This document contains a pre-solicitation notice and request for information for an environmental consulting services contract opportunity with the U.S. Army Corps of Engineers Tulsa District. The notice seeks information for an upcoming solicitation for a firm-fixed-price indefinite delivery, multiple award task order contract with a maximum value of $20 million to be awarded as a HubZone set-aside. The contract will provide environmental consulting services for projects within the geographic boundaries of the USACE Southwestern Division and projects assigned to the Southwestern Division in accordance with regulatory guidance. Services will include areas such as environmental compliance, engineering, management, analysis, sampling, testing, audits, assessments, data, waste management, permitting, community involvement, investigations, and natural and cultural resources support. The solicitation is anticipated to award up to three contracts with a base period of three years and an option for two additional years. The solicitation and any amendments will be issued via beta.SAM.gov with a planned issue date of March 16, 2020 and proposal due date of April 16, 2020.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Hubzone Indefinite Delivery Contract (IDC) Multiple Aw ard Task Order Contract (MATOC) for Environmental Consulting Services for Projects w ithin the Geographic Boundaries of the Southw estern Division (SWD) and Projects assigned to the Southw estern Division in accordance w ith UAI 5107.102-100 and ER 5-1-10.
1. This Amendment is being issued to change the proposal due date from 11 September 2020 to 10 August 2020 and replace Section L, Instructions to Offerors to correct the due date listed in Paragraph 2.5.3 and correct the Solicitation Number listed in Attachment L-3.
2. The Point of Contact for this action is Richard Van De Linde, 918-669-7544.
1. CONTRACT ID CODE PAGE OF PAGES
1 30
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV20R0028
X 9B. DATED (SEE ITEM 11)
12-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-May-2020
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV20R0028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 11-Sep-2020 02:00 PM to 10-Aug-2020 02:00 PM.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
Section L
Instructions, Conditions and Notices to Contractor
Multiple Environmental Government Acquisition (MEGA) Hubzone
Indefinite Delivery Contract (IDC) Multiple Award Task Order Contract (MATOC)
For Environmental Consulting Services (ECS) Projects
Within the Southwestern Division (SWD) Boundaries And As Assigned in Accordance with UAI 5107.102-100 and ER 5-1-10
Amendment #0001
17 April 2020 19 May 2020
INSTRUCTION TO OFFERORS
1.0 GENERAL INFORMATION
1.1. The U.S. Army Corps of Engineers, Tulsa District, intends to award a $20,000,000 Firm Fixed Price (FFP) Indefinite Delivery Contract (IDC) Multiple Award Task Order Contract (MATOC) for Environmental Consulting Services for Projects assigned to the Regional Planning and Environmental Center (RPEC) within the geographic boundaries of the Southwestern Division (SWD) and projects assigned to SWD in accordance with UAI 5107.102-100 and ER 5- 1-10 using a competitive, “best value” trade-off source selection process. From this solicitation, up to three (3) Firm Fixed Price, IDCs as part of a MATOC under the Multiple Environmental Government Acquisition (MEGA) may be awarded to the Offerors submitting proposals determined to be most advantageous to the Government, price, and other factors considered. The intent is to award up to three (3) Indefinite Delivery Contracts (IDCs); however, if the Source Selection Authority (SSA) determines during the source selection process that fewer or more than that number of contracts shall be awarded, the SSA has the discretion of adjusting that number (higher or lower), or awarding none at all. In any case, the Government may not award any contract if the resulting contract would not represent a "best value" to the Government using trade-off selection procedures as required by the Defense Federal Acquisition Regulations (DFARS). The resulting FFP contracts will be awarded in accordance with FAR Part 15 and applicable supplements, guidance, and instructions. All Evaluation Factors other than cost or price, when combined, are significantly more important than cost or price. It is strongly suggested that the provisions stated in the proposal information be fully studied prior to assembly of the proposal.
1.2. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation Factors. The Offeror shall submit in their proposal all information specified in this section of the RFP solicitation at or before the exact time specified. There will be no public opening of the proposals received as a result of this solicitation. Failure to meet a requirement may result in an offer being ineligible for award.
1.3. North American Industry Classification System (NAICS) code and small business size standard. The NAICS code for this acquisition is 541620 (Environmental Consulting Services) with a small business size standard of $16,500,000.00.
1.4. If an Offeror believes that any element of the RFP is unclear or inconsistent, the Offeror is encouraged to submit an inquiry to the Bidders Inquiry System identifying their concern.
Instruction for the Bidders Inquiry System and the deadline for submission of any inquiries will be provided via the document entitled: Inquiries-Offerors Questions and Comments use of Bidders Inquiry in the RFP.
1.5. If the Contractor believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the Contractor shall immediately notify the Contracting Officer or Contract Specialist in writing (email is the preferred method) with supporting rationale. The Contractor is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussions.
1.6. The Contracting Officer (KO) and Contract Specialist are the sole points of contact for this acquisition. Address any questions or concerns you may have, that are not appropriate for Bidders Inquiry, to the Contract Specialist who will then communicate the concerns with the KO.
Written concerns shall be sent to the e-mail address below. The Contract Specialist for this acquisition is as follows:
Contract Specialists: Mr. Richard Van De Linde U.S. Army Corps of Engineers, Tulsa District 2488 E. 81st Street, Suite 1600 Tulsa, OK 74137 Phone: 918-669-7544
E-mail: Richard.VanDeLindelii@usace.army.mil
Contracting Officer: Mr. Robert E. “Woody” Reed E-mail: Robert.E.Reed@usace.army.mil
1.7. Debriefings
The KO will notify Offerors excluded from the competitive range or otherwise excluded from the competition before award, if a competitive range is established. Upon such notice, the Offeror may request a debriefing in accordance with FAR 15.505. Offerors may request a pre-award debriefing or delay its debriefing until after award provided such a request is submitted in compliance with FAR 15.505. However, it shall be noted that the Offeror will receive no more than one debriefing for this acquisition.
The Contracting Officer will notify all Offerors in the competitive range, if a competitive range is established, of the source selection decision. Upon such notification, the Offerors may request a post-award debriefing in accordance with FAR 15.506.
1.8. Oral Presentations
As part of the RFP, the government reserves the right to conduct oral presentations, if necessary.
1.9. Communications
Exchanges of information between the Government and Offerors will be controlled by the KO.
1.10. Cover Letter
Each Offeror shall include a Cover Letter in Volume I that identifies: the name, title telephone number and email address of the company/division point of contact (POC) regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the government with respect to this procurement and provide their names, titles, telephone numbers, and email addresses.
1.11. Proposal Incorporated into Contract Award
The successful Offeror’s proposal, in its entirety, will be deemed incorporated into any resultant contract award and, thereby, part of the contract. This includes the Offeror’s response to clarifications or revisions made to any Volume, including Final Proposal Revisions resulting from discussions, during the evaluation and selection process.
2.0. SPECIFIC INSTRUCTIONS – ORGANIZATION/PROPOSAL SUBMISSION/PAGE
LIMITS
2.1. This Request for Proposal (RFP) does not commit the Government to any costs incurred in the preparation and submission of a proposal or for any other costs incurred by your firm submitting a proposal in response to this solicitation. Note specifically that the Contractor will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this Request for Proposal does not constitute an award commitment on the part of the Government.
2.2. The Government reserves the right to discuss aspects of proposals with Offerors in the competitive range, if one is determined to be necessary, upon completion of the evaluation, and to award a contract to other than the Offeror submitting the lowest priced offer. Offerors are advised that the Government may make award without discussions, clarifications, or any contact concerning the proposals received. Therefore, proposals shall be submitted on the most favorable terms from a price and technical standpoint. Do not assume that Offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.
2.3. Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments), if applicable. The penalty for making false statements is prescribed in 18 U.S.C. 1001.
2.4. Each Offeror shall submit a proposal that consists of two Volumes:
Volume I – Technical Proposal
Volume II – Cost/Price Proposal
2.4.1. Volume/Page Labeling and Preparation
Volumes I and II may not be submitted together within the same binding (separate volume submissions are required). Each Volume shall include, as a minimum, the following:
a. Volume number and Volume name on proposal cover (i.e. Volume I – Technical
Proposal).
b. The prime, consortium, or joint venture’s name, address, and a telephone number shall appear in the lower left corner of the proposal cover, title page and table of contents of any document/volume to be evaluated. Signature of the official that can bind the firm shall appear on the title page. Proposal volume cover format is at the Offeror’s discretion so long as the information required by this paragraph and subsequent paragraphs are met.
c. A Table of Contents, which provides a cross-reference of the Offeror’s proposal to the applicable sections of the solicitation.
d. List of tables/figures.
e. Volume number, section and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).
f. The Offeror shall ensure that a complete Volume I and Volume II is submitted, separately, as a .pdf document, each inclusive of all documents for the respective Volume.
Be sure to apply all appropriate markings, as applicable, including those prescribed in accordance with FAR 52.215-1(e), "Restriction on Disclosure and Use of Data."
2.5. Proposal Submission
HARD COPY PROPOSALS WILL NOT BE PERMITTED.
THE ONLY AUTHORIZED TRANSMISSION METHOD FOR SUBMITTING
PROPOSALS IN RESPONSE TO THIS SOLICITATION IS THROUGH THE DOD
SAFE WEBSITE AT: https://safe.apps.mil. NO OTHER TRANSMISSION METHODS
(EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE
ACCEPTED.
Proposal submissions shall be uploaded to the DOD SAFE website by the identified date and time. In order to submit a proposal, the firm must submit a drop-off request for each transmission to Richard.VanDeLindelii@usace.army.mil. Once the drop off request is made, you will receive an email with a link to submit your drop-off. The drop-off request is valid for 14 days, at which time it will expire.
FIRMS ARE STRONGLY ENCOURAGED TO READ THE DOD SAFE WEBSITE
INSTRUCTIONS AND FAQS AND TO SUBMIT THEIR DROP OFF REQUEST AT
LEAST 10 DAYS IN ADVANCE OF THE SUBMITTAL DUE DATE.
2.5.1 Electronic File Submission Organization:
Offerors shall submit their proposals in response to this RFP via DOD SAFE in two (2) separate transmissions to the identified USACE receivers in paragraph 2.5.2 below.
a. The first transmission will consist of all electronic files relating to Volume 1 – Technical Proposal. Offerors shall ensure their company name is within the file name of each document transmitted. Both pdf and native file versions of documents shall be submitted (i.e., Word, MS Project, etc.).
b. The second transmission will consist of all electronic files relating to Volume 2 – Cost/Price. Offerors shall ensure their company name is within the file name of each document transmitted. Both pdf and native file versions of documents shall be submitted (i.e., Word, Excel, etc.)
All of the proposal files may be compressed (zipped) into one file entitled proposal zip using the latest version of WinZip or 7-Zip, or as separate uploads. The USACE utilizes Microsoft Office 2013. Ensure files are compatible and viewable in Microsoft Office 2013 format. Self-extracting exe files are not acceptable.
*NOTE: In accordance with FAR Subpart 4.8, "Government Contract Files," the government will retain one copy of all unsuccessful proposals.
2.5.2 DOD SAFE Website and Submission Receiver Information:
DOD SAFE site at: https://safe.apps.mil
Email addresses to enter as ‘Receivers’ in DOD SAFE:
Richard.VanDeLindelii@usace.army.mil and Robert.E.Reed@usace.army.mil
2.5.3 Proposal Submission Date/Time:
Proposals shall be received not later than 1500 hours (3:00 p.m.) Central Standard Time on xx 2020 10 August 2020.
(NOTE: Offerors are cautioned to allow sufficient time for their proposals’ files to upload, transmit and time stamp by DOD SAFE. Therefore, waiting until the last minute to attempt transmission of your proposal could result in your proposal being deemed late due to the website’s slow performance, etc.)
2.5.4 Receipt of Proposal
For the purposes of establishing whether a proposal is considered late, the government considers (the earlier of) the date and time of receipt of the DOD SAFE website email notification of the last proposal submission to the Contract Specialist and Contracting Officer, NOT the date and time of uploading of the proposal into the DOD SAFE website as the time of proposal submission.
For proposals larger than the 8GB capacity of the DOD SAFE website and require multiple submissions, the government will consider the date and time of receipt of the email notification to the Contract Specialist and Contracting Officer.
Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases. Per Federal Acquisition Regulation (FAR) 15.208 any proposal, modification, or revision, thereof that is received after the exact time specified for receipt of proposals is “late” and will not be considered.
The government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals.
Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
2.6. Page Format Restrictions and Limitations
2.6.1. Page Limitations
Page limitations shall include typewritten text pages, charts, graphs, figures, diagrams, schematics, etc., aside from those items specifically stated as exempt from the page count.
Outlines and other similar information documents shall be included as numbered pages - no exceptions. The total number of pages for the Volume I submittal shall not exceed fifty (50) pages. Compliance with page count limits shall be verified via the pdf version of the Volume I submission. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal. Page limitations shall also be placed on responses to Evaluation Notices (ENs) if issued. The specified page limits for EN responses will be identified in the letters forwarded to the Offeror(s) if necessary.
2.6.2. Pages Counted
Each page shall be counted except the following: cover pages, executive summary, table of contents, title page, list of tables/figures/acronyms, list of appendices, glossaries, separator tabs, dividers, blank pages, Past Performance Questionnaires, Resumes, Example Project’s Schedule and Volume II in its entirety.
NOTE: Proposals that exceed fifty (50) pages will have only those pages that are within the page count limits evaluated. All information appearing thereafter will not be evaluated.
2.6.3. Page Size
Unless otherwise stated, a “page” is defined as being one (1) 8.5” x 11” sheet of paper. Pages shall be typewritten except for the reproduced sections of the solicitation document and the font size shall be no less than 10 point and fully legible. A smaller font size (minimum of 8 point and fully legible) may be used on charts, graphs, figures, diagrams, and schematics to accommodate a “make to fit” software capability; however, all text shall be legible and easily read by a reasonable person. Margins on all four edges of each sheet will be at least one inch. Proprietary statements, security markings, and page numbers can fall within the defined margin area. Pages shall be numbered sequentially by volume. These page format restrictions shall apply to responses to EN responses (if required), as well as to the initial proposal.
2.6.4. Indexing
Each Volume shall contain a more detailed table of contents to delineate the subparagraphs within that Volume. Tab indexing shall be used to identify sections.
2.6.5. Larger Pages
Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible and shall not exceed 11” x 17” in size. Each page up to and including 11” x 17” will count as one (1) page. For tables, charts, graphs and figures, the font shall be no smaller than 8 point and fully legible; font style utilized is the Offeror’s choice; however, all text shall be legible and easily read by a reasonable person. All information (except documentation identification, solicitation number, and page numbers) shall be contained within an image area of 9 x 15½ inches of each page.
2.7. Proposal Format
The Offeror’s proposal shall be assembled (electronically) in the format shown below in Table 1 below.
TABLE 1
PROPOSAL FORMAT
Volume Tab Title Maximum # of Pages
I
VOLUME I – TECHNICAL PROPOSAL
NA Cover Letter
Factor 1 – Past Experience
50 page count total limit (cover letter/executive summary and PPQs excluded from page count)
Factor 2 – Management Approach and Key Personnel
Factor 3 – Example Project Technical Approach (including Attachment L-1, Milestone Payment Schedule without Cost)
Factor 4 – Past Performance
II
VOLUME II – COST/PRICE PROPOSAL
Factor 5 – Section B, Pricing Schedules (Tables 1 and 2, Annual Escalation Rates Table 3, and Markups)
No Limit
Factor 6 – Example Project Cost/Price Proposal (including Attachment L-2, Milestone Pricing Schedule with Cost)
SF 33 - Solicitation, Offer, and Award (Section A) and Amendments (if applicable)
DFARS 252.209-7999,
Representation by Corporation Certificate
Contractor Team Arrangements
3.0. VOLUME I, TECHNICAL PROPOSAL
3.1. Cover Letter/Executive Summary
Volume I of the proposal shall include a Cover Letter/Executive Summary which shall include the information identified in Section 1.10 as well as an Introduction to the proposal’s team. The Cover Letter/Executive Summary shall not exceed two (2) pages in length and will be excluded from the fifty (50) page limitation.
Proposals submitted in response to this solicitation shall consist of the contents required in the sub-paragraphs described below:
3.2. Tab 1, Volume I, Factor 1 – Past Experience
3.2.1. Past Experience will be evaluated based on the breath, depth, and relevance of the projects submitted by each Offeror; these submitted projects must demonstrate the Offeror’s Past Experience performing environmental compliance and environmental program work elements identified in the
Section C SOW of the solicitation. In evaluating experience, the complexity and innovativeness of the projects listed will be considered.
Each Offeror’s Past Experience will be evaluated based on the quality of each project narrative describing the work performed (i.e. how well the project’s scope is described), how relevant the work is to the Section C SOW, and the depth and breadth of each project’s scope (i.e. how many of the Section C SOW program areas and work elements within each program area are covered by the example project’s scope), and complexity.
The complexity of a submitted project and innovativeness of the Offeror’s technical approach to achieve the performance objectives or to overcome obstacles, either anticipated or unforeseen, will be considered if presented by the Offeror in the project’s narrative.
The description of each project shall indicate the Offeror’s role in the execution of that project (i.e.
prime or sub-contractor), as well as the specific work elements performed by the Offeror (reference the project information form below). References, to include name, address, telephone number and email address of the customer, shall be provided for each submitted project.
Confidential clients will not be accepted as references.
The Offeror shall submit no more or no less than ten (10) projects to demonstrate the organization's/team’s Past Experience, ensuring each project meets the relevance requirements to the Section C PWS of this RFP as well as the definition of a ‘project’ below. Projects not meeting the definition of a ‘project’ will not be considered in the evaluation of this factor.
3.2.2. Past Experience Project Criteria
Criteria for the Offeror’s Factor 1 – Past Experience:
a. Submit no more or no less than ten (10) projects to demonstrate the organization’s/team’s Past Experience;
b. At least five (5) of the submitted projects must be performed by the Offeror as the Prime;
c. Ensure each submitted project meets the relevance requirements to the Section C SOW of this RFP;
d. Ensure each submitted project meets the definition of a ‘project’, as defined below.
Submitted projects not meeting the definition of a ‘project’ will not be considered in the evaluation of offeror’s Past Experience.
e. Submitted projects shall be 100% completed, or at least 75% physically completed, not amount invoiced, and within the last 5 years prior to the proposal due date. 75% physically completed means at least 75% of the contractual requirements have been accomplished.
3.2.3. ‘Project’ Definition
A project is defined as:
In order to be deemed a ‘project’, it must meet one, and only one, of the following:
a. 1 single Task Order against an IDC (a “D” contract) covering work performed at one single site;
b. 1 single Task Order against an IDC (a “D” contract) covering work at multiple sites within one single installation or facility;
c. 1 single “C” type contract (not a “D” contract) covering work performed at one single site (the following also will qualify as a non-‘D’-type: a Cooperative Agreement or Grant; single BPA/BOA Call; single order against a GSA Schedule; or Purchase Order);
d. 1 single “C” type contract (not a “D” contract) covering work performed at multiple sites within one single installation or facility (the following also will qualify as a non- ‘D’-type: a Cooperative Agreement or Grant; single BPA/BOA Call; single order against a GSA Schedule; or Purchase Order);
e. 1 single Task Order against an IDC (a “D” contract) covering work performed at multiple but separate installations, meaning the installations are in different cities, states, etc.; OR
f. 1 single “C” type contract (not a “D” contract) covering work performed at multiple but separate installations, meaning the installations are in different cities, states, etc. (the following also will qualify as a non-‘D’-type: a Cooperative Agreement or Grant; single BPA/BOA Call; single order against a GSA Schedule; or Purchase Order)
3.2.4. Past Experience Project Narrative Requirements
Each submitted past experience project shall include the following information to adequately present previous relevant experience for evaluation:
a. Project #: Name of project and location (City and State, and military installation name, if applicable)
b. Contract Number, Task Order Number (if applicable)
c. Award Date, Original Completion Date, Actual Completion Date
d. Award Amount, Final Amount
e. Client POC, Address, Telephone Number, Email Address
f. Contract Contracting Officer Name, Address, Telephone Number, Email Address
g. A general narrative overview of the site including project description and use of any innovation or value engineering, as well as any major accomplishments.
h. Project performance issues: Describe any performance issues encountered. This could include cost/schedule, health and safety issues, regulatory/stakeholder issues and other performance issues, as well as what was implemented to overcome these issues and the results.
i. Regulatory Involvement. In order to evaluate the Offeror’s ability to create and maintain a cooperative working environment with State, US Environmental Protection Agency (USEPA) and/or other relevant regulatory bodies, the Offeror shall provide information that demonstrates experience with submitting accurate and timely reporting/regulatory submittals in accordance with regulatory requirements. Include, at a minimum:
Regulators Name, organization, and contact information Regulatory program (CERCLA, RCRA, UST program or other regulatory driver)
The Offeror shall include discussion of effective resolution of regulatory issues, expediting regulatory reviews and approvals, or other information demonstrating ability to work constructively with the regulatory community.
j. Section C Criteria: The Offeror shall provide information on the project as to the size, complexity, relevancy, and any distinctive and/or unique features. Additionally, the Offeror shall present project information that demonstrates their experience in the management and execution of specific elements of the work relevant to Section C SOW Program Areas, including Environmental Studies and Investigations (3.1), National Environmental Policy Act (NEPA) support (3.2), Natural Resources Support (3.3), Cultural Resources Support (3.4), Environmental Compliance Support (3.5), and Pollution Prevention Support (3.6).
The Offeror may include both federal and commercial work, however federal experience is preferred. The Offeror must indicate whether it was prime contractor or subcontractor on each project. If the Offeror was the prime contractor, the Offeror shall also describe its primary role/duties in execution of the work (i.e. the major components of the project which were completed by the prime’s staff and major components which were subcontracted). If the Offeror was a subcontractor, identify the total dollar amount and percentage of the total contract price of the work performed by the Offeror, as well as the total contract amount awarded to the prime. The Offeror shall provide specific information to demonstrate that it has relevant experience to all of the activities for this project.
3.2.5. Past Experience Project Template
Below is a template for past performance example project submission. The Offeror may use its own format, but must ensure that all identified information is presented.
Past Experience Project Information Summary
Project Name: Project Location- City:
State:
Installation Name (if applicable):
Contract Number:
Task Order Number (if applicable):
Was the project terminated early or were cure/show-cause letters issued?
Yes or No (if yes, explain)
Offeror’s Role: (Prime or Subcontractor) Percentage of total value of contract performed by the Offeror: (If the Offeror was the Prime, what percentage was subcontracted; if the Offeror was the subcontractor, what dollar amount and percentage of the total project amount, as well as the total contract amount, was awarded to the subcontractor?)
Contract Type: (ex. FFP, CPFF, CPAF, CPIF, etc.)
Percentage of work billed to date by Offeror:
Date of Award: Performance Based: Yes or No Initial Award Amount:
Final Contract Amount:
Original Completion Date:
Actual Completion Date (or ongoing, if applicable):
Amount added by modification(s):
Percentage the project is physically complete to date:
Explanation (reason) of any cost growth: Explanation of any late finish or time extensions:
Multiple interim schedule milestones/payment milestones? Y or N General Project Narrative:
Performance Issues Encountered:
Regulatory Involvement:
Applicable Section C SOW Criteria:
Major Project Accomplishments:
Client Contact Project’s Contracting Officer
Name:
Email:
Telephone:
Name:
Email:
Telephone:
3.3. Tab 2: Volume I, Factor 2 –Management Approach and Key Personnel The Offeror’s technical capabilities and management approach will be evaluated based on the qualifications of their proposed Key Personnel and management approach, which will include organization structure and overall management approach.
3.3.1. Management Approach, Tab 2a
The Offeror shall submit a Management Approach that clearly demonstrates their organizational approach for ongoing and successful project execution, including lines of authority for Key Personnel, and organizational relationships with any proposed subcontractors. Include whether you anticipate the use of your own resources totally, a joint venture, a teaming arrangement, or other subcontracting arrangements. Include names and addresses of team subcontractors as well as the contractual agreements and/or corporate commitments binding the firms to the contract. If these agreements are not in place, provide information on how they will be implemented. If these agreements are in place, provide a certified copy of the contractual agreement(s) in Volume II, Tab 5, which will not be included in the total page count. A certified copy is defined as a copy of a document or record, signed and certified as a true copy by the officer to whose custody the original is entrusted.
Organizational charts shall be presented demonstrating prime contractor and any team subcontractor roles and responsibilities. Personnel on the organization charts shall be identified by name, discipline, and firm office. The organizational charts shall clearly indicate reporting lines. Firms shall indicate the extent of their previous working relationship with any proposed subcontractors. In the event that the use of subcontractor(s) in a “team” approach is proposed, wherein the sub(s) will accomplish significant portions of a clearly identifiable scope of work on a consistent basis, a “team” relationship will be considered. In such instances, the prime shall clearly identify the limits of responsibility for each team subcontractor.
The Offeror shall provide a clear and concise overall management approach for this contract and how the work issued via task order(s) will be managed and controlled, and if the Offeror has multiple task orders performing work requirements concurrently how the Offeror will manage the concurrent work efforts to successfully meet the performance objectives within the identified period of performances. The Offeror shall describe the program management organization proposed as well as the project management procedures that shall be applied to ensure successful completion of specific work requirements. The organization description shall include any planning, recruiting, and staffing requirements for this contract as well as the project management procedures that shall be applied to ensure successful completion of site specific work requirements. The Offeror shall describe the responsibilities and authorities granted to key personnel in the organization and the ability to adapt to changing requirements and to be flexible, versatile and responsive to customer requirements. The Offeror shall address how field and/or on-site personnel will be supervised.
Indicate the depth and size of your organization/team. Provide data regarding locations of your home and branch offices and their personnel respective personnel resources. This data may be in summary form indicating numbers of home and branch office personnel by discipline or trade.
Indicate numbers of general personnel by discipline or trade that can be applied to this contract under normal circumstances or emergencies. Describe your technique for assuring efficient utilization and balance of all manpower, material and equipment. Discuss staffing plan to accommodate normal fluctuating workloads in order to maintain an experienced work force during periods of work buildup and decline, including working and managing multiple concurrent task orders. Demonstrate your firm’s ability to rapidly respond and mobilize to the geographical areas of coverage identified for this contract.
The Offeror shall provide a narrative of its corporate/team Quality Assurance/Quality Control (QA/QC) Program and its business practices, which demonstrates adherence to the QA/QC Program. The Offeror shall also describe its data management experience and procedures used to maintain quality and accuracy of data from generation to reporting.
The Contractor shall provide a narrative to describe its ongoing and successful execution of their Safety and Health Program, addressing items such as training, the number of current Safety and Health professionals and type, and the procedures and guidance used in the preparation and implementation of an Accident Prevention Plan/Site Safety and Health Plans relevant to this contract’s scope of work activities. The Offeror shall provide a signed certification sheet stating that the Offeror has developed and implemented a Safety and Health Program in accordance with OSHA Health Program. The Offeror shall also certify that a Certified Industrial Hygienist (CIH) performs the Health and Safety supervision. The Offeror shall provide a summary list of any/all OSHA violations and reported lost time accidents in the past five (5) years, or so state that there were none.
3.3.2. Key Personnel and Resumes, Tab 2b
The evaluation of Key Personnel will consider education, professional qualifications, complexity and range of experience, and accomplishments/successes in executing and providing environmental consulting services in accordance with the Section C SOW of the RFP.
The Offeror shall provide resumes of Key Personnel that demonstrate they have the qualifications and experience in the Program areas described in Section C to successfully perform the requirements of this contract. Resumes are excluded from the 50 page count limit for Volume I, but are limited to two (2) pages for each proposed key staff member.
Key Personnel that require resume submittals as identified in Section 4.0 of the Section C SOW are as follows:
Program Manager* Senior Project Manager* Senior Archeologist Senior Biologist National Environmental Policy Act (NEPA) Manager Senior Civil/Environmental Engineer or Scientist Senior CADD/GIS/Remote Sensing Specialist
*Must be an employee of the Prime
Offerors shall ensure that each resume (example below) provides detailed information on specific education, professional registration (if applicable), required years of experience, accomplishments, and achievements relevant to the proposed Key Personnel role for which the individual is being proposed.
The resumes shall also include appropriate cross-references of the proposed individual’s work on submitted Past Experience projects, if applicable (i.e. if the individual worked in that role on any of the submitted Past Experience projects). Resumes for Key Personnel must be presented in the Offeror’s proposal in the order identified above.
Example Resume Format
Name Relationship to Prime
Key Personnel Role
Current Staff
Consultant Future Staff
Synopsis of qualifications:
Education:
School Degree Degree Focus Professional Registrations, Certifications, and Training:
Experience Relevant to Environmental Consulting Services (Repeat as needed) Project:
Company Job Title Dates Relevance to Past
Experience Projects
Summary of Duties and Accomplishments Other Relevant Information:
Years with Current Firm:
3.3.2.1. Manpower Chart/Matrix, Tab 2c
Offerors must provide a Manpower Chart or Matrix that identifies the proposed disciplines and the number of personnel within those disciplines from their organization and their subcontractor organizations to be utilized on this contract. The purpose of this submittal is to identify both the types of discipline expertise and number of personnel, by discipline, available to the team for this contract. Please note that this chart is not the same as the Offeror’s Organizational Chart required in Section 3.3.1.
3.3.2.2. Replacement of Key Personnel
After contract award, the Contracting Officer shall approve replacement of any key personnel after verifying that they meet or exceed the requirements of the solicitation. If further key management personnel are required to perform any work under this contract, the contractor will be required to submit their resumes for approval by the Contracting Officer.
3.4. Tab 3, Volume I, Factor 3, Example Project Technical Approach The Government has provided an Example Project Performance Work Statement (PWS) for the Offeror to prepare and submit both technical and cost/price proposals as part of their submission for this RFP. The example project is a fictitious project that is representative of work that could be performed under this MATOC. The example project PWS and Milestone Payment Schedule (MPS) without Cost (Attachment L-1) are located in Section J of this solicitation.
The Offeror shall develop and submit a technical approach for all activities and implementation in support of the milestones, as outlined in the example project PWS. The technical approach shall include a detailed plan describing how the Offeror would accomplish the work within the proposed milestone schedule (identified on the MPS without Cost), to include the disciplines used and level of effort anticipated (man hours per discipline), anticipated risks, and risk mitigation measures.
The Offeror shall ensure that pricing information is NOT included in the technical approach. The Offeror shall also submit an Integrated Master Schedule (IMS) to support completion of the
Example Project within the stated period of performance; the IMS shall not include any cost information and is excluded from the page count.
The Government will assess the Offeror’s technical understanding of the example project based upon their proposed technical approach, disciplines used, the hours proposed, and corresponding risk to the Government. Alternate milestones may not be proposed by adding additional CLINs or Sub-CLINs to the Milestone Payment Schedule without Cost (Attachment L-1).
The Example Project technical approach shall be included within Volume I, Factor 3, and shall be severable from the price portion for the example project proposal which shall be submitted within Volume II.
The Offeror shall ensure that the Attachment L-1, Milestone Payment Schedule without Cost, is submitted in Factor 3.
3.5. Tab 4, Volume I, Factor 4 – Past Performance
The Offeror shall make every attempt to submit a Past Performance Questionnaire (PPQ) for each project submitted in Factor 1 – Past Experience. The Government will evaluate the Offeror’s Past Performance information to determine the level of performance risk associated with the Offeror’s likelihood of unsuccessful performance in performing the requirements set forth in the solicitation. The relevancy (how relevant to the Section C SOW) of the submitted Past Performance information, the source of the information, context of the data, and general trends in the Offeror’s performance may be considered. The contractor’s Past Performance will be evaluated and rated for relevancy and confidence.
For the purpose of the past performance evaluation, an ‘Offeror’ shall be defined as business arrangements and relationships, such as Joint Venture participants, teaming partners, and major subcontractors. The past performance record of each firm in the business arrangement may be evaluated by the Government.
The Offeror must provide a narrative for each submitted Past Experience project that, at a minimum, addresses its’ past performance information such as if it was completed on-time/budget, whether or not the Offeror encountered any performance issues or challenges, and key and/or best management practices the Offeror employed to sustain successful performance for each past performance project submitted. If performance issues, customer dissatisfaction or challenges did arise, provide information on what corrective action was implemented or how they were addressed and outcomes. The narrative information does count toward the page limit; however, the PPQs are excluded from the page count.
For each example project submitted for Factor 1, the Offeror shall provide a PPQ that includes:
Project # - Title (matching past experience); Contract and task order number as applicable; Client Point of Contact including email and phone number, and a description of the performance on that project. The Offeror shall send the PPQ, found as Attachment L-3 below, to those Government agencies or private sector companies’ Point of Contact identified for each project in Factor 1 – Past Experience for completion. These agency or company contacts must have detailed information concerning the performance of the project in order to accurately complete the PPQ for the Offeror. The POCs may be contacted by the SSEB to assess the scope of work performed and to evaluate performance of the projects listed under the previous experience tab of this volume, if necessary; therefore, it is imperative to ensure correct telephone and email addresses are identified for the client POCs on each PPQ.
Completed Past Performance Questionnaires shall be submitted with your proposal if they are able to be received from the POC prior to the proposal due date. Offerors shall follow-up with clients/references to ensure timely submittal of questionnaires. If the Offeror’s client requests, he/she may submit the questionnaire directly to the Contract Specialist, Richard Van De Linde at Richard.VanDeLindelii@usace.army.mil prior to proposal closing date.
PPQs previously completed by the example project's POC may be submitted in lieu of requesting the POC to re-complete the form; however, Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. CPARS evaluations shall not be submitted by the Offeror in place of a PPQ.
In the event that one or more of the client POCs do not reply to the Offeror’s request to complete the PPQ, the Government may elect to contact them utilizing the information provided for each submitted project for Factor 1. Therefore, the Offeror must ensure the information provided for each project is accurate (i.e. POC name, telephone number, email address, etc.).
In addition to the above, the Government may review and consider any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
During the past performance evaluation, the Government reserves the right to obtain past performance information from any available source. The Government will consider information submitted by the Offeror, as well as any other relevant and reliable information obtained from any other source (including information from Government personnel and databases). The Government will evaluate the relevancy of the information, the source of the information, and general trends in performance, along with any other information, which may help the Government assess performance risk.
The Government intends to assess the relative risks associated with the Offeror’s performance based on the past performance information provided in the proposal and, if applicable, information obtained from available sources identified previously. A significant achievement, unexplained or unresolved problem, or lack of relevant data may significantly impact the risk rating by the Government. Therefore, it is incumbent upon the Offeror to include all relevant information, including demonstrated corrective actions, in its proposal.
In addition to the project information requested in this section, the Offeror shall also provide notification and information concerning any projects where it’s right to proceed was terminated for the convenience of the government or for default/cause during the last five (5) years, or so state that there were none. If any contracts were terminated, whether for convenience or default/cause, the Offeror shall list each, providing the contract number, title, brief type of work effort, and the reason for the termination.
In rating past performance, the Government may consider available past performance information on predecessor companies, employment histories of key personnel, or major subcontractors performing key elements of the project.
4.0. VOLUME II – COST/PRICE PROPOSAL (there is no page limitation) The Offeror shall submit, in Volume II, the cost/price information described below. Volume II will be evaluated to determine the reasonableness of each Offeror’s cost proposal over the life of the contract, and the adequacy and value of the cost data.
The Offeror shall carefully read the instructions for Volume II to ensure all requirements are complied with. Since the evaluation of the cost proposal represents a portion of the total evaluation as described in Section M, it is possible that an Offeror’s proposal might not be selected for award because of an Offeror’s oversight, unreasonable, unrealistic, incomplete or inaccurate information, or non-current cost proposal information and/or cost or pricing data.
Specifically-identified omissions will result in the Offeror’s Cost/Price Proposal to be deemed “Unreasonable” and, therefore, ineligible for further consideration for award. REMEMBER, the Government intends to award without discussions. The Cost/Price Proposal shall consist of the information identified below.
The hourly labor rates proposed on Tables 1 and 2, Annual Escalation Rates Table 3 and Markup Rates in Section B will be legally binding and will be the maximum rates that the Offeror will use for all Firm-Fixed-Price task orders issued within the Period of Performance of the contract.
Lower rates may be offered at the task order level, if deemed appropriate by…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .