This is Amendment 0001 to Solicitation W912CH-25-Q-0101, issued by the U.S. Army's Detroit Arsenal (W912CH) on April 16, 2026, with an effective date of April 14, 2026. The solicitation is for 120mm Mortar supply contracts using a firm fixed price contracting approach.

The amendment revises Section F (Time of Delivery) to modify the estimated quantities and delivery schedules for three contract line items (CLINs). CLIN 0001AA requires delivery of 1 lot of equipment in 150 days after award. CLIN 0002AA and CLIN 0003AA quantities have been reduced from 133 each to 13 each, with both items requiring delivery within 150 days after award. For CLIN 0002AA specifically, offerors may propose either 150 days with Factory Acceptance Testing (FAT) or 300 days without FAT. Offerors must propose delivery schedules within the specified timeframes and may not propose alternative schedules for CLIN 0001AA. An accelerated delivery schedule requires Contracting Officer approval with no additional cost to the Government. Offerors must acknowledge Amendment 0001 in Section A.4 of their proposals, which are due electronically by May 14, 2026, to ryan.d.nawrocki.civ@army.mil and richard.g.hall64@civ.army.mil. All other terms and conditions of the original solicitation remain unchanged. The contracting officer is Ryan D. Nawrocki, contact office symbol CCTA-APS-C.

View the file

Other files

File Type Posted
Attachment 0002 - FAT Waiver Worksheet.pdf PDF
W912CH25Q0101.pdf PDF
Attachment 0001 - Attachment A CUI 2024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0001 2026APR16

W912CH

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

RYAN D. NAWROCKI

EMAIL: RYAN.D.NAWROCKI.CIV@ARMY.MIL

W912CH-25-Q-0101

2026APR14

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 3

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: RYAN D. NAWROCKI

Buyer Office Symbol/Telephone Number: CCTA-APS-C/(520)687-3764

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Weapon System: Mortar, 120mm

*** End of Narrative A0000 ***

SOLICITATION: W912CH-25-Q-0101

AMENDMENT: 0001

The purpose of this Amendment 0001 to Solicitation W912CH-25-Q-0101 is to:

SECTION F:

a) Revise F.1 TIME OF DELIVERY:

FROM:

F.1.1 The Government requires delivery to be made according to the following schedule:

CLIN ESTIMATED QTY CALENDAR DAYS AFTER AWARD

0001AA 1 LO 150 DAYS AFTER AWARD

0002AA 133 EA 150 DAYS WITH FAT / 300 DAYS WITHOUT FAT

0003AA 133 EA 150 DAYS AFTER AWARD

F.1.2 The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, may be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

CLIN ESTIMATED QTY CALENDAR DAYS AFTER AWARD

0001AA 1 LO 150 DAYS AFTER AWARD

0002AA 133 EA ________ DAYS WITH FAT / _______ DAYS WITHOUT FAT

0003AA 133 EA ________ DAYS AFTER AWARD

**Offerors may not propose an alternative delivery schedule for CLIN 0001AA

F.1.2.1 If the offeror has a FAT waiver as part of its proposal, as allowed in Section L.4, the offeror is encouraged to still submit a delivery date in the even the waiver is not approved. If the FAT CLIN delivery is not filled in under F.1.2 and the FAT waiver is rejected, the Government's required delivery schedule in F.1.1 will apply.

F.1.3 Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

F.1.4, Only upon approval from Contracting Officer, an accelerated delivery schedule may be acceptable at no additional cost to the

Government.

2 3

W912CH-25-Q-0101

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

TO:

F.1.1 The Government requires delivery to be made according to the following schedule:

CLIN ESTIMATED QTY CALENDAR DAYS AFTER AWARD

0001AA 1 LO 150 DAYS AFTER AWARD

0002AA 13 EA 150 DAYS WITH FAT / 300 DAYS WITHOUT FAT

0003AA 13 EA 150 DAYS AFTER AWARD

F.1.2 The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, may be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

CLIN ESTIMATED QTY CALENDAR DAYS AFTER AWARD

0001AA 1 LO 150 DAYS AFTER AWARD

0002AA 13 EA ________ DAYS WITH FAT / _______ DAYS WITHOUT FAT

0003AA 13 EA ________ DAYS AFTER AWARD

**Offerors may not propose an alternative delivery schedule for CLIN 0001AA

F.1.2.1 If the offeror has a FAT waiver as part of its proposal, as allowed in Section L.4, the offeror is encouraged to still submit a delivery date in the even the waiver is not approved. If the FAT CLIN delivery is not filled in under F.1.2 and the FAT waiver is rejected, the Government's required delivery schedule in F.1.1 will apply.

F.1.3 Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

F.1.4, Only upon approval from Contracting Officer, an accelerated delivery schedule may be acceptable at no additional cost to the

Government.

This concludes all sections affected by this Amendment.

2. The contractor shall acknowledge this Amendment 0001 in Section A.4 Acknowledgement of Amendments in its proposal submission.

3. Proposals shall be submitted electronically to email address: ryan.d.nawrocki.civ@army.mil and richard.g.hall64@civ.army.mil by 14

May 2026.

4. All other terms and conditions of Solicitation W912CH-25-Q-0101 remain unchanged.