FY17_KC-46A_FTU_FTC_Simulator_Facility_Phase_2_RTA_Drawings.pdf

PDF 35 MB Posted

Attached to
KC-46A FTU FTC Simluator Facility at Altus AFB, OK
Solicitation number
W912BV-16-R-0144
Issued by

About this file

Drawings for original solicitation posting

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

2 3

C

A

B

C O

PY

R

IG

H

T C

B

U R

N S

AN

D

M C

D O

N N

EL

L

EN

G

IN

EE

R

IN

G C

O M

PA

N

Y, IN

C

6 7 8 9

E

F

FILE:

DATE:

Tulsa District

August 2016

SOLICITATION NO. W912BV-16-R-0144

JACKSON COUNTY

OKLAHOMA

KC-46A FTU FTC SIMULATOR FACILITY PHASE 2

(PROJECT NO. AGGN173001) FY-17

ALTUS AIR FORCE BASE

READY TO ADVERTISE

8/25/2016 9:45:24 AM

BURNS & McDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

(816) 333-9400

D

2 3

C

A

B

C O

PY

R

IG

H

B

U R

N S

AN

D

M C

D O

N N

EL

L

EN

G

IN

EE

R

IN

G C

O M

PA

N

Y, IN

C

6 7 8 9

E

F

FILE:

DATE:

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OKLAHOMA

KC-46A FTU FTC SIMULATOR FACILITY PHASE 2

ALTUS AIR FORCE BASE

8/25/2016 9:40:38 AM

08/31/16

SHT.

NO. ARCHITECTURAL

2-A-001 ABBREVIATIONS & SYMBOLS

2-A-002 ARCHITECTURAL GENERAL NOTES

2-A-010 AIR BARRIER ENCLOSURE

2-A-011 PHASE 1 FLOOR PLAN - FIRST FLOOR

2-A-012 PHASE 1 FLOOR PLAN - SECOND FLOOR

2-A-100 CODE NARRATIVE

2-A-101 OVERALL LIFE SAFETY PLAN - FIRST FLOOR

2-A-102 OVERALL LIFE SAFETY PLAN - SECOND FLOOR

2-A-103 ENLARGED LIFE SAFETY PLAN - FIRST FLOOR

2-A-104 ENLARGED LIFE SAFETY PLAN - SECOND FLOOR

2-A-111 FLOOR PLAN - FIRST FLOOR

2-A-112 FLOOR PLAN - SECOND FLOOR

2-A-121 REFLECTED CEILING PLAN - FIRST FLOOR

2-A-122 REFLECTED CEILING PLAN - SECOND FLOOR

2-A-130 ROOF PLAN

2-A-200 EXTERIOR BUILDING ELEVATIONS

2-A-201 EXTERIOR BUILDING ELEVATIONS

2-A-210 TRANSLUCENT WALL PANEL ELEVATION AND

SECTION

2-A-211 ENLARGED ELEVATIONS AND DETAILS

2-A-300 BUILDING SECTIONS

2-A-301 BUILDING SECTIONS

2-A-302 BUILDING SECTIONS

2-A-303 BUILDING SECTIONS

2-A-310 WALL SECTIONS

2-A-311 WALL SECTIONS

2-A-312 WALL SECTIONS

2-A-400 ENLARGED BREAK ROOM & TOILET PLAN

2-A-401 ENLARGED TOILET PLAN

2-A-402 ENLARGED PLANS

2-A-410 ENLARGED STAIR PLANS & SECTIONS

2-A-411 ENLARGED STAIR PLANS & SECTIONS

2-A-412 ENLARGED STAIR PLANS & SECTIONS

2-A-413 STAIR DETAILS

2-A-414 STAIR DETAILS

2-A-450 MISCELLANEOUS PLAN DETAILS

2-A-500 PARTITION TYPES

2-A-501 PARTITION TYPE DETAILS

2-A-502 TYPICAL PENETRATION DETAILS

2-A-503 FLOOR TRANSITION DETAILS

2-A-504 PLAN DETAILS

2-A-505 PLAN DETAILS

2-A-506 ADA/ABA INFORMATION

2-A-507 TYPICAL ACCESSIBILITY DETAILS

2-A-510 EXTERIOR WALL AND ROOF DETAILS

2-A-511 EXTERIOR WALL AND ROOF DETAILS

2-A-512 EXTERIOR WALL AND ROOF DETAILS

2-A-513 EXTERIOR WALL AND ROOF DETAILS

2-A-514 OVERHEAD DOOR AND TRANSLUCENT WALL PANEL

DETAILS

2-A-516 CEILING DETAILS

2-A-520 ROOF DETAILS

2-A-530 MILLWORK DETAILS

2-A-600 ROOM FINISH SCHEDULE

2-A-601 INTERIOR FINISH & SIGNAGE PLAN - FIRST FLOOR

2-A-602 INTERIOR FINISH & SIGNAGE PLAN - SECOND FLOOR

2-A-610 DOOR SCHEDULE

2-A-611 DOOR DETAILS

2-A-612 DOOR DETAILS

2-A-620 WINDOW SCHEDULE AND DETAILS

2-A-630 LOUVER SCHEDULE, TYPES, AND DETAILS

2-A-701 FURNITURE PLAN - FIRST FLOOR

2-A-702 FURNITURE PLAN - SECOND FLOOR

2-A-711 SIGNAGE SCHEDULE

2-A-712 SIGNAGE DETAILS

2-A-800 PERSPECTIVES

2-AD001 DEMOLITION PLAN - GENERAL NOTES

2-AD002 DEMOLITION PLAN - FIRST FLOOR

2-AD003 DEMOLITION PLAN - SECOND FLOOR

SHT.

NO. STRUCTURAL

2-S-001 GENERAL NOTES

2-S-002 GENERAL NOTES

2-S-003 LEGEND & ABBREVIATIONS

2-S-004 STATEMENT OF SPECIAL INSPECTIONS

2-S-005 WIND ROOF LOAD

2-S-006 STANDARD FOUNDATION DETAILS

2-S-007 STANDARD CONCRETE DETAILS

2-S-008 STANDARD SLAB ON GRADE DETAILS

2-S-009 STANDARD STEEL DETAILS

2-S-010 STANDARD JOIST DETAILS

2-S-011 STANDARD ELEVATED DECK DETAILS

2-S-012 STANDARD EXTERIOR STUD WALL DETAILS

2-S-013 STANDARD MASONRY VENEER DETAILS

2-S-014 STANDARD MASONRY DETAILS

2-S-015 TYPICAL ATFP

2-S-100 FOUNDATION AND SLAB ON GRADE PLAN

2-S-101 SECOND FLOOR FRAMING PLAN

2-S-102 ROOF FRAMING PLAN

2-S-103 HIGH ROOF FRAMING PLAN

2-S-104 BRIDGE CRANE FRAMING PLAN

2-S-106 TRENCH PLANS

2-S-107 CATWALK FRAMING PLAN

2-S-200 FRAMING ELEVATION

2-S-201 FRAMING ELEVATION

2-S-202 FRAMING ELEVATION

2-S-203 FRAMING ELEVATION

2-S-300 FOUNDATION DETAILS

2-S-301 FOUNDATION DETAILS

2-S-302 FOUNDATION DETAILS

2-S-500 COLUMN SCHEDULE

2-S-501 FRAMING DETAILS

2-S-502 FRAMING DETAILS

2-S-503 FRAMING DETAILS

2-S-504 FRAMING DETAILS

2-S-506 BRACING DETAILS

2-S-507 BRACING DETAILS

2-S-508 BRACING DETAILS

2-S-509 BRACING DETAILS

2-S-601 CATWALK SECTIONS AND DETAILS

2-S-602 CATWALK SECTIONS AND DETAILS

SHT.

NO. ELECTRICAL

2-E-001 ELECTRICAL SYMBOLS LEGEND - 1 OF 2

2-E-002 ELECTRICAL SYMBOLS LEGEND - 2 OF 2

2-E-011 ELECTRICAL PLAN SECOND FLOOR AREAS A & B

2-E-041 ENLARGED ELECTRICAL PLANS AREAS A & B

2-E-100 ELECTRICAL SITE PLAN

2-E-101 ELECTRICAL POWER PLAN FIRST FLOOR AREA C

2-E-102 ELECTRICAL POWER PLAN SECOND FLOOR AREA C

2-E-103 MEP COORDINATION FIRST FLOOR AREA C

2-E-104 MEP COORDINATION SECOND FLOOR AREA C

2-E-111 ELECTRICAL LIGHTING PLAN FIRST FLOOR AREA C

2-E-112 ELECTRICAL LIGHTING PLAN SECOND FLOOR AREA C

2-E-121 LIGHTNING PROTECTION ROOF PLAN

2-E-201 ELECTRICAL ELEVATIONS

2-E-401 ELECTRICAL ENLARGED PLANS

2-E-402 ELECTRICAL ENLARGED PLANS

2-E-501 ELECTRICAL DETAILS

2-E-502 ELECTRICAL DETAILS

2-E-503 ELECTRICAL DETAILS

2-E-504 ELECTRICAL DETAILS

2-E-505 ELECTRICAL DETAILS

2-E-506 ELECTRICAL DETAILS

2-E-601 PANELBOARD SCHEDULES

2-E-602 PANELBOARD SCHEDULES

2-E-603 PANELBOARD SCHEDULES

2-E-611 LIGHT FIXTURE SCHEDULE

2-E-621 MEP COORDINATION SCHEDULE

2-E-701 ELECTRICAL ONE-LINE DIAGRAM

2-E-702 ELECTRICAL ONE-LINE DIAGRAM - AREAS A & B

SHT.

NO. PLUMBING

2-P-001 PLUMBING LEGEND AND ABBREVIATIONS

2-P-101 BELOW GRADE PLUMBING PLAN

2-P-102 FIRST FLOOR PLUMBING PLAN

2-P-103 SECOND FLOOR PLUMBING PLAN

2-P-401 ENLARGED SANITARY RESTROOM PLUMBING PLANS

2-P-402 ENLARGED DOMESTIC RESTROOM PLUMBING PLANS

2-P-403 ENLARGED PLUMBING PLAN - MECHANICAL ROOM

2-P-501 PLUMBING DETAILS

2-P-502 PLUMBING DETAILS

2-P-601 PLUMBING SCHEDULES

2-P-901 DOMESTIC WATER RISER DIAGRAM

2-P-902 WASTE & VENT RISER DIAGRAM

2-P-903 COMPRESSED AIR FLOW DIAGRAM

SHT.

NO. TELECOMMUNICATIONS

2-T-001 TELECOMMUNICATIONS LEGEND

2-T-011 TELECOMMUNICATIONS PLAN SECOND FLOOR AREAS A & B

2-T-041 TELECOMMUNICATIONS ENLARGED PLANS AREAS A & B

2-T-101 TELECOMMUNICATIONS PLAN FIRST FLOOR AREA C

2-T-102 TELECOMMUNICATIONS PLAN SECOND FLOOR AREA C

2-T-401 TELECOMMUNICATIONS ENLARGED PLANS

2-T-501 TELECOMMUNICATIONS DETAILS

2-T-502 TELECOMMUNICATIONS DETAILS

2-T-503 TELECOMMUNICATIONS DETAILS

2-T-701 TELECOMMUNICATIONS SCHEDULE/RISER

SHT.

NO. SECURITY

2-TY001 SECURITY SYSTEMS LEGEND, NOTES, & ABBREVIATIONS

2-TY011 SECURITY PLAN FIRST FLOOR AREA A & B

2-TY012 SECURITY PLAN SECOND FLOOR AREA A & B

2-TY101 SECURITY PLAN FIRST FLOOR AREA C

2-TY102 SECURITY PLAN SECOND FLOOR AREA C

2-TY501 SECURITY DETAILS

2-TY701 SECURITY SCHEDULE/RISER

SHT.

NO. LANDSCAPE

2-LP101 TREE PLANTING, SODDING AND SEEDING PLAN

2-LP102 IRRIGATION COVERAGE PLAN

SHT.

NO. MECHANICAL

2-M-001 MECHANICAL LEGEND & ABBREVIATIONS

2-M-101 FIRST FLOOR MECHANICAL HVAC PLAN

2-M-102 SECOND FLOOR MECHANICAL HVAC PLAN

2-M-103 FIRST FLOOR HVAC PIPING PLAN

2-M-104 SECOND FLOOR HVAC PIPING PLAN

2-M-201 CHILLED WATER FLOW DIAGRAM

2-M-202 CHILLED WATER FLOW DIAGRAM

2-M-203 HEATING WATER FLOW DIAGRAM

2-M-204 HEATING WATER FLOW DIAGRAM

2-M-301 MECHANICAL SECTIONS

2-M-302 MECHANICAL SECTIONS

2-M-303 MECHANICAL SECTION

2-M-401 MECHANICAL ROOM DUCTWORK ENLARGED PLAN

2-M-402 MECHANICAL ROOM ENLARGED PIPING PLAN

2-M-403 CHILLED WATER TIE-IN LOCATIONS

2-M-404 MECHANICAL ROOM 113 ENLARGED PLANS

2-M-501 MECHANICAL DETAILS

2-M-502 MECHANICAL DETAILS

2-M-503 MECHANICAL DETAILS

2-M-504 MECHANICAL DETAILS

2-M-505 MECHANICAL DETAILS

2-M-601 MECHANICAL SCHEDULES

2-M-602 MECHANICAL SCHEDULES

2-M-603 MECHANICAL SCHEDULES

2-M-604 MECHANICAL SCHEDULES

2-M-605 MECHANICAL SCHEDULES

2-M-701 MECHANICAL CONTROL DIAGRAMS

2-M-702 CONTROL SYSTEM SCHEMATIC CHILLED WATER

2-M-703 CONTROL SYSTEM SCHEDULE CHILLED WATER

2-M-704 CONTROL SYSTEM SCHEMATIC HEATING HOT WATER

2-M-705 CONTROL SYSTEM SCHEDULE HEATING HOT WATER

2-M-706 CONTROL SYSTEM SCHEMATIC AHU-103

2-M-707 CONTROL SYSTEM SCHEDULE AHU-103

2-M-708 CONTROL SYSTEM SCHEMATIC AHU-104

2-M-709 CONTROL SYSTEM SCHEDULE AHU-104

2-M-710 CONTROL SYSTEM SCHEMATIC FCU

2-M-711 CONTROL SYSTEM SCHEMATIC EF & RF

2-M-712 CONTROL SYSTEM SCHEDULE UH & CUH

2-M-713 CONTROL SYSTEM SCHEMATIC CRAC-107 & 203

2-M-714 CONTROL SYSTEM SCHEMATIC CRAC-105 & 106

2-M-715 CONTROL SYSTEM SCHEMATIC VAV BOX

SHT.

NO. FIRE PROTECTION

2-FA001 FIRE ALARM SYMBOLS, LEGEND AND ABBREVIATIONS

2-FA101 FIRST FLOOR - FIRE ALARM AND MASS NOTIFICATION -

OVERALL

2-FA102 FIRST FLOOR - FIRE ALARM AND MASS NOTIFICATION -

NEW WORK

2-FA111 SECOND FLOOR - FIRE ALARM AND MASS

NOTIFICATION - OVERALL

2-FA112 SECOND FLOOR - FIRE ALARM AND MASS

NOTIFICATION - NEW WORK

2-FA501 FIRE ALARM DETAILS

2-FA601 FIRE ALARM RISER

2-FA602 FIRE ALARM MATRIX

2-FP001 FIRE SUPPRESSION NOTES, LEGEND AND

ABBREVIATIONS

2-FP101 FIRST FLOOR - FIRE SUPPRESSION - OVERALL

2-FP102 FIRST FLOOR - FIRE SUPPRESSION - NEW WORK

2-FP111 SECOND FLOOR - FIRE SUPPRESSION - OVERALL

2-FP112 SECOND FLOOR - FIRE SUPPRESSION - NEW WORK

SHT.

NO. CIVIL

2-GC001 CIVIL LEGEND AND ABBREVIATIONS

2-GC002 LOCATION PLAN AND VICINITY MAP

2-GC101 ACCESS AND SAFETY PLAN

2-GC102 ACCESS AND SAFETY NOTES

2-V101 EXISTING CONDITIONS PLAN

2-B-101 BORING LOCATION PLAN

2-B-102 BORING LOG 1 OF 2

2-B-103 BORING LOG 2 OF 2

2-CD100 DEMOLITION PLAN

2-CS100 OVERALL SITE PLAN

2-CS101 ENLARGED SITE PLAN 1 OF 2

2-CS102 ENLARGED SITE PLAN 2 OF 2

2-CS400 RIGID PAVEMENT JOINTING AND ELEVATION PLAN

2-CS501 SITE DETAILS 1 OF 2

2-CS502 SITE DETAILS 2 OF 2

2-CS503 PAVEMENT DETAILS 1 OF 2

2-CS504 PAVEMENT DETAILS 2 OF 2

2-CG100 OVERALL GRADING PLAN

2-CG101 ENLARGED GRADING PLAN 1 OF 2

2-CG102 ENLARGED GRADING PLAN 2 OF 2

2-CG120 EROSION AND SEDIMENT CONTROL PLAN

2-CG200 OVEREXCAVATION GRADING PLAN

2-CG501 EROSION CONTROL DETAILS 1 OF 2

2-CG502 EROSION CONTROL DETAILS 2 OF 2

2-CP100 OVERALL CATHODIC PROTECTION PLAN

2-CP501 CATHODIC PROTECTION DETAILS

2-CU100 OVERALL UTILITY PLAN

2-CU101 ENLARGED UTILITY PLAN 1 OF 2

2-CU102 ENLARGED UTILITY PLAN 2 OF 2

2-CU201 UTILITY PROFILES

2-CU501 UTILITY DETAILS 1 OF 3

2-CU502 UTILITY DETAILS 2 OF 3

2-CU503 UTILITY DETAILS 3 OF 3

GUY & ANCHOR

FIRE HYDRANT

WATER METER

GAS METER

UTILITY POLE

GM

LIGHT POLE

75.0

FINISH GRADE ELEVATION (PLAN)

CONCRETE SIDEWALK

VEHICULAR CONCRETE PAVEMENT

CONCRETE (SECTION)

ASPHALT (SECTION)

EARTH (SECTION)

XXXX

CASING PIPE

CULVERT WITH END WALL(s)

CULVERT WITH END SECTIONS

BUILDINGS AND STRUCTURES

CURB AND GUTTER

ROADS AND PAVED AREAS

SIDEWALKS

TOP OR TOE OF SLOPE TO MATCH EXIST. GRADE UNLESS AN ELEVATION

OR SLOPE IS INDICATED.

SECTION INDICATORS

SIGN

ELECTRICAL MANHOLE

TRANSFORMER/SWITCHGEAR

BM

VERTICAL CONTROL POINT (BENCH MARK)

4"G UTILITY REMOVAL

X X FENCE DEMOLITION

REDUCER

CAP, PLUG, BLIND FLANGE

VERTICAL CONTROL POINT

(TEMPORARY BENCH MARK)

VERTICAL CONTROL POINT

(USGS BENCH MARK)

C

COMMUNICATIONS MANHOLE

PP

GATE-SHOWING

DIRECTION OF SWING

LEGEND

TREES AND SHRUBS

TREE AND SHRUB REMOVAL

MAJOR CONTOUR (1.00')

BM

STORM MANHOLE

SANITARY

SEWER MANHOLE

SANITARY SEWER

CLEANOUT

ROOF DRAIN DOWNSPOUT

SIGN

TREEC TREE

ASPHALT PAVEMENT

REMOVAL/DEMOLITION

C TREE

F D

C

FIRE DEPARTMENT CONNECTION

CENTERLINE

STORM SEWER

SANITARY SEWER8"SS

XX

12"W

WATER LINE

4"G

UL

XX

GAS LINE

UNDERGROUND STREET LIGHTING CIRCUIT

POST INDICATOR VALVE

WATER LINE VALVE

FLOW LINE

SLOPE INDICATOR

TOP

TOE

XX

METAL SLAT FENCE

UE UNDERGROUND ELECTRIC LINE

TEMPORARY CHAINLINK FENCE

DIMENSION LINE EXTENSION BEYOND

MATCH LINE OR EDGE OF DRAWING

MATCH LINE

18"RCP

C

REINFORCED CONCRETE PIPE

COMMUNICATION LINE

SD 100' @1.00%

18" CLASS IV RCP

SILT FENCE

SS

RESTRAINED JOINT (THRUST BLOCK)

DIRECTION OF TRAVEL

(FOR CLARITY, NOT CONSTRUCTION)

GM

WV

1269.93

CO

PUG

D

S

CO

FOUND PROPERTY CORNER

GAS LINE VALVE

ELECTRIC OR TELEPHONE JUNCTION BOX

SPOT ELEVATION

75.0

CONTROL MONUMENT

FLARED END SECTION

AC- ACRE

ACM- ASBESTOS CONTAINING MATERIAL

ACP- ACCESS CONTROL POINT

ADA- AMERICANS WITH DISABILITIES ACT

ASTM- AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATFP- ANTI-TERRORISM/FORCE PROTECTION

B/C- BACK OF CURB

B/L- BUILDING LINE

BMP- BEST MANAGEMENT PRACTICES

C-C- CENTER TO CENTER

COE- CORPS OF ENGINEERS

CPNODE- CATHODIC PROTECTION SYSTEM NODE

CMP- CORRUGATED METAL PIPE

CI- CURB INLET OR CAST IRON PIPE

CGI- CURB/GUTTER INLET

CO- CLEAN OUT/CONTRACTING OFFICER

DEPT- DEPARTMENT

DI- DUCTILE IRON OR DROP INLET

DIA- DIAMETER

D.N.D.- DO NOT DISTURB

DS- DOWNSPOUT

DWG- DRAWING

EL/ELEV- ELEVATION

FDC- FIRE DEPARTMENT CONNECTION

FES- FLARED END SECTION

FF- FINISH FLOOR

FH- FIRE HYDRANT

FL- FLOW LINE

FNC- FENCE

FOD- FOREIGN OBJECT DEBRIS

FT- FOOT

FTC- FLIGHT TRAINING CENTER

FuT- FUSELAGE TRAINER

FW- FIREWATER

GI- GRATED INLET

HDPE- HIGH DENSITY POLYETHYLENE

HW- HEADWALL

ID- INSIDE DIAMETER

MAX- MAXIMUM

MH- MANHOLE

MIN- MINIMUM

MUTCD- MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES

NO- NUMBER

NPW- NON-POTABLE WATER

NTS- NOT TO SCALE

OC- ON CENTER

OC EW- ON CENTER EACH WAY

OD- OUTSIDE DIAMETER

ODEQ- OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY

ODOT- OKLAHOMA DEPARTMENT OF TRANSPORTATION

OSHA- OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION

PC- POINT OF CURVATURE

PCC- PORTLAND CEMENT CONCRETE

PE- POLYETHYLENE

PI- POINT OF INTERSECTION

PIV- POST INDICATOR VALVE

POV- PRIVATELY OWNED VEHICLE

PSI- POUNDS PER SQUARE INCH

PT- PHYSICAL TRAINING, POINT OF TANGENCY

PUG- POWER UNDERGROUND

PVC- POLYVINYL CHLORIDE, POINT OF VERTICAL CURVATURE

PVI- POINT OF VERTICAL INTERSECTION

PVT- POINT OF VERTICAL TANGENCY

RCP- REINFORCED CONCRETE PIPE

RFDC- REMOTE FIRE DEPARTMENT CONNECTION

RFP- REQUEST FOR PROPOSAL

SS- SANITARY SEWER

SSMH- SANITARY SEWER MANHOLE

SD- STORM DRAIN

SDI- STORM DRAIN INLET

SDMH- STORM DRAIN MANHOLE

ST- STREET

SWPPP- STORM WATER POLLUTION PREVENTION PLAN

T/C- TOP OF CURB

(TYP)- TYPICAL

U/E- UTILITY EASEMENT

WM- WATER METER

WV- WATER VALVE

WW- WASTE WATER

WWF- WELDED WIRE FABRIC

LETTER DESIGNATION

OF SECTION/DETAIL

DWG. NO. WHERE

SECTION IS DETAILED

TREE

EXISTING NEW DESCRIPTION

LEGEND

EXISTING NEW DESCRIPTION

LEGEND

EXISTING NEW DESCRIPTION

LEGEND

ABBREVIATIONS DESCRIPTION

XXX

XX

XX

XXX

CO

GAS VENT PIPE

E

C

G

X

W

X

C

X

ES

X

T TELEPHONE MANHOLE

GROUNDING POINT

GAS LINE MARKER

SF

TS-XX

CATHODIC PROTECTION TEST STATION

FOR HYDRANT ASSEMBLY W/ 2 MAG

TS-XX

CATHODIC PROTECTION TEST STATION

SINGLE FITTING W/ 2 MAG

TS-XX

CATHODIC PROTECTION TEST STATION

SINGLE FITTING W/ 1 MAG

B-XX

INF-XX

RES-XX

TEMPORARY STABILIZED

CONSTRUCTION ENTRANCE

BORING LOCATION

RESISTIVITY TEST LOCATION

INFILTRATION TEST LOCATION

POTENTIAL BORROW AND

STOCKPILE LOCATION

STAGING/LAYDOWN AREA

PROJECT SITE

LIMITS OF CONSTRUCTION

CONTRACTOR HAUL ROUTE

TEMPORARY CONSTRUCTION

SNOW FENCE

CATV

FOS

FO

E

X

X

X

SD

AIRCRAFT FUELING LINE

FIBER OPTIC LINE

CABLE TELEVISION LINE

VEHICULAR ASPHALT PAVEMENT

70.00

GRADED-CRUSHED

AGGREGATE (SECTION)

8/23/2016 1:00 PM

Z:\Clients\ANF\USCOE\SwT\89371_AltusFTC2\Design\Civil\Sheets\89371-GC001.dwg

B U

R N

S

M c D

O N

N E

L L

W

A R

D

P

A R

K W

A Y

K A

N S

I T

Y

O

US ARMY CORPS

OF ENGINEERS ®

D

2 3

C

A

B

D R

A W

I N

G

C

O D

E

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

D A

T E

C H

E C

K E

D

B

Y

S C

A L

E

SHEET

REFERENCE

NUMBER:

C O

P Y

R I G

H

B

U R

N

D

O N

N E

L

E

G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

6 7 8 9

D A

T E

E

F

FILE:

DATE:

P R

O J E

G

I N

E E

R A

R C

H I T

E C

T

TULSA DISTRICT

D

A T

E A

P P

R

D E

S C

R I P

T I O

N S

Y M

B O

L

R E

V I S

I O

N S

D E

P A

R T

M E

F

T

R M

Y

U S

A

R M

Y

C

O R

P

E

N G

I N

E E

R S

TU

LS

A D

IS

TR

IC

T

O K

L A

H O

M A

AL

TU

S

AI

R

FO

RC

E

BA

SE

, O

KL

AH

OM

A

PR

OJ

EC

T

NO

. A

GG

N1

F Y-

KC

-4 6A

F

TU

F

TC

S

IM

UL

AT

OR

F

AC

ILI

TY

P

HA

SE

R E

A D

Y

T

O

A

D V

E R

T I S

E

A s

I n d i c a t e d

2-GC001

I V

I L

L E

G E

N D

A N

D

A

B B

R E

V I A

T I O

N S

R

B

A U

R T

H

C

F

R A

N Z

E N

S

W

A G

N E

R

AutoCAD SHX Text G

AutoCAD SHX Text W

AutoCAD SHX Text

CO

CONTRACTOR ENTRANCE

(SEE SHEET 2-GC101)

PROJECT LOCATION

ALTUS AIR FORCE BASE, OKLAHOMA

SITE LOCATION

V

E

N

U

E

N

D

S

T R

E E

T

FIR DRIVE

R

E

E

T

R

E

E

T

O

R

D

N

A

N

A

D

S

T

S

T R

E E

T

A L T

U

A

B

E

N

U

E

E AVENUE

F AVENUE

HIGHWAY 62

HIGHWAY 62

ORDNANCE ROAD

R

E

E

T

R

E

E

T

E. FALCON ROAD

E

N

U

E

8/23/2016 1:00 PM

Z:\Clients\ANF\USCOE\SwT\89371_AltusFTC2\Design\Civil\Sheets\89371-GC002.dwg

T

A

X

I W

Y

NORTH

RAMP

T A

X I W

U

N W

L

R U

N W

L

R

B U

R N

D

O N

N E

L L

R

D

P

A R

K W

A Y

K A

N S

T

Y

US ARMY CORPS

OF ENGINEERS ®

D

2 3

C

A

B

D R

A W

I N

G

C

O D

E

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

D A

T E

C H

E C

K E

D

B

Y

S C

A L

E

SHEET

REFERENCE

NUMBER:

C O

P Y

R I G

B

U R

D

O N

N E

G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

6 7 8 9

D A

T E

E

F

FILE:

DATE:

P R

O J E

G

I N

E E

R A

R C

H I T

E C

T

TULSA DISTRICT

D

A T

E A

P P

R

D E

S C

R I P

T I O

N S

Y M

B O

L

R E

V I S

I O

N S

D E

P A

R T

M E

T

M

Y

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

TU

LS

A D

IS

TR

IC

T

O K

L A

H O

M A

AL

TU

S

AI

R

FO

RC

E

BA

SE

, O

KL

AH

OM

A

PR

OJ

EC

T

NO

. A

GG

N1

F Y-

KC

-4 6A

F

TU

F

TC

S

IM

UL

AT

OR

F

AC

ILI

TY

P

HA

SE

R E

A D

Y

T

O

A

D V

E R

T I S

E

0 1000' 2000'

NOT TO SCALE

LOCATION PLAN

D6

1" = 1000'

VICINITY MAP

A1

A s

I n d i c a t

2-GC002

O

C A

T I O

N

P

L A

N

A N

D

V

I C

I N

I T

Y

M

A P

R

B

A U

R T

H

C

F

R A

N Z

E N

S

W

A G

N E

R

S

C

O U

N T

Y

R

O A

D

S

C

O U

N T

Y

R

O A

D

PLAN

NORTH

TRUE

NORTH

AutoCAD SHX Text N

AutoCAD SHX Text o

AutoCAD SHX Text r

AutoCAD SHX Text t

AutoCAD SHX Text h

AutoCAD SHX Text C

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text a

AutoCAD SHX Text d

AutoCAD SHX Text i

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text R

AutoCAD SHX Text i

AutoCAD SHX Text v

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text C

AutoCAD SHX Text i

AutoCAD SHX Text m

AutoCAD SHX Text a

AutoCAD SHX Text r

AutoCAD SHX Text r

AutoCAD SHX Text o

AutoCAD SHX Text n

AutoCAD SHX Text C

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text a

AutoCAD SHX Text d

AutoCAD SHX Text i

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text R

AutoCAD SHX Text i

AutoCAD SHX Text v

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text R

AutoCAD SHX Text i

AutoCAD SHX Text v

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text W

AutoCAD SHX Text a

AutoCAD SHX Text s

AutoCAD SHX Text h

AutoCAD SHX Text i

AutoCAD SHX Text t

AutoCAD SHX Text a

AutoCAD SHX Text R

AutoCAD SHX Text i

AutoCAD SHX Text v

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text R

AutoCAD SHX Text e

AutoCAD SHX Text d

AutoCAD SHX Text R

AutoCAD SHX Text i

AutoCAD SHX Text v

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text A

AutoCAD SHX Text r

AutoCAD SHX Text k

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text s

AutoCAD SHX Text a

AutoCAD SHX Text s

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text a

AutoCAD SHX Text k

AutoCAD SHX Text e

AutoCAD SHX Text T

AutoCAD SHX Text e

AutoCAD SHX Text x

AutoCAD SHX Text o

AutoCAD SHX Text m

AutoCAD SHX Text a

AutoCAD SHX Text E

AutoCAD SHX Text u

AutoCAD SHX Text f

AutoCAD SHX Text a

AutoCAD SHX Text u

AutoCAD SHX Text l

AutoCAD SHX Text a

AutoCAD SHX Text L

AutoCAD SHX Text a

AutoCAD SHX Text k

AutoCAD SHX Text e

AutoCAD SHX Text R

AutoCAD SHX Text o

AutoCAD SHX Text b

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text t

AutoCAD SHX Text S

AutoCAD SHX Text K

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text r

AutoCAD SHX Text R

AutoCAD SHX Text e

AutoCAD SHX Text s

AutoCAD SHX Text O

AutoCAD SHX Text o

AutoCAD SHX Text l

AutoCAD SHX Text o

AutoCAD SHX Text g

AutoCAD SHX Text a

AutoCAD SHX Text h

AutoCAD SHX Text L

AutoCAD SHX Text a

AutoCAD SHX Text k

AutoCAD SHX Text e

AutoCAD SHX Text L

AutoCAD SHX Text a

AutoCAD SHX Text k

AutoCAD SHX Text e

AutoCAD SHX Text O

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text h

AutoCAD SHX Text e

AutoCAD SHX Text C

AutoCAD SHX Text h

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text o

AutoCAD SHX Text k

AutoCAD SHX Text e

AutoCAD SHX Text e

AutoCAD SHX Text s

AutoCAD SHX Text H

AutoCAD SHX Text u

AutoCAD SHX Text g

AutoCAD SHX Text o

AutoCAD SHX Text L

AutoCAD SHX Text a

AutoCAD SHX Text k

AutoCAD SHX Text e

AutoCAD SHX Text L

AutoCAD SHX Text i

AutoCAD SHX Text t

AutoCAD SHX Text t

AutoCAD SHX Text l

AutoCAD SHX Text e

AutoCAD SHX Text R

AutoCAD SHX Text i

AutoCAD SHX Text v

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text B

AutoCAD SHX Text r

AutoCAD SHX Text o

AutoCAD SHX Text k

AutoCAD SHX Text e

AutoCAD SHX Text n

AutoCAD SHX Text B

AutoCAD SHX Text o

AutoCAD SHX Text w

AutoCAD SHX Text L

AutoCAD SHX Text a

AutoCAD SHX Text k

AutoCAD SHX Text e

AutoCAD SHX Text W

AutoCAD SHX Text a

AutoCAD SHX Text t

AutoCAD SHX Text o

AutoCAD SHX Text n

AutoCAD SHX Text g

AutoCAD SHX Text a

AutoCAD SHX Text A

AutoCAD SHX Text d

AutoCAD SHX Text a

AutoCAD SHX Text A

AutoCAD SHX Text l

AutoCAD SHX Text t

AutoCAD SHX Text u

AutoCAD SHX Text s

AutoCAD SHX Text A

AutoCAD SHX Text l

AutoCAD SHX Text v

AutoCAD SHX Text a

AutoCAD SHX Text A

AutoCAD SHX Text n

AutoCAD SHX Text a

AutoCAD SHX Text d

AutoCAD SHX Text a

AutoCAD SHX Text r

AutoCAD SHX Text k

AutoCAD SHX Text o

AutoCAD SHX Text A

AutoCAD SHX Text n

AutoCAD SHX Text t

AutoCAD SHX Text l

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text s

AutoCAD SHX Text A

AutoCAD SHX Text r

AutoCAD SHX Text d

AutoCAD SHX Text m

AutoCAD SHX Text o

AutoCAD SHX Text r

AutoCAD SHX Text e

AutoCAD SHX Text A

AutoCAD SHX Text t

AutoCAD SHX Text o

AutoCAD SHX Text k

AutoCAD SHX Text a

AutoCAD SHX Text B

AutoCAD SHX Text l

AutoCAD SHX Text a

AutoCAD SHX Text c

AutoCAD SHX Text k

AutoCAD SHX Text w

AutoCAD SHX Text e

AutoCAD SHX Text l

AutoCAD SHX Text l

AutoCAD SHX Text B

AutoCAD SHX Text o

AutoCAD SHX Text i

AutoCAD SHX Text s

AutoCAD SHX Text e

AutoCAD SHX Text C

AutoCAD SHX Text i

AutoCAD SHX Text t

AutoCAD SHX Text y

AutoCAD SHX Text C

AutoCAD SHX Text h

AutoCAD SHX Text i

AutoCAD SHX Text c

AutoCAD SHX Text k

AutoCAD SHX Text a

AutoCAD SHX Text s

AutoCAD SHX Text h

AutoCAD SHX Text a

AutoCAD SHX Text C

AutoCAD SHX Text l

AutoCAD SHX Text a

AutoCAD SHX Text r

AutoCAD SHX Text e

AutoCAD SHX Text m

AutoCAD SHX Text o

AutoCAD SHX Text r

AutoCAD SHX Text e

AutoCAD SHX Text C

AutoCAD SHX Text l

AutoCAD SHX Text i

AutoCAD SHX Text n

AutoCAD SHX Text t

AutoCAD SHX Text o

AutoCAD SHX Text n

AutoCAD SHX Text C

AutoCAD SHX Text u

AutoCAD SHX Text s

AutoCAD SHX Text h

AutoCAD SHX Text i

AutoCAD SHX Text n

AutoCAD SHX Text g

AutoCAD SHX Text D

AutoCAD SHX Text u

AutoCAD SHX Text n

AutoCAD SHX Text c

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text D

AutoCAD SHX Text u

AutoCAD SHX Text r

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text t

AutoCAD SHX Text E

AutoCAD SHX Text l

AutoCAD SHX Text R

AutoCAD SHX Text e

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text E

AutoCAD SHX Text l

AutoCAD SHX Text k

AutoCAD SHX Text C

AutoCAD SHX Text i

AutoCAD SHX Text t

AutoCAD SHX Text y

AutoCAD SHX Text E

AutoCAD SHX Text u

AutoCAD SHX Text f

AutoCAD SHX Text a

AutoCAD SHX Text u

AutoCAD SHX Text l

AutoCAD SHX Text a

AutoCAD SHX Text F

AutoCAD SHX Text r

AutoCAD SHX Text e

AutoCAD SHX Text d

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text i

AutoCAD SHX Text c

AutoCAD SHX Text k

AutoCAD SHX Text G

AutoCAD SHX Text u

AutoCAD SHX Text t

AutoCAD SHX Text h

AutoCAD SHX Text r

AutoCAD SHX Text i

AutoCAD SHX Text e

AutoCAD SHX Text G

AutoCAD SHX Text u

AutoCAD SHX Text y

AutoCAD SHX Text m

AutoCAD SHX Text o

AutoCAD SHX Text n

AutoCAD SHX Text H

AutoCAD SHX Text e

AutoCAD SHX Text n

AutoCAD SHX Text r

AutoCAD SHX Text y

AutoCAD SHX Text e

AutoCAD SHX Text t

AutoCAD SHX Text t

AutoCAD SHX Text a

AutoCAD SHX Text H

AutoCAD SHX Text o

AutoCAD SHX Text b

AutoCAD SHX Text a

AutoCAD SHX Text r

AutoCAD SHX Text t

AutoCAD SHX Text H

AutoCAD SHX Text o

AutoCAD SHX Text l

AutoCAD SHX Text d

AutoCAD SHX Text e

AutoCAD SHX Text n

AutoCAD SHX Text v

AutoCAD SHX Text i

AutoCAD SHX Text l

AutoCAD SHX Text l

AutoCAD SHX Text e

AutoCAD SHX Text H

AutoCAD SHX Text u

AutoCAD SHX Text g

AutoCAD SHX Text o

AutoCAD SHX Text I

AutoCAD SHX Text d

AutoCAD SHX Text a

AutoCAD SHX Text b

AutoCAD SHX Text e

AutoCAD SHX Text l

AutoCAD SHX Text M

AutoCAD SHX Text c

AutoCAD SHX Text A

AutoCAD SHX Text l

AutoCAD SHX Text e

AutoCAD SHX Text s

AutoCAD SHX Text t

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text M

AutoCAD SHX Text i

AutoCAD SHX Text a

AutoCAD SHX Text m

AutoCAD SHX Text i

AutoCAD SHX Text O

AutoCAD SHX Text k

AutoCAD SHX Text m

AutoCAD SHX Text u

AutoCAD SHX Text l

AutoCAD SHX Text g

AutoCAD SHX Text e

AutoCAD SHX Text e

AutoCAD SHX Text P

AutoCAD SHX Text a

AutoCAD SHX Text u

AutoCAD SHX Text l

AutoCAD SHX Text s

AutoCAD SHX Text V

AutoCAD SHX Text a

AutoCAD SHX Text l

AutoCAD SHX Text l

AutoCAD SHX Text e

AutoCAD SHX Text y

AutoCAD SHX Text P

AutoCAD SHX Text a

AutoCAD SHX Text w

AutoCAD SHX Text h

AutoCAD SHX Text u

AutoCAD SHX Text s

AutoCAD SHX Text k

AutoCAD SHX Text a

AutoCAD SHX Text P

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text r

AutoCAD SHX Text y

AutoCAD SHX Text P

AutoCAD SHX Text o

AutoCAD SHX Text t

AutoCAD SHX Text e

AutoCAD SHX Text a

AutoCAD SHX Text u

AutoCAD SHX Text P

AutoCAD SHX Text r

AutoCAD SHX Text y

AutoCAD SHX Text o

AutoCAD SHX Text r

AutoCAD SHX Text S

AutoCAD SHX Text a

AutoCAD SHX Text p

AutoCAD SHX Text u

AutoCAD SHX Text l

AutoCAD SHX Text p

AutoCAD SHX Text a

AutoCAD SHX Text S

AutoCAD SHX Text e

AutoCAD SHX Text i

AutoCAD SHX Text l

AutoCAD SHX Text i

AutoCAD SHX Text n

AutoCAD SHX Text g

AutoCAD SHX Text S

AutoCAD SHX Text h

AutoCAD SHX Text a

AutoCAD SHX Text t

AutoCAD SHX Text t

AutoCAD SHX Text u

AutoCAD SHX Text c

AutoCAD SHX Text k

AutoCAD SHX Text T

AutoCAD SHX Text a

AutoCAD SHX Text h

AutoCAD SHX Text l

AutoCAD SHX Text e

AutoCAD SHX Text q

AutoCAD SHX Text u

AutoCAD SHX Text a

AutoCAD SHX Text h

AutoCAD SHX Text W

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text d

AutoCAD SHX Text w

AutoCAD SHX Text a

AutoCAD SHX Text r

AutoCAD SHX Text d

AutoCAD SHX Text V

AutoCAD SHX Text i

AutoCAD SHX Text n

AutoCAD SHX Text i

AutoCAD SHX Text t

AutoCAD SHX Text a

AutoCAD SHX Text M

AutoCAD SHX Text a

AutoCAD SHX Text d

AutoCAD SHX Text i

AutoCAD SHX Text l

AutoCAD SHX Text l

AutoCAD SHX Text S

AutoCAD SHX Text e

AutoCAD SHX Text m

AutoCAD SHX Text i

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text l

AutoCAD SHX Text e

AutoCAD SHX Text B

AutoCAD SHX Text u

AutoCAD SHX Text f

AutoCAD SHX Text f

AutoCAD SHX Text a

AutoCAD SHX Text l

AutoCAD SHX Text o

AutoCAD SHX Text G

AutoCAD SHX Text r

AutoCAD SHX Text o

AutoCAD SHX Text v

AutoCAD SHX Text e

AutoCAD SHX Text C

AutoCAD SHX Text o

AutoCAD SHX Text a

AutoCAD SHX Text l

AutoCAD SHX Text g

AutoCAD SHX Text a

AutoCAD SHX Text t

AutoCAD SHX Text e

AutoCAD SHX Text S

AutoCAD SHX Text u

AutoCAD SHX Text l

AutoCAD SHX Text p

AutoCAD SHX Text h

AutoCAD SHX Text u

AutoCAD SHX Text r

AutoCAD SHX Text W

AutoCAD SHX Text a

AutoCAD SHX Text u

AutoCAD SHX Text r

AutoCAD SHX Text i

AutoCAD SHX Text k

AutoCAD SHX Text a

AutoCAD SHX Text S

AutoCAD SHX Text a

AutoCAD SHX Text y

AutoCAD SHX Text r

AutoCAD SHX Text e

AutoCAD SHX Text B

AutoCAD SHX Text a

AutoCAD SHX Text r

AutoCAD SHX Text t

AutoCAD SHX Text l

AutoCAD SHX Text e

AutoCAD SHX Text s

AutoCAD SHX Text v

AutoCAD SHX Text i

AutoCAD SHX Text l

AutoCAD SHX Text l

AutoCAD SHX Text e

AutoCAD SHX Text B

AutoCAD SHX Text r

AutoCAD SHX Text o

AutoCAD SHX Text k

AutoCAD SHX Text e

AutoCAD SHX Text n

AutoCAD SHX Text A

AutoCAD SHX Text r

AutoCAD SHX Text r

AutoCAD SHX Text o

AutoCAD SHX Text w

AutoCAD SHX Text E

AutoCAD SHX Text d

AutoCAD SHX Text m

AutoCAD SHX Text o

AutoCAD SHX Text n

AutoCAD SHX Text d

AutoCAD SHX Text E

AutoCAD SHX Text n

AutoCAD SHX Text i

AutoCAD SHX Text d

AutoCAD SHX Text L

AutoCAD SHX Text a

AutoCAD SHX Text w

AutoCAD SHX Text t

AutoCAD SHX Text o

AutoCAD SHX Text n

AutoCAD SHX Text M

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text r

AutoCAD SHX Text e

AutoCAD SHX Text M

AutoCAD SHX Text u

AutoCAD SHX Text s

AutoCAD SHX Text k

AutoCAD SHX Text o

AutoCAD SHX Text g

AutoCAD SHX Text e

AutoCAD SHX Text e

AutoCAD SHX Text N

AutoCAD SHX Text o

AutoCAD SHX Text r

AutoCAD SHX Text m

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text P

AutoCAD SHX Text o

AutoCAD SHX Text n

AutoCAD SHX Text c

AutoCAD SHX Text a

AutoCAD SHX Text C

AutoCAD SHX Text i

AutoCAD SHX Text t

AutoCAD SHX Text y

AutoCAD SHX Text S

AutoCAD SHX Text h

AutoCAD SHX Text a

AutoCAD SHX Text w

AutoCAD SHX Text n

AutoCAD SHX Text e

AutoCAD SHX Text e

AutoCAD SHX Text S

AutoCAD SHX Text t

AutoCAD SHX Text i

AutoCAD SHX Text l

AutoCAD SHX Text l

AutoCAD SHX Text w

AutoCAD SHX Text a

AutoCAD SHX Text t

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text T

AutoCAD SHX Text u

AutoCAD SHX Text l

AutoCAD SHX Text s

AutoCAD SHX Text a

AutoCAD SHX Text O

AutoCAD SHX Text k

AutoCAD SHX Text l

AutoCAD SHX Text a

AutoCAD SHX Text h

AutoCAD SHX Text o

AutoCAD SHX Text m

AutoCAD SHX Text a

AutoCAD SHX Text C

AutoCAD SHX Text i

AutoCAD SHX Text t

AutoCAD SHX Text y

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text W

AutoCAD SHX Text i

AutoCAD SHX Text c

AutoCAD SHX Text h

AutoCAD SHX Text i

AutoCAD SHX Text t

AutoCAD SHX Text a

AutoCAD SHX Text M

AutoCAD SHX Text t

AutoCAD SHX Text s

AutoCAD SHX Text A

AutoCAD SHX Text r

AutoCAD SHX Text b

AutoCAD SHX Text u

AutoCAD SHX Text c

AutoCAD SHX Text k

AutoCAD SHX Text l

AutoCAD SHX Text e

AutoCAD SHX Text M

AutoCAD SHX Text t

AutoCAD SHX Text s

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text B

AutoCAD SHX Text l

AutoCAD SHX Text a

AutoCAD SHX Text c

AutoCAD SHX Text k

AutoCAD SHX Text M

AutoCAD SHX Text e

AutoCAD SHX Text s

AutoCAD SHX Text a

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SOUTH GATE

MAIN GATE

SECURITY POLICE

FIRE DEPARTMENT

CONSTRUCTION MANAGMENT

BASE CE OFFICE

CP#1

(60 D N

AIL)

CP#1

(60 D N

AIL)

CP#1

(60 D N

AIL)

CP#1

(M

AG N

AIL)

CP#1

(60 D N

AIL)

CP#1

2 R

ESET (C

OE M

ON)

T A

X I W

T

A

X

I

W

T

A

X

I

W

T

A

X

I

W

E

N

U

E

T

H

S

T

R

E

E

T

FIR AVENUE

R

E

E

T

R

E

E

T

FIR AVENUE

R

E

E

E

N

U

E

D A

VENUE

R

E

E

T

R

E

E

T

R

E

E

T

E

S

T

O

P

S

T

O

P

S

T

O

P

XX

XX

XX

X X

E 1582936.37

TEMPORARY

CHAINLINK FENCE

N 485616.78

E 1583060.33

TEMPORARY CHAINLINK FENCE

N 485830.93

CP#151(60D NAIL)

CP#121(60D NAIL)

CP#152(60D NAIL)

CP#150(MAG NAIL)

CP#153(60D NAIL)

CP#12 RESET (COE MON)

E

N

U

E

R

E E

T

F

E

N

U

E

T

H

S

T R

E E

T

T

H

S

T R

E E

T

F

E

N

U

E

T

H

S

T R

E E

T

D A

VENUE

D AVENUE

T

H

S

T R

E E

T

T

H

S

T R

E E

T

T

H

S

T R

E E

T

E

STOP

S T

O P

S T

O P

8/24/2016 8:13 AM

Z:\Clients\ANF\USCOE\SwT\89371_AltusFTC2\Design\Civil\Sheets\89371-GC101.dwg

PROJECT SITE

(SEE ENLARGED

PLAN THIS SHEET)

E

N

U

E

N

D

S

T R

E E

T

S

T

S

T R

E E

T

FIR AVENUE

R

E

E

T

R

E

E

T

S

C

O U

N T

Y

R

O A

D

AIRFIELD

APRON

O

R

D

N

A

N

A

D

S

T

S

T R

E E

T

R

E E

T

A L T

A

D

B AVENUE

E AVENUE

F AVENUE

AIRFIELD

APRON

AIRFIELD

APRON

HIGHWAY 62

ORDNANCE ROAD

R

E

E

T

R

E

E

T

E. FALCON ROAD

E

N

U

E

LEGEND:

NOTES:

1. SEE SHEET 2-GC102 FOR ACCESS AND SAFETY

NOTES.

2. TEMPORARY STORMWATER PIPE INVERT SHALL BE

INSTALLED AT BOTTOM OF SWALE ELEVATION.

CONTRACTOR SHALL VERIFY ELEVATION PRIOR TO

INSTALLATION.

PROJECT SITE

CONTRACTOR

STAGING/LAYDOWN AREA

TEMPORARY STABILIZED

CONSTRUCTION ENTRANCE

TEMPORARY CHAINLINK FENCE

TEMPORARY ORANGE

CONSTRUCTION FENCE

CONTRACTOR HAUL ROUTE

XX

B U

R N

D

O N

N E

L L

R

D

P

A R

K W

A Y

K A

N S

T

Y

US ARMY CORPS

OF ENGINEERS ®

D

2 3

C

A

B

D R

A W

I N

G

C

O D

E

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

D A

T E

C H

E C

K E

D

B

Y

S C

A L

E

SHEET

REFERENCE

NUMBER:

C O

P Y

R I G

B

U R

D

O N

N E

G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

6 7 8 9

D A

T E

E

F

FILE:

DATE:

P R

O J E

G

I N

E E

R A

R C

H I T

E C

T

TULSA DISTRICT

D

A T

E A

P P

R

D E

S C

R I P

T I O

N S

Y M

B O

L

R E

V I S

I O

N S

D E

P A

R T

M E

T

M

Y

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

TU

LS

A D

IS

TR

IC

T

O K

L A

H O

M A

AL

TU

S

AI

R

FO

RC

E

BA

SE

, O

KL

AH

OM

A

PR

OJ

EC

T

NO

. A

GG

N1

F Y-

KC

-4 6A

F

TU

F

TC

S

IM

UL

AT

OR

F

AC

ILI

TY

P

HA

SE

R

E A

A

D V

E R

T I S

E

0 500' 1000'

200'0 100'

SCALE 1" = 100'

ENLARGED PLAN

C5

SCALE 1" = 500'

ACCESS AND SAFETY PLAN

A1

A s

I n d i c a t

2-GC101

C

C E

F

E T

Y

P

L

B

A U

R T

H

C

F

R A

N Z

E N

S

W

A G

N E

R

AVAILABLE AREA FOR

CONTRACTOR STAGING

AND LAYDOWN AREA

TEMPORARY STABILIZED

CONSTRUCTION ENTRANCE

TEMPORARY 18-INCH STORMWATER

PIPE WITH FLARED END SECTIONS

AND RIP-RAP (SEE NOTE 2)

TEMPORARY CHAINLINK FENCE

2-CG502

C6

2-CS502

A7

EXISTING FTC

(BY AGGN143004

CONTRACT)

EXISTING

FUT

TEMPORARY ORANGE

CONSTRUCTION FENCE

CONTRACTOR

ENTRY GATE

2-CU501

A7

F

E

N

U

E

T

H

S

T R

E E

T

D AVENUE

PLAN

NORTH

TRUE

NORTH

PLAN

NORTH

TRUE

NORTH

AutoCAD SHX Text

ASPH

AutoCAD SHX Text E

AutoCAD SHX Text

EBOX

AutoCAD SHX Text

HYD FUEL EMERG SHUTDOWN

AutoCAD SHX Text

FNC

AutoCAD SHX Text

FNC

AutoCAD SHX Text

POST

AutoCAD SHX Text

POST

AutoCAD SHX Text

2-GV

AutoCAD SHX Text

LP

AutoCAD SHX Text

FNC

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

TELBOX

AutoCAD SHX Text

CONC.

AutoCAD SHX Text E

AutoCAD SHX Text 12"

AutoCAD SHX Text 15"

AutoCAD SHX Text 24"

AutoCAD SHX Text 24"

AutoCAD SHX Text 3"

AutoCAD SHX Text

ASPH.

AutoCAD SHX Text

ASPH.

AutoCAD SHX Text

TRANS.

AutoCAD SHX Text E

AutoCAD SHX Text

EBOX TRANS

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

FH

AutoCAD SHX Text

FNC

AutoCAD SHX Text

LP

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text

FACULTY PKNG

AutoCAD SHX Text

CO

AutoCAD SHX Text

SSCO

AutoCAD SHX Text

TELBOX

AutoCAD SHX Text

WV

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

FL:1359.03

AutoCAD SHX Text E

AutoCAD SHX Text

10"PVC

AutoCAD SHX Text 18"H X 28"W

AutoCAD SHX Text

BTM:1351.96'

AutoCAD SHX Text

COMMH TR:1360.91

AutoCAD SHX Text 32"H X 50"W

AutoCAD SHX Text 15"

AutoCAD SHX Text 24"

AutoCAD SHX Text E

AutoCAD SHX Text

EVAULT

AutoCAD SHX Text

LP

AutoCAD SHX Text

POST'S

AutoCAD SHX Text

YIELD

AutoCAD SHX Text T

AutoCAD SHX Text

TELMH TR:1359.90

AutoCAD SHX Text

WV'S

AutoCAD SHX Text E

AutoCAD SHX Text

FH FLUSH MOUNT

AutoCAD SHX Text

3-GNODE

AutoCAD SHX Text

GNODE

AutoCAD SHX Text

MW EL:1360.98

AutoCAD SHX Text

PUG

AutoCAD SHX Text

PUG

AutoCAD SHX Text

PUG

AutoCAD SHX Text T

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WVR

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text 24"

AutoCAD SHX Text

FL:1359.77'

AutoCAD SHX Text

13X16 CGOMP

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text 15"

AutoCAD SHX Text 15"

AutoCAD SHX Text E

AutoCAD SHX Text

EBOX

AutoCAD SHX Text E

AutoCAD SHX Text

EBOX

AutoCAD SHX Text E

AutoCAD SHX Text

EBOX

AutoCAD SHX Text E

AutoCAD SHX Text

EMH TR:1360.21

AutoCAD SHX Text E

AutoCAD SHX Text

EMH TR:1360.54

AutoCAD SHX Text

MW EL:1359.56

AutoCAD SHX Text

MW EL:1359.84

AutoCAD SHX Text

VPR

AutoCAD SHX Text

POST

AutoCAD SHX Text

3" VERT. PVC PIPE

AutoCAD SHX Text

TELBOX

AutoCAD SHX Text T

AutoCAD SHX Text

TELMH TR:1359.91

AutoCAD SHX Text

WV

AutoCAD SHX Text

TUG

AutoCAD SHX Text

PUG

AutoCAD SHX Text

TUG

AutoCAD SHX Text T

AutoCAD SHX Text

TELMH TR:1360.71

AutoCAD SHX Text

WL WV

AutoCAD SHX Text

JP8

AutoCAD SHX Text

24"RCP

AutoCAD SHX Text

24"RCP

AutoCAD SHX Text

6"RCP

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

8"TC

AutoCAD SHX Text

10"PVC

AutoCAD SHX Text

8"TC

AutoCAD SHX Text

10"PVC

AutoCAD SHX Text S

AutoCAD SHX Text

SSMH TR:1358.53

AutoCAD SHX Text

10"PVC

AutoCAD SHX Text S

AutoCAD SHX Text

CO

AutoCAD SHX Text

SSCO

AutoCAD SHX Text T

AutoCAD SHX Text

6"PVC

AutoCAD SHX Text

INDUST. CONTL VALVE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

JP8 FUEL LINE

AutoCAD SHX Text

JP8 FUEL LINE

AutoCAD SHX Text

DIRECTION AND ANGLE UNKNOWN

AutoCAD SHX Text

POST

AutoCAD SHX Text

FROM CADD FILE NOT LOCATED IN FIELD

AutoCAD SHX Text

SSMTR:1360.87' FL IN:1354.01' OUT:1353.97'

AutoCAD SHX Text

SSMH TR:1361.30' FL IN:1354.75' OUT:1354.70'

AutoCAD SHX Text

SGDI TR:1357.75' FL IN/OUT:1354.05' FL 6" RCP:1354.43'

AutoCAD SHX Text

SGDI TR:1359.05' FL:1354.77'

AutoCAD SHX Text

SDMH TR:1361.47' FL IN/OUT:1358.97'

AutoCAD SHX Text

SDMH TR:1361.02' FL:1357.09'

AutoCAD SHX Text

SSMH TR:1359.77' FL NE:1353.40' FL NW-SE:1353.37'

AutoCAD SHX Text

EMH TR:1352.40 BTM:1353.65'

AutoCAD SHX Text

EMH TR:1361.18' NA ACCESS

AutoCAD SHX Text

EMH TR: 1360.93 BTM: 1352.93

AutoCAD SHX Text

FOD CHECKPOINT

AutoCAD SHX Text E

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text

ASPH

AutoCAD SHX Text E

AutoCAD SHX Text

EBOX

AutoCAD SHX Text

HYD FUEL EMERG SHUTDOWN

AutoCAD SHX Text

FNC

AutoCAD SHX Text

FNC

AutoCAD SHX Text

POST

AutoCAD SHX Text

POST

AutoCAD SHX Text

2-GV

AutoCAD SHX Text

LP

AutoCAD SHX Text

FNC

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

TELBOX

AutoCAD SHX Text

CONC.

AutoCAD SHX Text E

AutoCAD SHX Text 12"

AutoCAD SHX Text 15"

AutoCAD SHX Text 24"

AutoCAD SHX Text 24"

AutoCAD SHX Text 3"

AutoCAD SHX Text

ASPH.

AutoCAD SHX Text

ASPH.

AutoCAD SHX Text

TRANS.

AutoCAD SHX Text E

AutoCAD SHX Text

EBOX TRANS

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

FH

AutoCAD SHX Text

FNC

AutoCAD SHX Text

LP

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text

FACULTY PKNG

AutoCAD SHX Text

CO

AutoCAD SHX Text

SSCO

AutoCAD SHX Text

TELBOX

AutoCAD SHX Text

WV

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

FL:1359.03

AutoCAD SHX Text E

AutoCAD SHX Text

10"PVC

AutoCAD SHX Text 18"H X 28"W

AutoCAD SHX Text

BTM:1351.96'

AutoCAD SHX Text

COMMH TR:1360.91

AutoCAD SHX Text 32"H X 50"W

AutoCAD SHX Text 15"

AutoCAD SHX Text 24"

AutoCAD SHX Text E

AutoCAD SHX Text

EVAULT

AutoCAD SHX Text

LP

AutoCAD SHX Text

POST

AutoCAD SHX Text

POST'S

AutoCAD SHX Text

FL:1360.07

AutoCAD SHX Text

24"RCP

AutoCAD SHX Text

FL:1359.68

AutoCAD SHX Text

YIELD

AutoCAD SHX Text

YIELD

AutoCAD SHX Text

SPEED LIMIT 25

AutoCAD SHX Text T

AutoCAD SHX Text

TELMH TR:1359.90

AutoCAD SHX Text

WV'S

AutoCAD SHX Text E

AutoCAD SHX Text

FH FLUSH MOUNT

AutoCAD SHX Text

3-GNODE

AutoCAD SHX Text

GNODE

AutoCAD SHX Text

MW EL:1360.98

AutoCAD SHX Text

PUG

AutoCAD SHX Text

PUG

AutoCAD SHX Text

PUG

AutoCAD SHX Text T

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WVR

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text 24"

AutoCAD SHX Text

FL:1359.77'

AutoCAD SHX Text

13X16 CGOMP

AutoCAD SHX Text

FL:1359.27'

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text 15"

AutoCAD SHX Text 15"

AutoCAD SHX Text E

AutoCAD SHX Text

EBOX

AutoCAD SHX Text E

AutoCAD SHX Text

EBOX

AutoCAD SHX Text E

AutoCAD SHX Text

EBOX

AutoCAD SHX Text E

AutoCAD SHX Text

EMH TR:1360.21

AutoCAD SHX Text E

AutoCAD SHX Text

EMH TR:1360.54

AutoCAD SHX Text

MW EL:1359.56

AutoCAD SHX Text

MW EL:1359.84

AutoCAD SHX Text

VPR

AutoCAD SHX Text

POST

AutoCAD SHX Text

3" VERT. PVC PIPE

AutoCAD SHX Text

TELBOX

AutoCAD SHX Text T

AutoCAD SHX Text

TELMH TR:1359.91

AutoCAD SHX Text

WV

AutoCAD SHX Text

TUG

AutoCAD SHX Text

PUG

AutoCAD SHX Text

TUG

AutoCAD SHX Text T

AutoCAD SHX Text

WL WV

AutoCAD SHX Text

JP8

AutoCAD SHX Text

24"RCP

AutoCAD SHX Text

24"RCP

AutoCAD SHX Text

6"RCP

AutoCAD SHX Text

24"RCP

AutoCAD SHX Text

15"RCP

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

8"TC

AutoCAD SHX Text

10"PVC

AutoCAD SHX Text

8"TC

AutoCAD SHX Text

10"PVC

AutoCAD SHX Text

CO

AutoCAD SHX Text

SSCO

AutoCAD SHX Text T

AutoCAD SHX Text

INDUST. CONTL VALVE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

FUEL NODE

AutoCAD SHX Text

JP8 FUEL LINE

AutoCAD SHX Text

JP8 FUEL LINE

AutoCAD SHX Text

DIRECTION AND ANGLE UNKNOWN

AutoCAD SHX Text

DIR & LOCATION UNKNOWN

AutoCAD SHX Text

POST

AutoCAD SHX Text

FROM CADD FILE NOT LOCATED IN FIELD

AutoCAD SHX Text

SSMTR:1360.87' FL IN:1354.01' OUT:1353.97'

AutoCAD SHX Text

SSMH TR:1361.30' FL IN:1354.75' OUT:1354.70'

AutoCAD SHX Text

SGDI TR:1357.75' FL IN/OUT:1354.05' FL 6" RCP:1354.43'

AutoCAD SHX Text

SGDI TR:1359.05' FL:1354.77'

AutoCAD SHX Text

DGDI TR:1359.29' FLIN/OUT:1356.09'

AutoCAD SHX Text

SDMH TR:1361.47' FL IN/OUT:1358.97'

AutoCAD SHX Text

SDMH TR:1361.02' FL:1357.09'

AutoCAD SHX Text

EMH TR:1352.40 BTM:1353.65'

AutoCAD SHX Text

EMH TR:1361.18' NA ACCESS

AutoCAD SHX Text

EMH TR: 1360.93 BTM: 1352.93

AutoCAD SHX Text

FOD CHECKPOINT

AutoCAD SHX Text E

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

8"

GENERAL NOTES:

1. ALTUS AFB BASE CIVIL ENGINEERING FORM AF-103 DIG PERMIT SHALL BE

ROUTED THROUGH THE CONTRACTING OFFICER. THIS MAY TAKE

APPROXIMATELY 3 WEEKS OR MORE TO COMPLETE. UPON COMPLETION

CONTRACTOR SHALL CALL OKIE ONE-CALL FOR UTILITY LOCATING SERVICES

AT 1-800-522-6543.

2. CONTRACTOR IS REQUIRED TO FILE FAA FORM 7460 IN REFERENCE TO THE

CONTRACTOR'S SITE CONSTRUCTION EQUIPMENT. MAXIMUM EQUIPMENT

HEIGHT IS 150'-0". CONTRACTOR SHALL COORDINATE WITH ALTUS BASE CE

OFFICE FOR ANY TEMPORARY AIRFIELD WAIVERS.

3. THE STABILIZED CONSTRUCTION ENTRANCE LOCATION, AS SHOWN ON

2-GC101, SHALL BE DETERMINED BY THE CONTRACTOR, COORDINATED AND

APPROVED BY THE CONTRACTING OFFICER.

4. CONTRACTOR SHALL STOP WORK IMMEDIATELY AND CONTACT THE

CONTRACTING OFFICER IF A UTILITY LINE IS DISTURBED.

5. CONTRACTORS SHALL KEEP ALL ROADS AND STREETS CLEAN OF

CONSTRUCTION DEBRIS, MUD, ETC. AT ALL TIMES. CONTRACTOR SHALL

PROVIDE EQUIPMENT AND PERSONNEL TO CLEAN ANY STREETS AS

REQUESTED BY THE CONTRACTING OFFICER. CONTRACTOR IS RESPONSIBLE

FOR ALL REPAIRS TO STREETS, PARKING AREAS, AND BASE OR GOVERNMENT

PROPERTY, DUE TO DAMAGE BY THEIR CONSTRUCTION ACTIVITIES.

CONTRACTOR SHALL PROVIDE PHOTOGRAPHS AND/OR VIDEO RECORDING OF

THE EXISTING STATE FOR THE PROJECT LIMITS. ACCESS POINTS, HAUL

ROUTES, LAYDOWN AREA AND ANY OTHER AREAS DISTURBED BY THE

CONTRACTOR SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR

BETTER TO THE SATISFACTION OF THE CONTRACTING OFFICER.

CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER FOR A

PRECONSTRUCTION VIDEO DETAILING THE EXISTING CONDITION OF ACCESS

POINTS, HAUL ROUTES, AND LAYDOWN AREAS TO BE PERFORMED.

6. ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL

OF STATE, LOCAL, AND GOVERNMENT REGULATORY AGENCIES AND THE

CONTRACTING OFFICER.

7. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND

SPECIFICATIONS, STATE, LOCAL, AND GOVERNMENT CODES, ORDINANCES,

AND REGULATIONS. IN CASE OF CONTRADICTION OR DISCREPANCY BETWEEN

REQUIREMENTS, CONTRACTOR SHALL INCORPORATE WHICHEVER IS MOST

STRINGENT. WHERE A QUESTION REMAINS ON WHICH REQUIREMENT IS MOST

STRINGENT, CONTRACTOR SHALL SUBMIT ISSUE TO THE CONTRACTING

OFFICER IN WRITING. THE DECISION OF THE CONTRACTING OFFICER SHALL

BE CONSIDERED FINAL.

8. COORDINATE THE DISCONNECTION OF UTILITIES THROUGH THE

CONTRACTING OFFICER. DEMOLITION SHALL NOT BEGIN UNTIL WRITTEN BASE

APPROVAL IS RECEIVED. ALL EXISTING UTILITIES ARE TO BE TERMINATED AT

THEIR POINT OF CONNECTION TO THE MAINS. WHERE CONNECTIONS OF NEW

UTILITIES TO EXISTING UTILITIES ARE SHOWN ON THE PLANS, THE

CONTRACTOR SHALL EXPOSE THE EXISTING LINES AT THE PROPOSED

CONNECTIONS TO VERIFY THE LOCATIONS AND DEPTHS PRIOR TO

EXCAVATION FOR THE NEW LINES.

9. THE CONTRACTOR SHALL EXPOSE, VERIFY AND BACKFILL ALL EXISTING

UNDERGROUND UTILITIES AND STRUCTURES AT UTILITY CROSSINGS PRIOR

TO EXCAVATION OF PIPELINE TRENCH. UTILITY CROSSINGS AT A DEPTH

GREATER THAN 12-INCHES BELOW TRENCH BOTTOM DO NOT NEED TO BE

EXPOSED. UTILITY ALIGNMENT AND GRADE MAY BE CHANGED IF THERE ARE

CONFLICTS WITH ANY EXISTING UNDERGROUND UTILITIES AND STRUCTURES,

WHETHER SHOWN ON THE PLANS OR NOT. COORDINATE WITH THE

CONTRACTING OFFICER AND DESIGN ENGINEER.

RECORD DRAWING NOTES:

1. CONTRACTOR SHALL MAINTAIN UPDATED RECORD DRAWINGS AT ALL TIMES

THROUGH THE DURATION OF THE PROJECT. CONSTRUCTION RECORD

DRAWINGS IN CADD FORMAT, SHALL BE SUBMITTED TO THE CONTRACTING

OFFICER.

2. DURING CONSTRUCTION OF THE PROJECT, CONTRACTOR SHALL BE

RESPONSIBLE FOR KEEPING TRACK OF ANY CONTRACTING OFFICER

APPROVED FIELD CONSTRUCTION REVISIONS TO THE DESIGN DEPICTED ON

APPROVED CONSTRUCTION DRAWINGS. THESE REVISIONS SHALL BE USED

TO PREPARE RECORD DRAWINGS OF COMPLETED CONSTRUCTION.

3. ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS, AND

CONFIGURATIONS, AND ANY OTHER CHANGES OR DEVIATIONS FROM THE

INFORMATION PRESENTED ON THE ORIGINAL, APPROVED CONSTRUCTION

DRAWINGS SHALL BE NOTED. THIS INCLUDES BURIED OR CONCEALED

CONSTRUCTION AND UTILITY FEATURES THAT WERE REVEALED DURING

CONSTRUCTION.

ACCESS AND SAFETY NOTES:

ACCESS AND STAGING

1. ACCESS TO THE PROJECT FOR ALL CONTRACTOR PERSONNEL, VEHICLES,

AND EQUIPMENT IS ILLUSTRATED ON SHEET 2-GC101. ACCESS ROUTES MAY

BE SUBJECT TO CHANGE BASED ON OPERATIONAL REQUIREMENTS ON ALTUS

AFB. POTENTIAL SCHEDULE IMPACTS SHALL BE COORDINATED WITH THE

CONTRACTING OFFICER.

2. CONTRACTOR SHALL PROVIDE AND INSTALL A PROFESSIONALLY PAINTED

SIGN, MEETING CONTRACTING OFFICER APPROVAL, AT THE TEMPORARY

CONSTRUCTION ENTRANCE TO DIRECT MATERIAL SUPPLIERS AND

EMPLOYEES TO THE CONSTRUCTION SITE. CONTRACTOR SHALL PROVIDE A

MINIMUM NOTICE OF 48 HOUR ADVANCE NOTICE TO THE CONTRACTING

OFFICER REGARDING CONSTRUCTION DELIVERIES. DELIVERIES SHALL BE

SCHEDULED MONDAY-FRIDAY, 8:00 AM TO 4:00 PM.

3. CONTRACTOR'S STAGING AREA AND EMPLOYEE PARKING WILL BE LOCATED

AS INDICATED ON SHEET 2-GC101 OR AS DIRECTED BY THE CONTRACTING

OFFICER. CONTRACTOR MAY SUBMIT ALTERNATIVES TO STAGING AREA

LOCATIONS AS SHOWN. CONTRACTOR'S STAGING AREA SHALL BE SUBJECT

TO APPROVAL OF CONTRACTING OFFICER'S REPRESENTATIVE. LOCATION OF

CONTRACTOR'S STAGING AREA SHALL BE WITHIN THE PROJECT WORK AREA.

4. EXISTING BASE ROADS USED AS HAUL ROADS SHALL BE MAINTAINED SUCH

THAT UNOBSTRUCTED ACCESS WILL BE PROVIDED AT ALL TIMES FROM THE

ROAD TO THE STAGING AREA AND FROM THE STAGING AREA TO THE WORK

SITE AND FACILITATE GOVERNMENT ACCESS TO THE BASE AT ALL TIMES. THE

HAUL ROAD LOCATIONS SHALL BE AS INDICATED ON SHEET 2-GC101 AND

APPROVED BY THE CONTRACTING OFFICER.

5. CONTRACTOR SHALL COORDINATE ACTIVITIES THROUGHOUT THE PROJECT IN

A MANNER THAT ALLOWS EMERGENCY ACCESS TO ALL EXISTING ROADWAYS

AT ALL TIMES WITHOUT DELAYS TO EMERGENCY VEHICLE'S RESPONSE TIME.

CONTRACTOR SHALL MAINTAIN THE ACCESS ROUTE TO BE FREE FROM

DEBRIS CAUSED FROM CONSTRUCTION ACTIVITIES ON A DAILY BASIS.

6. STAGING AREA AND ANY OTHER AREA DISTURBED BY CONTRACTOR DURING

CONSTRUCTION SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION

OF EXISTING SITE. CONTRACTOR SHALL PROVIDE PHOTOGRAPHS AND VIDEO

RECORDING OF THE EXISTING PROJECT SITE, ALL HAUL ROADS, ALL BORROW

AREAS, ETC. PRIOR TO STARTING ANY WORK.

7. ALL CONTRACTOR VEHICLES AND PERSONNEL MAY BE SEARCHED BY ALTUS

AFB SECURITY POLICE WHEN ENTERING OR EXITING THE BASE AND MAY

EXPERIENCE DELAYS. ALL PERSONNEL, VEHICLES, AND TRAILERS ENTERING

OR EXITING ALTUS AFB MUST HAVE A VALID PHOTO ID PER BASE SECURITY

REQUIREMENTS. ALL VEHICLES ENTERING THE BASE MUST HAVE

CURRENT/VALID REGISTRATION, CURRENT/VALID INSURANCE, AND

CURRENT/VALID DRIVER'S LICENSE FOR THE OPERATOR. ALL CONTRACTOR

VEHICLES AND PERSONNEL SHALL BE RESPONSIBLE FOR COORDINATING

WITH THE BASE SECURITY OFFICER IN OBTAINING PROPER SECURITY

CLEARANCE AND BADGING PRIOR TO ENTERING SECURE AREAS. WHEN NOT

ENGAGED IN CONSTRUCTION ACTIVITIES, THE CONTRACTOR'S

CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE PARKED WITHIN THE

WORK/STAGING AREA.

8. CONTRACTOR SHALL COORDINATE WITH CONTRACTING OFFICER

CONCERNING ANY GOVERNMENT OWNED EQUIPMENT REQUIRING

RELOCATION TO COMPLETE PROJECT.

9. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION

ACTIVITIES, CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER,

POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES OF

THE CLOSURE. SEE NOTE 5, TRAFFIC CONTROL.

10. EROSION CONTROL DEVICES SHALL BE USED FOR THE STAGING AREA AND

ANY MATERIAL STOCK PILES WHEN NECESSARY TO CONTROL EROSION AND

STORM WATER RUNOFF, IN ACCORDANCE WITH ALL FEDERAL, STATE, AND

LOCAL REGULATIONS.

11. THE EXISTING BASE ROAD SPEED LIMITS AND LOAD LIMITS ARE STRICTLY

ENFORCED. ALL CONCRETE TRUCKS SHALL PUT DOWN EXTRA AXLES WHEN

TRAVELING ON ALTUS AFB PROPERTY.

COORDINATION AND COMMUNICATION

1. CONTRACTOR SHALL APPOINT A CONSTRUCTION SUPERINTENDENT, SUBJECT

TO THE APPROVAL OF THE CONTRACTING OFFICER, WHO SHALL BE PRESENT

ON THE CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS WHILE

JOB IS IN PROGRESS. THE SUPERINTENDENT SHALL BE DESIGNATED THE

RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE

ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S REPRESENTATIVE IS NOT

AVAILABLE ON THE CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE

SHALL BE PROVIDED.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT

COORDINATION BETWEEN ANY SUBCONTRACTORS AND THE CONTRACTING

OFFICER. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR

SHALL BE COORDINATED WITH THE CONTRACTING OFFICER.

TRAFFIC CONTROL

1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF THE LIMITS OF

CONSTRUCTION BY USING REINFORCED ORANGE TEMPORARY

CONSTRUCTION FENCE AND CHAINLINK FENCE AS APPROVED BY THE

CONTRACTING OFFICER.

2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH

COMPANY DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY

VISIBLE.

3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO

SOUND AN ALARM WHEN MOVING IN REVERSE.

4. ONLY RUBBER-TIRE VEHICLES WILL BE ALLOWED ON EXISTING

PAVEMENT-TO-REMAIN.

5. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 15 CALENDAR DAYS TO

ALTUS AFB AND THE CONTRACTING OFFICER FOR ROAD CLOSURE PRIOR TO

THE ROAD REQUIRING CLOSURE.

6. ANY DAMAGE TO ROADS AND PAVEMENTS-TO-REMAIN DUE TO

CONSTRUCTION EQUIPMENT OR TRAFFIC SHALL BE REPAIRED TO RESTORE

THE ROADS AND PAVEMENTS TO THEIR ORIGINAL CONDITION TO THE

SATISFACTION OF THE CONTRACTING OFFICER.

7. CONTRACTOR IS REQUIRED TO IMMEDIATELY CLEAN ANY DEBRIS CARRIED

ONTO THE ROADS/STREETS FROM CONTRACTOR'S EQUIPMENT OR

OPERATIONS. MATERIAL DROPPED WITHIN THESE AREAS SHALL BE

CONTINUOUSLY REMOVED BY SURFACE SWEEPERS OR OTHER APPROVED

METHODS DURING WORKING HOURS. ADDITIONAL CONSTRUCTION FENCE

MAY BE REQUIRED TO FULFILL THIS RESPONSIBILITY. STOCKPILED MATERIAL

SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING

FROM WIND, AIRCRAFT PROPWASH, OR JET BLAST.

EQUIPMENT AND STOCKPILE HEIGHT

1. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL HAVE BOOMS

OR ARMS LOWERED TO THEIR LOWEST ELEVATION.

2. CONTRACTOR SHALL NOT STOCKPILE CONSTRUCTION MATERIALS, SPOILS,

OR DEBRIS IN ANY AREA WHERE SUCH STOCKPILES WOULD PENETRATE

AVIATION SURFACES. RED OBSTRUCTION LIGHT, 360 DEGREES, SHALL BE

PLACED AT THE HIGHEST POINT OF THE STOCKPILE. STOCKPILING OF

MATERIAL WITHIN THE AIRFIELD SAFETY AREAS IS PROHIBITED.

3. TEMPORARY OBSTRUCTIONS, SUCH AS CRANES, MUST BE MARKED AND

LIGHTED IN ACCORDANCE WITH FAA AC 70/7460. ALL HAZARDOUS AREAS

(SUCH AS EXCAVATIONS OR STOCKPILED MATERIALS) ON THE AIRFIELD MUST

BE DELINEATED WITH LIGHTED BARRICADES ON ALL EXPOSED (VISIBLE OR

ACCESSIBLE) SIDES. CONTRACTOR SHALL PROVIDE ALL NECESSARY

INFORMATION TO THE BASE CE FOR CONSTRUCTION CRANES, EQUIPMENT,

AND RELATED EQUIPMENT, AND RELATED ACTIVITIES. ALL FORMS SHALL BE

APPROVED PRIOR TO USING OR BRINGING EQUIPMENT ON SITE.

CONTRACTOR TO SUBMIT 7460 FORMS TO FAA FOR ALL CONSTRUCTION.

4. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT

OPERATING IN AN AIRCRAFT OPERATIONS AREA IS GOVERNED BY FAA AC

150/5370-2F AND AC 150/5300-13A (CURRENT EDITIONS). TEMPORARY

OBSTRUCTIONS, SUCH AS CRANES AND EQUIPMENT LESS THAN 150'-0" IN

HEIGHT REQUIRE ADDITIONAL LOCAL APPROVAL AS WELL AS FAA 7460

APPROVAL. COORDINATE WITH ALTUS BASE CE OFFICE FOR LOCAL

OBSTRUCTION APPROVAL. WHEN EQUIPMENT IS EXPECTED TO PENETRATE

THE AIRFIELD APPROACH SURFACES OR WHEN CRANES WILL BE USED

ON-SITE, CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 60 DAYS TO

THE CONTRACTING OFFICER AND BASE AIRFIELD OPERATIONS PRIOR TO THE

START OF CONSTRUCTION TO COORDINATE THE SUBMITTAL OF FAA FORM

7460 TO THE FAA REGIONAL OFFICE. PERMISSION TO USE CRANES SHALL BE

ISSUED BY BASE AIRFIELD OPERATIONS AND THE CONTRACTING OFFICER

AFTER APPROVAL BY THE FAA.

5. OBSTRUCTION LIGHT FIXTURES SHALL BE AVIATION RED INCANDESCENT

STEADY BURNING FAA AC 150/5345-43, TYPE L-810. AIR FORCE POLICY DOES

NOT ALLOW USE OF LED FIXTURES FOR OBSTRUCTION LIGHTING.

OTHER SAFETY REQUIREMENTS

1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS

AND THE USCAE EM 385-1-1 SAFETY AND HEALTH REQUIREMENT MANUAL".

2. THE CONTRACTOR SHALL PERFORM ON-SITE INSPECTIONS DAILY AND PRIOR

TO LEAVING THE SITE EACH DAY TO REMEDY ANY SAFETY CONCERNS

IMMEDIATELY.

3. THERE SHALL BE NO PERMANENT WASTE SITES ON BASE PROPERTY. ANY

TEMPORARY WASTE AREA SHALL BE APPROVED BY THE CONTRACTING

OFFICER AND SHALL BE KEPT IN AN ORDERLY CONDITION. REMOVAL OF

WASTE THAT IS NOT PROPERLY MAINTAINED IS SUBJECT TO THE DIRECTION

OF THE CONTRACTING OFFICER.

4. CONTRACTOR SHALL COORDINATE THE RELOCATION AND SALVAGE OF ANY

GOVERNMENT OWNED EQUIPMENT WITH THE CONTRACTING OFFICER.

5. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO CONTROL DUST

CAUSED BY CONSTRUCTION ACTIVITIES TO A LIMIT ACCEPTABLE TO BASE

OPERATIONS. THE CONTRACTOR SHALL CONTROL BLOWING DUST ON THE

PROJECT SITE FROM ANY HAUL ROUTE OR WORK AREA REGARDLESS OF

SOURCE.

6. GASOLINE, DIESEL FUEL, OIL,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .