This is an Amendment of Solicitation for a Tension Device, TRAC (NSN: 2530-01-345-8887) issued by the U.S. Army Contracting Command. The solicitation is a total small business set-aside for a five-year firm-fixed price Indefinite Delivery Indefinite Quantity (IDIQ) contract. The amendment modifies several sections of the original solicitation, including updates to the delivery schedule, addition of progress payment and accounting system administration clauses, and changes to evaluation factors and instructions.
Key details include a delivery schedule requiring 46 units every 30 days starting 390 days after delivery order award, with CLIN 0016 delivery set at 450 days after award. The solicitation has two primary evaluation factors: Delivery Schedule Factor and Price Factor, with price being significantly more important. Offerors must submit proposals electronically via email, with specific formatting requirements. The government plans to award without discussions, and proposals will be evaluated on delivery schedule (rated as Outstanding, Acceptable, Marginal, or Unacceptable) and price reasonableness, with the goal of selecting the offer representing the best value to the government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contractor Questions W912CH25R0180 (2).xlsx | XLSX spreadsheet | |
| W912CH25R0180-0002.pdf | ||
| Contractor Questions W912CH25R0180.xlsx | XLSX spreadsheet | |
| First-Article-Waiver-Worksheet.pdf | ||
| W912CH25R0180.pdf | ||
| Special Packaging Instructions_AK13458887 rev b.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2025NOV06
W912CH
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
KERRI E. GINTER
EMAIL: KERRI.E.GINTER.CIV@ARMY.MIL
W912CH-25-R-0180
2025NOV04
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 16
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: KERRI E. GINTER
Buyer Office Symbol/Telephone Number: CCTA-APN-A/(571)588-9329
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of Amendment 0001 to Solicitation W912CH-25-R-0180 is to:
1. Section F
a) Update language in narrative F.2 DELIVERY SCHEDULE FOR DELIVERY ORDERS.
2. Section I
a) Added Clause 52.232-16 PROGRESS PAYMENTS
b) Added Clause 252.232-7004 DOD PROGRESS PAYMENT RATES
c) Added Clause 252.242-7006 ACCOUNTING SYSTEM ADMINISTRATION
3. Section L
a) Update language in narrative L.3 EVALUATION FACTORS.
4. Section M
a) Update language in narrative M.6 EVALUATION CRITERIA.
This concludes all sections affected by this amendment.
All other terms and conditions of the Solicitation remain unchanged and in full force and effect.
*** END OF NARRATIVE A0002 ***
2 16
W912CH-25-R-0180
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
F. 1 Delivery- LONG TERM CONTRACTS
For the purpose of offerors compiling FOB Destination offers, the final destination for the supplies will be one or more of the following destinations; in the following estimated percentages, if listed: 100% to Anniston, AL.
F.2 DELIVERY SCHEDULE FOR DELIVERY ORDERS
F.2.1 Delivery under this contract must conform to the required schedule specified below, unless no-cost acceleration is acceptable.
F.2.2 DEFINITIONS:
F.2.2.1 DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.
F.2.2.2 DELIVERY is defined as follows:
F.2.2.3 DARO (Days After Receipt of Order).
FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.
F.2.3 The Government requires deliveries according to the following schedule on all orders:
F.2.3.1 GOVERNMENT SOLICITED DELIVERY SCHEDULE: CLIN(s) 0011-0015
F.2.3.1.1 Start deliveries 390 DARO; or FAT Approval, whichever is later.
F.2.3.1.2 You will deliver 46 units every thirty days.
F.2.3.1.3 You may deliver more units every thirty days at no additional cost to the government with PCO approval.
F.2.3.2 GOVERNMENT SOLICITED DELIVERY SCHEDULE: CLIN 0016
F.2.3.2.1 Delivery is 450 days after award.
F.2.3.2.2 *CLIN 0016: Offerors may not propose an alternative Delivery Schedule for this CLIN.
F.2.4 Accelerated delivery schedule is acceptable for CLINs 0011-0015.
F.2.5 The Offeror may propose an alternative delivery schedule or accelerated delivery schedule at no additional cost for CLINs 0011-
0015; fill in the appropriate information here:
F.2.5.1 OFFERORS PROPOSED DELIVERY SCHEDULE:
F.2.5.1 Start deliveries ____ DARO; or FAT Approval, whichever is later.
F.2.5.1.1 Any acceleration in F.2.5.1 will be subtracted from F.2.3.2.1 at award.
*** END OF NARRATIVE F0001 ***
3 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
I-1 ADDED 252.242-7006 ACCOUNTING SYSTEM ADMINISTRATION (JAN 2025) JAN/2025
I-2 CHANGED 52.232-16 PROGRESS PAYMENTS (NOV 2021)--ALTERNATE II (APR 2003) (DEVIATION APR/2003
2020-O0010)
The Government will make progress payments to the Contractor when requested as work progresses, but not more frequently than monthly, in amounts of $2,500 or more approved by the Contracting Officer, under the following conditions:
(a) Computation of amounts.
(1) Unless the Contractor requests a smaller amount, the Government will compute each progress payment as 80 percent of the
Contractor's total costs incurred under this contract whether or not actually paid, plus financing payments to subcontractors (see paragraph (j) of this clause), less the sum of all previous progress payments made by the Government under this contract. The
Contracting Officer will consider cost of money that would be allowable under Federal Acquisition Regulation (FAR) 31.205-10 as an incurred cost for progress payment purposes.
(2) The amount of financing and other payments for supplies and services purchased directly for the contract are limited to the amounts that have been paid by cash, check, or other forms of payment, or that are determined due and will be paid to subcontractors--
(i) In accordance with the terms and conditions of a subcontract or invoice; and
(ii) Ordinarily within 30 days of the submission of the Contractor's payment request to the Government.
(3) The Government will exclude accrued costs of Contractor contributions under employee pension plans until actually paid unless--
(i) The Contractor's practice is to make contributions to the retirement fund quarterly or more frequently; and
(ii) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution remaining unpaid shall be excluded from the Contractor's total costs for progress payments until paid).
(4) The Contractor shall not include the following in total costs for progress payment purposes in paragraph (a)(1) of this clause:
(i) Costs that are not reasonable, allocable to this contract, and consistent with sound and generally accepted accounting principles and practices.
(ii) Costs incurred by subcontractors or suppliers.
(iii) Costs ordinarily capitalized and subject to depreciation or amortization except for the properly depreciated or amortized portion of such costs.
(iv) Payments made or amounts payable to subcontractors or suppliers, except for--
(A) Completed work, including partial deliveries, to which the Contractor has acquired title; and
(B) Work under cost-reimbursement or time-and-material subcontracts to which the Contractor has acquired title.
(5) The amount of unliquidated progress payments may exceed neither (i) the progress payments made against incomplete work (including allowable unliquidated progress payments to subcontractors) nor (ii) the value, for progress payment purposes, of the incomplete work.
Incomplete work shall be considered to be the supplies and services required by this contract, for which delivery and invoicing by the
Contractor and acceptance by the Government are incomplete.
(6) The total amount of progress payments shall not exceed 80 percent of the total contract price.
(7) If a progress payment or the unliquidated progress payments exceed the amounts permitted by subparagraphs (a)(4) or (a)(5) above, the Contractor shall repay the amount of such excess to the Government on demand.
(8) Notwithstanding any other terms of the contract, the Contractor agrees not to request progress payments in dollar amounts of less than $2,500. The Contracting Officer may make exceptions.
(9) The costs applicable to items delivered, invoiced, and accepted shall not include costs in excess of the contract price of the items.
(b) Liquidation. Except as provided in the Termination for Convenience of the Government clause, all progress payments shall be
4 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
liquidated by deducting from any payment under this contract, other than advance or progress payments, the unliquidated progress payments, or 80 percent of the amount invoiced, whichever is less. The Contractor shall repay to the Government any amounts required by a retroactive price reduction, after computing liquidations and payments on past invoices at the reduced prices and adjusting the unliquidated progress payments accordingly. The Government reserves the right to unilaterally change from the ordinary liquidation rate to an alternate rate when deemed appropriate for proper contract financing.
(c) Reduction or suspension. The Contracting Officer may reduce or suspend progress payments, increase the rate of liquidation, or take a combination of these actions, after finding on substantial evidence any of the following conditions:
(1) The Contractor failed to comply with any material requirement of this contract (which includes paragraphs (f) and (g) below).
(2) Performance of this contract is endangered by the Contractor's (i) failure to make progress or (ii) unsatisfactory financial condition.
(3) Inventory allocated to this contract substantially exceeds reasonable requirements.
(4) The Contractor is delinquent in payment of the costs of performing this contract in the ordinary course of business.
(5) The fair value of the undelivered work is less than the amount of unliquidated progress payments for that work.
(6) The Contractor is realizing less profit than that reflected in the establishment of any alternate liquidation rate in paragraph
(b) above, and that rate is less than the progress payment rate stated in subparagraph (a)(1) above.
(d) Title.
(1) Title to the property described in this paragraph (d) shall vest in the Government. Vestiture shall be immediately upon the date of this contract, for property acquired or produced before that date. Otherwise, vestiture shall occur when the property is or should have been allocable or properly chargeable to this contract.
(2) Property, as used in this clause, includes all of the below-described items acquired or produced by the Contractor that are or should be allocable or properly chargeable to this contract under sound and generally accepted accounting principles and practices.
(i) Parts, materials, inventories, and work in process;
(ii) Special tooling and special test equipment to which the Government is to acquire title;
(iii) Nondurable (i.e., noncapital) tools, jigs, dies, fixtures, molds, patterns, taps, gauges, test equipment, and other similar manufacturing aids, title to which would not be obtained as special tooling under subparagraph (ii) above; and
(iv) Drawings and technical data, to the extent the Contractor or subcontractors are required to deliver them to the Government by other clauses of this contract.
(3) Although title to property is in the Government under this clause, other applicable clauses of this contract, e.g., the termination clauses, shall determine the handling and disposition of the property.
(4) The Contractor may sell any scrap resulting from production under this contract without requesting the Contracting Officer's approval, but the proceeds shall be credited against the costs of performance.
(5) To acquire for its own use or dispose of property to which title is vested in the Government under this clause, the Contractor must obtain the Contracting Officer's advance approval of the action and the terms. The Contractor shall (i) exclude the allocable costs of the property from the costs of contract performance, and (ii) repay to the Government any amount of unliquidated progress payments allocable to the property. Repayment may be by cash or credit memorandum.
(6) When the Contractor completes all of the obligations under this contract, including liquidation of all progress payments, title shall vest in the Contractor for all property (or the proceeds thereof) not
(i) Delivered to, and accepted by, the Government under this contract; or
(ii) Incorporated in supplies delivered to, and accepted by, the Government under this contract and to which title is vested in the
Government under this clause.
(7) The terms of this contract concerning liability for Government-furnished property shall not apply to property to which the
Government acquired title solely under this clause.
(e) Risk of loss. Before delivery to and acceptance by the Government, the Contractor shall bear the risk of loss for property, the
5 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
title to which vests in the Government under this clause, except to the extent the Government expressly assumes the risk. The Contractor shall repay the Government an amount equal to the unliquidated progress payments that are based on costs allocable to property that is lost (see 45.101).
(f) Control of costs and property. The Contractor shall maintain an accounting system and controls adequate for the proper administration of this clause.
(g) Reports, forms, and access to records.
(1) The Contractor shall promptly furnish reports, certificates, financial statements, and other pertinent information (including estimates to complete) reasonably requested by the Contracting Officer for the administration of this clause. Also, the Contractor shall give the Government reasonable opportunity to examine and verify the Contractor's books, records, and accounts.
(2) The Contractor shall furnish estimates to complete that have been developed or updated within six months of the date of the progress payment request. The estimates to complete shall represent the Contractor's best estimate of total costs to complete all remaining contract work required under the contract. The estimates shall include sufficient detail to permit Government verification.
(3) Each Contractor request for progress payment shall:
(i) Be submitted on Standard Form 1443, Contractor's Request for Progress Payment, or the electronic equivalent as required by agency regulations, in accordance with the form instructions and the contract terms; and
(ii) Include any additional supporting documentation requested by the Contracting Officer.
(h) Special terms regarding default. If this contract is terminated under the Default clause, (i) the Contractor shall, on demand, repay to the Government the amount of unliquidated progress payments, and (ii) title shall vest in the Contractor, on full liquidation of progress payments, for all property for which the Government elects not to require delivery under the Default clause. The Government shall be liable for no payment except as provided by the Default clause.
(i) Reservations of rights.
(1) No payment or vesting of title under this clause shall (i) excuse the Contractor from performance of obligations under this contract or (ii) constitute a waiver of any of the rights or remedies of the parties under the contract.
(2) The Government's rights and remedies under this clause (i) shall not be exclusive but rather shall be in addition to any other rights and remedies provided by law or this contract and (ii) shall not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or privilege, nor shall such exercise or any single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.
(j) Financing payments to subcontractors. The financing payments to subcontractors mentioned in paragraphs (a)(1) and (a)(2) of this clause shall be all financing payments to subcontractors or divisions, if the following conditions are met:
(1) The amounts included are limited to--
(i) The unliquidated remainder of financing payments made; plus
(ii) Any unpaid subcontractor requests for financing payments.
(2) The subcontract or interdivisional order is expected to involve a minimum of approximately 6 months between the beginning of work and the first delivery; or, if the subcontractor is a small business concern, 4 months.
(3) If the financing payments are in the form of progress payments, the terms of the subcontract or interdivisional order concerning progress payments--
(i) Are substantially similar to the terms of this clause for any subcontractor that is a large business concern, or this clause with its Alternate I for any subcontractor that is a small business concern;
(ii) Are at least as favorable to the Government as the terms of this clause;
(iii) Are not more favorable to the subcontractor or division than the terms of this clause are to the Contractor;
(iv) Are in conformance with the requirements of FAR 32.504(e); and
(v) Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the
Government's right to require delivery of the property to the Government if--
6 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(A) The Contractor defaults; or
(B) The subcontractor becomes bankrupt or insolvent.
(4) If the financing payments are in the form of performance-based payments, the terms of the subcontract or interdivisional order concerning payments--
(i) Are substantially similar to the Performance-Based Payments clause at FAR 52.232-32 and meet the criteria for, and definition of, performance-based payments in FAR Part 32;
(ii) Are in conformance with the requirements of FAR 32.504(f); and
(iii) Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the
Government's right to require delivery of the property to the Government if--
(A) The Contractor defaults; or
(B) The subcontractor becomes bankrupt or insolvent.
(5) If the financing payments are in the form of commercial product or commercial service financing payments, the terms of the subcontract or interdivisional order concerning payments--
(i) Are constructed in accordance with FAR 32.206(c) and included in a subcontract for a commercial product or commercial service purchase that meets the definition and standards for acquisition of commercial products and commercial services in FAR parts 2 and 12;
(ii) Are in conformance with the requirements of FAR 32.504(g); and
(iii) Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the
Government's right to require delivery of the property to the Government if--
(A) The Contractor defaults; or
(B) The subcontractor becomes bankrupt or insolvent.
(6) If financing is in the form of progress payments, the progress payment rate in the subcontract is the customary rate used by the contracting agency, depending on whether the subcontractor is or is not a small business concern.
(7) Concerning any proceeds received by the Government for property to which title has vested in the Government under the subcontract terms, the parties agree that the proceeds shall be applied to reducing any unliquidated financing payments by the Government to the
Contractor under this contract.
(8) If no unliquidated financing payments to the Contractor remain, but there are unliquidated financing payments that the Contractor has made to any subcontractor, the Contractor shall be subrogated to all the rights the Government obtained through the terms required by this clause to be in any subcontract, as if all such rights had been assigned and transferred to the Contractor.
(9) To facilitate small business participation in subcontracting under this contract, the Contractor shall provide financing payments to small business concerns, in conformity with the standards for customary contract financing payments stated in FAR 32.113. The
Contractor shall not consider the need for such financing payments as a handicap or adverse factor in the award of subcontracts.
(k) Limitations on undefinitized contract actions. Notwithstanding any other progress payment provisions in this contract, progress payments may not exceed 80 percent of costs incurred on work accomplished under undefinitized contract actions. A contract action is any action resulting in a contract, as defined in subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes. This limitation shall apply to the costs incurred, as computed in accordance with paragraph (a) of this clause, and shall remain in effect until the contract action is definitized. Costs incurred which are subject to this limitation shall be segregated on Contractor progress payment requests and invoices from those costs eligible for higher progress payment rates. For purposes of progress payment liquidation, as described in paragraph (b) of this clause, progress payments for undefinitized contract actions shall be liquidated at 80 percent of the amount invoiced for work performed under the undefinitized contract action as long as the contract action remains undefinitized. The amount of unliquidated progress payments for undefinitized contract actions shall not exceed 80 percent of the maximum liability of the Government under the undefinitized contract action or such lower limit specified elsewhere in the contract. Separate limits may be specified for separate actions.
(l) Due date. The designated payment office will make progress payments on the 30th day after the designated billing office receives a proper progress payment request. In the event that the Government requires an audit or other review of a specific progress payment
7 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date. Progress payments are considered contract financing and are not subject to the interest penalty provisions of the Prompt Payment Act.
(m) Progress payments under indefinite-delivery contracts. The Contractor shall account for and submit progress payment requests under individual orders as if the order constituted a separate contract, unless otherwise specified in this contract.
(n) The Contracting Officer will liquidate progress payments made under this letter contract, unless previously liquidated under paragraph (b) of this clause, using the following procedures:
(1) If this letter contract is superseded by a definitive contract, unliquidated progress payments made under this letter contract shall be liquidated by deducting the amount from the first progress or other payments made under the definitive contract.
(2) If this letter contract is not superseded by a definitive contract calling for the furnishing of all or part of the articles or services covered under the letter contract, unliquidated progress payments made under the letter contract shall be liquidated by deduction from the amount payable under the Termination clause.
(3) If this letter contract is partly terminated and partly superseded by a contract, the Government will allocate the unliquidated progress payments to the terminated and unterminated portions as the Government deems equitable, and will liquidate each portion under the relevant procedure in paragraphs (n)(1) and (n)(2) of this clause.
(4) If the method of liquidating progress payments provided in this clause does not result in full liquidation, the Contractor shall immediately pay the unliquidated balance to the Government on demand.
(o) The amount of unliquidated progress payments shall not exceed 80 percent of costs incurred on work accomplished under undefinitized contract actions.
(End of clause)
I-3 ADDED 252.232-7004 DOD PROGRESS PAYMENT RATES (MAR 2020) (DEVIATION 2020-O0010) MAY/2023
If the Contractor is a small business concern, the Progress Payments clause of this contract is modified to change each mention of the progress payment rate and liquidation rate (excepting paragraph (k), Limitations on Undefinitized Contract Actions) to 95 percent.
(End of clause)
8 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 General Proposal Information
L.1.1 The proposal, subject to the Submission, Modification, Revision, and Withdrawal paragraph of Instructions to Offeror(s)
Competitive Acquisitions (FAR Provision 52.215-1) contained in Section L of the solicitation, shall be submitted in the format and quantities set forth below. All information necessary for the review and evaluation of a proposal is to be contained in the proposal.
Section M of the solicitation sets forth the evaluation criteria and delineates the Factors to be evaluated and their relative order of importance. The offeror's proposal, as required by this section, will be evaluated as set forth in Section M of this solicitation. The
Government will not assume the offeror possesses any capability, understanding, or commitment not specified in its proposal. It is an offeror's responsibility to submit a well-written proposal, with adequately detailed information, which clearly demonstrates an understanding of and the ability to comply with the solicitation requirements to allow for a meaningful evaluation. The Government does not assume the duty to search for data to cure problems it finds in proposals.
L.1.2 Minimum Acceptance Period.
This provision supersedes any language pertaining to the acceptance period that may appear elsewhere in this solicitation (e.g. SF 33
Box 12).
ACCEPTANCE PERIOD means the number of calendar days available to the Government for awarding a contract from the date specified in this solicitation for receipt of offers.
L.1.2.1. The Government specified minimum acceptance period is 180 calendar days.
L.1.2.2. The offeror shall clearly state in its proposal the acceptance period. Offerors may specify a longer acceptance period than the
Government's minimum acceptance period stated above.
L.1.2.3. An offer allowing less than the Government's minimum acceptance period, or failing to provide a proposal acceptance period, may be rejected.
L.2 Proposal Content, Format, and Instructions
L.2.1 Proposal Content
L.2.1.1 All proposals shall be in English (American Standard) and shall be in US dollars. Proposals not in English (American Standard) or in US Dollars may be rejected. The proposal shall include all information specified and shall address all requirements outlined in
Section L.
L.2.1.2 A Proposal Executive Summary or transmittal letter is optional. It will neither be considered as part of the proposal, nor will it be evaluated. If a Proposal Executive Summary is submitted, it should be no more than five pages in length.
L.2.2 Proposal Method of Submission, Format, and Instructions
L.2.2.1 The proposal shall be electronically submitted via E-mail to the Contract Specialist, Haley Bruns, and cc the corresponding
Contracting Officer at the following e-mail address(s) with the subject header: Proposal Submission W912CH-25-R-0180(company name):
Contract Specialist: haley.r.bruns.civ@army.mil
Contracting Officer: scott.l.follen2.civ@army.mil
Fax, hardcopy, and DVD/CD-ROM proposals will NOT be accepted. Hand-carried offers, whether hardcopy or electronic, will NOT be accepted.
Maximum size of each e-mail shall be 10 megabytes. The offeror may use multiple e-mail messages for each submission; however, it should annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of 3.
Note: There is no "expected" or "target" length of time for proposal submission via email; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
L.2.2.1.1 Each submitted File shall be labeled with a name that clearly identifies what information it contains.
L.2.2.1.2 Acceptable File Formats. All electronic information provided in response to the solicitation must be provided in Microsoft
(MS) Office 2013 compatible or Adobe Portable Document Format (PDF) format or except as noted in the proposal instructions below. For files in PDF format, scanners should be set to 200 dots per inch. The proposal shall not contain citations for, or active links to live
Internet sites or pages. All linked information shall be contained within the electronic proposal. Any linked information that is not contained in the proposal will not be accepted.
9 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.2.2.1.3 Electronic Files. The proposal electronic file name should not exceed 50 characters in length (not including the file extension). Ensure the file name does not contain any periods, does not contain spaces, and does not contain special characters, which should limit Government virus scanners rejecting the email as unscannable.
L.2.2.1.4 Unless otherwise specified, it is recommended that the proposal be formatted for 8.5 inch x 11 inch paper with a minimum font size of 10 pt. and with a minimum of 0.5 margins. Schedules, drawings and other documents more appropriate to larger size should be formatted for no larger than 8.5 inch x 14 inch dimensions.
L.2.2.1.5 If providing spreadsheets, include all formulas, function, macros, computations, or equations used to compute the proposed amounts. For each workbook, all Rows, Columns, Cells, and Worksheets are to be visible. Do not include Zero height and zero width rows and columns in Worksheets. Do not format Worksheet cells with the font color equal to the fill color. If Workbooks or Worksheets are password protected, then the passwords must be provided. Do not submit Print image files or pictures or files containing only values.
L.2.2.1.6 The offeror shall make every effort to ensure that the proposal is virus-free. Proposals (or portions thereof) submitted which indicate the presence of a virus, or which are otherwise rendered unreadable by damage in electronic transit, shall be treated as
"unreadable" as described in FAR 15.207(c).
L.2.2.2 Submission Due Date
The offeror must ensure its proposal, in its entirety, reaches the required destination before the date and time set for closing of the solicitation set forth in Block 9 on the SF 33, front page of the solicitation.
L.2.2.2.1 Lateness
The lateness rules for submitted proposals are outlined in FAR 52.215-1 "Instructions to Offerors-Competitive Acquisition" and are incorporated into this solicitation.
L.2.3 Single Proposal Submission
Offerors are limited to submitting one proposal with one approach to meeting the requirements of this solicitation.
L.2.3.1 All or None
Offers in response to this solicitation must be submitted for all the requirements identified in the solicitation. Offers submitted for less than all the requirements called for by this solicitation may be rejected or ineligible for award. Proposals that contain alternative terms and conditions may be considered as taking exception to the requirements of the solicitation. See Section M.1.
L.3 Evaluation Factors
Offeror proposals shall address the following Factors:
a. Delivery Schedule Factor
b. Price Factor
L.3.1 Delivery Schedule Factor
The following applies to all Delivery Schedule Subfactors, unless otherwise noted below.
The Government has no set delivery schedule as to the number of deliveries per month. The only requirement is that all must be delivered within the days specified in Section F.2, Delivery Schedule For Delivery Orders. An offeror is not to propose a delivery rate; this makes the proposal unawardable regardless of what is proposed.
L.3.1.1 Offerors shall submit the following:
The Offeror shall submit a filled-in Section F.2, Delivery Schedule for Delivery Orders of the RFP with its proposal if it proposes an alternative delivery schedule as allowed by this Factor. The offeror may propose an alternate delivery schedule for CLINS 0011-0015 expressed in terms of 'after date of delivery order award' by filling in its proposed schedule for Days after Delivery order Award in the Offerors Proposed Delivery Schedule in Section F.2, Delivery Schedule for Delivery Orders. The Offeror may not propose an alternate quantity or an alternate schedule for Days With FAT.
If the offeror does NOT propose an alternative schedule for CLINS 0011-0015 within Section F.2, Delivery Schedule for Delivery Orders, then the offeror's proposed delivery date(s) is the same as the Government Solicited Delivery Schedule set forth in Section F.2, Delivery Schedule for Delivery Orders.
10 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.3.1.1.1 In order to be considered for award, a proposal must provide a delivery date expressed in terms of 'after date of delivery order award' that is either 1) sooner than the solicited schedule of the respective CLIN identified in Section F.2, Delivery Schedule for Delivery Orders; or 2) equal to the solicited schedule of the respective CLIN identified in Section F.2, Delivery Schedule for
Delivery Orders; or 3) within 45 days after delivery order award or less than the solicited schedule of the respective CLIN identified in Section F.2, Delivery Schedule for Delivery Orders.
L.3.1.1.2 Proposals that provide a delivery schedule that is later than 45 days after the solicited schedule of the respective CLIN identified in Section F.2, Delivery Schedule for Delivery Orders will constitute a failure to meet a stated requirement of the solicitation (deficiency) and be unawardable.
L.3.1.2 If selected for award, the offeror's proposed delivery date will be incorporated and become the requirement in any resulting contract.
L.3.2 Price Factor
L.3.2.1 In accordance with FAR 15.403-5(a)(1), certified cost or pricing data is not required for initial proposal submission. However, after initial proposal submission, if only one offer is received, the Government reserves the right to request certified cost or pricing data in accordance with DFARS 252.215-7008. In the event certified cost or pricing data is required, the offeror may submit a written request for exception based on the applicable clauses contained herein.
For initial proposal submission, the offeror shall provide its proposed prices by providing a filled in Section B of the RFP.
L.3.2.2 The Government reserves the right to request additional or more detailed cost or price information to support its evaluation.
L.4 Provide the following information:
L.4.1 Signature Actions/offeror Fill-Ins. Provide a scanned image of a signed copy of the SF33 cover page, a copy of all completed fill-ins for Sections A through K, and (if applicable) a signed copy of all Amendments to the solicitation. System for Award Management (SAM) certifications need not be separately submitted; however, all offerors must be successfully registered and valid in SAM prior to award.
L.4.1.1 The offeror's proposal acceptance period in terms of calendar days from the date for receipt of offers specified in the RFP.
(See Section L.1.2)
L.4.3 Statement of Acknowledgement. A statement specifying the extent of agreement with all terms, conditions, and provisions of the
RFP, and a statement of agreement to furnish and deliver the items or perform services set forth in the RFP in consideration for offeror's proposed price(s) set opposite each item. Any exceptions taken to the attachments, exhibits, enclosures, or other solicitation terms, conditions, or documents may be determined to be a Deficiency or grounds for the Government to reject the proposal from further consideration in the source selection process (Reference M.4).
L.4.4 Assumptions. The offeror shall consolidate and identify all offeror's generated "assumptions" contained anywhere in the proposal.
The offeror shall include a statement that none of the "assumptions" contradict or take exception to any terms, conditions, or requirements of the solicitation. Any exceptions taken to the attachments, exhibits, enclosures, or other solicitation terms, conditions, or documents may be determined to be a Deficiency or grounds for the Government to reject the proposal from further consideration in the source selection process (Reference M.4).
L.5 HQ-AMC LEVEL PROTEST PROCEDURES
Complete AMC Protest Procedures can be found at: http://www.amc.army.mil/Connect/Legal-Resources/
An agency protest may be filed with either the contracting officer or to HQAMC but not both following the procedures listed on the website above.
L.6 PROVISION FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL
NOTE: For this Solicitation, Partial FAT Waivers are not being solicited or considered.
L.6.1 The requirement entitled FIRST ARTICLE APPROVAL (FAR 52.209-3) in Section E of this solicitation may be waived by the Government, provided that the offeror meets the conditions outlined below.
L.6.1.1 Offerors who intend to request a waiver of the First Article Test must provide sufficient information for the Government to determine whether the request is to be approved. If the offeror intends to request a waiver, a First Article Waiver Worksheet must be completed and submitted to the Government along with any supporting documentation. The worksheet can be found in Section J "Attachments" of this solicitation. The offeror's request will not be considered if the worksheet and any supporting documentation is not submitted to the Government. The worksheet must be completed in its entirety. For those sections of the worksheet which do not apply, annotate with
11 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
N/A (not applicable). To substantiate or clarify information provided by the offeror, the Government may request additional information.
Incomplete worksheets can result in the waiver request being denied, Offerors should contact the Contract Specialist listed on the face page of this solicitation for assistance in filling out the worksheet completely.
L.6.1.2 Offerors should not assume that the FAT waiver request will be granted even if the completed worksheet and any supporting information is submitted to the Government.
L.6.1.3 The worksheet and any additional supporting documentation is part of your quote/offer and must be submitted as part of the response to this solicitation on Company letterhead and signed by an agent of the Company.
L.6.1.4 Supporting documentation.
L.6.1.4.1 The request for waiver must be accompanied by documentation in support of the request. The documentation may include information such as the following; (1) Copy of the Administrative Contracting Officer's (ACO's) or Procuring Contracting Officer's (PCO) letter approving a First Article Test report on a recent contract for the same or similar item. (2) Copy of a First Article Test report for the same or a similar item as that herein solicited. (3) Copy of an ACO or PCO letter approving a prior waiver request. (4) If the waiver request is based on similarity, a copy of the drawing/other appropriate technical requirements of the similar item.
L.6.4.6.2 If a copy of a First Article Test report is submitted in support of a request for waiver under this solicitation, the test report must have been approved and signed by an authorized representative of the Government.
L.6.4.6.3 The FAT report and all supporting documentation should be submitted IAW Section L.2.2 and accompany the offeror's proposal. If the FAT report and supporting documentation cannot be transmitted by electronic media, the offeror shall contact the PCO for further instruction.
L.7 PART NUMBERS NOT CURRENTLY APPROVED
As specified elsewhere in this solicitation, part or all of the contract item to be procured hereunder is restricted to certain approved manufacturer's part numbers as set forth in the Schedule and/or the Technical Data Package. Any firm that produces an item which it believes to be equivalent to one of these approved part numbers is hereby encouraged to have such item tested and approved, so that the item will be eligible to be bought on future acquisitions. Please write to the attention of the buyer at the address indicated on the cover page of this solicitation and request a statement of the procedures by which items can be tested and approved for procurement.
Such an enquiry should cite the applicable National Stock Number (NSN), the already approved part number, the part number of the item which the enquirer believes to be identical to our approved item, and a brief statement of the basis on which the new item is believed to be equivalent to our already approved item.
L.8 NOTICE REGARDING REQUIRED SOURCE-CONTROLLED COMPONENT OR MANUFACTURER'S PART NUMBER
L.8.1 Please see the provision entitled ACQUISITION OF MANUFACTURER'S PART NUMBER in Section C of the Scope of Work in this solicitation. This acquisition is restricted to source-controlled component(s) or manufacturer's part number(s) identified in the
Schedule (Section B), or in the Technical Data Package. Offers that propose to furnish any alternative to the required source-controlled component(s) or manufacturer's part number(s) will not be considered for contract award. It is understood that, by submitting an offer under this solicitation, offeror agrees to supply one of the required part numbers unless the proposed part meets the conditions set forth in paragraph (b) below.
L.8.2 Require Approval for Alternatives to the Source-Controlled Component or required Manufacturer's Part Number.
L.8.2.1 If a firm manufactures an item which it believes to be totally equivalent to the required item(s), it may submit an offer based on the equivalent item if the following conditions are met:
L.8.2.1.1 Prior to receipt of this solicitation, the firm must have received written U.S. Army TACOM approval of a test procedure on its non-listed item;
L.8.2.1.2 The firm must indicate in its offer the date of the written U.S. Army TACOM approval, and the name and title of the approving official;
L.8.2.1.3 The firm indicates in its offer that it is in the process of having its item independently tested per the approved test procedure to demonstrate full physical, functional, and mechanical interchangeability of its part with an already approved part cited in this solicitation, or that it is awaiting final U.S. Army TACOM engineering approval of the summary report furnished at the conclusion of independent testing; and
L.8.2.1.4 The firm must have secured final written approval of its part from U.S. Army TACOM engineering by the time of bid opening, (in the case of formally advertised acquisitions), or by the time of contract award, (in the case of negotiated acquisitions).
L.8.2.2 Notwithstanding the foregoing, the Government expressly reserves to the Contracting Officer the right to waive the conditions
12 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
set forth above in making an award when written approval from U.S. Army TACOM engineering of a non-listed part number can be obtained without delay in the anticipated date of award.
L.8.2.3 When either of the foregoing conditions are met, the Government reserves the right to make an award for a non-listed item. In no other instance will award be made to any firm that does not agree to furnish one of the required part numbers listed in this solicitation.
L.8.3 Any firm that manufactures or regularly sells an item which it views as equivalent in all respects to one of the required component(s) or manufacturer's part number(s), but that has not initiated approved qualification testing in order to demonstrate that its part is totally equivalent to the required part, should contact the Contract Specialist listed on the first page of the solicitation to inquire about getting qualification testing initiated.
L.9 SOURCE NOTES ON DRAWINGS: CONFORMANCE TO MILITARY TECHNICAL DATA REQUIREMENTS
Notwithstanding the fact that ordnance drawings furnished with this solicitation may list particular manufacturer part numbers as approved sources, or as being the same as, or equivalent to, the ordnance part described on the drawing, the item to be supplied under this solicitation must conform to all specific technical requirements expressed on such drawing(s). To the extent that there may be any inconsistency between a manufacturer's part number and specific technical requirements expressed on an ordnance drawing which references the manufacturer's part number, the specific technical requirements shall control and take precedence. Bidders shall bear the responsibility of verifying that the approved part as supplied will conform to all such specific technical requirements.
*** END OF NARRATIVE L0001 ***
13 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION M - EVALUATION FACTORS FOR AWARD
M.1 CONTRACTOR RESPONSIBILITY AND ELIGIBILITY FOR AWARD
M.1.1 The Government will only award a contract to an offeror that meets all the responsibility criteria at FAR 9.104.
M.1.2 To make sure that an offeror meets the responsibility criteria at FAR 9.104 the Government may:
M.1.2.1 arrange a visit to the offerors plant and perform a preaward survey;
M.1.2.2 ask the offeror to provide financial, technical, production, or managerial background information.
M.1.3 If the offeror does not provide the Government with the data requested within 7 days from the date the requested is received, or if the offeror refuses to have an onsite visit to the offeror's facility, the Government may determine the offeror to be nonresponsible.
M.1.4 If the Government visits the offerors facility, the offeror shall ensure that current certified financial statements and other data relevant to the bid or proposal are available for Government personnel to review.
M.2 EVALUATION FACTORS FOR FIRST ARTICLE TEST REQUIREMENT
M.2.1 If the offeror submits a request for waiver of First Article Approval but fails to comply with the requirements of paragraph L.6 entitled PROVISION FOR WAIVER, the requested waiver may not be granted. If the waiver is not granted, more favorable alternative offers of price or delivery, conditioned upon the granting of a waiver, will not be considered in the evaluation process.
M.2.2 FAT WAIVER AND THE PRICE FACTOR
M.2.2.1 As specified in this solicitation; the Government reserves the right to waive the requirement entitled FIRST ARTICLE APPROVAL
(FAR 52.209-3) and subtract the price of the proposed First Article Test (at Section B, CLIN 0016) from the proposal of offerors who elect to seek and are granted such a waiver. If the offeror requests and receives a waiver of First Article Approval requirements, the price for such testing, as identified by the offeror in Section B, CLIN 0016, shall be deducted from the total price otherwise cited for the materiel herein solicited. The offer will then be evaluated for award at the resulting alternate price.
M.2.2.2 If the offeror requests a waiver of First Article Approval requirements but fails to separately identify the cost of First
Article Testing in Section B, CLIN 0016 of this solicitation, the Government will still require that offeror perform First Article
Approval requirements if the First Article requirement is NOT waived at no additional cost to the Government.
M.2.2.3 If the offeror requests but is not granted a waiver of First Article Approval, the evaluated price will include the full amount entered for CLIN 0016, which will not be deducted by the Government.
M.3 Basis of Award
M.3.1 The solicitation is a total small business set-aside.
This is the start of the file's text. The full file is on GovTribe.