Cover VOL 2 - Tulsa OKANG.pdf
PDF 442 KB Posted
- Attached to
- Tulsa ANG Fuel Facility Federal contract opportunity
- Solicitation number
- W912BV20R0031
About this file
This solicitation is for the construction of fuel facilities for the Oklahoma Air National Guard in Tulsa. The scope of work includes constructing three 50,000 gallon welded horizontal steel above-ground fuel storage tanks with railings and appurtenances, two commercial truck unloading stands with canopies, two refueler loading stands with optional canopies, an enclosed electrical control house, open shelter filter house, fuel operations facility with fuel testing laboratory, refueler vehicle parking with concrete parking and secondary containment, and an R-11 maintenance building. Additionally, the project includes an 8,000 gallon diesel and 8,000 gallon motor gas military service station with two dispensing nozzles each, equipment, an optional dispensing area canopy, a control building, and secondary containment for tanks, offloading and dispensing. Site work will include utility extensions, site preparation, local streets and drainage systems, and security fencing and gates. The estimated value is between $10-25 million with a 545 calendar day performance period. This is an unrestricted procurement conducted by the Tulsa District of the U.S. Army Corps of Engineers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV20R0031 Amendment 0002.pdf | ||
| Site visit sign-in sheet.pdf | ||
| VOL 3- RTA_DWG-Tulsa-ConstructFuelFacilities-20200806.pdf | ||
| VOL 2- RTA_DWG-Tulsa-ConstructFuelFacilities-20200806.pdf | ||
| VOL 2_ RTA_DWG-Tulsa-ConstructFuelFacilities-20200806.pdf | ||
| W912BV20R0031 Amendment 0001.pdf | ||
| VOL 2 -RTA_DWG-Tulsa-ConstructFuelFacilities-Part_1.pdf | ||
| VOL 1_Specs-Tulsa-ConstructFuelFacilities-20200806.pdf | ||
| VOL 2 -RTA_DWG-Tulsa-ConstructFuelFacilities-Part 2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUME II
Drawings Construct Fuel Facilities
PN DESC1912
FY20 MCP
HQ DLA/U.S. Air National Guard Project Tulsa International Airport, Oklahoma Submittal – August 2020
Prepared for
U.S. Army Corps of Engineers Omaha District
Prepared by
Argus Consulting, Inc
The Schemmer Associates
Jensen Hughes
Solicitation: W912BV20R0031 http://www.jensenhughes.com/
File details come from the government source that posted it. Updated .