RFP NO. : W912BV-12-R-0032
US Army Corps of Engineers
Tulsa District
HUBZone SET-ASIDE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD TASK ORDER CONTRACTS (MATOCs) FOR MAINTENANCE, REPAIR AND REHABILITATION (MRR) SERVICES IN SUPPORT OF VARIOUS
MILITARY AND CIVIL WORKS CONSTRUCTION PROJECTS WITHIN THE USACE
TULSA DISTRICT BOUNDARIES. (“USACE Tulsa District HUBZone IDIQ MATOCs for MRR Services”)
Scope of Work (SOW) & Specifications (Seed TO only)
Seed TO: Tenkiller Ferry Lake – Weir & Foundation Access Road
Revised 9 July 2012 (added drawing) May 2012________________________________________________
Tenkiller Ferry Lake – Weir & Foundation Access Road
TABLE OF CONTENTS
- - End Table of Contents - -
SECTION TITLE
00 01 10 BID SCHEDULE
00 73 00 SPECIAL CONTRACT REQUIREMENTS
01 10 00 SCOPE OF WORK
DRAWING
SECTION 00 11 00 Page 1
00 01 10
BID SCHEDULE
ITEM
NO ITEM DESCRIPTION QTY UNIT UNIT
PRICE AMOUNT
Base Bid
0001a
Brushhogging
LS
0001b
Rough Grading
LS
0001c
Rock Rill
Ton
TOTAL BASE BID
Option 1 – Ditch Check & Drainage Swale
TOTAL OPTION 1
TOTAL BASE
TOTAL OPTION 1
TOTAL BASE & OPTIONS
NOTES
1. All costs for items of work not listed separately in the Proposal Schedule or specifically mentioned to be included in a particular item price shall be included in the listed item price most closely associated with the work involved.
2. This solicitation requires submission of a proposal on all items.
Failure to do so will result in the proposal being rejected without further consideration.
3. Optional items may be awarded, at the option of the government, at the time of contract award or may be exercised at any time from the date of contract award until 30 days after the date of contract award.
SECTION 00 73 00 Page 1
THE FOLLOWING PARAGRAPHS TO BE INCLUDED IN SECTION 00 73 00
AS PART OF THIS TASK ORDER
52.211-10 COMMENCEMENT, EXECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and
(c) complete the work:
If Base awarded WITHOUT Option: 50 calendar days
If Base awarded WITH Option: 80 calendar days
If Option awarded as a Modification AFTER TO award:
30 additional calendar days from date of modification
(End of Clause)
52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION(SEP 2000)
(1) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $988 for each calendar day of delay until the work is completed or accepted.
(2) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of Clause)
(END OF SECTION 00 73 00)
SECTION 01 00 00 Page 1
SECTION 01 00 00
SCOPE OF WORK
PART 1 GENERAL
1.1 GENERAL REQUIREMENTS
The Contractor shall provide all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management to complete all work in accordance with the base MATOC contract and this task order. When in conflict, task order documents supersede base MATOC documents.
1.2 PRICE PROPOSAL
The price proposal shall be in accordance with DIVISION 00 22 00 – PROPOSAL PROCUREMENT AND CONTRACTING REQUIREMENTS and be submitted on the Bid Schedule in Section 00 11 00.
1.3 WORK HOURS
Work hours shall be Monday through Friday, 7 a.m. to 6:00 p.m. unless otherwise requested in writing by the Contractor and approved in writing by the Administrative Contracting Officer (ACO).
1.4 SAFETY
All work shall comply with all Local, State and Federal Regulations and comply with USACE Safety Manual EM385-1-1, dated 15 September 2008 and all revisions/addendums since date of issue.
1.5 GOVERNMENT FURNISHED UTILITIES AND EQUIPMENT
None.
1.6 GOVERNMENT ACCESS
The Government retains right of access to all Government property regardless of the stage of construction.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 STAGING/STORAGE AREAS
Staging/storage areas shall be coordinated with and approved by the
ACO.
3.2 ACCESS TO PROJECT SITE
SECTION 01 00 00 Page 2
The Contractor shall enter and exit the project site only through areas as directed by the ACO.
3.3 PROTECTION OF EXISTING PROPERTY
The Contractor shall not damage existing roads and facilities. Any damage to Government property and facilities by the Contractor shall be repaired at no additional cost to the Government as directed by the ACO. Repairs shall commence immediately after completion of construction. Earnings will be withheld pending completion of repairs to the satisfaction of the ACO.
3.4 LOCATION OF EXISTING UTILITIES
The Contractor shall be responsible for locating and protecting existing utilities. Any damage to utilities shall be repaired by the Contractor at no additional cost to the Government.
3.5 TECHNICAL SPECIFICATIONS AND DRAWINGS
All work shall be performed by the Contractor in accordance with the base MATOC specifications and the task order specifications and drawings.
3.6 SUBMITTALS
Product data, manufacturer’s data and certifications, and test reports shall be submitted for all materials and material components included in this task order. Submittal shall include, but not be limited to, the following materials:
Rock Fill
Submittals shall be reviewed and approved by the Contractor Quality Control System Manager and Government before use. All unapproved materials shall be removed and replaced with approved materials at no additional cost to the Government. No time extension for such work will be granted. All submittals shall be in accordance with Section 01 33 00 SUBMITTAL PROCEDURES and Section 01 31 20 QUALITY CONTROL SYSTEM (QCS). Items shall be submitted and numbered under the technical specification section to which the materials and equipment apply and those numbers shall properly interface with WinRMS and QCS.
3.7 BRUSHHOGGING
Existing vegetation shall be removed to a maximum remaining height of 3 inches by brushhogging (mowing) with a rotary mower. Brushhog immediately prior to stripping and only when the ground is sufficiently firm to prevent rutting. After brushhogging, remove all mowed vegetation by raking. Payment for brushhogging shall be lump sum.
3.8 ROUGH GRADING
SECTION 01 00 00 Page 3
After raking, brushhogged area shall be rough graded. Rough grading shall be accomplished by heavy machine grading and some drifting of material in a balanced cut and fill method, similar to ODOT Section 209 MATHINE GRADING. Road shall be comfortably passable by passenger, automobile after completion of rough grading to the satisfaction of the ACO. Payment for rough grading shall be lump sum.
3.9 ROCK RILL
Rock fill shall be placed as shown on drawing. Rock fill material shall meet 1999 ODOT STANDARD SPECIFICATIONS, SECTION 713.03. Method oc completion shall be submitted for approval by the ADO before rock fill is delivered on site. Payment shall be by the ton based on original weight tickets from rock material supplier’s certified scale.
1.10 CONSTRUCT DITCH CHECK AND ESTABLISH DRAINAGE SWALE
Ditch check and drainage swale shall be as shown on drawing. Payment for construction of ditch and drainage swale shall be lump sum.
(END OF SECTION 01 00 00)
ACCESS ROAD PLAN
APPROXIMATE GROUNDLINE { ROAD
OF ROAD
APPROXIMATE {
FLUME
EXISTING CONCRETE
NO WORK
’0
XORPPA
0+00
1+00
3+00
9+00
10+00
11+00
+0
7PI
1+2 4.
P I
P I
PI
3+9
0.
P I
P I
P I
PI
7+5
9.
P I
P I
PI
9+9
1.
P I
PI16+25.74
P I
ROAD
ALONG CENTERLINE OF
APPROXIMATE GROUNDLINE
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00
R BEAUCHAMP,P.E.
R BEAUCHAMP, P.E.
SHAWN PAINTER,P.E.
40:1 tl12rd-c101-existr
FOUNDATION ACCESS ROAD
C101
A
B
C
D
123456
D
C
B
A
6 5 4 3
DWG. CODE:
NUMBER
REFERENCE
SHEET
INVITATION NO.
CONTRACT NO.SHEET OF
US Army Corps of Engineers
Tulsa District
Tulsa, Oklahoma
CONTRACT DATE:PLOT SCALE:
PLOT DATE:
DESIGN FILE:
SYMBOL DESCRIPTION DATE APPR
DESIGNED BY:
REVIEWED BY:
DRAWN BY:
SUBMITTED BY:
CHIEF,
JAN 2011
W912BV-12-R-0032
W912BV-__-C-____
DESIGN BR
FY:2012
ACCESS ROAD
WEIR & FOUNDATION
TENKILLER FERRY LAKE
ILLINOIS RIVER GORE, OKLAHOMA
MARK BURKHOLDER,P.E.
LINK FENCE
EXIST 6’ CHAIN
EXIST 12’ GATE
A C
C E S S
T
O
S I T E
HWY 100
LAKE TENKILLER
AUXILLIARY SPILLWAY
SPILLWAY
IN THIS AREA
MASS APPROXIMATELY 10 CY
FILL & COMPACT TO A DENSE
DEPTH VARIES
3"-5" ROCK FILL;
DEPRESSED AREA FILL DETAIL
NO SCALE
ROCK FILL:10 TONS
ROUGH GRADING: 13, 216 SF (1468 SY)
BRUSH HOG: 2180 SY
APPROXIMATE QUANTITIES:
(918-487-5252)
4. CONTACT TENKILLER PROJECT OFFICE FOR ACCESS.
ROUTING FLOWS TO THE FLUME.
RUNOFF BETWEEN THE DITCH CHECK AND THE FLUME
OF THE DITCH CHECK AWAY FROM THE FLUME AND CAPTURE
THE ROAD. THE OBJECTIVE IS TO DIVERT RUNOFF UPSTREAM
FROM DITCH CHECK TO THE FLUME ON THE NORTH SIDE OF
(APPROXIMATE STATION 12+50) ESTABLISH DRAINAGE SWALE
OF THE ROAD AT A LOCATION INDICATED BY USACE.
4. OPTION 1: CONSTRUCT A DITCH CHECK ON THE NORTH SIDE
TO STATION 16+52.
CREATING AN EARTHEN ROAD BETWEEN STATION 0+00 (FLUME)
3. ROUGH GRADE ALONG ACCESS ROAD CENTERLINE INDICATED
FROM OFFSITE SOURCES. COMPACT TO A DENSE MASS.
3"-5" SIZE ROCK PER ODOT SPECIFICATION 713.03
2. FILL AND COMPACT DEPRESSED AREA INDICATED WITH
WIDE.
1. BRUSHHOG ALONG ROAD CENTERLINE APPROXIMATELY 10’
NOTES:
EXISTING GROUND