This document includes a pricing schedule bid and related federal contract opportunity solicitation. The pricing schedule bid outlines costs for various park maintenance services at Marion Reservoir in Kansas over four option years, including mowing, janitorial work, park cleaning, herbicide application, buoy installation and maintenance, and tree maintenance. The related federal contract opportunity solicitation is from the U.S. Army Corps of Engineers, Tulsa District for a Park Cleaning and Maintenance Contract at Marion Reservoir, Kansas. Solicitation number is W912BV20Q0118 and is set aside for small businesses. The base period is firm fixed price with four option years to be exercised at the government's discretion. Anticipated award date is July 15, 2020 with quotes due by July 10, 2020. The solicitation will be posted to Beta.SAM.gov and any amendments must be acknowledged by potential offerors.
The document provides pricing details for maintenance services at a federal park property over multiple years as well as information on an associated solicitation from the Army Corps of Engineers for these services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 with Maps.pdf | ||
| Amendment 0001.pdf | ||
| All Attachments.pdf | ||
| Solicitation W912BV20Q0118.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Schedule Base Year 01 Aug 2020‐31 July 2021 Item No. Description of Services Quanity Unit Unit Price Total Amount Total By Appendix
Appendix A ‐ Mowing
*IMPROVED AREAS*
0001 Cottonwood Point 7 MO 0002 French Creek Cove 7 MO 0003 Hillsboro Cove 7 MO 0004 Marion Cove 7 MO 0005 Outlet Channel 7 MO
Total Improved Areas
*SEMI‐IMPROVED*
0006 Cottonwood Point Day Use Area 14 AC 0007 Miscellaneous 100 AC
Total Semi Improved Areas
*EMBANKMENT*
0008 Embankment, River and Outlet Channel 7 MO 0009 Rim Dike 7 MO
Total Embankment
*OTHER*
0010 Willow Walk Nature Trail 7 MO 0011 Lawn 7 MO
Total Other Total Appendix A
Appendix B ‐ Janitorial Services 0012 Project Office 104 DY
Total Appendix B Appendix C ‐ Cleaning of Parks
*SUMMER PERIOD*
0013 Cottonwood Point 7 MO 0014 Hillsboro Cove 7 MO 0015 French Creek Cove 7 MO 0016 Marion Cove 7 MO 0017 Overlook 7 MO
0018 Spillway 7 MO Total Summer Period
*WINTER PERIOD*
0019 Cottonwood Point 7 MO 0020 Hillsboro Cove 7 MO 0021 French Creek Cove 7 MO 0022 Marion Cove 7 MO 0023 Overlook 7 MO 0024 Spillway 7 MO
Total Winter Period
*OTHER*
0025 Cleaning of toilet/shower facilities after flooding 16 EA 0026 Cleaning of refuse Containers (2 per year) 608 EA
Total Other
*HIGH PRESSURE POWER WASHING*
0027 Picnic Table Units/Pads 510 EA 0028 Pedestal Cookers/Grills 173 EA 0029 Toilet Floors or Shower Floors 64 EA
Total High Pressure Washing Total Appendix C
Appendix D ‐ Herbicide Application
*SOIL STERILANT*
0030 Soil Sterilant‐Parking Pads 6 MO 0031 Soil Sterilant‐Parking lots and Misc Facilities 6 MO
Total Soil Sterilant
*RIP‐RAP AREAS*
0032 Embankment/Training Dikes 6 MO 0033 Overlook/Rock Pit 6 MO 0034 Cottonwood Point 6 MO 0035 Spillway East Channel 6 MO 0036 Spillway East Upper Area 6 MO 0037 Spillway West Channel 6 MO 0038 Spillway West Upper Area 6 MO
Total Rip‐Rap Areas
*GUARDRAIL AREAS*
0039 Embankment/Training Dikes 6 MO 0040 Spillway East Upper Area 6 MO 0041 Spillway West Upper Area 6 MO
Total Guardrail Areas
*PAVED ROADS & PARKING LOTS*
0042 Paved road & parking lot shoulders 6 MO 0043 Road/Parking lot cracks/wheelstops 6 MO 0044 Rip‐rap edging 6 MO
Total Paved Roads & Parking Lots
*OTHER*
0045 Noxious Weed Control 100 AC Total Noxious Weed Total Appendix D
Appendix E ‐ Buoy Installation, Maintenance & Inspection 0046 Project Waters 11 MO
Total Appendix E Appendix F ‐ Tree Maintenance
0047 Tree Pruning (less than 10' from ground) 50 EA 0048 Tree Pruning (greater than 10' from ground) 50 EA 0049 Tree Removal (less than 10" DBH) 30 EA 0050 Tree Removal (greater than 10" DBH) 80 EA 0051 Tree Removal (greater than 20" DBH) 40 EA 0052 Stump Removal (less than 20") 20 EA 0053 Stump Grinding (greater than 20" less than 36") 20 EA 0054 Stump Grinding (greater than 36") 20 EA 0055 Emergency work 40 HR
Total Tree Maintenance Total Appendix E
ACRONYMS: AC‐Acre, DY‐Day, HR‐Hour, MO‐Month, EA‐Each Total All Appendices
Pricing Schedule Option Yr 1 01 August 2021‐ 31 July 2022 Item No. Description of Services Quanity Unit Unit Price Total Amount Total By Appendix
Appendix A ‐ Mowing
*IMPROVED AREAS*
1001 Cottonwood Point 7 MO 1002 French Creek Cove 7 MO 1003 Hillsboro Cove 7 MO 1004 Marion Cove 7 MO 1005 Outlet Channel 7 MO
Total Improved Areas
*SEMI‐IMPROVED*
1006 Cottonwood Point Day Use Area 14 AC 1007 Miscellaneous 100 AC
Total Semi Improved Areas
*EMBANKMENT*
1008 Embankment, River and Outlet Channel 7 MO 1009 Rim Dike 7 MO
Total Embankment
*OTHER*
1010 Willow Walk Nature Trail 7 MO 1011 Lawn 7 MO
Total Other Total Appendix A
Appendix B ‐ Janitorial Services 1012 Project Office 104 DY
Total Appendix B Appendix C ‐ Cleaning of Parks
*SUMMER PERIOD*
1013 Cottonwood Point 7 MO 1014 Hillsboro Cove 7 MO
1015 French Creek Cove 7 MO 1016 Marion Cove 7 MO 1017 Overlook 7 MO 1018 Spillway 7 MO
Total Summer Period
*WINTER PERIOD*
1019 Cottonwood Point 7 MO 1020 Hillsboro Cove 7 MO 1021 French Creek Cove 7 MO 1022 Marion Cove 7 MO 1023 Overlook 7 MO 1024 Spillway 7 MO
Total Winter Period
*OTHER*
1025 Cleaning of toilet/shower facilities after flooding 16 EA 1026 Cleaning of refuse Containers (2 per year) 608 EA
Total Other
*HIGH PRESSURE POWER WASHING*
1027 Picnic Table Units/Pads 510 EA 1028 Pedestal Cookers/Grills 173 EA 1029 Toilet Floors or Shower Floors 64 EA
Total High Pressure Washing Total Appendix C
Appendix D ‐ Herbicide Application
*SOIL STERILANT*
1030 Soil Sterilant‐Parking Pads 6 MO 1031 Soil Sterilant‐Parking lots and Misc Facilities 6 MO
Total Soil Sterilant
*RIP‐RAP AREAS*
1032 Embankment/Training Dikes 6 MO 1033 Overlook/Rock Pit 6 MO 1034 Cottonwood Point 6 MO 1035 Spillway East Channel 6 MO
1036 Spillway East Upper Area 6 MO 1037 Spillway West Channel 6 MO 1038 Spillway West Upper Area 6 MO
Total Rip‐Rap Areas
*GUARDRAIL AREAS*
1039 Embankment/Training Dikes 6 MO 1040 Spillway East Upper Area 6 MO 1041 Spillway West Upper Area 6 MO
Total Guardrail Areas
*PAVED ROADS & PARKING LOTS*
1042 Paved road & parking lot shoulders 6 MO 1043 Road/Parking lot cracks/wheelstops 6 MO 1044 Rip‐rap edging 6 MO
Total Paved Roads & Parking Lots
*OTHER*
1045 Noxious Weed Control 100 AC Total Noxious Weed Total Appendix D
Appendix E ‐ Buoy Installation, Maintenance & Inspection 1046 Project Waters 11 MO
Total Appendix E Appendix F ‐ Tree Maintenance
1047 Tree Pruning (less than 10' from ground) 50 EA 1048 Tree Pruning (greater than 10' from ground) 50 EA 1049 Tree Removal (less than 10" DBH) 30 EA 1050 Tree Removal (greater than 10" DBH) 80 EA 1051 Tree Removal (greater than 20" DBH) 40 EA 1052 Stump Removal (less than 20") 20 EA 1053 Stump Grinding (greater than 20" less than 36") 20 EA 1054 Stump Grinding (greater than 36") 20 EA 1055 Emergency work 40 HR
Total Tree Maintenance
Total Appendix E
MO‐Month, EA‐Each
Pricing Schedule Option Yr 2 01 Aug 2022 ‐ 31 July 2023 Item No. Description of Services Quanity Unit Unit Price Total Amount Total By Appendix
Appendix A ‐ Mowing
*IMPROVED AREAS*
2001 Cottonwood Point 7 MO 2002 French Creek Cove 7 MO 2003 Hillsboro Cove 7 MO 2004 Marion Cove 7 MO 2005 Outlet Channel 7 MO
Total Improved Areas
*SEMI‐IMPROVED*
2006 Cottonwood Point Day Use Area 14 AC 2007 Miscellaneous 100 AC
Total Semi Improved Areas
*EMBANKMENT*
2008 Embankment, River and Outlet Channel 7 MO 2009 Rim Dike 7 MO
Total Embankment
*OTHER*
2010 Willow Walk Nature Trail 7 MO 2011 Lawn 7 MO
Total Other Total Appendix A
Appendix B ‐ Janitorial Services 2012 Project Office 104 DY
Total Appendix B
Appendix C ‐ Cleaning of Parks
*SUMMER PERIOD*
2013 Cottonwood Point 7 MO 2014 Hillsboro Cove 7 MO 2015 French Creek Cove 7 MO 2016 Marion Cove 7 MO 2017 Overlook 7 MO 2018 Spillway 7 MO
Total Summer Period
*WINTER PERIOD*
2019 Cottonwood Point 7 MO 2020 Hillsboro Cove 7 MO 2021 French Creek Cove 7 MO 2022 Marion Cove 7 MO 2023 Overlook 7 MO 2024 Spillway 7 MO
Total Winter Period
*OTHER*
2025 Cleaning of toilet/shower facilities after flooding 16 EA 2026 Cleaning of refuse Containers (2 per year) 608 EA
Total Other
*HIGH PRESSURE POWER WASHING*
2027 Picnic Table Units/Pads 510 EA 2028 Pedestal Cookers/Grills 173 EA 2029 Toilet Floors or Shower Floors 64 EA
Total High Pressure Washing Total Appendix C
Appendix D ‐ Herbicide Application
*SOIL STERILANT*
2030 Soil Sterilant‐Parking Pads 6 MO 2031 Soil Sterilant‐Parking lots and Misc Facilities 6 MO
Total Soil Sterilant
*RIP‐RAP AREAS*
2032 Embankment/Training Dikes 6 MO 2033 Overlook/Rock Pit 6 MO 2034 Cottonwood Point 6 MO 2035 Spillway East Channel 6 MO 2036 Spillway East Upper Area 6 MO 2037 Spillway West Channel 6 MO 2038 Spillway West Upper Area 6 MO
Total Rip‐Rap Areas
*GUARDRAIL AREAS*
2039 Embankment/Training Dikes 6 MO 2040 Spillway East Upper Area 6 MO 2041 Spillway West Upper Area 6 MO
Total Guardrail Areas
*PAVED ROADS & PARKING LOTS*
2042 Paved road & parking lot shoulders 6 MO 2043 Road/Parking lot cracks/wheelstops 6 MO 2044 Rip‐rap edging 6 MO
Total Paved Roads & Parking Lots
*OTHER*
2045 Noxious Weed Control 100 AC Total Noxious Weed Total Appendix D
Appendix E ‐ Buoy Installation, Maintenance & Inspection 2046 Project Waters 11 MO
Total Appendix E Appendix F ‐ Tree Maintenance
2047 Tree Pruning (less than 10' from ground) 50 EA 2048 Tree Pruning (greater than 10' from ground) 50 EA 2049 Tree Removal (less than 10" DBH) 30 EA 2050 Tree Removal (greater than 10" DBH) 80 EA 2051 Tree Removal (greater than 20" DBH) 40 EA 2052 Stump Removal (less than 20") 20 EA
2053 Stump Grinding (greater than 20" less than 36") 20 EA 2054 Stump Grinding (greater than 36") 20 EA 2055 Emergency work 40 HR
Total Tree Maintenance Total Appendix F
ACRONYMS: AC‐Acre, DY‐Day, HR‐Hour, MO‐Month, EA‐Each Total All Appendices
Pricing Schedule Option Yr 3 01 Aug 2023 ‐ 31 July 2024 Item No. Description of Services Quanity Unit Unit Price Total Amount Total By Appendix
Appendix A ‐ Mowing
*IMPROVED AREAS*
3001 Cottonwood Point 7 MO 3002 French Creek Cove 7 MO 3003 Hillsboro Cove 7 MO 3004 Marion Cove 7 MO 3005 Outlet Channel 7 MO
Total Improved Areas
*SEMI‐IMPROVED*
3006 Cottonwood Point Day Use Area 14 AC 3007 Miscellaneous 100 AC
Total Semi Improved Areas
*EMBANKMENT*
3008 Embankment, River and Outlet Channel 7 MO 3009 Rim Dike 7 MO
Total Embankment
*OTHER*
3010 Willow Walk Nature Trail 7 MO 3011 Lawn 7 MO
Total Other
Total Appendix A Appendix B ‐ Janitorial Services
3012 Project Office 104 DY Total Appendix B
Appendix C ‐ Cleaning of Parks
*SUMMER PERIOD*
3013 Cottonwood Point 7 MO 3014 Hillsboro Cove 7 MO 3015 French Creek Cove 7 MO 3016 Marion Cove 7 MO 3017 Overlook 7 MO 3018 Spillway 7 MO
Total Summer Period
*WINTER PERIOD*
3019 Cottonwood Point 7 MO 3020 Hillsboro Cove 7 MO 3021 French Creek Cove 7 MO 3022 Marion Cove 7 MO 3023 Overlook 7 MO 3024 Spillway 7 MO
Total Winter Period
*OTHER*
3025 Cleaning of toilet/shower facilities after flooding 16 EA 3026 Cleaning of refuse Containers (2 per year) 608 EA
Total Other
*HIGH PRESSURE POWER WASHING*
3027 Picnic Table Units/Pads 510 EA 3028 Pedestal Cookers/Grills 173 EA 3029 Toilet Floors or Shower Floors 64 EA
Total High Pressure Washing Total Appendix C
Appendix D ‐ Herbicide Application
*SOIL STERILANT*
3030 Soil Sterilant‐Parking Pads 6 MO 3031 Soil Sterilant‐Parking lots and Misc Facilities 6 MO
Total Soil Sterilant
*RIP‐RAP AREAS*
3032 Embankment/Training Dikes 6 MO 3033 Overlook/Rock Pit 6 MO 3034 Cottonwood Point 6 MO 3035 Spillway East Channel 6 MO 3036 Spillway East Upper Area 6 MO 3037 Spillway West Channel 6 MO 3038 Spillway West Upper Area 6 MO
Total Rip‐Rap Areas
*GUARDRAIL AREAS*
3039 Embankment/Training Dikes 6 MO 3040 Spillway East Upper Area 6 MO 3041 Spillway West Upper Area 6 MO
Total Guardrail Areas
*PAVED ROADS & PARKING LOTS*
3042 Paved road & parking lot shoulders 6 MO 3043 Road/Parking lot cracks/wheelstops 6 MO 3044 Rip‐rap edging 6 MO
Total Paved Roads & Parking Lots
*OTHER*
3045 Noxious Weed Control 100 AC Total Noxious Weed Total Appendix D
Appendix E ‐ Buoy Installation, Maintenance & Inspection 3046 Project Waters 11 MO
Total Appendix E Appendix F ‐ Tree Maintenance
3047 Tree Pruning (less than 10' from ground) 50 EA
3048 Tree Pruning (greater than 10' from ground) 50 EA 3049 Tree Removal (less than 10" DBH) 30 EA 3050 Tree Removal (greater than 10" DBH) 80 EA 3051 Tree Removal (greater than 20" DBH) 40 EA 3052 Stump Removal (less than 20") 20 EA 3053 Stump Grinding (greater than 20" less than 36") 20 EA 3054 Stump Grinding (greater than 36") 20 EA 3055 Emergency work 40 HR
Total Tree Maintenance Total Appendix F
ACRONYMS: AC‐Acre, DY‐Day, HR‐Hour, MO‐Month, EA‐Each
Pricing Schedule Option Yr 4 01 Aug 2024 ‐ 31 July 2025 Item No. Description of Services Quanity Unit Unit Price Total Amount Total By Appendix
Appendix A ‐ Mowing
*IMPROVED AREAS*
4001 Cottonwood Point 7 MO 4002 French Creek Cove 7 MO 4003 Hillsboro Cove 7 MO 4004 Marion Cove 7 MO 4005 Outlet Channel 7 MO
Total Improved Areas
*SEMI‐IMPROVED*
4006 Cottonwood Point Day Use Area 14 AC 4007 Miscellaneous 100 AC
Total Semi Improved Areas
*EMBANKMENT*
4008 Embankment, River and Outlet Channel 7 MO 4009 Rim Dike 7 MO
Total Embankment
*OTHER*
4010 Willow Walk Nature Trail 7 MO 4011 Lawn 7 MO
Total Other Total Appendix A
Appendix B ‐ Janitorial Services 4012 Project Office 104 DY
Total Appendix B Appendix C ‐ Cleaning of Parks
*SUMMER PERIOD*
4013 Cottonwood Point 7 MO 4014 Hillsboro Cove 7 MO 4015 French Creek Cove 7 MO 4016 Marion Cove 7 MO 4017 Overlook 7 MO 4018 Spillway 7 MO
Total Summer Period
*WINTER PERIOD*
4019 Cottonwood Point 7 MO 4020 Hillsboro Cove 7 MO 4021 French Creek Cove 7 MO 4022 Marion Cove 7 MO 4023 Overlook 7 MO 4024 Spillway 7 MO
Total Winter Period
*OTHER*
4025 Cleaning of toilet/shower facilities after flooding 16 EA 4026 Cleaning of refuse Containers (2 per year) 608 EA
Total Other
*HIGH PRESSURE POWER WASHING*
4027 Picnic Table Units/Pads 510 EA 4028 Pedestal Cookers/Grills 173 EA
4029 Toilet Floors or Shower Floors 64 EA Total High Pressure Washing
Total Appendix C Appendix D ‐ Herbicide Application
*SOIL STERILANT*
4030 Soil Sterilant‐Parking Pads 6 MO 4031 Soil Sterilant‐Parking lots and Misc Facilities 6 MO
Total Soil Sterilant
*RIP‐RAP AREAS*
4032 Embankment/Training Dikes 6 MO 4033 Overlook/Rock Pit 6 MO 4034 Cottonwood Point 6 MO 4035 Spillway East Channel 6 MO 4036 Spillway East Upper Area 6 MO 4037 Spillway West Channel 6 MO 4038 Spillway West Upper Area 6 MO
Total Rip‐Rap Areas
*GUARDRAIL AREAS*
4039 Embankment/Training Dikes 6 MO 4040 Spillway East Upper Area 6 MO 4041 Spillway West Upper Area 6 MO
Total Guardrail Areas
*PAVED ROADS & PARKING LOTS*
4042 Paved road & parking lot shoulders 6 MO 4043 Road/Parking lot cracks/wheelstops 6 MO 4044 Rip‐rap edging 6 MO
Total Paved Roads & Parking Lots
*OTHER*
4045 Noxious Weed Control 100 AC Total Noxious Weed Total Appendix D
Appendix E ‐ Buoy Installation, Maintenance & Inspection
4046 Project Waters 11 MO Total Appendix E
Appendix F ‐ Tree Maintenance 4047 Tree Pruning (less than 10' from ground) 50 EA 4048 Tree Pruning (greater than 10' from ground) 50 EA 4049 Tree Removal (less than 10" DBH) 30 EA 4050 Tree Removal (greater than 10" DBH) 80 EA 4051 Tree Removal (greater than 20" DBH) 40 EA 4052 Stump Removal (less than 20") 20 EA 4053 Stump Grinding (greater than 20" less than 36") 20 EA 4054 Stump Grinding (greater than 36") 20 EA 4055 Emergency work 40 HR
Total Tree Maintenance Total Appendix F
MO‐Month, EA‐Each