This is a pre-solicitation synopsis for a firm-fixed-price indefinite delivery, multiple award task order contract for environmental consulting services. The U.S. Army Corps of Engineers Tulsa District intends to issue solicitation number W912BV-20-R-0028 to acquire these services for projects within the boundaries of the Southwestern Division as well as projects assigned to the Southwestern Division. Services will include environmental quality and compliance, engineering and technical support, management system support, analysis, program management support, sampling, testing, audits, assessments, investigations, natural and cultural resources support, and scientific studies. The contract will have a base period of three years with a two-year option and a maximum shared capacity of $20 million. Evaluation will use a tradeoff best value method. The North American Industry Classification System code is 541620 and the size standard is $16.5 million. The solicitation will be issued on or around March 16, 2020 via beta.SAM.gov and proposals will be due on or around April 16, 2020.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 11 Sep 2020

X

A X B X C

D

EX

X G F 232 - 244

245 - 280 X H 281 - 295 richard.vandelinde@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 295

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912BV 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and via DOD SAFE website conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

RICHARD VAN DE LINDE 918.669.7544

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 17

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

18 - 40 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 43 - 45 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 46 - 49 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

50 - 186

PART II - CONTRACT CLAUSES

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

918-669-7436FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

187 - 231

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

12 May 2020

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912BV20R0028

Section A - Solicitation/Contract Form

BIDDER'S INQUIRY INSTRUCTIONS

INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS

USE OF BIDDER’S INQUIRY

Prospective offerors should submit questions and inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):

a. For information related to amendments, and the dates set for receipt of proposals, please check https://www.beta.sam.gov

b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

2. From this page you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.

4. The Solicitation Number is: W912BV-20-R-0028

The Bidder Inquiry Key is: 3E72XD-ZM3CTR

c. The Bidder Inquiry System will be unavailable for new inquiries 10 days prior to proposal due date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

g. The point of contact for this solicitation is:

Contract Specialist: Richard Van De Linde Telephone: 918-669-7544 E-MAIL: Richard.VanDeLindeIII@usace.army.mil

Section B - Supplies or Services and Prices

PRICING

SECTION B

PRICING SCHEDULE

Hubzone

Indefinite Delivery Contract (IDC) Multiple Award Task Order Contract (MATOC)

Environmental Consulting Services for Projects within the Geographic Boundaries of the Southwestern Division (SWD) and Projects assigned to the Southwestern Division in accordance with UAI 5107.102-100 and ER 5-1-10

17 April 2020

1. This contract is a Hubzone Indefinite Delivery Contract (IDC) Multiple Award Task Order Contract (MATOC) for Environmental Consulting Services for Projects within the Geographic Boundaries of the Southwestern Division (SWD) and Projects Assigned to the Southwestern Division (within the Continental United States) in accordance with UAI 5107.102-100 (Policy for USACE Acceptance of Work) and ER 5-1-10 to be executed through Solicitation No.

W912BV-20-R-0028. The collective ceiling for this contract is $20,000,000. The minimum guaranteed amount for this IDIQ contract is $2,500. There is no minimum guaranteed amount for any subsequent option period.

2. The Contract Line Item structure shall be established at the Task Order level. Pricing of Task Orders shall be pursuant to the instructions and limitations in accordance with FAR Clause 52.216-19, Order Limitation. The Contractor shall complete the Discipline Rate Schedules in Tables 1 and 2 below for the 3-year Base Period, the 2-year Option Period and the Additional 6-month Period (do not apply escalation to the 6-month period, as these rates must be the same as the Option Period Year 2 rates). An hourly rate must be provided for each discipline for every year within the Base and Option Period; failure to provide an hourly rate for all disciplines will result in the Offeror’s proposal being deemed ineligible for further consideration for contract award. These rates will apply to the prime contractor and all teaming subcontractors. A list of all teaming subcontractors must be submitted with the proposal.

3. All costs associated with travel shall be in accordance with the Joint Travel Regulations

(JTR).

4. The Period of Performance for the base period for all contracts will be from the date of award + 36 months. In addition, there will be one two-year option period (exercisable at the government’s discretion) not to exceed 5 years. However, if Contract Clause 52.217-8 is exercised it will extend the contract for an additional 6 months at the existing Year 5 rates.

5. To clarify, FAR Clause 52.217-8, Option to Extend Services, the following will apply: An Option period of two years is included as part of this contract. The Government may exercise the option at any time; however, it will be accomplished no later than the last day of the basic contract period of performance. The option period will add an extension to the period of performance.

6. This is a firm fixed price type contract for the services specified in Section C, Statement of Work that may or may not be required during the contract period. The Government is setting forth its anticipated requirements and its obligation under this contract. If the Government has any requirements for this type of work described Section C, Statement of Work, during the contract period, the Government will procure said services on Task Orders under this contract on a per Job basis.

7. To clarify FAR Clause 52.216-18, ORDERING the following will apply:

(a) Services for each task order may be requested either verbally or in writing. A letter request for proposal will be issued by the Contracting Officer. Oral or telecommunications requests will be issued only by the Contracting Officer.

(b) The Government request for proposal will delineate (1) General Scope of Work, (2) Location of Work, (3) Character and Extent of Services, (4) Technical Requirements with supplemental or complement those contained in Section C of this basic contract, and (5) time period(s) within which the work must be performed.

(c) The Contractor will prepare an estimate of his time and cost(s) to perform the work, and submit his proposal in writing to the Contracting Officer within the time specified. Verbal proposals, when so requested and authorized, will be directed only to the Contracting Officer.

Itemized cost proposals will strictly correspond to the units contained in Section B of this contract.

(d) Each task order will be discussed by the Contractor and the Contracting Officer’s Representative, as necessary, to develop a mutual understanding of:

(1) Type and scope of work to be accomplished, including accuracy criteria.

(2) End product required by the Contracting Officer.

(3) Commencement and completion dates required by the Contracting Officer.

(4) Existing site conditions, survey control, and other available data.

(5) A fair and reasonable cost to perform the work.

(e) Time periods within which required work must be accomplished will be defined in each task order placed against the basic contract. Each task order will contain the agreed to scope of work, type(s) of service(s) to be performed, specific deliverable items, and the negotiated fixed-price cost for performing the work.

8. The Contractor will not accept instructions issued by any person employed by the U.S.

Government or otherwise, other than the Contracting Officer, or the Authorized Representative of the Contracting Officer acting within the limits of his authority.

9. The Contractor will assign a member or employee who will act as Project Manager during the course of this contract (or during the course of a task order if this is an indefinite task order contract). This official will be responsible for affording liaison between the contract forces and the Contracting Officer. This designation will be in writing and a copy furnished to the Contracting Officer.

10. Accounting and appropriation data will be established at the time of award for each task order.

11. Payments will be made on the Contractor’s estimate of work accomplished upon submission of Engineer Form 93, “Payment Estimate-Contract Performance.” No partial payment will be made for task orders of less than 30 calendar day’s duration. Each task order will include payment information.

12. Annual Escalation Rates for Hourly Labor Rates as Shown in Table 3 below:

Table 3 – Annual Escalation Rates

Base Year

Option Period 1/ Year 4

Option Period 1/ Year 5

Total Labor (Home Office)

Annual Escalation % % % %

Total Labor (Field Labor)

Annual Escalation % % % %

Note-Annual escalation rates will not be in addition to fully burdened rates provided in

Tables 1 and 2.

13. ODCs and Sub-contractor costs shall be paid at negotiated cost on a task order basis, plus the prime contractor’s pre-established markups identified below (Markup Rates Table to be included below the Annual Escalation Rates in the Cost/Price Proposal):

Markup Rates Table

Markup Item Markup Rate (%)

G&A on Other Direct Costs (ODCs)

Sub-contractor Markup (if applicable)*

*Only the awarded sub-contractor markup rate will be allowed on sub-contractor cost, no additional profit or other markup (i.e. G&A) shall be applied.

14.0 Department of Labor Wage Rates. For individual task orders written against the contract, the appropriate Department of Labor Wage Determination will be provided.

DISCIPLINE RATE SCHEDULE

HOME OFFICE RATES

TABLE 1

Three year base period and one two-year option period.

Labor Rate (in $/hr, fully burdened, without profit)

Item No

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

1 Program Manager** $ $ $ $ $ $

2 Project Manager, Senior** $ $ $ $ $ $

3 Project Manager, Staff $ $ $ $ $ $

4 Archeologist, Senior** $ $ $ $ $ $

5 Archeologist, Staff $ $ $ $ $ $

6 Archeologist, Junior $ $ $ $ $ $

7 Archeologist Crew Chief $ $ $ $ $ $

8 Archeologist Tech I $ $ $ $ $ $

9 Archeologist Tech II $ $ $ $ $ $

10 Archeologist Tech III $ $ $ $ $ $

11 Archeology Laboratory Technician, Senior

12 Archeology Laboratory Technician, Staff

13 Biologist, Senior** $ $ $ $ $ $

14 Biologist, Staff $ $ $ $ $ $

15 Biologist, Junior $ $ $ $ $ $

16 Ecologist, Senior $ $ $ $ $ $

17 Ecologist, Staff $ $ $ $ $ $

18 Ecologist, Junior $ $ $ $ $ $

19 Outdoor Recreation Planner, Senior

20 Outdoor Recreation Planner, Staff

21 Outdoor Recreation Planner, Junior

22 Historical Architect, Senior

23 Historical Architect, Staff $ $ $ $ $ $

24 Historic Architect, Junior $ $ $ $ $ $

25 Historical Resources Technician, Senior

Item No

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

26 Historical Resources Technician, Staff

27 NEPA Manager** $ $ $ $ $ $

28 Natural Resource Compliance Specialist (NEPA-NEPA Support)

29 Cultural Resources Compliance Specialist (NEPA-NEPA Support)

30 Noise Specialist (NEPA- NEPA Support)

31 Airspace Specialist (NEPA- NEPA Support)

32 Biological Tech I $ $ $ $ $ $

33 Biological Tech II $ $ $ $ $ $

34 Biological Tech III $ $ $ $ $ $

35 Environmental Engineer, Senior**

36 Environmental Engineer, Staff

37 Environmental Engineer, Junior

38 Chemist, Senior $ $ $ $ $ $

39 Chemist, Staff $ $ $ $ $ $

40 Chemist, Junior $ $ $ $ $ $

41 Geologist, Senior $ $ $ $ $ $

42 Geologist, Staff $ $ $ $ $ $

43 Geologist, Junior $ $ $ $ $ $

44 OHSA Specialist $ $ $ $ $ $

45 Environmental Assistant, Senior

46 Environmental Assistant, Staff

47 Environmental Assistant, Jr. $ $ $ $ $ $

48 Environmental Specialist, Senior

49 Environmental Specialist, Staff

50 Environmental Specialist, Jr.

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

51 Hazardous Waste Specialist, Senior

52 Hazardous Waste Specialist, Staff

53 Hazardous Waste Specialist, Junior

54 Recycling Program Manager

55 Environmental Trainer, Sr. $ $ $ $ $ $

56 Environmental Trainer, Staff

57 Environmental Trainer, Jr. $ $ $ $ $ $

58 CADD/GIS/Remote Sensing Specialist, Senior**

59 CADD/GIS/Remote Sensing Specialist, Staff

60 CADD/GIS/Remote Sensing Specialist, Junior

61 Information Technologist, Senior

62 Information Technologist, Staff

63 Information Technologist, Junior

64 Hydraulic/Hydrologic Engineer, Senior

65 Hydraulic/Hydrologic Engineer, Staff

66 Hydraulic/Hydrologic Engineer, Junior

67 Archivist/Librarian, Senior $ $ $ $ $ $

68 Archivist/Librarian, Staff $ $ $ $ $ $

69 Archivist/Librarian, Junior $ $ $ $ $ $

70 Civil Engineer, Senior $ $ $ $ $ $

71 Civil Engineer, Staff $ $ $ $ $ $

72 Civil Engineer, Junior $ $ $ $ $ $

73 Economist/Cost Analyst (NEPA/NEPA Support)

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

74 Environmental Tech I $ $ $ $ $ $

75 Environmental Tech II $ $ $ $ $ $

76 Environmental Tech III $ $ $ $ $ $

77 Industrial Hygienist, Senior $ $ $ $ $ $

78 Industrial Hygienist, Staff $ $ $ $ $ $

79 Industrial Hygienist, Junior $ $ $ $ $ $

80 Preservation Planner, Sr. $ $ $ $ $ $

81 Preservation Planner, Staff $ $ $ $ $ $

82 Preservation Planner, Jr. $ $ $ $ $ $

83 Editor $ $ $ $ $ $

84 Administrative Support, Senior

85 Administrative Support, Staff

86 Administrative Support, Junior

87 Public Affairs/Communication Specialists, Senior

88 Public Affairs/Communication Specialists, Staff

89 Public Affairs/Communication Specialists, Junior

90 Risk Assessor, Senior $ $ $ $ $ $

91 Risk Assessor, Staff $ $ $ $ $ $

92 Risk Assessor, Junior $ $ $ $ $ $

93 Cost Estimator/Engineer $ $ $ $ $ $

DISCIPLINE RATE SCHEDULE

FIELD RATES

TABLE 2

Three year base period and one two-year option period.

Labor Rate (in $/hr, fully burdened, without profit)

Item No

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

1 Program Manager** $ $ $ $ $ $

2 Project Manager, Senior** $ $ $ $ $ $

3 Project Manager, Staff $ $ $ $ $ $

4 Archeologist, Senior** $ $ $ $ $ $

5 Archeologist, Staff $ $ $ $ $ $

6 Archeologist, Junior $ $ $ $ $ $

7 Archeologist Crew Chief $ $ $ $ $ $

8 Archeologist Tech I $ $ $ $ $ $

9 Archeologist Tech II $ $ $ $ $ $

10 Archeologist Tech III $ $ $ $ $ $

11 Archeology Laboratory Technician, Senior

12 Archeology Laboratory Technician, Staff

13 Biologist, Senior** $ $ $ $ $ $

14 Biologist, Staff $ $ $ $ $ $

15 Biologist, Junior $ $ $ $ $ $

16 Ecologist, Senior $ $ $ $ $ $

17 Ecologist, Staff $ $ $ $ $ $

18 Ecologist, Junior $ $ $ $ $ $

19 Outdoor Recreation Planner, Senior

20 Outdoor Recreation Planner, Staff

21 Outdoor Recreation Planner, Junior

22 Historical Architect, Senior

23 Historical Architect, Staff $ $ $ $ $ $

24 Historic Architect, Junior $ $ $ $ $ $

25 Historical Resources Technician, Senior

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

26 Historical Resources Technician, Staff

27 NEPA Manager** $ $ $ $ $ $

28 Natural Resource Compliance Specialist (NEPA-NEPA Support)

29 Cultural Resources Compliance Specialist (NEPA-NEPA Support)

30 Noise Specialist (NEPA- NEPA Support)

31 Airspace Specialist (NEPA- NEPA Support)

32 Biological Tech I $ $ $ $ $ $

33 Biological Tech II $ $ $ $ $ $

34 Biological Tech III $ $ $ $ $ $

35 Environmental Engineer, Senior**

36 Environmental Engineer, Staff

37 Environmental Engineer, Junior

38 Chemist, Senior $ $ $ $ $ $

39 Chemist, Staff $ $ $ $ $ $

40 Chemist, Junior $ $ $ $ $ $

41 Geologist, Senior $ $ $ $ $ $

42 Geologist, Staff $ $ $ $ $ $

43 Geologist, Junior $ $ $ $ $ $

44 OHSA Specialist $ $ $ $ $ $

45 Environmental Assistant, Senior

46 Environmental Assistant, Staff

47 Environmental Assistant, Jr. $ $ $ $ $ $

48 Environmental Specialist, Senior

49 Environmental Specialist, Staff

50 Environmental Specialist, Jr.

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

51 Hazardous Waste Specialist, Senior

52 Hazardous Waste Specialist, Staff

53 Hazardous Waste Specialist, Junior

54 Recycling Program Manager

55 Environmental Trainer, Sr. $ $ $ $ $ $

56 Environmental Trainer, Staff

57 Environmental Trainer, Jr. $ $ $ $ $ $

58 CADD/GIS/Remote Sensing Specialist, Senior**

59 CADD/GIS/Remote Sensing Specialist, Staff

60 CADD/GIS/Remote Sensing Specialist, Junior

61 Information Technologist, Senior

62 Information Technologist, Staff

63 Information Technologist, Junior

64 Hydraulic/Hydrologic Engineer, Senior

65 Hydraulic/Hydrologic Engineer, Staff

66 Hydraulic/Hydrologic Engineer, Junior

67 Archivist/Librarian, Senior $ $ $ $ $ $

68 Archivist/Librarian, Staff $ $ $ $ $ $

69 Archivist/Librarian, Junior $ $ $ $ $ $

70 Civil Engineer, Senior $ $ $ $ $ $

71 Civil Engineer, Staff $ $ $ $ $ $

72 Civil Engineer, Junior $ $ $ $ $ $

73 Economist/Cost Analyst (NEPA/NEPA Support)

Discipline Base

Period Year 1

Base Period Year 2

Base Period Year 3

Option Period 1 Year 4

Option Period 1 Year 5

Additional Six Months (52.217-8)

74 Environmental Tech I $ $ $ $ $ $

75 Environmental Tech II $ $ $ $ $ $

76 Environmental Tech III $ $ $ $ $ $

77 Industrial Hygienist, Senior $ $ $ $ $ $

78 Industrial Hygienist, Staff $ $ $ $ $ $

79 Industrial Hygienist, Junior $ $ $ $ $ $

80 Preservation Planner, Sr. $ $ $ $ $ $

81 Preservation Planner, Staff $ $ $ $ $ $

82 Preservation Planner, Jr. $ $ $ $ $ $

83 Editor $ $ $ $ $ $

84 Administrative Support, Senior

85 Administrative Support, Staff

86 Administrative Support, Junior

87 Public Affairs/Communication Specialists, Senior

88 Public Affairs/Communication Specialists, Staff

89 Public Affairs/Communication Specialists, Junior

90 Risk Assessor, Senior $ $ $ $ $ $

91 Risk Assessor, Staff $ $ $ $ $ $

92 Risk Assessor, Junior $ $ $ $ $ $

93 Cost Estimator/Engineer $ $ $ $ $ $

** Denotes Key Personnel (both tables): Resumes required

NOTES (applicable to both tables):

1. Offerors are to submit their labor rates for each of the ordering periods at the time of proposal submission. Offerors shall assume that Section B rates should be established based on 120 to 180 days from the proposal due date.

2. The offeror shall complete only one Table 1 and Table 2. For each labor discipline, the offeror shall annotate whether the discipline provided is Prime or Subcontractor.

Each table shall show one rate per labor discipline, including those provided by subcontractors. The offeror may not have all personnel on staff. Therefore, if those personnel are subcontracted, their rates shall be provided in the tables as well. All contracted personnel shall be identified on the tables following “(SUB)” after the title of this discipline title. For example, “Cultural Resources Compliance Specialist (SUB)”. The rates shown per labor discipline shall be fully burdened rates, exclusive of profit.

NOTE: If during the Contract Period of Performance, the Contractor’s original subcontracted personnel are no longer available to the Prime, the Prime shall find a subcontractor that has at a minimum, the same qualifications as the previous subcontracted personnel. The Prime shall be responsible for negotiating the labor rates for those personnel that have been provided in this RFP. Those rates provided are the maximum that will be paid by the Government for any replacement personnel.

3. See Sections L and M for complete discussion of the content of the Cost/Price

Proposal and its evaluation. The Pricing Schedule is only one part of the contents of the required Cost/Price Proposal.

4. Subcontractors: The subcontractors who will be included by the prime in the Pricing

Schedule and in the full cost/price proposal are those identified by the prime contractor as “team subcontractors”. Team subcontractors are subcontractors that the prime used in their proposal to the Government to qualify for this contact and/or are subcontractors that the prime wishes to use during the life of the contract without having to obtain competition.

5. The job titles and classifications noted in the Pricing Schedule at the solicitation phase are the Government’s anticipated job titles and classifications to be used over the life of the contract. All offerors must include and price all of these job titles and classifications, whether through the use of personnel from the prime’s firm or through subcontractors. In other words, the prime contractor must submit completely filled out Tables 1 and 2 (no blanks) and identify any job title and price by a team subcontractor. Offerors shall not modify by adding to or deleting from the Government’s list of anticipated job titles and classifications for both prime and subcontractor(s). If the offeror has a job title and/or classification that is equivalent to one on the Government’s list, they can price that job title using the Government job title and/or classification as a substitute.

6. The Government has shown the job classifications within job titles as Senior, Staff, and Junior levels. The following definitions apply to the use of these classifications:

o Senior Level of the Profession: Job technical and oversight management with some review function.

o Staff Level of the Profession: Hands-on work effort; responsible for most of the work on a task order.

o Junior Level of the Profession: Relatively new to the profession; still in an apprenticeship, not fully credentialed; works under the supervision of a staff or senior level person.

7. The Offeror and its subcontractors cannot separate the job titles into different classifications other than the Senior, Staff, and Junior scheme. Offeror can define their scheme and give definitions of the levels in their proposal. As stated above, Offerors will not use job titles that will not charge directly to task order work and use of a job title and/or classification not included in the Government’s list will be negotiated on a task order basis.

8. The requirement for any other direct labor cost not included in the Government’s list will be negotiated on a task order basis. As stated above the unit prices entered into the Pricing Schedule will be “fully burdened” as defined above. Please note that equipment, material, supply, travel and laboratory costs will be handled as noted below.

9. All Other Direct Costs (ODCs) including but not limited to reproduction, mailing/shipping, equipment, material and supply direct costs will be negotiated as required on each Task Order and not pre-priced or listed on the Pricing Schedule.

The Contractor shall present the Government, as part of each task order’s cost proposal, the equipment, material and supply costs for the task order with support for the proposed costs which indicate that they are fair and reasonable. The Contractor shall present the Government, with the task order’s cost proposal, with at least two quotes on required equipment, materials, and supplies obtained from subcontractors by the Prime Contractor to support the Contractor’s proposed costs. The Contractor will be allowed to apply the pre-negotiated G&A on ODCs Markup and profit as negotiated on each task order to equipment, material and supply costs.

10. Per Diem (lodging and MI & E expenses) shall be paid at the current Government rates in accordance with the Joint Travel Regulations (JTR) per person per calendar day spent in travel status. No per diem will be paid for travel less than the number of hours per day stated in the current JTR. Per diem rate information may be obtained at https://secureapp2.hqda.pentagon.mil/perdiem/. Actual cost of transportation by public conveyance (plane, limited to coach class) shall be paid. Privately owned vehicles shall be paid at the current Government mileage rate in accordance with the JTR. If required by a task order under this contract, cost for travel, lodging, meals, vehicle rental, and mileage are allowable subject to the limitations of FAR 31.205-46. These costs will be negotiated on each task order. The contractor is not allowed to apply indirect costs (G&A) to travel costs.

11. Any labor classification rates or other direct costs for the prime or subcontractors that are needed during the life of the contract but were not included in the Pricing Schedule will be negotiated on the task order and added by modification to the contract as necessary. However, the fully burdened hourly labor rates entered on the Pricing Schedule and thereby, proposed by the Contractor will be the contract’s rates and prices for the period for which they are proposed (base contract period) and will not be renegotiated during that period.

12. Task Orders: Services will be ordered by the Government in accordance with Section I, Contract Clause entitled “Ordering”. All services shall be charged at unit prices or lower set forth in this Section B, Supplies or Services and Prices. There is no guarantee of work beyond the $2,500.00 Guaranteed Minimum on the base year of this contract.

Exercising the option period on this contract is at the convenience of the Government and is NOT guaranteed.

13. Sub-contractor Mark-up, identified previously prior to Table 1, is a fixed percentage that is lower than the Prime’s negotiated profit and applied by the Prime on a Task order basis to sub-contracted costs. Neither the prime’s profit nor G&A is included in this percentage. The Prime’s profit is negotiated on a Task Order basis and applied only to costs incurred by the Prime. The negotiated profit shall not be applied to sub-contracted costs in addition to the Sub-contractor mark-up.

14. Allowable markups on a Task Order basis:

Profit will be allowable on:

o Total fully burdened labor cost o Other Direct Costs (ODCs)

G&A on ODCs Markup o This percentage is the Prime’s Overhead (OH) or G&A (pre-negotiated, see paragraph 13 above) Sub-contractor Markup o This percentage is the Prime’s markup on sub-contractor’s costs in lieu of profit (pre-negotiated, see paragraph 13 above)

15. Non-allowable markups on a Task Order basis:

Profit cannot be applied to travel costs Profit cannot be applied to sub-contractor costs. The sub-contractor markup in

Section 13 above is applied in lieu of profit.

G&A (or OH) cannot be applied to travel costs. The Prime must include an adequate number of hours for Administrative labor disciplines for scheduling travel and paying travel invoices.

G&A (or OH) cannot be applied to sub-contractor costs. The Prime must include an adequate number of hours for Administrative labor disciplines to source, compete, schedule and pay sub-contractors.

Section C - Descriptions and Specifications

STATEMENT OF WORK

Section C

Statement of Work

Multiple Environmental Government Acquisition (MEGA) Hubzone

Indefinite Delivery Contract (IDC) Multiple Award Task Order Contract (MATOC)

For Environmental Consulting Services (ECS) Projects

Within the Southwestern Division (SWD) Boundaries And As Assigned in Accordance with UAI 5107.102-100 and ER 5-1-10

Solicitation # W912BV20R0028

Contract # TBD

6 November 2019

1.0 INTRODUCTION

1.1 PURPOSE

The purpose of this contract is to provide a full range of environmental and related services, including on-site support services for projects assigned to the Southwestern Division (SWD) Regional Planning and Environmental Center (RPEC) and projects assigned to the Southwestern Division (within the Continental United States), U.S. Army Corps of Engineers (USACE) as approved in accordance with UAI 5107.102-100 and ER 5-1-10. Work to be performed under this contract may include, but not necessarily be limited to, environmental quality and compliance, environmental engineering and technical support, environmental management system support, environmental analysis, environmental program management support, environmental sampling of various media, laboratory testing, environmental and occupational safety and health compliance audits and training, environmental assessments, environmental data inventories, hazardous and regulated waste handling, management, and recycling, permit applications, community involvement, environmental services, environmental investigation, natural resources conservation support, cultural resources support, and other scientific and technological investigations to accomplish the mission. Wage Determinations will be incorporated with each task order, if required.

1.2 APPLICABLE WORK LOCATIONS

This contract is meant to satisfy requirements primarily within the SWD area of responsibility.

However, contract capacity may be shared with other CONUS geographic districts where the principles of the Project Management Business Process and ER-1-10 have been met. The geographic territory for this contract will include the geographic boundaries of the Southwestern Division (SWD) and projects assigned to SWD including any of a variety of military installations, Federal agencies, and civil work entities where the USACE is otherwise authorized to respond. The Contractor shall provide environmental support as requested in the task orders (TOs) issued under this contract. This contract requires the Contractor to perform all work necessary to complete simultaneously executed TOs.

It is noted that the term “installation” is generically used within this Statement of Work to refer to any potential location, agency, or facility as discussed above, that a TO may be awarded to/for under this contract. The Contractor may be required to perform tasks on-site or at their own facilities.

1.3 TECHNICAL REQUIREMENTS

The general technical requirements specified in this statement of work are intended to provide requirements for execution of the contract and an overall understanding of the functions that the Contractor may be required to perform. Specific services required under this contract shall be described in detail within individual scopes of work for each TO. The USACE will prepare the specific Performance Work Statement (PWS) for each TO. However, the Contractor may be required to provide input to support the planning, scheduling, and formulation of the USACE's PWS. Individual TOs will contain additional detailed requirements and/or plans and specifications for each specific project. The Contractor may also receive available data and work products from past environmental activities performed by other Contractors and/or government personnel.

1.4 GENERAL REQUIREMENTS

The Contractor is required to furnish all plant, labor, materials, and equipment to provide environmental services at project locations, unless otherwise directed by individual TOs. The Contractor's personnel shall comply with Occupational Safety and Health Administration (OSHA) requirements. The Contractor shall provide all support activities, described herein or in individual TOs, necessary to ensure the safe and effective accomplishment of project criteria within specified completion times. All work shall be performed in accordance with this contract, applicable Federal, State, and local installation regulations.

The Contractor shall be responsible for acquiring the latest version of applicable regulatory or agency guidance, including but not limited to, the referenced documents cited in this Section C of this Solicitation and/or subsequent TOs issued after award of the Contract, unless otherwise specified.

1.5 TASK ORDER REQUIREMENTS AND PERIOD OF PERFORMANCE

TOs will be issued as firm-fixed price (FFP) performance-based TOs. For performance based TOs, the Contractor shall be responsible for developing technical and management approaches that directly satisfy the government’s TO objectives, including working with and maintaining good working relationships with regulators on all aspects of their work. As will be detailed in specific TOs, the USACE and its customers will review and comment on all documents prior to their submission to the regulatory agencies.

Any TO issued during the ordering period of this contract and not completed prior to the end of the ordering period shall be completed by the Contractor within the time specified in the TO.

The Contract shall govern the Contractor's and Government's rights and obligations with respect to that TO's Period of Performance.

2.0 GENERAL CONTRACT INFORMATION

2.1 CONTRACT TYPE

This is an indefinite delivery contract to provide a full range of environmental and related services, including full time on-site support services for projects specified in individual TOs, and it is effective for a period of 5 years (three-year base and a two-year option) from the date of award of the contract, if the option is exercised.

2.2 DELIVERY

Delivery or performance shall be made only as authorized by TOs issued in accordance with each ordering clause. The Contractor shall furnish to the Government, when and if ordered, work for the items specified in individual TOs. There is no limit on the number or size of orders that may be issued, and the Government may issue concurrent orders requiring delivery to multiple destinations or performance at multiple locations.

2.3 COMMENCEMENT OF WORK

The Contractor shall be required to commence the work required by a TO at the time specified on the TO, execute the work, and complete the entire project not later than the completion time specified on the TO.

2.4 PURPOSE

The express purpose of this contract is the provision of environmental services, including on-site support services. In order to accomplish this, through TOs, the Contractor shall maintain a management staff and system that ensures flexibility, effective communications, and the diversity of disciplines necessary to successfully execute complex, multi-faceted work. The Contractor shall maintain a staffing and program management system that will promote retention of institutional knowledge and continuity. The Contractor shall maintain a communication program that will apprise key personnel executing various TOs of any significant findings that may impact ongoing or planned environmental support activities.

2.5 REGULATORY COMPLIANCE AND GUIDANCE

The investigations, studies, and reports will pertain to the following, but not limited to: military activities; the planning, construction, operations and maintenance of the USACE Civil Works projects; activities in support of other Government agencies; and Federal and State regulatory compliance. These studies and reports will be carried out in full accordance with the requirements of the following (but not limited to) acts, laws, and/or statutes, as applicable:

- American Antiquity Style Guide

- Archeological and Historic Preservation Act, as amended

- Archeological Resources Protection Act

- Asbestos Hazardous Emergency Response Act of 1986

- Bald Eagle Protection Act

- Clean Air Act, as amended

- Clean Water Act (CWA or Federal Water Pollution Control Act), as amended

- Coastal Zone Management Act of 1972, as amended

- Comprehensive Environmental Responsibility, Compensation and Liability Act

- Endangered Species Act of 1973, as amended

- Emergency Planning and Community Right-to-Know Act

- Estuary Protection Act of 1986, as amended

- Federal Water Project Recreation Act, as amended

- Federal Facilities Compliance Act

- Federal Insecticide, Fungicide, and Rodenticide Act

- Fish and Wildlife Conservation Act

- Military Lands Withdrawal Act

- National Environmental Policy Act (NEPA), as amended

- National Historic Preservation Act of 1966, as amended

- Native American Graves Protection and Repatriation Act

- Noise Control Act of 1972, as amended

- Ocean Dumping Act

- Occupational Safety and Health Act

- Oil Pollution Act

- Resource Conservation and Recovery Act

- Rivers and Harbors Act of 1899, as amended

- Safe Drinking Water Act

- Superfund Amendments and Reauthorization Act

- The Solid Waste Disposal Act

- Toxic Substances Control Act

- Watershed Protection and Flood Prevention Act, as amended

- Wetlands Conservation Act

- Wilderness Act

- Wild and Scenic Rivers Act, as amended

In addition to the above, there are Executive Orders, promulgated regulations, and implementing guidance documents including, but not limited to, the following: Executive Order 11593 (Protection and Enhancement of the Cultural Environment); Executive Order 11990 (Protection of Wetlands); Executive Order 13423 Strengthening Federal Environmental, Energy, and Transportation Management; Executive Order 13101 Greening of the Government Through Waste Prevention, Recycling, and Federal Acquisition; Executive Order (EO) 13693 Planning for Federal Sustainability in the next Decade; Air Force Instruction (AFI) 32-7061 "The Environmental Impact Analysis Process"; Engineering Regulation (ER) 200-2-2 "Procedures for Implementing NEPA"; Army Regulation (AR) 200-1 Environmental Protection and

Enhancement; AR 200-2 "Environmental Effects of Army Actions"; AR 200-3 Natural Resources - Land, Forest and Wildlife Management; AFI 32-7065 “Historic Preservation”; AR 200-4 "Historic Preservation"; International Organization for Standardization (ISO) 14001 Standard, EMSs – Requirements with guidance for use; CFR 28 Part 61, Procedures for Implementing the National Environmental Policy Act; ER 1102-2-100 Guidance for Conducting Civil Works Planning Studies; Technical Manual (TM) 5-803-12 Planning of Outdoor Recreation Areas; ER 1165-2-400 Water Resource Policies and Authorities; ER 1130-2-435 Preparation of Project Master Plans; EM 1110-1-400 Recreation Planning and Design Criteria;

ER 1130-2-438 Historic Preservation Program; ER 1130-2-400 Management of Natural Resources and Outdoor Recreation at Civil Works Water Resource Projects; Air Force Policy Directive (AFPD) 32-70 Environmental Quality, and AFI 32-7001 Environmental Management.

All contract work shall comply with the above, in addition to all applicable State and local statutes and regulations.

2.6 PROFESSIONAL REGISTRATION/CERTIFICATION AND REGULATED

PROCEDURES

In performing the work effort, the Contractor shall adhere to professional guidelines and procedures established or approved by applicable Federal, State, and local regulatory agencies.

All mid and senior level disciplines should have or be able to obtain appropriate certification or registration appropriate to their professional field of endeavor. If the Contractor is providing on-site support services, the Contractor may be required to provide suitably registered or certified personnel for applicable tasks in specific TOs.

In the performance of air and water quality testing, the Contractor shall utilize only collection, transportation, testing, recording, and sample disposal procedures approved by the Environmental Protection Agency, the applicable State agency involved, and local installation requirements, if any. The Contractor must obtain and maintain all transportation and chain of custody documentation and certifications required by the applicable State and Federal agencies.

Laboratories used (prime or subcontracted facilities) must obtain approval from the Contracting Officer (KO), COR, or a KO approved point of contact (POC) as designated within specific TOs.

2.7 CONTRACT AUTHORITY AND WORK DEVIATION

The Contractor shall thoroughly coordinate with the USACE KO or COR and other government agency representatives that are involved in the work effort. The USACE KO is the only responsible party for contractual matters; consequently, the Contractor shall not take any action relating to this contract at the direction of any other party. Any deviation from the established and approved PWS, including specific methods and techniques, must be proposed in writing by the Contractor and approved by the KO prior to implementation. Unapproved deviations shall not result in any additional cost to the Government. Primary contact for all technical matters will be established within each specific TO.

As outlined above, the Contractor shall not take any action relating to this contract at the direction of any other party, however all Contractors must comply with lawful orders issued by certain authorized officials. Examples of this would be, but not limited to, orders by an

Installation Commander to address emergency directions or a Safety Officer’s prerogative to issue stop work notices on-site. Various installations have industrial hygiene, security, and range control programs which have authority to “direct” that certain actions occur or not occur on the installation. Additionally, many installation policies and regulations directly apply to Contractors and all Contractor personnel. Specific circumstances that may apply at any particular installation will be addressed prior to a TO commencement at each particular installation. If the Contractor receives any safety or security direction as outlined in this paragraph that will or potentially will impact TO execution and/or result in deviations that may have a cost impact, the Contractor must immediately notify the KO and COR.

2.8 SAFETY

2.8.1 The Contractor shall at all times conduct operations in a safe manner and in accordance with all applicable Federal, State, and local statutes and regulations as well as the USACE Safety and Health Requirements Manual (EM 385-1-1, latest version). Based on TO award, the Contractor will also comply with all applicable agency or installation/facility safety policies and requirements. The Contractor may be required to develop a health and safety management plan for any TO issued under this contract and to make such a plan available for inspection by the Government.

2.8.2 If an Unexploded Ordnance (UXO) Safety Specialist and/or UXO Technician are required to provide/perform surface and/or subsurface anomaly avoidance for any Task Order requirement, the Contractor's proposal must identify the appropriate labor disciplines, hourly rates, and levels of effort on their proposals. The applicable Wage Determination will be incorporated with each Task Order, if required.

3.0 SCOPE OF WORK

3.1 ENVIRONMENTAL STUDIES AND INVESTIGATIONS (GENERAL)

The Contractor may be required to execute and/or support a wide range of studies, evaluations, and field work activities under this contract that are common to one or more environmental programs. The actual degree of support, technical assistance, or administration of tasks associated with any particular study or evaluation will depend on specific TO requirements.

Studies and evaluations that may be required under this contract include, but are not limited to:

environmental investigation/site characterizations; environmental impact analyses and documentation; environmental baseline studies; air quality studies and evaluations;

historical/records searches; interviews; permit applications and modifications; public health evaluations; risk assessments; ecological assessments; environmental assessments; NEPA evaluations; wetland determinations; hydrological studies; preliminary hazardous/toxic/radiological studies (phase I and II preliminary site assessments, environmental due diligence audits, environmental baseline studies, etc.); preparation of spill prevention plans;

modeling; fate and transport analysis; treatability/compatibility studies; bioassay/toxicity studies;

regulatory permit preparation, documentation, and monitoring; facility and utility system design;

transfer of non-spatial and spatial data into Department of Defense (DoD) and US Army accepted databases; and regulatory/guidance determinations. The Contractor may be required to conduct other special economic, social, recreational, or general studies in support of ongoing environmental evaluations or water resources/installation planning.

The Contractor may be required to provide one or more full time on-site support staff to support the ongoing installation environmental compliance and other related environmental programs.

Multi-disciplinary professionals will provide the necessary support as directed by individual TOs.

The Contractor may be required to perform a wide array of field activities, field surveys, and site visits that may include, but are not limited to: drilling; analysis of environmental media to include, but not limited to soil, sediment, air, and various water sampling; sampling and testing of geotechnical materials; well installation; instrumentation installation; aquifer testing; borehole geophysics; excavation of test pits; geophysical surveying; support to engineering and remediation services; participation in public meetings; monitoring for process control; waste classification and handling; and waste disposal.

The Contractor shall field the appropriate qualified personnel for the specific environmental studies assigned. The Contractor shall prepare plans/work plans and meet all permits/certifications requirements consistent with Federal, State, and local regulatory agencies prior to performing various field investigations and activities.

Contract deliverables for investigations may include, but are not limited to: work plans and supporting plans/documents; pre-design reports (survey reports, strategy papers, and conceptual planning documents); technical findings reports; environmental design reports; detailed plans, specifications and permanent or temporary field installation reports; databases; and logs, maps, drawings, and sketches. Deliverables shall meet all State and Federal requirements for quality and technical expertise requirements, including any accreditation or registration requirements.

Data validation and analysis and interpretation of data will be performed as appropriate to accomplish the intent of individual TOs.

3.2 NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) STUDIES

The Contractor will provide technical support for NEPA requirements including, but not limited to: implementing natural and cultural resource programs; analyzing land use proposals and plans; attending and participating at NEPA report on-board reviews; preparing for, conducting and/or participation in public hearings/scoping meetings; conducting Public Affairs Programs for keeping the public informed of NEPA actions; synopsis of public comments; and provide recommendations for mitigation or avoidance measures.

The Contractor will provide technical support for preparation and/or distribution of NEPA documents to include, but not be limited to: Environmental Impact Statements (EIS's);

Supplemental Environmental Impact Statements (SEIS's); Programmatic EIS's; Environmental Assessments (EA's); Abbreviated EA's; Environmental Baseline Surveys (EBS's); records of Environmental Consideration (REC's);…