Convert Circuit 6, Selected Portions from OH to UG, Sheppard Air Force Base, Wichita County, TX
Solicitation number
W912BV-16-R-0058
Issued by

About this file

Amendment 2 continuation page

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Continuation Page – Amendment 0002 1

AMENDMENT 0002

Solicitation RFP Number: W912BV-16-R-0058

Assigned ATS Number: SWT-15-1094 / FY16 Project VNVP162401 Convert Circuit 6, Selected Portions

Sheppard Air Force Base, Wichita County, Texas

PHASE 1 of 2

BASE BID + TEN (10 Ea.) OPTIONS Base Bid: Convert Circuit 6 from OH to UG & Replace UG Main Feeder Cables (VNVP 162401) OPTION 1: Replace Padmounted Switch VS‐601 OPTION 2: Replace Padmounted Switch VS‐602 OPTION 3: Replace Padmounted Switch VS‐603 OPTION 4: Replace #4/0 UG lateral cables in Identified Areas OPTION 5: Replace Padmounted Switch VS‐605 OPTION 6: Replace Padmounted Switch VS‐610 OPTION 7: Replace Padmounted Switch VS‐611 OPTION 8: Replace UG Ductbank/Manhole System 2500 Area OPTION 9: Replace UG Secondary at Buildings 2406 & 2410 OPTION 10: Rework Genset at Building 2559

Offer Closing Date: February 24, 2016 Offer Closing Time: 2:00 pm Central Time RFI due date/time will be February 17, 2016 (Remains the same for this Amendment)

The Request for Proposal (RFP) documents are revised as follows:

RFP Coversheet, Summary, Table of Contents, and all Specification Headers Project Title has been changed from “Convert Electrical Circuit 6 from OH to UG” to “Repair Circuit 6, Selected Portions”.

00 21 00 Instructions to Offerors Changes are made in “red” and referenced with (Amendment 0002).

00 22 00 Phase 1 of 2 Phase Design-Build Selection Procedures Changes are made in “red” and referenced with (Amendment 0002).

Design and Construction Schedule Design and Construction Schedule Replaced.

Post Award Design and Construction Schedule Post Award Design and Construction Schedule for maximum activity durations for planning included in the RFP.