W912BV20R0031 Amendment 0001.pdf
PDF 365 KB Posted
- Attached to
- Tulsa ANG Fuel Facility Federal contract opportunity
- Solicitation number
- W912BV20R0031
About this file
This amendment modifies a solicitation for a fuel facility project. The U.S. Army Corps of Engineers - Tulsa District seeks to award a fixed-price construction contract to build fuel storage tanks, truck unloading stands, refueling stations, buildings, and site infrastructure for the Oklahoma Air National Guard in Tulsa County. The project scope includes three 50,000-gallon above-ground steel tanks, two commercial and two refueler truck offloading areas, an electrical and filter house, fuel operations building and lab, vehicle parking, secondary containment, and a maintenance building. Additionally, the military service station will comprise 8,000-gallon diesel and gasoline tanks with dispensing nozzles, equipment, an optional canopy, and secondary containment. The amendment changes the site visit date to September 9, 2020 at 10:00 AM, replaces the second volume of attachments, and extends the proposal due date to September 28, 2020 at 2:00 PM. The procurement is unrestricted with an estimated value between $10-25 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV20R0031 Amendment 0002.pdf | ||
| Site visit sign-in sheet.pdf | ||
| VOL 3- RTA_DWG-Tulsa-ConstructFuelFacilities-20200806.pdf | ||
| VOL 2- RTA_DWG-Tulsa-ConstructFuelFacilities-20200806.pdf | ||
| VOL 2_ RTA_DWG-Tulsa-ConstructFuelFacilities-20200806.pdf | ||
| VOL 2 -RTA_DWG-Tulsa-ConstructFuelFacilities-Part_1.pdf | ||
| Cover VOL 2 - Tulsa OKANG.pdf | ||
| VOL 2 -RTA_DWG-Tulsa-ConstructFuelFacilities-Part 2.pdf | ||
| VOL 1_Specs-Tulsa-ConstructFuelFacilities-20200806.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Tulsa ANG Fuel Storage W912BV20R0031
Amendment 0001 is hereby issued to Remove VOL 2 and Replace w ith updated VOL 2. The site visit is changed to take place on 09 September 2020 at 10AM CST. The proposal due date is changed to 2PM CST on 28 September 2020.
POC is the Contract Specialist at jason.l.floyd@usace.army.mil or 918-669-7022.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV20R0031
X 9B. DATED (SEE ITEM 11)
10-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Aug-2020
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV20R0031
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
File details come from the government source that posted it. Updated .