Amendment 0002 W912BV25Q0023.pdf
PDF 453 KB Posted
- Attached to
- Eufaula Lake Refuse Removal Federal contract opportunity
- Solicitation number
- W912BV25Q0023
About this file
This is Amendment 0002 to solicitation W912BV25Q0023, issued by the U.S. Army Corps of Engineers Tulsa District, which extends the response date for quotes to February 19, 2025 at 2:00 PM and provides an updated Statement of Work.
The solicitation is for refuse collection services at Eufaula Lake, Oklahoma, requiring the contractor to provide labor, supervision, transportation, equipment, and dumpsters for multiple locations. The work includes maintaining and servicing dumpsters with varying frequencies based on seasonal periods: Spring (April 1-30) and Fall (October 1-31) require semiweekly service on Tuesdays and Fridays; Summer (May 1-September 30) requires service three times per week on Monday, Wednesday, and Friday; Winter (November 1-March 31) requires weekly service Tuesday through Friday. The contractor must provide 2-cubic yard and 4-cubic yard dumpsters at specified quantities across multiple locations including Belle Starr South, Brooken Cove, Damsite East, and other recreational areas. Work hours are 7:00 AM to 5:30 PM, and the contractor must comply with specific performance requirements regarding dumpster maintenance, cleanliness, refuse removal, and disposal at approved sanitary landfills.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV25Q0023 Amendment 0001.pdf | ||
| Eufaula Refuse Site Visit - Sign-in Sheet.pdf | ||
| Solicitation_W912BV25Q0023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912BV25Q0023
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0002 is hereby issued to extend the response date for quotes and provide an updated SOW.
All other terms and conditions remain unchanged. Government POC is Caitlyn Cox via email at caitlyn.m.cox@usace.army.mil.
1. CONTRACT ID CODE PAGE OF PAGES
1 23
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Feb-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV25Q0023
X 9B. DATED (SEE ITEM 11)
23-Jan-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Feb-2025
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 13-Feb-2025 02:00 PM to 19-Feb-2025 02:00 PM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
SPECIFICATIONS
S P E C I F I C A T I O N S
EUFAULA LAKE
OKLAHOMA
MAINTENANCE CONTRACT
FOR
REFUSE COLLECTION SERVICES
13 February 2025
REDLINE
ORGANIZATION OF SPECIFICATIONS
This specification consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following pages.
The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.
Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.
TABLE OF CONTENTS
Para.
No. Paragraph Title 1 Scope of Work 2 Definitions 3 References 4 Initiation, Execution, & Acceptance of Work 5 Personnel 6 Equipment 7 Performance Requirements 8 Deductions for Deficient Work 9 Safety 10 Pre-work Conference 11 Contractor Submittals 12 Billing 13 Changes in Amount of Facilities Serviced
EXHIBITS
No. Title 1 Quality Assurance Report 2 Performance Requirements 3 Invoice Format
APPENDICES
Appendix Title A Refuse Collection Services Maps
1. SCOPE OF WORK. The work required under this specification provides for labor, supervision, transportation, equipment, and supplies to perform refuse pickup at designated areas of Eufaula Lake Project.
2. DEFINITIONS.
2.1. Contracting Officer Representative (COR). A Government employee designated by the Contracting Officer as their representative in administering this contract.
2.2. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements.
2.3. Government. The term "Government" as used herein means the United States of America.
2.4. Performance Requirement (PR). The Government's requirement for each service provided under the contract. Performance Standard (PStd) specifies the minimum standard (quality) for each service provided under the contract.
2.5. Project. The term "project" as used herein means all Government property and easements at Eufaula Lake.
2.6. Public Use Area (PUA). Parks as well as overlooks, nature and hiking trails, access points, and other areas used by the public for recreation.
2.7. Quality Assurance (QA). The procedure by which the Government determines whether the contractor is in conformance with the contract specification (quality of work).
2.8. Quantification. Determining actual weight of solid waste and reporting solid waste by weight (tons).
2.9. Regulations. The term "regulations" refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.
2.10. Semiweekly. Work required to be performed twice each week.
2.11. Workday. A workday is any day, Monday through Friday, exclusive of Federal Holidays.
This definition should not be interpreted to mean work is not required by this specification on other days.
3. REFERENCES. Corps of Engineers Safety and Health Requirements Manual, (EM 385-1-1, current issue) is hereby incorporated into this specification. The COR will furnish EM 385-1-1 to the contractor after contract award.
4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.
4.1. Initiation and Execution of work shall be in accordance with this specification.
4.2. Acceptance of Work. The Government shall accept work unless the COR notifies the contractor of deficient services (Reference Contract Clause 52.212-4(a)).
4.2.1. Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the COR in writing within two (2) workdays. Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance Report (SWT Form 982, Exhibit 1).
4.2.2. If the COR notifies the contractor of deficient work, the contractor shall initiate action to accomplish corrective work. Work performed on a daily schedule shall be re-performed the same day. Work performed on less than a daily schedule shall be re-performed not later than the following day. Refer to paragraph 8 for deficient work not re-performed.
4.2.3. The contractor shall notify the COR when deficiencies have been corrected by completing Part IV of the QA Report, provided it has been furnished the contractor. If not, notification shall be made orally. When work has been corrected, the COR shall complete Part V of the QA Report and furnish the contractor a copy. A copy will also be provided the COR at the Tulsa District Office.
5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.
5.1. Experience and Skills. The contractor shall provide personnel that are experienced and demonstrate proficiency in the skills required to perform the work specified.
5.2. Supervision.
5.2.1. The contractor shall provide one supervisor on the project who shall have full authority to direct any work required. This supervisor and alternates, who shall have full authority to execute work during his absence, shall be designated in writing.
5.2.2. The contractor shall provide the COR a local or toll-free telephone number at or through which the supervisor can be reached between 8:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cellular-type phone is acceptable.
6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish all work required by this specification within specified time limits.
6.1. All equipment must be in good operating and mechanical condition and shall comply with
EM 385-1-1.
6.2. Vehicles performing work under this contract shall be operated and parked only on roads, parking areas, or pullouts unless the COR approves use of other areas.
6.3. All dumpster service vehicles shall be front or rear loading and be equipped with operational back-up alarms.
7. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit 2. The contractor's performance will be evaluated using these PRs as follows:
7.1. Services provided by the contractor will be inspected for compliance with PStds. Those not meeting PStds shall be considered deficient.
7.2. Deficient services are determined during initial QA inspections. The results of inspections are not changed as a result of satisfactory re-performance.
8. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PStds in Exhibit 2. Deductions for documented defects will be made in accordance with the following procedures:
8.1. Each service found deficient and re-performed by the contractor: No deduction.
8.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on the Government's cost for performing the work.
8.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.
8.4. Each service found deficient and not re-performed by anyone, or work not performed at all: Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.
9. SAFETY.
9.1. Safety Plan. The contractor shall furnish the COR an Accident Prevention Plan (APP) to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1. The APP shall include, but not be limited to the following:
9.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.
9.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.
9.1.3. Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.
9.1.4. Procedures for treating and transporting injured persons to medical facilities.
9.2. Safety Violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently discharged upon the request of the COR.
9.3. Personal Clothing and Safety Apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts, tank tops, or shorts). Clothing shall be in good repair. Personnel will wear additional protective apparel when required by Section 5, EM 385-1-1.
9.4. Accident Reports.
9.4.1. The contractor shall immediately notify the COR of all known accidents that occur at the project and result in death or serious injury.
9.4.2. The contractor shall investigate all accidents involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the COR immediately and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.
9.5. Exposure Reports. The contractor shall maintain an accurate record of exposure data (man-hours worked) and submit the figure in writing monthly by the 2nd workday of the following month.
10. PREWORK CONFERENCE. The COR shall conduct a Pre-work Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 11 below. As a minimum, the officer of the company that signed the contract and the supervisor shall represent the contractor. The COR shall establish the location, date, and time of the Pre-work Conference after consultation with the contractor.
11. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the COR prior to starting work. All submittals, other than copies of contracts, shall be typed and the original and one copy shall be furnished the COR. If the COR determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week:
11.1. Names of supervisor and his alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1.).
11.2. Safety Plan (subparagraph 9.1.).
11.3. Exposure reports (submit by 2nd workday of each month) (subparagraph 9.5.).
11.4. Contractor’s agreement with approved disposal site.
12. BILLING.
12.1. The contractor shall submit the original and two copies of invoices at the end of each month for all completed work.
12.2. Invoices shall be prepared in the format shown at
Exhibit 3.
12.3. All exposure reports shall be submitted before an invoice will be accepted.
12.4. Invoices and supporting documents shall be emailed to
Matthew.l.roberts@usace.army.mil
12.5. STANDARD CONTRACT LANGUAGE.
The Contractor shall comply with the following requirements marked with an “x”.
X
1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all Subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (KO), (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are Subject to search when entering federal installations.
Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
2. Antiterrorism (AT) Level I training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website Subject to change).
3. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures.
Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
4. Contract personnel requiring a common access card (CAC): Contract personnel will be issued a common access card (CAC) only if duties involve one of the following:
(1) both physical access to a DoD facility and access to DoD information systems or networks; (2) remote access to a DoD information system or network using DoD-approved remote access procedures; or (3) physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. Before CAC issuance, contract personnel must have, at a minimum, a favorably adjudicated Tier 1 investigation or an equivalent or higher investigation in accordance with applicable Army regulations and Homeland Security Presidential Directive-12 (HSPD-12). At the discretion of the RA, an initial CAC may be issued based on a favorable review of a fingerprint check and a successfully scheduled Tier 1 investigation with the National Background Investigations Bureau. The RA provides contract personnel with additional information and forms to initiate the CAC issuance process, and/or to initiate background investigations, when required. Contract personnel shall complete these processes within established timelines to avoid delays.
5. Security requirements for contract performance outside the US: For contract performance requirements that involve services or delivery in a foreign country, the Contractor shall comply with the requirements of DFARS clause 252.225-7043. For performance requirements that involve contract personnel accompanying or supporting US Armed Forces deployed outside the US, the Contractor shall comply with the requirements of DFARS clause 252.225-7040. Contract personnel accessing DoD or other federal facilities outside the US shall comply with applicable Status of Forces Agreements and Geographic Combatant Command requirements. Prior to contract personnel traveling outside the US, the Contractor shall provide documentation of AT, OPSEC, and other required training to the Government representative. Additionally, contract personnel shall comply with requirements specified in the DoD Foreign Clearance Guide, including country and theater clearance processes.
6. Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
7. Contract personnel requiring access to Government information systems: All contract personnel with access to a government information system (including USACE business systems and CAC-enabled websites) shall comply with applicable DoD and Army regulations, and shall use the organization's UserID-Password Administration and Security System (U-PASS) at commencement of services to request network user accounts. Contract personnel shall complete DoD Information Assurance Awareness training prior to accessing information systems, and annually thereafter.
8. Contracts requiring a formal OPSEC program: The Contractor shall develop an OPSEC SOP/Plan within 90 days of contract award. The OPSEC SOP/Plan shall be reviewed and accepted by the RA OPSEC Officer. This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it, and why it needs to be protected. In accordance with Army and DoD regulations, the contractor shall have a certified Level II OPSEC coordinator, who shall ensure OPSEC compliance during contract performance.
9. Training requirements for the protection of sensitive information: All contract personnel with access to critical information (as identified in the RA's OPSEC Program) shall complete initial and annual refresher OPSEC Level I Awareness training, which is available at the following websites: https://www.iad.gov/ioss/, or http://www.cdse.edu/catalog/operations-security.html (websites Subject to change). All contract personnel with access to Controlled Unclassified Information (CUI) shall complete initial and annual refresher CUI training in accordance with applicable Army policy.
10. Information Assurance (IA)/Information Technology (IT) requirements: All contract personnel performing IA/IT services must comply with DoD training and certification requirements specified in DoD 8570.01-M, Information Assurance Workforce Improvement Program, and maintain required background investigations specified in RA policy. Contract personnel shall provide the Government representative with documentation of certification(s) prior to performing on the contract. In accordance with applicable DoD, Army, and USACE regulations, the Contractor shall ensure that all information systems (IS) and platform information technology (PIT) systems developed and/or supported under this contract comply with cybersecurity and architectural requirements, including, but not limited to: security technical implementation guides (STIG)(e.g., the current version of the Application Security and Development STIG, and the internet access point (IAP) demilitarized zone (DMZ) STIG), and the use of security controls developed under the risk management framework documentation for the system or platform. The Contractor shall address questions regarding these provisions to the Government representative, who will coordinate between the Contractor and the USACE Chief Information Officer (CIO).
11. Contracts requiring handling or access to classified information: The prime Contractor shall have a Facility Clearance (FCL) at the appropriate level prior to performance on the contract; the RA will sponsor the prime contract company in obtaining the FCL. All cleared contract personnel shall comply with the FCL requirements, as well as applicable laws and regulations regarding contractor access to national security information. For classified contracts, the RA will generate the DD Form 254, which will be attached to the contract.
12. Threat Awareness Reporting Program: All contract personnel who maintain an active security clearance shall receive initial and annual refresher training on the Threat Awareness and Reporting Program (commonly referred to as “TARP”), provided by a Counterintelligence Agent. As determined by the servicing Counterintelligence Agent for the RA, contract personnel may complete web-based TARP training.
13. Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.
14. Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website Subject to change) to meet the contract employment eligibility requirements.
Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/ eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and Submit it to the Contracting Officer to become part of the official contract file.
15. Contracts requiring armed security guards: All contract personnel performing contract security guard duties shall comply with the Individual Reliability Program in accordance with AR 190-56 (The Army Civilian Police and Security Guard Program), as well as applicable installation, facility and area commander installation/facility policies and procedures regarding storing weapons and ammunition in accordance with AR 190-11 (Physical Security of Arms Ammunition, and Explosives).
16. Contracts requiring delivery of food and water: The supplies delivered under this contract shall be transported in delivery conveyances maintained to prevent tampering with and/or adulteration or contamination of the supplies, and if applicable, equipped to maintain a prescribed temperature. All delivery vehicles and storage locations are Subject to inspection at any time by the COR, Post Veterinarian, law enforcement officers, or other RA representatives authorized to conduct such inspections. When the sanitary conditions of the delivery conveyance have led, or may lead to product contamination, adulteration, constitute a health hazard, the delivery conveyance is not equipped to maintain prescribed temperatures, or the transport results in product “unfit for intended purpose,” supplies tendered for acceptance may be rejected without further inspection. As the holder of a contract with the DoD, the Contractor shall ensure that all products and/or packaging have not been tampered with or contaminated. The Contractor shall ensure all delivery conveyances are always locked or sealed, except when actively loading or unloading. Unsecured vehicles shall not be left unattended. All incoming truck drivers shall provide adequate identification upon request. In the event of an identified threat to a delivery location, or a heightened force protection/Homeland Security threat level, the Contractor may be required to adjust delivery routes to minimize vulnerability risks and enable direct delivery to DoD facilities.
13. CHANGES IN AMOUNT OF FACILITIES SERVICED. Adjustment in contract price will be negotiated at the request of either party, only if either or both of the following conditions occur:
13.1. Services required are deleted for a period of one (1) month or longer in an entire park.
13.2. A singular change in the amount of project facilities to be serviced is made and the change results in an annual increase or decrease in the cost of work that exceeds $100.
The cost of increases or decreases shall be based upon estimates of the contractor's costs for performing the work.
EXHIBIT 1
QUALITY ASSURANCE REPORT
See section J
EXHIBIT 2
PERFORMANCE REQUIREMENTS
SERVICE REQUIREMENTS PR NO. PERFORMANCE STANDARDS
APPENDIX A
Dumpster Maintenance 1 Dumpsters shall have functioning lids.
Dumpsters shall have neat and uniform appearance. Free of graffiti.
Clean Dumpsters 2 Dumpsters shall be clean. Odor control applied as necessary to correct visitor complaints, and minimally once per week.
Refuse Removal 3 Dumpsters shall be totally emptied when serviced. Items placed outside containers within a 6-foot radius shall be picked up.
Refuse Disposal 4 All refuse disposed in approved sanitary landfill or incinerator. All applicable county, State, and Federal regulations are complied with.
Solid Waste Quantification 5 Monthly invoices shall include total solid waste weight in tons, 1 cubic yard of non-compacted waste equals 95 lbs.
Dumpster Storage 6 Dumpsters shall be stored in areas designated by COTR when not required by this contract.
EXHIBIT 3
INVOICE FORMAT
BILLING FOR
MAINTENANCE CONTRACT
PROJECT: ________________________________ SHEET ____ OF ____
CONTRACTOR: _____________________________ Date____________
ADDRESS: ________________________________ CONTRACT NO: W912BV-__-__-_____
BILLING PERIOD: __________ THRU _________ INVOICE NO: ____________
PAYMENT TERMS: __________________________
(Payment Discount or N/A)
BID ITEM NO. SOLID WASTE WEIGHT (tons) AMOUNT
PAYMENT REQUESTED: ________________
______________________________________ CONTRACTOR (Signature/Date)
APPENDIX A
REFUSE COLLECTION
1. FACILITIES TO BE SERVICED. All park facilities listed in Tables A-1 and A-2.
2. FREQUENCIES AND TIMES OF SERVICES. The contractor shall accomplish services in accordance with the following:
2.1. Seasonal Work Periods. The amount of work required varies with the seasons of the year based on need. The following work periods are established to reflect changes in inventory of facilities and/or frequency of services from season to season:
Spring Period: 1 April - 30 April Summer Period: 1 May - 30 September Fall Period: 1 October - 31 October Winter Period: 1 November - 31 March
2.2. Spring and Fall Periods. The frequency is semiweekly and shall be performed Tuesday and Friday, exclusive of Federal Holidays. If the scheduled work day is a Federal Holiday, collections shall be performed on the work day immediately preceding or immediately following the scheduled day. For example, if Friday is a Federal Holiday, the work shall be performed on the immediately preceding Thursday.
2.3. Summer Period. The frequency is three times per week and shall be performed Monday, Wednesday, and Friday. If a regularly scheduled day is a Federal Holiday, all collections scheduled for that day will be performed on the day immediately following or preceding the Federal Holiday, and all other collections for that week shall be performed as scheduled. For example, if Monday is a Federal Holiday, collections will be performed on the Tuesday immediately following and also on Wednesday and Friday of that week. If Friday is a Federal Holiday, collections for that day shall be performed on the day immediately preceding the Holiday. For example, if Friday is a Federal Holiday, collections will be performed on the immediately preceding Thursday and also on Monday and Wednesday of that week.
2.4. Winter Period.
2.4.1. The frequency is weekly for all parks and may be performed any day Tuesday thru Friday, exclusive of Federal Holidays. Scheduled pickup days for each PUA shall remain consistent throughout the period.
2.5. The contractor shall begin work no earlier than 7:00 a.m. and shall complete work by 5:30 p.m.
3. DESCRIPTION OF WORK.
3.1. The contractor shall furnish dumpsters in accordance with the inventory provided in Tables A-1 and A-2.
3.2. The contractor may substitute different size dumpsters than those indicated in the tables with prior approval of the COR.
3.2. Exact placement of the dumpsters shall be coordinated with the COR. The COR may require dumpsters to be repositioned within a PUA and may require moving dumpsters from one PUA to another, to meet operational needs throughout the performance period (at no additional cost to the Government).
3.4. All dumpsters shall have functioning lids and shall be maintained for a neat and uniform appearance by the contractor. All dumpsters shall be prominently identified as to ownership and provider of services.
3.5. Cleanliness and sanitation of the vendor-owned containers will be the responsibility of the contractor and must comply with all Federal, State, and County regulations.
3.6. Refuse shall be emptied from refuse containers with a truck that is equipped with front- or rear-load dumpster dumping capabilities.
4. PERFORMANCE REQUIREMENTS. The work performed under this appendix shall comply with the PRs given in Exhibit 2.
TABLE A-1
INVENTORY OF DUMPSTERS
SPRING, SUMMER, AND FALL PERIODS
Location 2 CY 4 CY Belle Starr South 8 Brooken Cove 1 4 Damsite East 1 Damsite East (North Fishing Area) 1 Damsite East (ATV Parking) 1 Damsite East (South Fishing Area) 1 Ladybird Landing 1 4 Elm Point 2 Gentry Creek 2 2 Highway 9 East 2 Highway 9 North 4 Highway 9 South 4 Mill Creek 1 Oak Ridge 1 Overlook 1 Porum Landing 2 6 Powerhouse 1 Project Office 2
TOTALS 10 42
TABLE A-2
INVENTORY OF DUMPSTERS
WINTER PERIOD
Location 2 CY 4 CY Belle Starr South 2 Brooken Cove Damsite East 1 Damsite East (North Fishing Area) 1 Damsite East (ATV Parking) 1 Damsite East (South Fishing Area) 1 Ladybird Landing 1 Elm Point 1 Gentry Creek 1 Highway 9 East Highway 9 North 2 Highway 9 South Mill Creek 1 Oak Ridge 1 Overlook Porum Landing 2 Powerhouse 1 Project Office 2
TOTALS 3 15
(End of Summary of Changes)
File details come from the government source that posted it. Updated .