AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment 0006 is to incorporate a revised price schedule. All other terms and conditions remain unchanged and in full effect.
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Apr-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV-16-R-0001
X 9B. DATED (SEE ITEM 11)
10-Feb-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Apr-2016
CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
KC-46A Depot 2-Bay Maintenance Hangar W912BV-16-R-0001 Tinker AFB, OK
00 11 00 - 1
REPLACED IN ITS ENTIRETY BY AMENDMENT 0006
SECTION 00 11 00
PRICING (CLIN) SCHEDULE
CLIN Estimated Unit Unit Amount No. Description Quantity Price
--------------------------------BASE PROPOSAL--------------------------------
2-BAY DEPOT MAINTENANCE HANGAR/MECHANICAL SUPPORT BUILDING
0001 All work 1 JOB XXXX $____________ (unless listed separately)
0002 Drilled Caissons 31 VLF $______ $____________ 24-inch Dia.
0003 Drilled Caissons 2,081 VLF $______ $____________ 30-inch Dia.
0004 Drilled Caissons 1,080 VLF $______ $____________ 48-inch Dia.
0005 Drilled Caissons 459 VLF $______ $____________ 60-inch Dia.
0006 As–Built Drawings 1 JOB XXXX $____________
0007 O&M Manuals 1 JOB XXXX $____________
0008 Hot-Mix Asphalt for 28 TON $______ $____________ Airfields
0009 Concrete for Airfields 5,937 CY $______ $____________
0010 Site Concrete 2,704 CY $______ $____________
0011 Stabilized Drainage Layer (Bid only CLIN 0011A or 0011B) 0011A Asphalt Stabilized 4,392 SY $______ $____________ 0011B Cement Stabilized 4,392 SY $______ $____________
0012 Aggregate Base Course 4,865 CY $______ $____________
0013 Hot Mix Asphalt for Roads 160 TON $______ $____________
0014 Lime Modified Soil 11,845 SY $______ $____________
TOTAL BASE PROPOSAL
(CLINS 0001 – 0014 Inclusive) $_________________
00 11 00 - 2
--------------------------------OPTIONAL ITEMS-------------------------------
1001 Option 1 Construction Access Road with Bridge (See note 8a) 1 JOB XXXX $____________
2001 Option 2 Dry Shake Floor Hardener (See note 8b) 1 JOB XXXX $____________
3001 Option 3 Main Switchboard Tie (See note 8c) 1 JOB XXXX $____________
4001 Option 4 UMCS Connection (See note 8d) 1 JOB XXXX $____________
Subtotal Options 1 – 4 (CLINS 1001 – 4001 Inclusive) $__________________
5001 Option 5 FF&E (Furniture, Fixtures, & Equipment) (See note 8e) 1 JOB XXXX $____________
6001 Option 6 Chemical/Acid Storage Tanks, Pumps, Equipment (See note 8f) 1 JOB XXXX $____________
7001 Option 7 Chemical/Acid Distribution Piping, Valves, & Fittings (See note 8g) 1 JOB XXXX $____________
8001 Option 8 Central Dust Collection System (See note 8h) 1 JOB XXXX $____________
9001 Option 9 Air Showers (See note 8i) 1 JOB XXXX $____________
10001 Option 10
00 11 00 - 3
Telescoping Platform System (See note 8j) 1 JOB XXXX $____________
11001 Option 11 Grinder Pumps (See note 8k) 1 JOB XXXX $____________
12001 Option 12 Paint Booths (See note 8l) 1 JOB XXXX $____________
13001 Option 13 Hangar Bay Fall Protection System (See note 8m) 1 JOB XXXX $____________
14001 Option 14 Hangar Maintenance and Material Hoists (See note 8n) 1 JOB XXXX $____________
15001 Option 15 Path Panels & Rack (See note 8o) 1 JOB XXXX $____________
16001 Option 16 CCTV System (See note 8p) 1 JOB XXXX $____________
17001 Option 17 Card Readers (See note 8q) 1 JOB XXXX $____________
18001 Option 18 CATV Cable Systems (See note 8r) 1 JOB XXXX $____________
19001 Option 19 Contaminated Soil Removal & Disposal (See note 8s) 5 CY $______ $____________
Subtotal Options 5 – 19 (CLINS 5001 – 19001 Inclusive) $__________________
Total Base Proposal and Options (CLINS 1001 – 19001 Inclusive) $__________________
Contract Duration (See Note 6):____________________
00 11 00 - 4
PRICING SCHEDULE NOTES
1. The Offeror shall submit pricing data on the latest Pricing Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
2. Offerors must insert a price on all numbered items (unless directed otherwise) of the Pricing Schedule. Failure to do so will disqualify the Offer.
3. All quantities are estimated except where the unit is given as JOB.
4. If a modification to a proposal is submitted and provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price and/or lump sum price, in the Pricing Schedule must be stated or, if it is not stated, the Offeror agrees that the lump-sum adjustment shall be applied on a prorated basis to every item in the Pricing Schedule.
5. All extensions of the unit prices shown (if applicable) will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
6. The Offeror shall propose a total contract duration in number of calendar days after the Notice to Proceed (NTP) is received by the Contractor, whether via electronic means or hard copy, whichever is the earliest method of delivery. The total number of proposed calendar days for construction through completion, ready for turnover shall not exceed the days shown at, SCR: 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK. The proposed duration shall become the required contract duration.
The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP.
7. AWARD
Only one contract will be awarded under this solicitation.
8. OPTIONAL BID ITEM DESCRIPTIONS
a. Provides the HGR Contractor use of the Haul Road and Access Road provided by the INF Contractor from Air Depot Blvd on the west of the project site going east to the construction haul road to the Construction Site. Bid Option includes the cost credit and considers all impacts due to all equipment and personnel entering the contractor-controlled work site not needing Tinker AFB Security background checks, badges, passes, or inspections. Only the work elements within the Tinker Security perimeter would require proper security clearance. See the Security limits indicated on drawing GC005 for Base Bid Construction Access and GC006 for Bid Option Construction Access.
b. Option 2 – Dry Shake Floor Hardener - Dry shake floor hardener in lieu of sealed concrete for hangar bays
00 11 00 - 5
c. Option 3 – Main Switchboard Tie – 2500 Amp section and breaker with Kirk Key interlock.
d. Option 4 – UMCS Connection – Connect the stand-alone building DDC control system to Tinker AFB’s front end Utility Monitoring and Control System (UMCS).
e. Option 5 – Furniture, Fixtures, & Equipment (FF&E)
f. Option 6 – Chemical/Acid Storage Tanks, Pumps, Equipment
g. Option 7 – Chemical/Acid Distribution Piping, Valves, & Fittings
h. Option 8 – Central Dust Collection System
i. Option 9 – Air Showers
j. Option 10 – Telescoping Platforms - runway beams, telescoping platforms satisfying user requirements (12 total), fall arrest anchor points on platform, hoists attached to platform carrier, hoist spreader beams, utility connection points on platforms, safety railing, anti-collision system for platform, remote control system, energy chain to platform carriers, and all associated additional requirements.
k. Option 11 – Grinder Pumps – 3 Grinder pumps per bay for paint stripping operations in the trench drains.
l. Option 12 – Paint Booths
m. Option 13 – Hangar Bay Fall Protection System - includes proprietary rigid rail beam connection to primary structure, rigid rail fall protection beams (2 at fuselage, 3 users on each beam), self-retracting lifelines, and lanyards)
n. Option 14 - Hangar Maintenance and Material Hoists - includes two separate hoist systems. Maintenance hoists include proprietary monorail beams with manual switching capability (attached to provided structure), 3 ton powered trolley/hoist (4 total), shock absorbing bumpers on monorail, manual rail extensions through doorways. Material hoists include runway beams and bridge crane to span between provided runway beams, ½ ton air powered hoist on manual trolley.
o. Option 15 – Patch Panels & Rack – Provide 19” floor mounted communication racks in the communication rooms. The main communication room shall have 3 rack and the secondary communication rooms shall have 2 racks. Racks are provide to mount all communication active equipment and cable management.
Provide patch panels in the communication racks to terminal all building and outside plant cabling. Provide fiber optic and copper patch panels with sufficient capacity to terminate all cabling including 20% spare for future work.
p. Option 16 – CCTV System – Provide cameras, cables, and control cabinets for an entire system. Cameras shall include 15
00 11 00 - 6 autofocus, remote zoom, dynamic IR Bullet Camera, 6 PTZ Day/Night Cameras, 4 lockable cabinets, Cat 6 cable from control cabinet to cameras, fiber from cabinet to main comm room and some remote cameras, programming to add camera to MOC in 3001.
q. Option 17 – Card Readers –Provide card readers at the North and
South Vehicular Access Gates.
r. Option 18 – CATV Cable Systems – Provide infrastructure from the main communication room to the CATV demarcation point in The break room and from the demarcation point to all distributed points. Infrastructure shall include raceways and cabling.
Provide CATV Distribution equipment at the demarcation point.
s. Option 19 – Contaminated Soil Removal and Disposal: The work shall include removal and disposal of contaminated soil associated with construction on this project. Costs for this item shall include excavation, laboratory analytical testing, characterization, manifesting, confirmation sampling, containerization, transportation, and off-site disposal.
9. EVALUATION OF OPTIONS
The government will evaluate offers for award purposes by adding the total price for all options to the total price for the Base Proposal.
(Total Base Proposal and Optional Proposal Items.) Evaluation of options will not obligate the Government to exercise the options.
10. AWARD OF OPTIONAL BID ITEMS
Optional CLINS 1001-4001 as stated above may, at the option of the Government, be awarded at the time of contract award or may be exercised at any time from the date of contract award until 90 days after issue of the Notice to Proceed.
Optional CLINS 5001-18001 as stated above may, at the option of the Government, be awarded at the time of contract award or may be exercised at any time from the date of contract award until 515 days after issue of the Notice to Proceed.
Optional CLIN 19001, as stated above may, at the option of the Government, be awarded at the time of contract award or may be exercised at any time from the date of contract award to the completion of the contract.
Any and all optional line items may be exercised solely at the discretion of the Government.
11. CLINS 0002, 0003, 0004, and 0005 Drilled Caissons shall include the cost of the drilled caissons and the temporary casings.
--END OF SECTION--