W912BV-16-R-0001_AMENDMENT_0002.pdf
PDF 363 KB Posted
- Solicitation number
- W912BV-16-R-0001
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment 0002 is to revise various sections of the RFP as noted in the summary of changes.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Feb-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV-16-R-0001
X 9B. DATED (SEE ITEM 11)
10-Feb-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Feb-2016
CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
AMENDMENT 0002
KC-46A TWO-BAY DEPOT MAINTENANCE
HANGAR Tinker AFB, Oklahoma
W912BV-16-R-0001
Summary of Changes The solicitation documents are revised as follows:
1. The revised/new sections/appendices listed below are hereby added to or revised and made a part of the solicitation. Revised or added/deleted information can be located in the specifications by searching for an asterisk and amendment number (e.g., *AM1).
Revised sections/appendices:
2. SPECIFICATIONS
Added by Amendment 0002:
SECTION 09 96 35: Chemical Resistant Containment Lining System (125 MIL, Fiberglass Reinforced Vinyl Ester)
Revised by Amendment 0002:
TABLE OF CONTENTS: Replaced in its entirety
00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, BASIS OF
AWARD See highlights in paragraphs 5.1, 5.2, 7.1, and 7.2
01 45 01.00 10 USACE QUALITY CONTROL Amended Paragraph 3.4.4 Construction Superintendent
PROJECT TABLE OF CONTENTS Page 1
KC-46A Two-Bay Depot Maintenance Hangar Tinker AFB, Oklahoma
REPLACED IN ITS ENTIRETY BY AMENDMENT 0002
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00 STANDARD FORM 1442 AND PRICING (CLIN) SCHEDULE
00 21 00 INSTRUCTIONS TO OFFERORS
00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, BASIS
OF AWARD
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATION SCHEDULE
DIVISION 01 - GENERAL REQUIREMENTS
01 04 00 COORDINATION, FIELD ENGINEERING, AND MEETINGS
01 11 00 SUMMARY OF WORK
01 32 01.00 10 PROJECT SCHEDULE
01 33 00.10 10 DIGITAL SUBMITTAL PROCEDURES AND CORRESPONDENCE AND
CORRESPONDENCE
01 33 23.33 AVIATION FUEL SYSTEM SPECIFIC SUBMITTAL REQUIREMENTS
01 33 29 LEED(TM) DOCUMENTATION
01 35 26.00 10 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 40.00 20 ENVIRONMENTAL MANAGEMENT
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 45 01.00 10 USACE QUALITY CONTROL
01 50 02.00 10 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 58 00.00 10 BULLETIN BOARD, PROJECT SIGN, AND SAFETY SIGN
01 60 00.00 50 MATERIAL AND EQUIPMENT
01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIALS
01 70 00.00 10 CONTRACT CLOSEOUT
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23.33 OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL SYSTEMS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.00 40 COMMISSIONING
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
03 53 14.00 20 LIGHT REFLECTIVE NONFERROUS METALLIC AGGREGATE FLOOR SYSTEM
DIVISION 04 - MASONRY
04 20 00 MASONRY
PROJECT TABLE OF CONTENTS Page 2
Tinker AFB, Oklahoma
REPLACED IN ITS ENTIRETY BY AMENDMENT 0002
DIVISION 05 - METALS
05 05 23 WELDING, STRUCTURAL
05 12 00 STRUCTURAL STEEL
05 21 19 OPEN WEB STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 21 19 SPRAYED POLYURETHANE FOAM INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIER
07 42 13 METAL WALL PANELS
07 42 63 FABRICATED PANEL ASSEMBLIES
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 72 01 ROOF ACCESSORIES
07 81 00 SPRAY-APPLIED FIREPROOFING
07 81 01 CEMENTITIOUS THERMAL BARRIER OVER FOAM
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
07 95 00 EXPANSION CONTROL
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 33 13 METAL ROLLING COUNTER DOORS
08 34 16.10 STEEL SLIDING HANGAR DOORS
08 34 19.10 20 ROLLING SERVICE AND FIRE DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 06 90 COLOR SCHEDULE
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 13 CERAMIC TILING
PROJECT TABLE OF CONTENTS Page 3
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23 RESINOUS COATING SYSTEMS
09 90 00 PAINTS AND COATINGS
09 96 00 HIGH-PERFORMANCE COATINGS
09 96 35 CHEMICAL RESISTANT CONTAINMENT LINING SYSTEM (125 MIL,
FIBERGLASS REINFORCED VINYL ESTER)
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES
DIVISION 10 - SPECIALTIES
10 10 00 VISUAL COMMUNICATIONS SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 14 01 EXTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 11 - EQUIPMENT
11 01 50 RIGID RAIL FALL PROTECTION SYSTEMS
11 13 10 DOCK LEVELERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 48 13.13 ENTRANCE FLOOR MATS
12 50 00 FURNITURE SYSTEMS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
DIVISION 14 - CONVEYING EQUIPMENT
14 50 00 TELESCOPING PLATFORM SYSTEMS (TPS)
14 55 00 VERTICAL RECIPROCATING CONVEYOR
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 25.00 10 HIGH EXPANSION FOAM (HI EX. HEF) FIRE PROTECTION SYSTEM
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 08 00.00 10 COMMISSIONING OF PLUMBING SYSTEMS
22 15 19.19 20 NONLUBRICATED ROTARY SCREW AIR COMPRESSORS AND ACCESSORIES
22 20 00 DUST COLLECTION SYSTEM
22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)
22 60 70 BREATHING AIR SYSTEM
PROJECT TABLE OF CONTENTS Page 4
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED AND CONDENSER WATER PIPING SYSTEMS
23 65 00 COOLING TOWERS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
23 81 23.00 20 COMPUTER ROOM AIR CONDITIONING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND
INTEGRATION
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00.00 10 COMMISSIONING OF ELECTRICAL SYSTEMS
26 08 00 APPARATUS INSPECTION AND TESTING
26 09 23.00 40 LIGHTING CONTROL DEVICES
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 SWITCHBOARDS AND SWITCHGEAR
26 27 13.10 30 ELECTRIC METERS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 33 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 42 19.00 20 CATHODIC PROTECTION BY IMPRESSED CURRENT
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
PROJECT TABLE OF CONTENTS Page 5
Tinker AFB, Oklahoma
REPLACED IN ITS ENTIRETY BY AMENDMENT 0002
31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL
31 63 26 DRILLED CAISSONS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 10 DRAINAGE LAYER
32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE
32 11 29 LIME-MODIFIED SUBGRADE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY
PAVEMENTS
32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS
32 17 23.00 20 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 01 99 SLIP LINING OF INDUSTRIAL WASTE PIPING
33 11 00 WATER DISTRIBUTION
33 16 15 WATER STORAGE STEEL TANKS
33 30 00 SANITARY SEWERS AND INDUSTRIAL WASTE PIPING
33 32 13.15 INDUSTRIAL GRINDER OPEN CHANNEL-ELECTRIC
33 40 00 STORM DRAINAGE UTILITIES
33 51 15 NATURAL-GAS DISTRIBUTION
33 61 00 PREFABRICATED UNDERGROUND HEATING/COOLING DISTRIBUTION SYSTEM
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 23.19 MONORAIL HOISTS
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT
43 32 69 CHEMICAL FEED SYSTEMS
APPENDICES:
APPENDIX A DRAFT STORMWATER POLLUTION PREVENTION PLAN
APPENDIX B PROJECT DRAWINGS (SEPARATELY BOUND)
APPENDIX C FURNITURE, FIXTURES, AND EQUIPMENT
APPENDIX D STRUCTURAL INTERIOR DESIGN
--End of Section--
AMENDMENT 0002 (*AM2*)
SECTION 00 22 11 - PROPOSAL SUBMISSION REQUIREMENTS,
EVALUATION CRITERIA, BASIS OF AWARD
1.0 OVERVIEW
2.0 BASIS OF AWARD
3.0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
4.0 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS AND SUBFACTORS
5.0 VOLUME 1 – TAB A: FACTOR 1 CORPORATE EXPERIENCE
5.1. SUBMISSION REQUIREMENTS
5.2. EVALUATION CRITERIA
6.0 VOLUME 1 – TAB B: FACTOR 2 PAST PERFORMANCE
6.1. SUBMISSION REQUIREMENTS
6.2. EVALUATION CRITERIA
7.0 VOLUME 1 -TAB C: FACTOR 3 MANAGEMENT PLAN/KEY PERSONNEL
7.1. SUBMISSION REQUIREMENTS
7.2. EVALUATION CRITERIA
8.0 VOLUME 1 -TAB D: FACTOR 4 CONSTRUCTION SCHEDULE
8.1. SUBMISSION REQUIREMENTS
8.2. EVALUATION CRITERIA
9.0 VOLUME 1 -TAB E: FACTOR 5 SMALL BUSINESS PARTICIPATION PLAN
9.1. SUBMISSION REQUIREMENTS
9.2. EVALUATION CRITERIA
10.0 VOLUME 2 – PRICE PROPOSAL
10.1. GENERAL
11.0 EVALUATION PROCEDURES
11.1 SOURCE SELECTION EVALUATION BOARD (SSEB)
11.2 EVALUATION
11.3 DEFINITIONS
11.4 EVALUATION RATING SYSTEM
11.5 PAST PERFORMANCE EVALUATION SYSTEM
ATTACHMENTS
1 – COMPANY SPECIALIZED EXPERIENCE PRIME (OR KEY SUBCONTRACTOR IF WORK TO BE
SUBCONTRACTED)
2 – PAST PERFORMANCE SURVEY FORM
3 – KEY PERSONNEL RESUME
4 – LETTER OF COMMITMENT FOR KEY PERSONNEL
5 – LETTER OF COMMITMENT FOR KEY SUBCONTRACTORS
6 – SMALL BUSINESS PARTICIPATION PLAN FORM
1. 0 OVERVIEW
1.1. This is a “Best Value-Trade Off” solicitation for the construction project entitled Construct KC-46A Two Bay Hanger located at Tinker Air Force Base, OK. The Government will evaluate the proposals in accordance with the criteria described herein and award a firm fixed price contract to the responsible firm whose proposal conforms to all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government.
General Description of Work: Construct the KC-46A Two Bay Hanger at Tinker AFB, Oklahoma in accordance with the plans and specification.
2.0 BASIS OF AWARD
The Contracting Officer intends to award a firm fixed-price contract to the responsible Offeror whose proposal the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non-price factors described herein, and price. All evaluation factors, other than price, when combined, are considered significantly more important than the price. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. The Government will not award a contract to a Firm whose proposal contains a deficiency, as defined in FAR 15.001. The Government reserves the right to reject any offer if the offer is not in the best interest of the Government.
If awarded the contract, the Offeror shall construct the project in accordance with the plans and specifications.
3. 0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
3.1 REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS.
3.1.1 Each Offeror must submit both a Price Proposal and a Technical Proposal. The Price Proposal and the Technical Proposal must be submitted as separate files. Ensure that each file is clearly marked to indicate its contents; and the identity of the Offeror.
3.1.2 Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.
3.1.3 No dollar amounts from the Price Proposal are to be included in the Technical Proposal.
3.1.4 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal (Volume 1). Do not merely cross-reference similar material in the Price Proposal, or vice versa.
Also, do not include links to websites in lieu of incorporating information into your proposal.
3.1.5 Deviations, Exception and Assumptions
Deviations and exceptions to the terms and conditions of the solicitation are not allowed. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer shall be deemed “unacceptable” and thus ineligible for award. Should the Offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer. If the Offeror must make any assumptions prior to submitting the proposal, the Offeror shall list and describe in detail the assumptions on the first page of each Tab. All assumptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP. The Offeror shall clearly describe on the Proposal Cover Sheet submitted with the Price Proposal any assumption to the contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal. This information will not be evaluated separately but may impact the evaluation of other factors.
3.2 DISCUSSIONS
The Government does not intend to enter into discussions with offerors prior to making an award. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency in accordance with (IAW) FAR Part 15.306(c)(2).
3.3 GENERAL INSTRUCTIONS.
3.3.1 Submit only the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages should be numbered.
3.3.2 Proposal materials shall be submitted via AMRDEC SAFE website https://safe.armdec.army.mil/safe/ , or via email, containing the proposal in PDF file format using Adobe Acrobat software. Proposals shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches where sheets are prepared specifically for this proposal, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use alternative paper sizes (e.g., 11” x 14” or 11” x 17” sheets) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers.
3.3.3 Provide read-only PDF file format using Adobe Acrobat software containing the technical volume as well as a read-only PDF format using Adobe Acrobat software containing the price volume.
3.3.4 “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215- 1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.
3.3.5 For submissions with page limitations: Where authorized, alternative page sizes (11" x 14" or 11" x 17") will count as one page. Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.
3.3.6 Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision, shall be submitted in appropriate number of copies (e.g., if two (2) copies of the original page was required, then two (2) copies of the revised page will also be required). A revised copy of the entire proposal in .pdf format shall be provided on two (2) CD-ROM copies.
3.4 SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL (VOLUME 1)
3.4.1 Technical Proposal. Proposals shall contain the entire proposal in .pdf format using Adobe Acrobat software to print to a .pdf file; do NOT scan the document(s) into a .pdf file. The text portion of the complete proposal shall be contained as a single .pdf file. Sections of the proposal shall be bookmarked (linked to the index) in logical order.
3.4.2 Format and Contents of the Technical Proposal and List of Tabs. The technical proposal will be appropriately organized using the tabs specified in the chart below. The proposals shall contain a detailed table of contents. A cover sheet identifying the Offeror (name, address, point of contact), project description, and solicitation number shall be provided. The second sheet shall be a Table of Contents. Offers that violate these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration. The Government will not evaluate any information beyond the page limitation noted.
3.4.3 Page Limitations. The following page limitations are established for each Factor:
Factor 1 – Corporate Experience – 20 pages limitation
Factor 2 – Past Performance: No page limitation Factor 3 – Management Plan/Key Personnel – 25 page limitation Factor 4 – Construction Schedule – 15 page limitation Factor 5 – Small Business Participation Plan – Limited to 5 pages (see paragraph 9.1)
3.5 SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL (VOLUME 2)
3.5.1. Price Proposal. Submit the Price Proposal in read only PDF files.
https://safe.armdec.army.mil/safe/
3.5.2. Size Restrictions and Page Limits. The following are established for each Factor:
Factor 6 – Section 00 11 00 Pricing Schedule (no page limit)
Proposal materials shall be submitted in PDF file. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches. There are no page limits set for the Price Proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation.
3.5.3 Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents, as indicated in the following chart. Note: If the Offeror is not required to submit any information under a listed Tab (such as a JV Agreement) in accordance with the instructions below, that tab can be omitted. However, do not renumber the subsequent tabs.
4.0 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS AND SUBFACTORS
VOLUME 1 – TECHNICAL PROPOSAL
Factor/ Subfactor/ Element
LOCATION DESCRIPTION RELATIVE IMPORTANCE
FACTOR 1 Vol 1 Tab A CORPORATE EXPERIENCE Most Important Factor (Equally Important to Factor 2)
FACTOR 2 Vol 1 Tab B PAST PERFORMANCE Most Important Factor (Equally Important to Factor 1)
FACTOR 3 Vol 1 Tab C MANAGEMENT PLAN/KEY
PERSONNEL
3rd most Important Factor (Less Important than Factor 1 and 2)
FACTOR 4 Vol 1 Tab D CONSTRUCTION
SCHEDULE
4th most Important Factor (less important than Factors 1, 2, 3 and 5 combined)
FACTOR 5 Vol 1 Tab E SMALL BUSINESS
PARTICIPATION PLAN
5th most Important Factor (less important than Factors 1, 2, 3 and 4 combined)
VOLUME 2 – PRICE PROPOSAL
Factor/ Subfactor/ Element
LOCATION DESCRIPTION
RELATIVE IMPORTANCE
N/A Vol 2 Tab 1 Proposal Cover Sheet Not Rated
N/A Vol 2 Tab 2 Signed Letter Responding to RFP, SF1442 and Acknowledgement of Amendments
Not Rated
FACTOR 6 Vol 2 Tab 3 SECTION 00 11 00, PRICING SCHEDULE
6th Most Important Factor (less important than Factors 1, 2, 3, 4 and 5 combined)
N/A Vol 2 Tab 4 Bid Guarantee (Bid Bond) Not Rated
N/A Vol 2 Tab 5 Representations & Certifications Not Rated
N/A Vol 2 Tab 6 JV Agreement (if applicable) Not Rated
5.0 VOLUME 1 – TAB A: FACTOR 1 – CORPORATE EXPERIENCE
5.1 Submission Requirements:
The offeror shall submit a project portfolio with a maximum of five projects. *AM2* utilizing the provided experience form at Attachment 1.
Data presented shall include construction projects relevant to this requirement as provided in the solicitations technical narrative which your team has completed, or which are currently under construction and are substantially complete. If the offeror represents the combining of two or more companies, state if this project represents a joint venture of the listed parties. Relevant construction experience will be limited to performance of projects similar in size, scope, and complexity to that outlined in the Technical Narrative. A maximum of five projects will be evaluated. If more than five projects are submitted, only the first five projects will be evaluated. Use the following format to provide project information:
a) Project Title, Contract Number and Location.
b) Project Contract Type (for example, Indefinite-Delivery, Indefinite-Quantity; Design/Build, Firm Fixed
Price, Cost Plus; Construction Manager at Risk, etc.)
c) Total Dollar Amount
d) Start and Completion Dates (Month/Year) or percentage until complete
e) Role of Firm, provide a detailed description (address type of work performed, to include design, and percentage of work, as applicable for each team member) (also include any proposed team members that were directly involved in this project, including work performed, roles and responsibilities)
f) Brief Description of Project and how this relates to this solicitation.
g) Provide a list of the management team and their responsibility at a minimum include Project Manager, Quality Control Representative and Construction Superintendent.
h) Customer Primary Point of Contact and alternate POC (name, relationship to project, agency/firm affiliation, city, state, current phone number, and e-mail address)
i) Awards or recognition received, where applicable
5.2 Evaluation Criteria:
The Government will evaluate the extent of relevant experience of the prime contractor and its proposed team in the roles they will have in this project. The extent of relevant experience will be determined based on the similarity of the submitted projects to the size, scope, and complexity of the construction required by the solicitations technical narrative.
To determine strengths and weaknesses, the agency will give more consideration to the following:
a) A higher number of relevant projects, up to a maximum of five.
b) Projects constructed on Military installations.
c) *AM2* Projects involving large scale vertical construction of airfield hangars (i.e. PDM Hangars, fuel cells, corrosion control, etc.)
d) Projects involving airfield pavement placements including hangar floors, hangar approach, aprons, runways, taxiways, etc.
e) Projects constructed in proximity to an active Military or Commercial Runway, taxiway, etc
f) Projects with a value of $25 million or greater.
g) Fully completed projects, rather than substantially complete projects.
h) Projects completed after 2010.
i) Projects involving construction in conditions dealing with concurrent work from adjacent contractors.
j) Projects that demonstrate experience managing multiple large activities simultaneously on a secure and confined site.
k) Projects that demonstrate experience of the team members commensurate with their proposed role on this project.
6.0 VOLUME 1 – TAB B: FACTOR 2 PAST PERFORMANCE
6.1 Submission Requirements:
a. For the projects listed under Factor 1 – Corporate Experience, the Government will query the Contractor Performance Assessment Reporting System (CPARS) to validate past performance ratings on Department of Defense contracts and any other past performance information the Government deems necessary to evaluate a contractor’s past performance.
b. For each project that does not have a CPARS evaluation, Offerors shall forward a copy of the Past Performance Questionnaire (PPQ) included as Attachment 2 to the points of contact responsible for monitoring performance under such contracts. The Past Performance Questionnaire included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment 2) which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Contract Specialist identified in Section 00 21 00, Instructions, Conditions, and Notices to Offerors via email prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
c. The information contained in the questionnaires will be used to evaluate the offeror’s past performance. If any negative past performance information is received, the contractor will be given an opportunity to provide rebuttal. Each contractor should provide at least three (3) past performance ratings. Any rating an offeror has in CPARS for the projects listed under Factor 1 will count toward this requirement. The offeror is responsible for ensuring that the Contracting Officer (KO) has received a minimum of three (3) past performance ratings (CPARS or PPQ) prior to that date/time or has provided written notification to the KO that they have current ratings in CPARS. Entities that have no past customers shall notify the KO in writing, prior to the date and time established for the RFP closing, that they have had no previous clients and that the minimum number of questionnaires cannot be provided. It is the contractor’s responsibility to ensure that the reference documentation is provided, as the Government may not make additional requests for past performance information from the references. The evaluation form shall be provided to the Contract Specialist directly from the reference. Do not request past performance questionnaires on projects that have final CPARS evaluation. If a past performance questionnaire is received on a project where a final CPARS evaluation exists, the CPARS evaluation will serve as the official rating of record for evaluation purposes.
d. The Government may contact references provided as part of Factor 1 – Experience, for information regarding the Offeror’s past performance on the project and for the purposes of assessing and verifying the scope of the work performed. Offerors should provide accurate, current, and complete contact information for references provided in the project descriptions.
e. Additionally, for each of the projects submitted under Factor 1, the offeror shall provide the final or most recent Individual Subcontracting Report (or SF 294 if report was prior to OCT 2005) prepared for submission through the Electronic Subcontracting Reporting System for government contracts. For non-government contracts, provide planned subcontracting goals and actual subcontracted dollars in terms of total contract dollars for Small Business (SB), Small Disadvantaged Business (SDB), Women-Owned Small Business (WOSB), HUBZone Small Business (HUBZone SB), Veteran-Owned Small Business (VOSB), Service-Disabled Veteran-Owned Small Business (SDVOSB), and Historically Black Colleges and Universities (HBCUs) and Minority Institutions (MI).
f. The Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other sources not provided by the offeror.
g. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
6.1.1 Joint Venture Submission Requirements. Offerors submitting proposals as a Joint Venture (JV) shall obtain a DUNS number and be registered in the CCR as the offering Joint Venture. The Offeror must provide three (3) to five
(5) "recent", "relevant" projects performed by the JV that reflect the JV's ability to perform the work required in this solicitation as required by paragraph 5.1 “Specialized Experience-Submission Requirements”.
a. If the Offeror cannot provide a sufficient number of projects as the JV to meet the minimum requirement, the Offeror must provide those "recent", "relevant" projects that it has performed as the JV, and then supplement the record with additional "recent", "relevant" projects performed by each JV member in their individual capacities. In such instance, each JV member must satisfy the minimum requirement of three (3) projects, to include any performed as the
JV.
b. If the JV has no "recent", "relevant" projects performed by the JV, then each member of the JV must provide three
(3) to five (5) "recent", "relevant" projects performed by the JV member that reflect the JV member's ability to perform the work required in this solicitation as required by paragraph 5.1 “Specialized Experience – Submission Requirements”.
c. In addition to the examples of "Company Specialized Experience" and "Past Performance Surveys", the Joint Venture shall provide a brief narrative stating the roles that each partner of the Joint Venture will perform on this project. The attached “Specialized Experience" and "Past Performance Survey" forms shall be used by the Joint Venture or the JV partners. Explain how the JV is structured.
d. Verification: The Government reserves the right to verify the experience record of cited projects or other recent projects not submitted by reviewing the Past Performance Information Retrieval System (PPIRS, or other Government appraisal systems or to interview owner or references. The Government may check any or all cited references to verify supplied information. An Offeror will be afforded the opportunity to reply to or explain adverse performance information to which the Offeror has not previously had an opportunity to address.
6.2 Evaluation Criteria:
a. Past Performance evaluation includes two aspects that results in the assessment of the offeror’s probability of performing the requirements stated in the RFP based on the offeror’s demonstrated performance on recent, relevant contracts (Projects at least 50% complete or turned over no longer than five (5) years preceding the date of this solicitation). First offeror’s past performance will be evaluated to determine how relevant a recent effort accomplished by the offeror is to the requirements of the RFP. The relevancy determination will be based on the Factor 1 Evaluation Criteria for Corporate Specialized Experience. Second the offeror’s past performance shall be given a Performance Confidence Assessment based on how well the contractor performed on recent and relevant past contracts. The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. If any firm has multiple functions or divisions, the Government will only evaluate past performance of the division or unit submitting the offer or by the team member. Owners/references may be asked to comment on items such as quality of construction, timeliness, management of the work, subcontractor management, including timely payment to subs or suppliers, small business participation, safety, relations between owner and contractor, level of support for such things as as-built documentation, O&M manuals, training, correcting construction errors, warranty work, etc. The Government will target areas covered in the requirements of this proposal including records of conforming to quality, schedule, cost control, customer satisfaction, level of support for such things as as-built documentation, O&M manuals, training, problem resolution for construction errors, warranty work, and safety. The Government will not release the Interview Forms to the Offeror at any time, in order for the Government to solicit candid, unbiased interview comments. The Government also places a higher value on projects, which document successful outcomes and are supported by outside source confirmation, for example, but not limited to telephone interviews with points of contact identified in the proposal, CCASS/ACASS or other agency performance databases, Offeror furnished references, or personal knowledge. The Government also places a higher value on recent relevant projects and projects, which provided particularly difficult or unique challenges and the innovative methods the contractor used to resolve problems successfully. The Government’s evaluation is not limited to past performance information on the cited example projects. Firms without a history of past performance will receive a neutral rating.
b. Each entity (firm) will be rated on its own performance or that of its predecessor, if relevant. An entity may not establish past performance based on the past performance of its proposed key personnel, apart from that of the entity. If the Government does not obtain past performance information for the projects identified by the Offeror and cannot establish a past performance record for the Offeror through other sources, past performance will be rated neither favorably nor unfavorably. The performance risk will be considered “unknown”.
7.0 VOLUME 1 –TAB C: FACTOR 3 – MANAGEMENT PLAN/KEY PERSONNEL
7.1 Submission Requirements
Offerors shall submit a Management Plan that outlines the offeror’s intended approach for this project. Offerors should provide examples to support the plan based on the projects submitted for Factor 1. Relate team members’ previous role to the proposed role in this project *AM2* utilizing key personnel resume form and letter of commitment provided at attachment 3 and 4 respectively. At a minimum, the offeror shall provide the following information:
1. Management Narrative.
a. Narrative shall include an explanation of whether the offeror will use its own resources exclusively, or those of a joint venture, a teaming arrangement, or a subcontract arrangement.
b. Describe the proposed management structure for the organization, describing how construction process will be managed and the authorities and the delegations of authority within the organization including partnering firms and subcontractors. Include an organizational chart outlining the primary management staff responsible for the contract execution. Present a matrix of responsibilities for each firm in executing the key work breakdown structure activities of the program.
c. Discuss internal procedures for handling delays to minimize adverse schedule and cost impacts.
Offeror should provide examples that support the offeror’s abilities to minimize delays and cost impacts. Include examples of methods to effectively manage subcontractors (i.e. Scheduling/ controlling, Submittals, RFI, etc.).
d. Describe the organization’s quality control approach, corporate systems and capabilities to maintain quality control of construction.
e. Describe the organization’s site safety and health program; provide EMR safety rating and if applicable a brief narrative of any challenges/corrections on the projects submitted in factor 1.
2. Key Personnel.
a. Offeror shall provide resumes for key personnel; including team members, which demonstrate the qualifications necessary for this project, which includes proposed role, relevant education and training; and previous relevant experience in similar type work, to manage, control and perform construction. Resumes shall include detailed experience in proposed role, relevant education & training, total relevant experience, and experience in projects referenced in corporate experience.
Resumes for each key personnel should be limited to 1 page. Key personnel shall at a minimum include prime contractor’s project manager responsible for construction, site safety manager, the on-site QC manager, and construction superintendent. Offeror shall submit resumes of additional key personnel who can be employees of either the Prime or a Subcontractor to include Materials Technician, and Airfield Paving Inspector.
7.2 Evaluation Criteria:
Government will evaluate the quality of the offeror’s Management Narrative and how well the Key Personnel proposal demonstrates that the offeror’s key personnel meet and exceed the qualifications required to complete this project.
Minimum qualifications of Key Personnel include:
a. Project Manager – Bachelor’s degree and 5 years industry experience
b. Construction Quality Control Systems Manager (CQCSM) – Meets the qualifications of any of (A), (B), or (C): (A) Licensed Professional Engineer with 5 years’ experience -OR- (B) Bachelor’s degree of Engineering or Construction Management (or equivalent) with 7 years’ experience -OR- (C) 10 years relevant construction experience. Relevant construction experience includes any work requiring oversight of construction quality and adherence to plans and specifications this includes work as a crew foreman, QCM, Assistant QC, Superintendent, or combination thereof to meet the 10 year requirement.
c. Site Safety Health Officer (SSHO) – Shall meet the qualifications requirements of EM 385-1-1
d. Construction Superintendent - 10 years construction experience with at least 5 years relevant experience *AM2*on heavy duty paving involving large scale vertical construction of airfield hangars (i.e. PDM hangars, fuel cells, corrosion control, etc.).
e. Concrete, Pavements, and Soils Materials Technician – Materials Technician with a minimum 5 years’ experience for appropriate area.
f. Airfield Paving Inspection – ACI Concrete Transportations Inspector Certification and minimum of 5 years construction inspection of heavy duty pavements.
To determine strengths and weaknesses, the agency will take the following into consideration:
a. Whether the Teaming Arrangements in Factor 1 projects demonstrate that the offeror’s proposed teaming arrangement has the necessary structure to effectively manage, control, administer, and execute the integrated construction operations, quality control program, and subcontracts. This shall be achievable with other projected ongoing work.
b. Similar teaming arrangements in Factor 1 projects that resulted in on-time delivery of projects with minimum safety or quality control issues.
c. Proposed Key Personnel who exceed the qualifications described above.
d. Key personnel that worked on Factor 1 projects.
e. *AM2*Proposed Key Personnel with Letters of Commitment provided at Attachment 4.
8.0 VOLUME 1 -TAB D: FACTOR 4 – CONSTRUCTION SCHEDULE
8.1 Submission Requirements:
For the evaluation of this factor, the offeror is to assume NTP date of July 1, 2016. Submit a summary level schedule for construction of the project. Offerors will describe specific constraints related to use of the site and separate deadlines for each of the CLINs. The offerors for must take into account these constraints and deadlines in preparing their submissions for this Factor.
Schedules and diagrams may be provided separately not to exceed 11” x 17” in a size that is easily read, but should be bound and clearly labeled. This summary schedule will, after contract award, be replaced with a project schedule as required by the solicitation: Project Schedule. The summary schedule should be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. Offeror may use a critical path or other method of their choice; however, schedules should be graphically represented. The proposed project schedule should reflect the proposed contract duration and show the following milestones as a minimum (use calendar days):
a) Notice to Proceed
b) Start Construction
c) Long lead items
d) Phasing of construction activities
e) Inspections
f) Utility Connections
g) Test Adjust & Balance and Commissioning
h) Final approved O&M Manuals
i) Final approved As-Built Drawings
j) Complete Construction
k) Turn over Project & Real Property
Submit a narrative explaining the offeror’s planned approach for completing this project to meet or exceed all contract requirements. The narrative should describe any unique scheduling to meet aggressive construction duration, the submission of Insurance, submittals, construction phasing, air field coordination, turnover and closeout. Narrative should address the capability and flexibility to plan and schedule the complete project to meet the proposed contract.
Identify any constraints on the schedules presented (i.e., labor or material availability, holidays, weather, etc.).
8.2 Evaluation Criteria
The schedule and narrative address the constraints, deadlines, and milestones described in the submission requirements in a way that demonstrates a reasonable, rational approach to execution of the project to meet the period of performance contractual requirements.
9.0 VOLUME 1 – TAB E: FACTOR 5 – SMALL BUSINESS PARTICIPATION PLAN
9.1 Submission Requirements:
All Offerors shall identify the extent to which Small Businesses (SBs), Veteran-Owned Small Businesses (VOSBs), Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), HUBZone Small Businesses, Small Disadvantage Businesses (SDBs), Woman-Owned Small Businesses (WOSBs), Historically Black Colleges/Universities or Minority Institutions (HBCU/MIs) would be utilized in the performance of this proposed contract. For small businesses, as defined by the North American Industry Classification System (NAICS) Code applicable to this solicitation, the Offeror’s shall identify their own participation as a SB, VOSB, SDVOSB, HUBZONE SB, SDB, WOSB, or HBCU/MI, and it will be considered in evaluating the Utilization of Small Business factor. All Offerors (both large and small businesses) are required to complete the Small Business Participation Plan Form (Attachment 6) and submit it with their proposal.
Address the following: Provide the names of the small business firms that would participate in the proposed contract, identifying specific components to be produced or services to be performed by them. Provide an estimated percentage of the total work the small business portion represents. Market research, based on the nature and location of the work is required to determine optimal percentage of total contract dollars planned to be performed by small businesses, however, the expected minimum participation goals are listed in the evaluation criteria below. Small business participation is the collective small business participation from any type of small business or sub-category small business. Work self-performed by a small business prime offeror will be credited as Small Business Participation.
9.2 Evaluation Criteria:
The Government will evaluate the Small Business Participation Plan using the following criteria:
A. The extent of participation of small business prime offerors and small business subcontractors in terms of the percentage of the value of the total acquisition. Failure to meet the expected goals below will result in an unacceptable rating.
1. Small Business 10% of total contract dollars (aggregate of all small businesses participation including the small business socioeconomic programs such as 8(a), HUBZone, SDVOSB, or WOSB programs).
2. Small Disadvantaged Business (SDB) 3% of total contract dollars
3. Women-Owned Small Business (WOSB) 3% of total contract dollars
4. Service-Disabled Veteran-Owned Small Business (SDVOSB) 3% of total contract dollars
5. Historically Underutilized Business Zone (HUBZone) 3% of total contract dollars
B. The extent to which such firms, as defined in FAR Part 19, are specifically identified in proposals;
C. The extent of commitment to use such firms (existing and enforceable commitments will be considered more favorably than business relationships that are simply planned or theoretical);
D. Identification of the complexity and variety of the work specific small firms are to perform;
IA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .