W912CH25Q0033.pdf
PDF 129 KB Posted
- Solicitation number
- W912CH25Q0033
- Issued by
-
Department of the Army
About this file
This is a Request for Quotation (RFQ) from the Army Contracting Command - Detroit Arsenal for an Environmental Control Unit (ECU) with National Stock Number 4120-01-608-7504. The solicitation is a total small business set-aside for a firm fixed price purchase order to procure 3 Environmental Control Units, with an option to purchase up to 100% additional units. The units will be delivered to the Blue Grass Army Depot in Richmond, Kentucky, with a delivery timeline of 150 days after contract award.
Key details include a production quantity of 3 units, part number 17-3-3260-2, with a distribution code "C" Technical Data Package that limits access to US Government agencies and contractors. The solicitation requires military preservation, packing, and marking per MIL-STD-2073-1. Offers must be submitted electronically through SAM.gov by the specified date, remain valid for 90 calendar days, and can be directed to Contract Specialists Kim Parisek (520-942-7021) and Kelly Germano. The Procuring Contracting Officer has authorized early shipping at no additional cost to the government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912CH25Q0033-0007.pdf | ||
| W912CH25Q0033-0006.pdf | ||
| W912CH25Q0033-0005.pdf | ||
| W912CH25Q0033-0004.pdf | ||
| W912CH25Q0033-0003.pdf | ||
| QandA Log 1 Air Conditioner ECU W912CH25Q0033.pdf | ||
| W912CH25Q0033-0002.pdf | ||
| W912CH25Q0033-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of
(This is NOT an Order)
1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating
See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)
See Schedule
7. Delivery
FOB Other Destination
5B. For Information Call: (Name and telephone no.) (No collect calls)
8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)
See Schedule
10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.
Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. Schedule (Include applicable Federal, State, and local taxes)
Item Number (a)
Supplies/Services (b)
Quantity (c)
Unit (d)
Unit Price (e)
Amount (f)
(See Schedule)
12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage
NOTE: Additional provisions and representations are are not attached.
13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation
16. Signer
a. Name (Type or Print) b. Telephone
Area Code
c. Title (Type or Print) Number
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)
X
W912CH-25-Q-0033 2025JUN25 DOA5
W912CHACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
KIMBERLY J. PARISEK (520)942-7021
CCTA
EMAIL: KIMBERLY.J.PARISEK.CIV@ARMY.MIL
X
2025JUL30
1 52
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: KIMBERLY J. PARISEK
Buyer Office Symbol/Telephone Number: CCTA/(520)942-7021
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: Collective Protection Equipment
*** End of Narrative A0000 ***
1. This request for quotation (RFQ) is a total small business set-aside and will result in a firm fixed price (FFP) purchase order for the supply identified below:
REQUIREMENT
NOUN: ENVIRONMENTAL CONTROL UNIT (ECU)
NSN: 4120-01-608-7504
PART NO.: 17-3-3260-2
PRODUCTION QUANTITY: 3 EA
OPTION QUANTITY: Up to 100%
UNIT OF ISSUE: Each (EA)
SURVEILLANCE CRITICALITY DESIGNATOR: B
2. There is a Technical Data Package (TDP) associated with this procurement. The TDP is distribution code "C", which limits access to US
Government agencies & their contractors. Please refer to Section C for additional information.
3. Military preservation, packing, and marking are required and shall be accomplished in accordance with Section D, all applicable requirements of MIL-STD-2073-1, and the Special Packaging Instruction (SPI).
4. All shipments shall be free on board (FOB) destination to the following address:
XU W0L7 BLUE GRASS ARMY DEPOT
XU GEN SUP STORAGE PT CRP WHSE 211
431 BATTLEFIELD MEMORIAL HIGHWAY
RICHMOND, KY, 40475-5070
DoDAAC: W22PVJ
NOTE: The Procuring Contracting Officer (PCO) has authorized the contractor to ship early when at no additional cost to the Government.
5. Please acknowledge all amendments to this RFQ in the space provided under Section A.
6. This RFQ contains provisions/clauses that require you, the offeror, to complete fill-ins and/or representations. Please review and complete all such items. Otherwise, your offer may be determined ineligible for award.
7. To be considered for award: Please return one signed copy of your offer, in accordance with Section A, by the date and time indicated in the associated SAM.gov posting. All offers submitted in response to this RFQ shall be valid for a minimum of ninety (90) calendar days following the offer due date.
8. All questions pertaining to this RFQ shall be directed in writing to:
Kim Parisek
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
E-MAIL: kimberly.j.parisek.civ@army.mil
AND
Kelly Germano
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
E-MAIL: kelly.l.germano.civ@army.mil
2 52
W912CH-25-Q-0033
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE A0001 ***
A.1 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website: https://www.tacom.army.mil/ombudsperson.
(Best viewed using Google Chrome or Microsoft Edge)
A.2 Electronic Contracting
(a) All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website
(https://www.sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) Interested offerors shall submit this completed request for Quotation (RFQ) / Standard Form 18 via e-mail, with the subject line
"RFQ Submission - W912CH-25-Q-0033", to the point of contact identified below:
KIM PARISEK
Contract Specialist, Army Contracting Command - Detroit Arsenal
Email: KIMBERLY.J.PARISEK.CIV@ARMY.MIL
AND
KELLY GERMANO
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
kelly.l.germano.civ@army.mil
Once a proposal is received, the contract specialist will reply to the respective offeror indicating receipt of the submission.
(1) Maximum size of each e-mail shall be 10 megabytes. You may use multiple e-mail messages for each submission. However, you must annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of 3.
Proposals can be submitted using any of the following electronic formats:
(i) Microsoft Office Products; Word, Excel or Powerpoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.
(ii) Files in Adobe PDF (Portable Document Format).
(iii) All other electronic formats are not acceptable.
(c) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(d) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(e) Solicitations may remain posted on www.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(f) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is
3 52
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.3 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.4 ALL OR NONE
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
A.5 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section
2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States
Code). This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily
Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:
http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six(6) to ten
(10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C
Technical Data Package instructions.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
*** END OF NARRATIVE A0002 ***
4 52
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 ENVIRONMENTAL CONTROL UNIT
NSN: 4120-01-608-7504
Mfr CAGE: 81337
Mfr Part Number: 17-3-3260-2
0001AA Production Quantity 3 EA $ $ ___________________________ ______________ __________________
COMMODITY NAME: ENVIRONMENTAL CONTROL UNIT
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH4C0782EH PRON AMD: 02
AMS CD: SM2B1100000
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS - SECTION D
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/acceptance at origin means that the contractor must contact the Defense Contract
Management Agency (DCMA) to arrange for a Government inspection before production under CLIN 0001AA is shipped.
Failure to have production inspected and accepted at origin will result in its rejection at destination.
Rejected production will be returned at the contractor's expense.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W58HZ14143V021 W22PVJ J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 3 0150
FOB POINT: Destination
SHIP TO:
(W22PVJ) XU W0L7 BLUE GRASS ARMY DEPOT
XU GEN SUP STORAGE PT CRP WHSE 211
431 BATTLEFIELD MEMORIAL HIGHWAY
5 52
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
RICHMOND,KY,40475-5070
0002 ENVIRONMENTAL CONTROL UNIT
NSN: 4120-01-608-7504
Mfr CAGE: 81337
Mfr Part Number: 17-3-3260-2
0002AA UNEXERCISED OPTION QUANTITY 3 EA $ $ ___________________________ ______________ __________________
COMMODITY NAME: ENVIRONMENTAL CONTROL UNIT
CLIN CONTRACT TYPE:
Firm Fixed Price
Option quantity, pursuant to FAR 52.217-7: Option for
Increased Quantity - Separately Priced Line Item.
The quantity stated for CLIN 0002AA does not form a part of the basic contractual quantity. However, all or part of it may be added to the contract, at the
Government's discretion, via exercise of the Option clause.
The offeror's failure to insert a unit price for the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated accordingly.
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS - SECTION D
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 3 0150
FOB POINT: Destination
SHIP TO:
6 52
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(W22PVJ) XU W0L7 BLUE GRASS ARMY DEPOT
XU GEN SUP STORAGE PT CRP WHSE 211
431 BATTLEFIELD MEMORIAL HIGHWAY
RICHMOND,KY,40475-5070
9000 DATA ITEMS __________
The Exhibit Line Item Numbers (ELINs) below are associated with specific contract requirements.
Please reference the citations listed within each
ELIN for additional information.
(End of narrative A001)
A001 ENGINEERING CHANGE PROPOSAL (ECP) 1 LO $ ** NSP ** _________________________________ __________________
SERVICE REQUESTED: CDRL A001 ECP
CLIN CONTRACT TYPE:
Firm Fixed Price
Engineering Change Proposal (ECP), pursuant to the requirements listed in:
SECTION C
- C.3.: Configuration Management Documentation; and
ADDENDA
-Exhibit A: Contract Data Requirements List - DD Form
1423, A001.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A002 REQUEST FOR VARIANCE (RFV) 1 LO $ ** NSP ** __________________________ __________________
SERVICE REQUESTED: CRDL A002 RFV
CLIN CONTRACT TYPE:
Firm Fixed Price
7 52
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Request For Variance (RFV), pursuant to the requirements listed in:
SECTION C
- C.3.: Configuration Management Documentation; and
ADDENDA
-Exhibit A: Contract Data Requirements List - DD Form
1423, A002.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A003 NOTICE OF REVISION (NOR) 1 LO $ ** NSP ** ________________________ __________________
SERVICE REQUESTED: CDRL A003 NOR
CLIN CONTRACT TYPE:
Firm Fixed Price
Notice of Revision (NOR), pursuant to the requirements listed in:
SECTION C
- C.3.: Configuration Management Documentation; and
ADDENDA
-Exhibit A: Contract Data Requirements List - DD Form
1423, A003.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A004 CERTIFICATE OF COMPLIANCE (COC) 1 LO $ ** NSP ** _______________________________ __________________
SERVICE REQUESTED: CDRL A004 COC
CLIN CONTRACT TYPE:
Firm Fixed Price
8 52
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Certificate of Compliance (COC), pursuant to the requirements listed in:
SECTION C
- C.3.: Configuration Management Documentation; and
ADDENDA
-Exhibit A: Contract Data Requirements List - DD Form
1423, A004.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
9 52
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 TECHNICAL DATA PACKAGE INFORMATION
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[X] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:
W912CH-25-Q-0033
To access the data through SAM:
a. Log on to the SAM web site: https://SAM.gov.
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense
Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract Specialist and
Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
C.2 USE OF CLASS I and CLASS II OZONE DEPLETING SUBSTANCES
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean
Air Act, (42 U.S.C. 7671a(a)), complete list provided at: https://www.govinfo.gov/content/pkg/USCODE-2013-title42/html/USCODE-2013-title42-chap85-subchapVI-sec7671a.htm
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that the contractor can meet or produce only by the use of CIODS.
(b) Per Section 326 of Public Law 102-484, the Army cannot award any contract that directly or indirectly requires the use of CIODS without the approval of the Senior Acquisition Official, per current Army Policy the approval authority is the Army Acquisition
Executive. Thus, no CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
10 52
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
C.3 CONFIGURATION MANAGEMENT DOCUMENTATION
The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
a. The Configuration Change Management section of SAE EIA-649-1 (current revision) Configuration Management Requirement for Defense
Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.
d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.
(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.
(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.
f. The Governments acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Governments sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the
Administrative Contracting Officer (ACO).
h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.
arql i. The contractor shall electronically transmit copies of all ECPs, NORs, RFVs and VECPs to:
CCDC CBC Engineering Office
OFFICE: FCDD-CBE-M
EMAIL: usarmy.ria.ccdc-cbc.mbx.cmaction@army.mil
FAX: (309) 782-4537
C.4 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN
(a) The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government
OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
(b) The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.
(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is
OPSEC Level I.
11 52
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.5 OPSEC TRAINING REQUIREMENT
Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
https://securityawareness.usalearning.gov/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officer's Representative (COR), if assigned to the contract, or the Procuring
Contracting Officer (PCO).
C.6 THREAT AWARENESS REPORTING PROGRAM
(a) All contractor employees with security clearances working on any Army contract must receive annual TARP training by a Counter
Intelligence (CI) agent, or other authorized designated training method, per Army Regulation 381-12, para. 2-4b, Threat Awareness and
Reporting Program (TARP). The in-person training is the preferred method and is available by contacting the local CI Office to arrange for the conduct of training.
(b) The Contractor shall contact the CI Office within (30) days of contract award to schedule TARP training. Once training is complete
Contractor shall provide certificates/proof of completion of training to the Contracting Officer's Representative (COR), if assigned to the contract, or to the Procurement Contracting Officer (PCO) within (10) days of completion.
(c) The Contractor shall contact the CI Office to schedule training for any new employee whose performance commences after award, and who did not attend the initial TARP training session. Upon completion of the TARP training, certification/proof of completion shall be provided as required in paragraph (b).In special circumstances (on deployments or in remote locations) when in-person training is not available, TARP computer based training (CBT), which has been approved by Deputy Chief of Staff (DCS), G-2, is the only authorized online training method permitted. This alternate CBT training is only authorized in special circumstances with written approval obtained from the PCO. Upon receipt of the necessary written approval, contractor employees possessing an Army Knowledge Online (AKO) account and password or a Common Access Card can register and complete the online TARP training course by utilizing the Army Learning Management
System (ALMS) at: www.lms.army.mil.
C.7 Contract employees will be required to maintain CUI or legacy U//FOUO at their contractor location (AR 380-5). Reference Attachment 0001 "Attachment A CUI 2023"
*** END OF NARRATIVE C0001 ***
PACKAGING AND MARKING
D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)
(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(4) SPECIAL PACKAGING INSTRUCTION NUMBER. P17-3-3260-2
(a) REVISION: N/A
12 52
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) DATE OF REVISION 31 JUL 24
(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL:
N/A
(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (HYPERLINK
"http://get.adobe.com/reader/"http://get.adobe.com/reader/) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to
"Tools," then "Internet Options." Click on the
"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(c) Marking:
(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
(2) When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html ) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging
Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees
Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating
(treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: HYPERLINK
"http://www.alsc.org"http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organizations compliance program.
(e) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of
13 52
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United
Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the
SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
(g) SUPPLEMENTAL INSTRUCTIONS:
PLACE A RED X AND THE WORDS SHORT BOX ON THE FRONT OF ANY BOX THAT HAS A SHORT
QUANTITY, THEN PLACE THAT BOX/BOXES WITH THE MARKINGS SHOWING ON THE TOP FRONT OF THE PALLET LOAD.
*** END OF NARRATIVE D0001 ***
INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-1 CONTRACTOR INSPECTION REQUIREMENTS APR/1984
2 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
3 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
4 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: ttps://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date____
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
14 52
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT:
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT:
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.2 REWORK AND REPAIR OF NONCONFORMING MATERIAL
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Representative for review and approval prior to implementation. Rework procedures are subject to the Governments disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting Officer for review and written Government approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review and approval, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The Government approved rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
E.3 REQUIREMENTS FOR PRETREATMENTS AND CHEMICAL AGENT RESISTANT COATINGS LOCAL WARREN - PAINTED MATERIEL
(a) Scope
15 52
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) This clause applies to contracts requiring Chemical Conversion Coatings and Pretreatments for Metallic Substrates, Chemical Agent
Resistant Coating (CARC), and their related materials. The requirements in this clause clarify and supplement those in the contract, unless nullified elsewhere in the contract or through an approved Request for Deviation.
(2) Coating qualification, spot paint repair, and MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base coatings are not within the scope of this clause.
(b) Definitions
(1) The "contracting agency," "appropriate agency," "procuring authority," "engineering authority," "procuring agency," and "procuring activity" is the PCO or designee.
(2) The "prime contractor" is the company awarded this contract, and the "subcontractors" comprise all companies involved in providing coated parts to the prime contractor, including companies that apply the coatings.
(c) General Requirements Clarifications
(1) The government retains the right for onsite verification of the prime contractors' and its subcontractors' products, processes, procedures, and test reports.
(2) The prime contractor shall be responsible for itself and its subcontractors to produce and maintain detailed process control plans, process control data, pre-production approval testing, ongoing quality control & quality control testing, and test reports. This information shall be available upon government request.
(3) The prime contractor shall immediately notify the PCO and the Defense Contract Management Agency (DCMA) of any failure to meet preproduction and production requirements.
(4) When a substrate is cleaned using multiple methods, each cleaning method shall be treated as a separate step in the process documentation.
(5) The Gage Repeatability and Reproducibility (Gage R&R) error shall be less than 30 percent for all process and product measurement systems.
(6) Products with hexavalent chromium and cadmium, including but not limited to certain fastener finishes, shall not be used.
(7) CARC primer and CARC topcoat shall not be applied directly to bare metal or plastic, except as provided for in MIL-DTL-53072.
(8) If the contract specifies application of CARC materials over a non-CARC coating, then both CARC primer and CARC topcoat are required. The complete coating system shall meet the requirements for CARC defined in MIL-DTL-53072.
(9) Neutral salt spray (NSS) testing shall not be used to validate compliance with materiel life cycle requirements; NSS is a production quality test and does not predict field performance.
(d) Pre-Production Approval Clarifications
(1) Pre-production testing shall include:
16 52
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(i) Thickness of each layer of the coating system;
(ii) Coating system adhesion;
(iii) Salt spray performance;
(iv) For phosphate pretreatments, the phosphate coating weight, crystal size and shape, and scanning electron microscope photos of the phosphate coatings at 500x and 1000x magnification.
(2) Pre-production test samples shall be from the material used for production parts, pieces cut from production representative parts, or production representative parts. Standardized test coupons shall not be used except when the coupons are of the same substrate material as the production parts.
(3) Nine samples shall be produced for the required testing and shall include: three cleaned and pretreated test samples, three samples with the complete paint system and three samples with pretreatment plus primer.
(4) One or more ISO 17025 laboratories shall conduct pre-production testing on the nine test samples in accordance with (IAW) the applicable test method accreditations. The applicable ISO 17025 test method accreditations include ASTM B117 Salt Spray, GMW 14872
Cyclic Corrosion, ASTM B244 Thickness of Non-Conductive Coatings on Non-Magnetic Metals, ASTM B487 Measurement of Metal and Oxide
Coating Thickness, ASTM B499 Thickness of Non-Conductive Coatings on Magnetic Metals, and ASTM D3359 Measuring Adhesion by Tape Test.
(5) Unless required elsewhere in the contract and specifications, the CARC coating system applied to hot and cold rolled steel, and aluminum and its alloys, shall meet a minimum of 1000 hours neutral salt spray resistance IAW ASTM B117.
(6) Test procedures shall be submitted IAW the Contract Data Requirements List (CDRL) DI-NDTI-80603 documenting Pretreatment and
Chemical Agent Resistant Coating procedures when this CDRL is included in the contract.
(7) Test reports from the ISO 17025 accredited labs shall be submitted for Pretreatment and Chemical Agent Resistant Coating testing specified in paragraph (d)(4) of this clause IAW the Contract Data Requirements List (CDRL) DI-NDTI-80809 when this CDRL is included in the contract.
(e) Production Testing Clarifications
(1) At a minimum, ongoing production quality tests shall conducted and recorded daily for coating adhesion and coating thickness, and monthly for salt spray testing. Use of ISO accredited laboratories is optional for these ongoing tests of production parts.
(2) Production parts or pieces cut from production parts shall be used for ongoing production quality testing. Standardized test coupons shall not be used.
(3) Unless specified elsewhere in the contract and specifications, the CARC coating system applied to hot and cold rolled steel, and aluminum and its alloys shall meet a minimum of 1000 hours neutral salt spray resistance IAW ASTM B117.
*** END OF NARRATIVE E0001 ***
DELIVERIES OR PERFORMANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
17 52
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
5 52.242-15 STOP-WORK ORDER AUG/1989
6 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
7 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
8 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER CONTRACT AWARD
CLIN 0001AA 3 EA 150 DAYS AFTER AWARD
CLIN 0002AA 3 EA 150 DAYS AFTER AWARD (IF EXERCISED)
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractor's date of receipt of the contract or notice of award by adding
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term
"working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of Clause)
18 52
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CONTRACT ADMINISTRATION DATA
9 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) JAN/2023
(a) Definitions. As used in this clause
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .