SBA determine affiliation?", if applicable to this IFB.

A.2.2 All bids received in response to this IFB shall be valid for a minimum of 120 calendar days. Please see RFO 52.214-16: Minimum

Bid Acceptance Period for additional information.

A.3. ELECTRONIC CONTRACTING

A.3.1 All Army Contracting Command - Detroit Arsenal IFBs will be publicized on the SAM website:

https://www.SAM.gov

Any additional attachments, including the TDP(s) when available electronically, will be separate attachments or links embedded in the

IFB.

A.3.2 Interested Bidders shall submit a completed IFB, including the Standard Form 33, via email with the subject line "IFB Submission -

W912CH-26-B-0014 (Contractor Name)" to the following personnel:

Richard Hall

CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

EMAIL: Richard.G.hall64.civ@army.mil

-and-

Elizabeth Levine Welhouse

Contracting Officer, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

EMAIL: Elizabeth.L.levinewelhouse.civ@army.mil

A.3.3 Once a bid is received, the Contract Specialist will reply to the respective Bidder indicating receipt of the submission. NOTE:

FAX, HARDCOPY (PAPER), AND DVD/CD-ROM BIDS WILL NOT BE ACCEPTED. HAND-CARRIED BIDS, WHETHER HARDCOPY OR ELECTRONIC, WILL ALSO NOT BE

ACCEPTED.

A.3.4 Please pay close attention to the Issued By block on the cover page of this IFB for a closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with RFO 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, Bidders are responsible for submitting bids, and any revisions/modifications, so as to be received by the Government office designated in the IFB by the date and time specified.

A.3.5 It is the Bidder's responsibility to ensure the bid is received by the date and time specified on the cover page of this IFB. In accordance with RFO 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, if the bid was not received at the initial point of entry to the Government infrastructure (in this case, received via email) by the exact date and time specified on the cover page of

3 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

this IFB, it will be determined late. Bid is defined to mean ALL volumes or parts required by the IFB are included in the electronic submission.

NOTE: There is no "expected" or "target" length of time for bid submission; size and content may be factors, therefore Bidders are strongly cautioned when submitting bids to allow adequate time for submission.

A.3.6 IFBs may remain posted on SAM.gov after the IFB closing date. If the response deadline has passed for the IFB, vendors will no longer be able to submit electronic responses.

A.3.7 Any award issued as a result of this IFB will be distributed electronically. In the event of a Freedom of Information Act (FOIA) request for a copy of any award issued as a result of this IFB, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price(s). This is the notice required by Executive Order 12600 (June 23, 1987) of the Government's intention to release unit prices in response to any request under FOIA, 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include cost or pricing data/information. If a Bidder objects to such release in the base contract or contract modifications, the Bidder must notify the Contracting Officer in writing prior to the closing date identified in this IFB and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on the rationale given.

A.3.8 All questions pertaining to this IFB shall be submitted via email to the following personnel by 31 July 2026 at 13:00 local time

(Warren, MI):

Richard Hall

CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

EMAIL: Richard.G.Hall64.civ@army.mil

-and-

Elizabeth Levine Welhouse

Contracting Officer, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

EMAIL: Elizabeth.L.levinewelhouse.civ@army.mil

A.3.9 Responses will be furnished via a Q&A log posting to SAM.gov or as an IFB amendment, if the information is necessary in submitting bids or if the lack thereof would be prejudicial to other prospective Bidders. Please see RFO 52.214-6: Explanation to Prospective

Bidders for additional information. The Government will review all questions received but is not obligated to answer questions submitted after the date/time noted above, prior to IFB close.

A.3.10 For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement

Technical Assistance Center (PTAC) website to locate a regional center at:

http://www.aptac-us.org

A.4 ACKNOWLEDGEMENT OF AMENDMENTS

A.4.1 Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date:

A.5 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON

A.5.1 Information regarding the Ombudsperson for this contract is located at the following website: https://tacom.army.mil/ombudsman

4 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(Best viewed using Google Chrome or Microsoft Edge).

A.6 ALL OR NONE

A.6.1 Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.

A.7 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

A.7.1 This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act

(Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD Directive 5230.25 and DoD Instruction 2040.02. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

A.7.2 To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, "Militarily

Critical Technical Data Agreement" certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's

Section C "Technical Data Package" instructions.

A.7.3 Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

A.7.4 Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the

TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

*** END OF NARRATIVE A0001 ***

5 62

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 Service for FAT

0001AA FIRST ARTICLE TEST REPORT (FATR) 1 LO $ ________________________________ __________________

SERVICE REQUESTED: Service for FAT

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH6C0283EH PRON AMD: 02

AMS CD: SM2B1100000

A First Article Test Report is required in accordance with the clause entitled "FIRST ARTICLE APPROAL

CONTRACTOR TESTING, "FAR 52.209-3".

See SECTION E.2, E.3

All bidder shall identify a dollar amount for CLIN

0001AA, even when requesting a First Article Test

Waiver in accordance with E.2. Provision for Waiver of Required First Article Approval- Sealed Bidding.

Failure to separately identify a FAT(R)dollar amount shall mean that the bidder will provide FAT(R)at no additional cost to the Government, and the bid will be evaluated accordingly.

1 Lot is equivalent to 1 report.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0150

0002 CABLE ASSEMBLY,SPEC

NSN: 6150-01-260-2747

Mfr CAGE: 19200

Mfr Part Number: 9385014

0002AA PRODUCTION QUANTITY 330 EA $ $ ____________________ ______________ __________________

6 62

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

COMMODITY NAME: CABLE ASSEMBLY,SPEC

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH4L0123EH PRON AMD: 03

AMS CD: SM2B1100000

The Government has authorized the contractor to ship early at no additional cost to the Government.

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING REQUIREMENTS D.1

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W52H093334023V W562RP J 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 330 0300

FOB POINT: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

0003 SPEC PURP ELEC CABLE ASSEM

0003AA UNEXERCISED OPTION QUANTITY 330 EA $ $ ___________________________ ______________ __________________

COMMODITY NAME: SPEC PURP ELEC CABLE ASSEM

CLIN CONTRACT TYPE:

Firm Fixed Price

OPTION QUANTITY, PURSUANT TO FAR CLAUSE 52.217-7:

OPTION FOR INCREASED QUANITTYSEPARATELY PRICED LINE

ITEM.

The quantity stated for option CLIN 0003AA DOES NOT

FORM A PART OF THE BASIC CONTRACTUAL QUANTITY. Part of all of it may, however, be added to the contract

7 62

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

at the discretion of the Government, by the exercise of the Option Clause.

The bidder's failure to insert a unit price for the option quantity shall mean that the bidder will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the bid will be evaluated accordingly.

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING REQUIREMENT D.1

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 330 0100

FOB POINT: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

CENTRAL RECEIVING POINT

7 FRANKFORD AVE BLDG 362

ANNISTON,AL,36201-4199

SR W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

1000 EXHIBIT A- CONTRACT DATA REQUIRMENTS LIST (CDRLS) _________________________________________________

The contractor shall prepare and deliver data submissions IAW Exhibit A, Contract Data Requirements

List.

See Section J, Exhibit A: DD Form 1423.

8 62

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative A001)

A001 CDRL A001- ENGINEERING CHANGE PROPOSAL (ECP) 1 LO $ ** NSP ** ____________________________________________ __________________

SERVICE REQUESTED: ENGINEERING CHANGE PROPOSAL

CLIN CONTRACT TYPE:

Firm Fixed Price

The contractor shall prepare and deliver data submissions IAW Exhibit A, Contract Data Requirements

List.

See Section J, Exhibit A: DD Form 1423, A001-

Engineering Change Proposal (ECP).

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A002 CDRL A002- REQUEST FOR VARIANCE (RFV) 1 LO $ ** NSP ** _____________________________________ __________________

SERVICE REQUESTED: REQUEST FOR VARIANCE

CLIN CONTRACT TYPE:

Firm Fixed Price

The contractor shall prepare and deliver data submissions IAW Exhibit A, Contract Data Requirements

List.

See Section J, Exhibit A: DD Form 1423, A002 Request

For Variance (RFV).

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

9 62

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

A003 CDRL A003- NOTICE OF REVISION (NOR) 1 LO $ ** NSP ** ___________________________________ __________________

SERVICE REQUESTED: NOTICE OF REVISION

CLIN CONTRACT TYPE:

Firm Fixed Price

The contractor shall prepare and deliver data submissions IAW Exhibit A, Contract Data Requirements

List.

See Section J, Exhibit A: DD Form 1423, A003 Notice of Revision (NOR).

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

10 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 TECHNICAL DATA PACKAGE INFORMATION

The following "X"d item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[X] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:

W912CH-26-B-0014

Attachment 0004-Technical Data Package (TDP)

To access the data through SAM:

a. Log on to the SAM web site: https://SAM.gov.

b. Search for the solicitation number.

c. Click on the attachment you would like to view.

d. If the attachment is restricted, request access to the document.

C.1.2 TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United

States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).

C.1.3 Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its Distribution

Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

C.1.4 To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense

Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.

C.1.5 Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.

Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

C.1.6 If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract

Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.

C.1.7 If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.

Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.

C.1.8 It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and Non-

Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.

C.1.9 There is a engineering revision that can be found in the zip file of the TDP, listed as REV.

C.2 CONFIGURATION MANAGEMENT DOCUMENTATION

C.2.1 The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).

C.2.2 The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense

Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).

C.2.3 Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

11 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.2.4 Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.

C.2.5 All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

C.2.6 For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

C.2.6.1 for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.

C.2.6.2 for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.

C.2.6.3 for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.

C.2.7 The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.

C.2.8 The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the Administrative Contracting Officer (ACO).

C.2.9 The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.

C.3 OPSEC TRAINING REQUIREMENT

C.4.1 Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:

https://securityawareness.usalearning.gov/opsec/index.htm. The Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officer's Representative (COR) or Procuring Contracting Officer (PCO) upon request.

C.5 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN

C.5.1 The contractor is subject to, at a minimum, the provisions of the current TACOM OPSEC Plan, or other approved U.S. Government

OPSEC plan, per AR 530-1, Operations Security. This Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

C.5.2 The contractor will receive a copy of the Plan (Attachment 0005) at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by TACOM G3/G2 or individual organizations supporting AT/OPSEC

Officers.

C.5.3 The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is

OPSEC Level I.

C.6 ANTI-TERRORISM (AT) LEVEL I TRAINING REQUIREMENT

C.6.1 All contractor employees with security clearances working on any Army contract must receive annual TARP training by a Counter

Intelligence (CI) agent, or other authorized designated training method, per Army Regulation 381-12, para. 2-4b, Threat Awareness and

Reporting Program (TARP). The in-person training is the preferred method, and is available by contacting the local CI Office to arrange for the conduct of training.

C.6.2 The Contractor shall contact the CI Office within (30) days of contract award to schedule TARP training. Once training is complete, the Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting

Officer's Representative (COR) or Procuring Contracting Officer (PCO) upon request.

C.6.3 The Contractor shall contact the CI Office to schedule training for any new employee whose performance commences after award, and who did not attend the initial TARP training session. Upon completion of the TARP training, certification/proof of completion shall be provided as required in paragraph (b). In special circumstances (on deployments or in remote locations) when in-person training is not available, TARP computer based training (CBT), which has been approved by Deputy Chief of Staff (DCS), G-2, is the only authorized online training method permitted. This alternate CBT training is only authorized in special circumstances with written approval obtained

12 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

from the PCO. Upon receipt of the necessary written approval, contractor employees possessing an Army Knowledge Online (AKO) account and password or a Common Access Card can register and complete the online TARP training course by utilizing the Army Learning Management

System (ALMS) at: www.lms.army.mil.

C.7. CONTROLLED UNCLASSIFIED INFORMATION GUIDELINES

C.7.1 The Contractor will be required to handle, access, or store Controlled Unclassified Information (CUI), legacy U//FOUO, and/or other technical data and is subject to guidelines contained within Attachment 0003: Additional Guidelines for Controlled Unclassified

Information.

*** END OF NARRATIVE C0001 ***

13 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D.1 PACKAGING REQUIREMENTS (SPECIFICATIONS/STANDARDS)

D.1.1 The preservation, packing, and marking requirements for this contract/order shall be accomplished in accordance with the requirements in the specification/standard defined below.

D.1.2 The following requirements shall apply:

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: B

(3) QUANTITY PER UNIT PACKAGE: 001

(4) SPECIFICATION/STANDARD: MIL-STD-2073-1

D.2 The specification/standard cited is intended to give a clear and accurate description of the technical packaging requirements for the item being procured, including the procedure by which it can be determined that the requirements have been met. Specific instructions and/or tailoring of the specification/standard is detailed in the supplemental instructions below. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing and without affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO with copies to the ACO.

The government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing.

D.3 Marking:

D.3.1 In addition to any special markings called out by the specification/standard above, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. NOTE: When an item has Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD

Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the UII and MIL-

STD-129 for UII package marking requirements. Contractors must verify the UII clause cited above are included in this solicitation/contract.

D.4 Heat Treatment and Marking of Wood Packaging Materials (WPM):

D.4.1 In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), "Regulation of Wood Packaging Material in International Trade," current edition, (hereinafter "ISPM 15"), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization's compliance program.

D.4.2 Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used

14 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

D.4.3 Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The

ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

D.5 Hazardous Materials (As applicable):

D.5.1 Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

D.5.2 When applicable, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

D.5.3 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the

United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

D.6 SUPPLEMENTAL INSTRUCTIONS:

D.6.1 SPECIFICATIONS, STANDARDS AND DRAWINGS LISTED HEREIN WHICH ARE IN EFFECT ON THE DATE OF THE SOLICITATION FORM A PART OF THIS

PACKAGING INSTRUCTION. THE APPLICABLE GENERAL AND REFERENCED REQUIREMENTS OF SPECIFICATION MIL-STD-2073-1 FORM PART OF THESE

INSTRUCTIONS. UNLESS OTHERWISE SPECIFIED, MATERIALS WILL BE MINIMUM SIZE IN ACCORDANCE WITH MIL-STD-2073-1. WEIGHTS AND SIZES ARE

ESTIMATED AND MAY VARY SLIGHTLY. INTERMEDIATE PACKAGING AND PACKING WILL BE IN ACCORDANCE WITH SPECIFICATION MIL-STD-2073-1 OR AS

OTHERWISE SPECIFIED HEREIN. TOLERANCES SHALL BE IN ACCORDANCE WITH MATERIAL SPECIFICATIONS. QUALITY PERFORMANCE AND TESTING REQUIREMENTS

SHALL BE IN CONFORMANCE WITH MIL-STD-2073-1, OR AS OTHERWISE SPECIFIED. * UNLESS OTHERWISE SPECIFIED, CLEANING AND DRYING SHALL BE IN

ACCORDANCE WITH PARAGRAPH 5.2.1 OF MIL-STD-2073-1.

D.6.1.1 CAP/PLUG THE ENDS OF THE CABLE ASSY, SPECIAL PURPOSE, ELECTRICAL: LAUNCHER RACK WITH PROTECTIVE CAPS/PLUGS AS SPECIFIED AND

DIRECTED IN THE ITEM DRAWING. IF NO CAPS/PLUGS ARE PROVIDED, WRAP THE ENDS OF THE CABLE ASSY, SPECIAL PURPOSE, ELECTRICAL: LAUNCHER RACK

IN ONE LAYER OF CELLULAR PLASTIC FILM CUSHIONING, PPP-C-795, CLASS 1; OR OPEN CELL PLASTIC CUSHIONING, A-A-3129, TYPE II, GRADE A; OR

POLYPROPYLENE FOAM CUSHIONING, PPP-C-1797, TYPE I. SECURE WITH TAPE IN ACCORDANCE WITH ASTM D6123/D6123M. DO NOT ALLOW TAPE TO COME INTO

CONTACT WITH THE CABLE ASSY, SPECIAL PURPOSE, ELECTRICAL: LAUNCHER RACK.

D.6.1.2 COIL THE CABLE ASSY, SPECIAL PURPOSE, ELECTRICAL: LAUNCHER RACK TO A DIAMETER OF APPROXIMATELY 28 INCHES. SECURE THE COIL AT A

MINIMUM OF THREE (3) EQUALLY SPACED LOCATIONS USING STRING, TWINE, OR PLASTIC CABLE TIES.

D.6.1.3 FILL THE VOID SPACE WITHIN THE CONTAINER WITH SUFFICIENT CRUMPLED KRAFT PAPER, A-A-203; OR CELLULAR PLASTIC FILM CUSHIONING, PPPC-795, CLASS 1; OR OPEN CELL PLASTIC CUSHIONING, A-A-3129; OR POLYPROPYLENE FOAM CUSHIONING, PPP-C-1797, TYPE I TO PREVENT ITEMS FROM

SHIFTING DURING TRANSIT.

*** END OF NARRATIVE D0001 ***

15 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/far-overhaul

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/class_deviations.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

QMS Requirements: ISO 9001:2015 (21 Oct 2015) or equivalent Untailored

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN

E.1.1 The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.

Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

ACCEPTANCE POINT: __________________________________________

(Name) (CAGE)

E.1.2 FIRST ARTICLE TEST REPORT (FATR) ACCEPTANCE: DESTINATION

The Government's acceptance of the First Article Test Report (if required) offered under this order shall take place at DESTINATION.

E.2 First Article Test (Contractor Testing)

16 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

E.2.1 The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality

Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.

E.2.1.1 The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

E.2.1.2 The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:

E.2.1.2.1 Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with CLIN 0001AA First Article Test Report.

E.2.1.2.2 Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with CLIN 0001AA First Article Test Report.

E.2.1.2.3 Corrosion resistance tests over 10 Calendar days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 Calendar days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.

E.2.1.2.4 Life cycle tests over 10 Calendar days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.

E.2.1.2.5 Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.

E.2.1.3 Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

E.2.1.4 CLIN 0001AA First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests

(including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to usarmy.ria.rdecom-ardec.mbx.rdar-qep@mail.mil

E.2.1.5 Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 Calendar days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall immediatetly notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the Government shall be borne by the Contractor.

E.3 NOTICE REGARDING FIRST ARTICLE

E.3.1 Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.

E.3.2 When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.

E.3.3 Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.

17 62

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

E.4. PROVISION FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL - SEALED BIDDING

E.4.1 The Government reserves the right to waive the requirement entitled First Article Approval (RFO 52.209-3), incorporated via

Section I. Bidders interested in submitting a First Article waiver request shall adhere to the following:

E.4.1.1 Bidders must provide sufficient information for the Government to determine whether the First Article waiver request will be approved. If the Bidder intends to request a waiver, Attachment 0002: First Article Waiver Worksheet must be completed and submitted to the Government, along with any supporting documentation, as part of its bid. The worksheet is located in Section J of this IFB. The

Bidder's request will not be considered if the worksheet and any supporting documentation are not submitted to the Government. The worksheet must be completed in its entirety. For those sections of the worksheet that do not apply, annotate with "N/A" (not applicable). To substantiate or clarify information provided by the Bidder, the Government may request additional information.

Incomplete worksheets may result in the waiver request being denied.

E.4.1.2 Supporting Documentation. The First Article waiver request must be accompanied by documentation in support of the request. This documentation may include the following:

E.4.1.2.1 A copy of the Administrative Contracting Officer (ACO) or Procuring Contracting Officer (PCO) letter approving a First Article

Test Report (FATR) on a recent contract for the same or similar item;

E.4.1.2.2 A copy of a FATR for the same or a similar item as that solicited herein*;

E.4.1.2.3 A copy of an ACO or PCO letter approving a prior waiver request; and/or

E.4.1.2.4 If the waiver request is based on similarity, a copy of the drawing/other appropriate technical requirements of the similar item.

*Note: If a copy of…