W921BU25BA009-Dwgs.pdf

PDF 8 MB Posted

Attached to
W912BU25BA009 - Indian River Inlet Beach Renourishment
Solicitation number
W912BU25BA009
Issued by

About this file

The document is a set of engineering drawings for the Indian River Inlet Beach Nourishment project by the U.S. Army Corps of Engineers Philadelphia District. The project involves beach renourishment of the north beach of Indian River Inlet in Sussex County, Delaware, spanning approximately 5,000 linear feet. The beach fill aims to provide flood and coastal storm damage reduction for Delaware Seashore State Park, Route 1, and the Route 1 bridge.

The technical drawings detail the project's design specifications, including a 60-foot berm at 9.2 ft NAVD elevation with a 1V:10H slope, borrow areas in the Indian River Ebb Shoal, and cross-sectional views of the proposed beach profile. The contract will involve dredging sand from two designated borrow areas (Area A and Area B), with specific requirements for dredging sequence and depth. The project is estimated to cost between $5-10 million, with a 120-calendar day completion timeline from the Notice to Proceed, and is classified under NAICS code 237990 for Heavy and Civil Engineering Construction.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

®US Army Corps of Engineers

DISTRICT

SOLICITATION NO:

CONTRACT NO:

ISSUE/SUBMITTAL DATE:

A

®US Army Corps of Engineers

DISTRICT

D

AT

E

SO

LI

C

IT

AT

IO

N N

U M

BE

R

FI

LE

N

AM

E:

M

AR

K

D W

G . S

IZ

E:

C O

N

TR

AC

T

N U

M

BE

R

SHEET NUMBER

BY

D

ES

C

R

IP

TI

O

N

AC

TI

ON

"X

IS

SU

E/

SU

BM

IT

TA

L

D

AT

E:

U.

S.

A

RM

Y

CO

RP

S

OF

E

NG

IN

EE

RS

D

IS

TR

IC

T D

R

AW

N B

Y:

SU

BM

IT

TE

D B

Y:

D

ES

IG

N

ED

B

Y:

PL

O

T

SC

AL

E:

C H

EC

KE

D B

Y:

2 3 4 5 6 7 8 9 10 11

B

C

E

F

G

H

I

J

D

T.

F

AT

ZI

NG

ER

RT

A

AS

S

HO

W

N

D.

N

EL

SO

N

J.

SC

HW

AR

TZ

J.

SC

HW

AR

TZ

PH

IL

AD

EL

PH

IA

-W

2B U2

5B A0

AP

RI

L 2

CO

VE

R

SH

EE

T.

dw g

CO

VE

R

SH

EE

T

IN

DI

AN

R

IV

ER

IN

LE

T

- N

OR

TH

B

EA

CH

BE

AC

H

NO

UR

IS

HM

EN

T

DE

LA

W

AR

E

SU

SS

EX

C

OU

NT

Y

G-001

PHILADELPHIA

W912BU25BA0009

APRIL 2025

SUSSEX COUNTY

DELAWARE

BEACH NOURISHMENT

INDIAN RIVER INLET - NORTH BEACH

PHILADELPHIA

SUBMITTED:

APPROVED:

CHIEF, ENGINEERING AND CONSTRUCTION DIVISION

CHIEF, ENGINEERING BRANCH

TRAVIS T. FATZINGER, P.E.

THIS PROJECT WAS DESIGNED BY THE

PHILADELPHIA DISTRICT OF THE U.S.

ARMY CORPS OF ENGINEERS. THE

INITIALS OR SIGNATURES AND

REGISTRATION DESIGNATIONS OF

INDIVIDUALS APPEAR ON THESE

PROJECT DOCUMENTS WITHIN THE

SCOPE OF THEIR EMPLOYMENT AS

REQUIRED BY ER 1110-1-8152. ANDREW J. SCHWAIGER, P.E.

N.T.S.

LOCATION MAP

N.T.S.

N

OF PROJECT

LOCATION

N

VICINITY MAP

N.T.S.

OF WORK

LOCATION

A

®US Army Corps of Engineers

DISTRICT

D

AT

E

SO

LI

C

IT

AT

IO

N N

U M

BE

R

FI

LE

N

AM

E:

M

AR

K

D W

G . S

IZ

E:

C O

N

TR

AC

T

N U

M

BE

R

SHEET NUMBER

BY

D

ES

C

R

IP

TI

O

N

AC

TI

ON

"X

IS

SU

E/

SU

BM

IT

TA

L

D

AT

E:

U.

S.

A

RM

Y

CO

RP

S

OF

E

NG

IN

EE

RS

D

IS

TR

IC

T D

R

AW

N B

Y:

SU

BM

IT

TE

D B

Y:

D

ES

IG

N

ED

B

Y:

PL

O

T

SC

AL

E:

C H

EC

KE

D B

Y:

2 3 4 5 6 7 8 9 10 11

B

C

E

F

G

H

I

J

D

PHILADELPHIA

G-002

SU

SS

EX

C

OU

NT

Y

DE

LA

W

AR

E

BE

AC

H

NO

UR

IS

HM

EN

T

IN

DI

AN

R

IV

ER

IN

LE

T

- N

OR

TH

B

EA

CH

DR

AW

IN

G

IN

DE

X

SH

EE

T

DR

AW

IN

G

IN

DE

X

SH

EE

T.

dw g

AP

RI

L 2

W

2B U2

5B A0

PH

IL

AD

EL

PH

IA

J.

SC

HW

AR

TZ

J.

SC

HW

AR

TZ

D.

N

EL

SO

N

AS

S

HO

W

N

RT

A

T.

F

AT

ZI

NG

ER

DRAWING INDEX

SHEET ID DESCRIPTION

GENERAL

G-001 COVER SHEET

G-002 DRAWING INDEX SHEET

G-101 GENERAL PLAN

G-102 SURVEY CONTROL DATA & CONTRACTOR WORK LIMIT

CIVIL

C-001 GENERAL INFORMATION SHEET

C-101 PLAN - STA. 0+00.0 TO STA. 12+08.0

C-102 PLAN - STA. 12+08.0 TO STA. 43+41.5

C-103 PLAN - STA. 43+41.5 TO STA. 55+00.0

C-104 IRI EBB SHOAL - BORROW AREA PLAN

C-301 TYPICAL SECTIONS - BEACH NOURISHMENT

C-302 CROSS SECTIONS - STA. 1+98 TO STA. 50+00

IN

DI

AN

R

IV

ER

IN

LE

T

SEE SHEET C-103

SEE SHEET C-102

SEE SHEET C-101

ATLANTIC OCEAN

MHW

MHW

MHW MHW MHW MHW

U.S.

COAST

GUARD

STATION

PROJECT LIMIT

STA. 55+00

PROJECT LIMIT

STA. 0+00

TEMPORARY

ACCESS ROAD

CONTRACTOR

STAGING

AREA

INDIAN RIVER INLET EBB

SHOAL BORROW AREA

(SEE SHEET C-104)

AREA A

AREA B

0+00 5+00

10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00 50+00 55+00

A

®US Army Corps of Engineers

DISTRICT

D

AT

E

SO

LI

C

IT

AT

IO

N N

U M

BE

R

FI

LE

N

AM

E:

M

AR

K

D W

G . S

IZ

E:

C O

N

TR

AC

T

N U

M

BE

R

SHEET NUMBER

BY

D

ES

C

R

IP

TI

O

N

AC

TI

ON

"X

IS

SU

E/

SU

BM

IT

TA

L

D

AT

E:

U.

S.

A

RM

Y

CO

RP

S

OF

E

NG

IN

EE

RS

D

IS

TR

IC

T D

R

AW

N B

Y:

SU

BM

IT

TE

D B

Y:

D

ES

IG

N

ED

B

Y:

PL

O

T

SC

AL

E:

C H

EC

KE

D B

Y:

2 3 4 5 6 7 8 9 10 11

B

C

E

F

G

H

I

J

D

PHILADELPHIA

G-101

SU

SS

EX

C

OU

NT

Y

DE

LA

W

AR

E

BE

AC

H

NO

UR

IS

HM

EN

T

IN

DI

AN

R

IV

ER

IN

LE

T

- N

OR

TH

B

EA

CH

GE

NE

RA

L P

LA

N

GE

NE

RA

L P

LA

N.

dw g

AP

RI

L 2

W

2B U2

5B A0

PH

IL

AD

EL

PH

IA

J.

SC

HW

AR

TZ

J.

SC

HW

AR

TZ

D.

N

EL

SO

N

AS

S

HO

W

N

RT

A

NOTES:

1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.

2. FOR SURVEY CONTROL DATA, SEE SHEET G-102.

3. FOR TYPICAL SECTIONS, SEE SHEET C-301.

4. FOR CROSS SECTIONS, SEE SHEET C-302.

5. SEE SHEET G-102 FOR CONTRACTOR WORK LIMIT.

T.

F

AT

ZI

NG

ER

500'500' 00250'

SCALE: 1" = 500'-0"A1 GENERAL PLANA1 GENERAL PLAN

IR

IR

IR

0 IR

8 IR

6 IR

4 IR

2 IR

ST

A.

+9

ST

A.

+9

ST

A.

+9

ST

A.

9+

ST

A.

5+

ST

A.

1+

ST

A.

+9

ST

A.

+0

TEMPORARY

ACCESS ROAD

STA. 9+37.42

N 222850.16 E 757193.83

STA. 0+00.00

N 221948.50 E 757450.29

STA. 55+00.00

N 227392.32

E 756762.67CONTRACTOR

STAGING AREA

4 5

8 9

10 11

13 14

0+00

5+00

10+00 15+00

20+00 25+00

30+00 35+00

40+00 45+00

50+00 55+00

MONITORING

LINE (TYP)

SURVEY &

CONSTR.

CONTRACTOR WORK LIMIT

POINT NUMBER

NORTHING

221965.2

221925.7

221915.3

222107.4

222185.3

222176.4

222205.5

222229.9

222253.3

222264.7

222404.8

222397.0

222596.9

222693.7

222752.7

222763.6

222636.4

222484.0

222503.2

222689.2

223100.4

223272.4

223471.1

223794.9

224464.8

225261.2

226115.2

226853.0

227353.3

227364.4

227364.4

EASTING

757626.6

757243.4

757091.8

757064.1

757053.7

756979.7

756972.1

756958.8

756934.6

756911.3

756892.8

756833.8

756808.0

756767.8

756731.8

756750.5

756824.4

756841.7

757011.5

756965.4

756895.1

756866.3

756833.9

756766.0

756641.9

756563.5

756467.7

756391.4

756340.4

756461.9

756461.9

NOTES:

1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.

A

®US Army Corps of Engineers

DISTRICT

D

AT

E

SO

LI

C

IT

AT

IO

N N

U M

BE

R

FI

LE

N

AM

E:

M

AR

K

D W

G . S

IZ

E:

C O

N

TR

AC

T

N U

M

BE

R

SHEET NUMBER

BY

D

ES

C

R

IP

TI

O

N

AC

TI

ON

"X

IS

SU

E/

SU

BM

IT

TA

L

D

AT

E:

U.

S.

A

RM

Y

CO

RP

S

OF

E

NG

IN

EE

RS

D

IS

TR

IC

T D

R

AW

N B

Y:

SU

BM

IT

TE

D B

Y:

D

ES

IG

N

ED

B

Y:

PL

O

T

SC

AL

E:

C H

EC

KE

D B

Y:

2 3 4 5 6 7 8 9 10 11

B

C

E

F

G

H

I

J

D

PHILADELPHIA

G-102

SU

SS

EX

C

OU

NT

Y

DE

LA

W

AR

E

BE

AC

H

NO

UR

IS

HM

EN

T

IN

DI

AN

R

IV

ER

IN

LE

T

- N

OR

TH

B

EA

CH

SU

RV

EY

C

ON

TR

OL

D

AT

A

CO

NT

RA

CT

OR

W

OR

K

LIM

IT

G-

2 S

UR

VE

Y

CO

NT

RO

L D

AT

A.

dw g

AP

RI

L 2

W

2B U2

5B A0

PH

IL

AD

EL

PH

IA

J.

SC

HW

AR

TZ

J.

SC

HW

AR

TZ

D.

N

EL

SO

N

AS

S

HO

W

N

RT

A

CROSS SECTION SURVEY LINE CONTROL

PROFILE ID EASTING NORTHING AZIMUTH (°)

IR102 757396.66 222137.87 84.575

IR106 757287.21 222522.60 84.575

IR110 757188.40 222909.34 84.575

IR118 757112.76 223705.75 84.575

IR126 757037.13 224502.17 84.575

IR134 756961.49 225298.59 84.575

IR142 756885.86 226095.00 84.575

IR150 756810.22 226891.42 84.575

T.

F

AT

ZI

NG

ER

0200' 200'100' SCALE: 1" = 200'-0"A1 SURVEY & CONSTRUCTION BASELINEA1 SURVEY & CONSTRUCTION BASELINE

BEFORE AND AFTER DREDGE ORIGIN POINTS

STATION PROFILE ORIGIN POINTS AZIMUTH

00+00 N221948.50 E757450.29 84.577° 01+00 N222044.69 E757422.93 84.577° 02+00 N222140.87 E757395.57 84.577° 03+00 N222237.06 E757368.22 84.577° 04+00 N222333.24 E757340.86 84.577° 05+00 N222429.43 E757313.50 84.577° 06+00 N222525.61 E757286.14 84.577° 07+00 N222621.80 E757258.78 84.577° 08+00 N222717.98 E757231.43 84.577° 09+00 N222814.17 E757204.07 84.577° 10+00 N222912.46 E757187.92 84.577° 11+00 N223012.01 E757178.47 84.577° 12+00 N223111.56 E757169.02 84.577° 13+00 N223211.12 E757159.57 84.577° 14+00 N223310.67 E757150.12 84.577° 15+00 N223410.22 E757140.67 84.577° 16+00 N223509.77 E757131.22 84.577° 17+00 N223609.33 E757121.77 84.577° 18+00 N223708.88 E757112.32 84.577° 19+00 N223808.43 E757102.87 84.577° 20+00 N223907.98 E757093.42 84.577° 21+00 N224007.54 E757083.97 84.577° 22+00 N224107.09 E757074.52 84.577° 23+00 N224206.64 E757065.07 84.577° 24+00 N224306.19 E757055.62 84.577° 25+00 N224405.74 E757046.17 84.577° 26+00 N224505.30 E757036.72 84.577° 27+00 N224604.85 E757027.27 84.577° 28+00 N224704.40 E757017.82 84.577° 29+00 N224803.95 E757008.37 84.577° 30+00 N224903.51 E756998.92 84.577° 31+00 N225003.06 E756989.47 84.577° 32+00 N225102.61 E756980.02 84.577° 33+00 N225202.16 E756970.57 84.577° 34+00 N225301.72 E756961.12 84.577°

BEFORE AND AFTER DREDGE ORIGIN POINTS

STATION PROFILE ORIGIN POINTS AZIMUTH

35+00 N225401.27 E756951.67 84.577° 36+00 N225500.82 E756942.22 84.577° 37+00 N225600.37 E756932.77 84.577° 38+00 N225699.93 E756923.32 84.577° 39+00 N225799.48 E756913.87 84.577° 40+00 N225899.03 E756904.42 84.577° 41+00 N225998.58 E756894.97 84.577° 42+00 N226098.13 E756885.52 84.577° 43+00 N226197.69 E756876.07 84.577° 44+00 N226297.24 E756866.62 84.577° 45+00 N226396.79 E756857.17 84.577° 46+00 N226496.34 E756847.72 84.577° 47+00 N226595.90 E756838.27 84.577° 48+00 N226695.45 E756828.82 84.577° 49+00 N226795.00 E756819.37 84.577° 50+00 N226894.55 E756809.92 84.577°

X-1011

VIEW NAME

MATCHLINE MATCHLINE

RE: X-XXX RE: X-XXX

X-101

X:XXXX

META

E XXXX

N XXXX

R=XXX'

LOCATION/IDENTFICATION OF UNDER

WATER CULTURAL ANTIQUITY W/

EXCLUSION ZONE

TEMPORARY ACCESS ROAD

SURVEY BASELINE

OUTFALL PIPE

BEACH PATROL DUNE CROSSOVER

BP

STATION

OFFSET

OFFSET

STATION

STONE GROIN

APPROX. LOCATION OF UNDER

WATER HAZARD

40+00

VIBRACORE BORING DESIGNATION

FILL SLOPE AND BERM LINE

TIMBER GROIN

VEGETATION

LIMIT OF DISTURBANCELOD

SAND FENCE, STRAIGHT

SAND FENCE, ZIG ZAG

FENCE LINE, METAL POST

CHAIN LINK FENCE

HANDRAIL

STEEL SHEET PILE

MEAN TIDE LINE

MEAN LOW WATER LINE

MEAN HIGH WATER LINE

LWL LANDWARD WORK LIMIT

CONTRACTOR STAGING AREA

CONTRACTOR WORK LIMIT POINT

REFERENCE NUMBER/POINT LOCATIONXXX

20' CONTOUR LINE

CONTRACTOR WORK LIMITCWL

TIDAL REFERENCE (LOCATION)

MLW

NAVD 88

-2 .25

+1 .56

MHW

GENERAL NOTES:

1. ELEVATIONS ARE EXPRESSED IN FEET AND TENTHS OF A FOOT AND REFER TO THE NORTH AMERICAN VERTICAL DATUM (NAVD) 1988.

2. HORIZONTAL CONTROL IS REFERENCED TO THE DELAWARE STATE PLANE COORDINATE SYSTEM (NAD 1983).

3. THE CONTRACTOR SHALL STAGE AND ACCESS THE SITE FROM THE LOCATIONS SHOWN ON SHEET G-101 AND G-102. SEE SPECIFICATIONS FOR FENCING AND SIGNAGE REQUIREMENTS. SIGNAGE, FENCING, AND OTHER RELATED INSTALLATIONS MAY HAVE TO SATISFY LOCAL REGULATIONS AND/OR PROPERTY USE AGREEMENTS. OFFSET DISTANCES FROM EXISTING CONCRETE PIER COLUMNS

TO BE CONFIRMED WITH LOCAL OFFICIALS.

4. THE EXISTING SITE CONDITION SURVEYS CAN ONLY BE CONSIDERED REPRESENTATIVE OF THE CONDITIONS AT THAT TIME THEY WERE TAKEN. THE SURVEY DATA BELOW ELEVATION 5 WAS TAKEN JULY 2024. DNREC CONDUCTED AN EMERGENCY BEACH FILL PROJECT SUBSEQUENT TO THE 2024 SURVEY BEING CONDUCTED. THE SURVEY ABOVE ELEVATION 5 IS REPRESENTATIVE OF THE AS BUILT CONDITION OF THE DNREC REPAIR AND OCCURRED IN 2025. UPON RECEIPT AND ACCEPTANCE OF THE PRE CONSTRUCTION SURVEY THE TEMPLATE WILL BE REVISED. THE MHW LINE SHOWN IN THE PLAN VIEW IS BASED ON THE JULY 2024 SURVEY.

5. THE CONTRACTOR SHALL NOT DAMAGE ANY AREAS OF THE EXISTING DUNE WITHIN THE CONTRACTOR WORK LIMIT.

6. SEE SPECIFICATIONS FOR SURVEY CONTROL POINT INFORMATION.

7. THE AERIAL WAS TAKEN ON MARCH 21 2021, AND CAN ONLY BE CONSIDERED REPRESENTATIVE OF THE CONDITIONS OCCURRING AT THAT TIME. DNREC CONDUCTED AN EMERGENCY BEACHFILL PROJECT SUBSEQUENT TO THE AERIAL BEING TAKEN.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR LAYING OUT THE WORK AND FIELD VERIFYING ALL MEASUREMENTS AND GRADE PRIOR TO

CONSTRUCTION.

9. DIMENSIONS AND/OR ELEVATIONS MARKED PLUS OR MINUS (+/-) ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY ACTUAL

DIMENSIONS IN THE FIELD.

10. THE CONTRACTOR SHALL MAKE HIS OWN INTERPRETATION OF THE CHARACTER AND CONDITION OF THE MATERIALS WHICH WILL BE ENCOUNTERED BETWEEN THE VIBRACORE LOCATIONS. THE CONTRACTOR, AT HIS OWN EXPENSE, MAY MAKE ADDITIONAL SURVEYS AND INVESTIGATIONS AS NECESSARY TO DETERMINE CONDITIONS WHICH WILL AFFECT THE PERFORMANCE OF THE WORK.

11. OFFSETS REFLECT A PERPENDICULAR OFFSET (90 DEGREES) FROM THE B/L LISTED AS L, (LEFT) OR R (RIGHT), UNLESS OTHERWISE

NOTED.

12. THE EXISTING STEEL SHEET PILE WALL LOCATED ALONG THE WESTERN LIMIT OF THE WORK AREA MUST BE PROTECTED FROM DAMAGE FROM EARTHMOVING EQUIPMENT DURING DUNE CONSTRUCTION. THE CONTRACTOR MUST MAINTAIN A CONSISTENT GROUND ELEVATION ON EITHER SIDE OF THE SHEET PILE WALL DURING EARTHWORK ACTIVITY TO PREVENT UNBALANCED LOADING ON THE WALL. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO INSTALLED SHEETPILE FROM DELDOT.

CLOUD

REVISION & AMENDMENT

CLOUD AND SYMBOL

REVISION SYMBOL

(NUMERIC)

AMENDMENT SYMBOL

(ALPHA)

1 a

SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

HORIZONTAL AND VERTICAL CONTROL

MARKER

LINE TYPE LEGENDBEACHFILL PLAN SYMBOLS LEGEND

FENCE LINE, WOOD POST

SCALE=NTS

SEAWARD EDGE OF BERM

STATION OFFSET

DUNE CENTERLINE

STATION OFFSET

VIEW TITLE SYMBOL SECTION CUT SYMBOL

VIEW IDENTIFICATION NUMBER

VIEW NAME

DIRECTION OF VIEW

CALLOUT SYMBOL

CALLOUT AREA VIEW

MATCHLINE SYMBOL

CALLOUT IDENTIFICATION

NUMBER

DETAIL SHEET

REF NUMBER

DRAWING SHEET

MATCHING REFERNECE

NUMBER

DRAWING SHEET SYMBOLS

GRAPHIC BAR SCALE SYMBOLS

PRIMARY

SCALE

EXTENSION

SCALE

X

SECTION IDENTIFICATION NUMBER

DETAIL SHEET

REF NUMBER

X X X X

PRIMARY

SCALE

EXTENSION

SCALE

V: X X X X X

X X X XH: X

SCALE IN FEET/METERS

(SINGLE SCALE, SCALE BAR)

SCALE IN FEET/METERS

(HORIZONTAL/VERTICAL SCALE BAR)

DIRECTION OF MAGNETIC

NORTH NNORTH

PLAN

MAGNETIC

NORTH

PLAN

NORTH

NORTH SYMBOLS

ABBREVIATIONS

ABBRV DESCRIPTION ABBRV DESCRIPTION ABBRV DESCRIPTION

AD AREA DRAIN EXT EXTERIOR PIV POST INDICATOR VALVE

ADDL ADDITIONAL FDN FOUNDATION PSF POUNDS PER SQUARE FOOT

BC BOTTOM OF CURB FF FINISHED FLOOR PSI POUNDS PER SQUARE INCH

BD BOARD FFE FINISHED FLOOR ELEVATION PT POINT OF TANGENCY

BIT BITUMINOUS FIN FINISH PVC POLYVINYL CHLORIDE

BL or BASE LINE FL FLOOR PVI POINT OF VERTICAL INFLECTION

BLDG BUILDING FM FORCE MAIN R, RAD RADIUS

BMP BEST MANAGEMENT PRACTICE FT FOOT, FEET REINF REINFORCEMENT

BOT BOTTOM FTG FOOTING ROW RIGHT OF WAY

BW BOTTOM OF WALL G GROUND RT RIGHT

BVCE BEGINNING OF VERTICAL CURVE ELEVATION GOVT GOVERNMENT S SOUTH

BVCS BEGINNING OF VERTICAL CURVE STATION GR GRADE SCH SCH

CB CATCH BASIN HDPE HIGH DENSITY POLYETHYLENE SECT SECTION

CC or C-C CENTER TO CENTER HORIZ HORIZONTAL SF SQUARE FEET, SILT FENCE CL or CENTERLINE HP HIGH POINT SPEC SPECIFICATION

CMP CORRUGATED METAL PIPE HS HIGH STRENGTH SQ SQUARE

CMU CONCRETE MASONRY UNIT HT HEIGHT SST STAINLESS STEEL

CO CLEAN OUT ID INSIDE DIAMETER STA STATION

COL COLUMN IN INCH STRU or STRUC STRUCTURE, STRUCTURAL

CONC CONCRETE INSUL INSULATION, INSULATED SUSP SUSPENDED

CONSTR CONSTRUCTION INT INTERIOR TEMP TEMPORARY

CONT CONTINUOUS INV INVERT TC TOP OF CURB

COR CONTRACTING OFFICER'S REPRESENTATIVE LL LIVE LOAD TD TRENCH DRAIN

CTRL CONTROL LP LOW POINT TDO TRENCH DRAIN OUTLET

CWL CONTRACTOR WORK LIMIT LT LEFT, LIGHT TELE TELEPHONE

DGA DENSE GRADED AGGREGATE LVC LENGTH OF VERTICAL CURVE TG TOP OF GRATE

DIA DIAMETER JCT JUNCTION TOPO TOPOGRAPHY

DIM DIMENSION MATL MATERIAL TW TOP OF WALL

DIP DUCTILE IRON PIPE MAX MAXIMUM TYP TYPICAL

DWG DRAWING MHW MEAN HIGH WATER UD UNDERDRAIN

E EAST MIN MINIMUM UDO UNDERDRAIN OUTLET PIPE

EA EACH MISC MISCELLANEOUS UE UNDERGROUND ELECTRIC

ECM EROSION CONTROL MAT MLLW MEAN LOWER LOW WATER UGND UNDERGROUND

EL or ELEV ELEVATION MLW MEAN LOW WATER UOP UNDERDRAIN OUTLET PIPE

ELEC ELECTRIC N NORTH UXO UNEXPLODED ORDINANCE

ELL ELLIPTICAL NLT NOT LESS THAN VC VERTICAL CURVE

EOP EDGE OF PAVEMENT NTS NOT TO SCALE VOL VOLUME

EOS EDGE OF SHOULDER OC ON CENTER VERT VERTICAL

EQ EQUAL, EQUALITY OD OUTSIDE DIAMETER W/ WITH

EQUIP EQUIPMENT OH OVERHEAD W WEST

EW or E-W EACH WAY OPP OPPOSITE WL WATER LEVEL EXIST or EX EXISTING PC POINT OF CURVE WS WATER SURFACE

EXP EXPANSION, EXPOSED PD PAVEMENT DRAIN WSEL WATER SURFACE ELEVATION

EXP JT EXPANSION JOINT PI POINT OF INFLECTION W/O WITHOUT

VIBRACORE BORING DESIGNATION

BORROW AREA LIMITS

A

®US Army Corps of Engineers

DISTRICT

D

AT

E

SO

LI

C

IT

AT

IO

N N

U M

BE

R

FI

LE

N

AM

E:

M

AR

K

D W

G . S

IZ

E:

C O

N

TR

AC

T

N U

M

BE

R

SHEET NUMBER

BY

D

ES

C

R

IP

TI

O

N

AC

TI

ON

"X

IS

SU

E/

SU

BM

IT

TA

L

D

AT

E:

U.

S.

A

RM

Y

CO

RP

S

OF

E

NG

IN

EE

RS

D

IS

TR

IC

T D

R

AW

N B

Y:

SU

BM

IT

TE

D B

Y:

D

ES

IG

N

ED

B

Y:

PL

O

T

SC

AL

E:

C H

EC

KE

D B

Y:

2 3 4 5 6 7 8 9 10 11

B

C

E

F

G

H

I

J

D

PHILADELPHIA

C-001

SU

SS

EX

C

OU

NT

Y

DE

LA

W

AR

E

BE

AC

H

NO

UR

IS

HM

EN

T

IN

DI

AN

R

IV

ER

IN

LE

T

- N

OR

TH

B

EA

CH

GE

NE

RA

L I

NF

OR

MA

TI

ON

S

HE

ET

GE

NE

RA

L I

NF

OR

MA

TI

ON

S

HE

ET

.dw g

AP

RI

L 2

W

2B U2

5B A0

P

H

IL

A D

E

LP

H

IA

J.

SC

HW

AR

TZ

J.

SC

HW

AR

TZ

D.

N

EL

SO

N

AS

S

HO

W

N

RT

A

T.

F

AT

ZI

NG

ER

IN

DI

AN

R

IV

ER

IN

LE

T

MHW

MHW

MHW

MHW

MHW

MHW

MHW

MHW

PROJECT LIMIT

STA. 0+00

TEMPORARY

ACCESS ROAD

STA. 9+37.42

N 222850.16 E 757193.83

STA. 0+00.00

N 221948.50 E 757450.29

CONTRACTOR STAGING AREA

NEW SR1 BRIDGE

ATLANTIC OCEAN

EXIST. BRIDGE

PIER

EXIST.

BRIDGE

PLYON

EXIST. CONCRETE

PLATFORM ON 4 SQ.

CONC. COLUMN

TO REMAIN

SEAWARD

EDGE OF

BERM

TOE OF

SLOPE

APPROXIMATE LOCATION OF EXISTING JETTY

(PARTIALLY SUBMERGED)

SURVEY & CONSTR.

SEE NOTE 6

APPROXIMATE LOCATION OF

DELDOT SHEET PILE

℄ OF DUNE

STA 1+87.49

OFF 56.95 ' R

STA 9+97.01

OFF 138.70 ' R

STA 2+31.80

OFF 183.23 ' L

STA 6+25.46

OFF 154.28 ' L

STA 7+42.01

OFF 227.66 ' L

STA 5+76.92

OFF 108.86 ' R

STA 5+76.92

OFF 108.86 ' R

STA 5+76.92

OFF 108.86 ' R

STA 5+76.92

OFF 108.86 ' R

STA 8+39.29

OFF 212.91 ' L

STA 6+42.92

OFF 232.57 ' L

STA 8+39.29

OFF 212.91 ' L

STA 9+37.36

OFF 203.18 ' L

SEAWARD

EDGE OF DUNE

LANDWARD

TOE OF DUNE

0+00 1+00

2+00 3+00

4+00 5+00

6+00 7+00

8+00 9+00 10+00 11+00 12+00

STA 2+31.80

OFF 183.23 ' L

STA 2+31.80

OFF 183.23 ' L

STA 1+87.49

OFF 56.95 ' RSTA 0+05.52

OFF 32.90 ' R

SEE NOTE 7

0+00

5+00

10+00

A

®US Army Corps of Engineers

DISTRICT

D

AT

E

SO

LI

C

IT

AT

IO

N N

U M

BE

R

FI

LE

N

AM

E:

M

AR

K

D W

G . S

IZ

E:

C O

N

TR

AC

T

N U

M

BE

R

SHEET NUMBER

BY

D

ES

C

R

IP

TI

O

N

AC

TI

ON

"X

IS

SU

E/

SU

BM

IT

TA

L

D

AT

E:

U.

S.

A

RM

Y

CO

RP

S

OF

E

NG

IN

EE

RS

D

IS

TR

IC

T D

R

AW

N B

Y:

SU

BM

IT

TE

D B

Y:

D

ES

IG

N

ED

B

Y:

PL

O

T

SC

AL

E:

C H

EC

KE

D B

Y:

KEY PLAN

2 3 4 5 6 7 8 9 10 11

B

C

E

F

G

H

I

J

D

PHILADELPHIA

C-101

SU

SS

EX

C

OU

NT

Y

DE

LA

W

AR

E

BE

AC

H

NO

UR

IS

HM

EN

T

IN

DI

AN

R

IV

ER

IN

LE

T

- N

OR

TH

B

EA

CH

PL

AN

ST

A.

0+

.0

TO

S

TA

. 1

2+

.0

PL

AN

ST

A.

0+

.0

TO

S

TA

. 1

2+

.0.

dw g

AP

RI

L 2

W

2B U2

5B A0

PH

IL

AD

EL

PH

IA

J.

SC

HW

AR

TZ

J.

SC

HW

AR

TZ

D.

N

EL

SO

N

AS

S

HO

W

N

RT

A

T.

F

AT

ZI

NG

ER

NOTES:

1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.

2. FOR SURVEY CONTROL DATA, SEE SHEET G-102.

3. FOR TYPICAL SECTIONS, SEE SHEET C-301.

4. FOR CROSS SECTIONS, SEE SHEET C-302.

5. SEE SHEET G-102 FOR CONTRACTOR WORK LIMIT.

6. EXTEND DUNE BACK SLOPE OF THE FEDERAL DUNE TO MEET THE

EXISTING DUNE BASED ON PRECONSTRUCTION SURVEYS.

7. UNIFORMLY GRADE FROM THE CREST OF EXISTING JETTY TO THE BERM

WITH A MAX SLOPE OF 10:1 H:V.

M

AT

C H

LI

N

E M

AT

C

H

LI

N E

R E:

C -1

R

E:

C

-1

100'100' 050' SCALE: 1" = 100'-0"A1 PLAN - STA. 0+00.0 - STA. 12+08.0A1 PLAN - STA. 0+00.0 - STA. 12+08.0

ATLANTIC OCEAN

MHW

MHW

MHW

MHW

MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW

IR-1

DCS-NO.14

COASTAL HIGHWAY - DELAWARE STATE ROUTE 1

SURVEY & CONSTR.

SURVEY &

CONSTR.

SEAWARD

EDGE OF

BERM

TOE

OF

SLOPE

℄ OF DUNE

APPROXIMATE LOCATION OF

DELDOT SHEET PILE

HAVEN RD

INLET RD

STA 17+95.37

OFF 94.76 ' R

STA 25+97.00

OFF 7.28 ' L

STA 33+97.00

OFF 19.32 ' L

STA 41+97.00

OFF 34.24 ' L

STA 17+96.99

OFF 229.95 ' L

STA 25+96.85

OFF 227.98 ' L

STA 33+96.99

OFF 214.56 ' L

STA 41+96.84

OFF 202.05 ' L

SEAWARD

EDGE OF DUNE

LANDWARD

TOE OF DUNE

12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00

15+00

20+00

25+00

30+00

35+00

40+00

SEE NOTE 6

A

®US Army Corps of Engineers

DISTRICT

D

AT

E

SO

LI

C

IT

AT

IO

N N

U M

BE

R

FI

LE

N

AM

E:

M

AR

K

D W

G . S

IZ

E:

C O

N

TR

AC

T

N U

M

BE

R

SHEET NUMBER

BY

D

ES

C

R

IP

TI

O

N

AC

TI

ON

"X

IS

SU

E/

SU

BM

IT

TA

L

D

AT

E:

U.

S.

A

RM

Y

CO

RP

S

OF

E

NG

IN

EE

RS

D

IS

TR

IC

T D

R

AW

N B

Y:

SU

BM

IT

TE

D B

Y:

D

ES

IG

N

ED

B

Y:

PL

O

T

SC

AL

E:

C H

EC

KE

D B

Y:

KEY PLAN

2 3 4 5 6 7 8 9 10 11

B

C

E

F

G

H

I

J

D

PHILADELPHIA

C-102

SU

SS

EX

C

OU

NT

Y

DE

LA

W

AR

E

BE

AC

H

NO

UR

IS

HM

EN

T

IN

DI

AN

R

IV

ER

IN

LE

T

- N

OR

TH

B

EA

CH

PL

AN

ST

A.

+0 8.0

T O

ST

A.

+4

1.5

PL

AN

ST

A.

+0 8.0

T O

ST

A.

+4

1.5 .dw g

AP

RI

L 2

W

2B U2

5B A0

PH

IL

AD

EL

PH

IA

J.

SC

HW

AR

TZ

J.

SC

HW

AR

TZ

D.

N

EL

SO

N

AS

S

HO

W

N

RT

A

T.

F

AT

ZI

NG

ER

NOTES:

1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.

2. FOR SURVEY CONTROL DATA, SEE SHEET G-102.

3. FOR TYPICAL SECTIONS, SEE SHEET C-301.

4. FOR CROSS SECTIONS, SEE SHEET C-302.

5. SEE SHEET G-102 FOR CONTRACTOR WORK LIMIT.

6. EXTEND DUNE BACK SLOPE OF THE FEDERAL DUNE TO MEET THE

EXISTING DUNE BASED ON PRECONSTRUCTION SURVEYS.

M

AT

C H

LI

N

E M

AT

C

H

LI

N E

R E:

C -1

R

E:

C

-1

M

AT

C H

LI

N

E M

AT

C

H

LI

N E

R E:

C -1

R

E:

C

-1

SCALE: 1" = 100'-0"A1 PLAN - STA. 12+08.0 TO STA. 43+41.5A1 PLAN - STA. 12+08.0 TO STA. 43+41.5

MHW MHW MHW MHW

PROJECT LIMIT

STA. 55+00

STA. 55+00.00

N 227392.32 E 756762.67

SAVAGES DITCH RD

DELAWARE SEASHORE STATE PARK

ATLANTIC OCEAN

DELAWARE STATE ROUTE 1

SEAWARD

EDGE OF

BERM

TOE OF

SLOPE

GRADE FILL INTO EXISTING BERM AND

DUNE. LENGTH OF TAPER MAY BE

ADJUSTED BASED ON PRECONSTRUCTION

SURVEYS

℄ OF DUNE

STA. 50+95

OFF 150 FT L

SURVEY & CONSTR.

SEE NOTE 6

STA 50+00.00

OFF 0.00 '

STA 49+97.86

OFF 211.10 ' L

SEAWARD

EDGE OF DUNE

LANDWARD

TOE OF DUNE

44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00

45+00

50+00

55+00

A

®US Army Corps of Engineers

DISTRICT

D

AT

E

SO

LI

C

IT

AT

IO

N N

U M

BE

R

FI

LE

N

AM

E:

M

AR

K

D W

G . S

IZ

E:

C O

N

TR

AC

T

N U

M

BE

R

SHEET NUMBER

BY

D

ES

C

R

IP

TI

O

N

AC

TI

ON

"X

IS

SU

E/

SU

BM

IT

TA

L

D

AT

E:

U.

S.

A

RM

Y

CO

RP

S

OF

E

NG

IN

EE

RS

D

IS

TR

IC

T D

R

AW

N B

Y:

SU

BM

IT

TE

D B

Y:

D

ES

IG

N

ED

B

Y:

PL

O

T

SC

AL

E:

C H

EC

KE

D B

Y:

KEY PLAN

2 3 4 5 6 7 8 9 10 11

B

C

E

F

G

H

I

J

D

PHILADELPHIA

C-103

SU

SS

EX

C

OU

NT

Y

DE

LA

W

AR

E

BE

AC

H

NO

UR

IS

HM

EN

T

IN

DI

AN

R

IV

ER

IN

LE

T

- N

OR

TH

B

EA

CH

PL

AN

ST

A.

+4 1.5

T O

ST

A.

+0

0.0

PL

AN

ST

A.

+4 1.5

T O

ST

A.

+0

0.0 .dw g

AP

RI

L 2

W

2B U2

5B A0

PH

IL

AD

EL

PH

IA

J.

SC

HW

AR

TZ

J.

SC

HW

AR

TZ

D.

N

EL

SO

N

AS

S

HO

W

N

RT

A

T.

F

AT

ZI

NG

ER

NOTES:

1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.

2. FOR SURVEY CONTROL DATA, SEE SHEET G-102.

3. FOR TYPICAL SECTIONS, SEE SHEET C-301.

4. FOR CROSS SECTIONS, SEE SHEET C-302.

5. SEE SHEET G-102 FOR CONTRACTOR WORK LIMIT.

6. EXTEND DUNE BACK SLOPE OF THE FEDERAL DUNE TO MEET THE

EXISTING DUNE BASED ON PRECONSTRUCTION SURVEYS.

M

AT

C H

LI

N

E M

AT

C

H

LI

N E

R E:

C -1

R

E:

C

-1

SCALE: 1" = 100'-0"A1 PLAN - STA. 43+41.5 TO STA. 50+00.0A1 PLAN - STA. 43+41.5 TO STA. 50+00.0

PERMITTED BORROW AREA

AREA A

AREA B

KHV-103

KHV-105

KHV-104

KHV-230

KHV-231

AREA NOT AVAILABLE

FOR CONTRACT

AREA NOT AVAILABLE

FOR CONTRACT

COORDINATES

POINT NUMBER

NORTHING

222524.4

222836.5

221275.4

220963.6

222704.5

221179.7

221166.1

222682.9

221119.5

221816.3

222271.1

EASTING

759312.7

764643.8

764794.8

759462.9

762388.3

763158.5

762925.8

762019.8

762128.9

761745.7

761061.3

A

®US Army Corps of Engineers

DISTRICT

D

AT

E

SO

LI

C

IT

AT

IO

N N

U M

BE

R

FI

LE

N

AM

E:

M

AR

K

D W

G . S

IZ

E:

C O

N

TR

AC

T

N U

M

BE

R

SHEET NUMBER

BY

D

ES

C

R

IP

TI

O

N

AC

TI

ON

"X

IS

SU

E/

SU

BM

IT

TA

L

D

AT

E:

U.

S.

A

RM

Y

CO

RP

S

OF

E

NG

IN

EE

RS

D

IS

TR

IC

T D

R

AW

N B

Y:

SU

BM

IT

TE

D B

Y:

D

ES

IG

N

ED

B

Y:

PL

O

T

SC

AL

E:

C H

EC

KE

D B

Y:

KEY PLAN

2 3 4 5 6 7 8 9 10 11

B

C

E

F

G

H

I

J

D

PHILADELPHIA

C-104

SU

SS

EX

C

OU

NT

Y

DE

LA

W

AR

E

BE

AC

H

NO

UR

IS

HM

EN

T

IN

DI

AN

R

IV

ER

IN

LE

T

- N

OR

TH

B

EA

CH

IR

I E

BB

S

HO

AL

BO

RR

OW

A

RE

A

PL

AN

C-

4 I

RI

E

BB

S

HO

AL

BO

RR

OW

A

RE

A

PL

AN

.dw g

AP

RI

L 2

W

2B U2

5B A0

PH

IL

AD

EL

PH

IA

J.

SC

HW

AR

TZ

J.

SC

HW

AR

TZ

D.

N

EL

SO

N

AS

S

HO

W

N

RT

A

T.

F

AT

ZI

NG

ER

NOTES:

1. THE SOUNDINGS DEPICTED ON THIS MAP REPRESENT THE RESULTS OF

CLASS 1 SURVEYS CONDUCTED IN JULY 2024 AND CAN ONLY BE

CONSIDERED AS INDICATIVE OF THE BATHYMETRY AS IT EXISTED AT

THAT TIME.

2. VERTICAL REFERENCE - NAVD 88.

NOOA TIDAL EPOCH- 1983 - 2001

3. HORIZONTAL REFERENCE - NAD 83 DELAWARE STATE PLANE, ZONE 0700,

U.S. FOOT.

4. THE POSITIONS OF THE AIDS TO NAVIGATION ARE PROVIDED FOR

INFORMATION ONLY, AND SHOULD NOT BE USED FOR NAVIGATION.

5. VIBRACORE LOGS AND SIEVE CURVES FOR THE VIBRACORES SHOWN ON

THIS PLAN CAN BE FOUND IN THE SPECIFICATIONS.

6. DREDGING SHALL BEGIN IN THE INDIAN RIVER INLET EBB SHOAL

BORROW AREA A. THE CONTRACTOR SHALL DREDGE ALL MATERIAL TO

WITHIN ONE FOOT ABOVE THE MAXIMUM CONTRACT DEPTH. DREDGING

IN THE INDIAN RIVER INLET EBB SHOAL BORROW AREA A SHALL BE

CONTINUOUS UNTIL ALL MATERIAL HAS BEEN REMOVED TO THE

SPECIFIED DEPTH OF THAT BORROW AREA PRIOR TO MOVING TO

BORROW AREA B. DREDGING IN BORROW AREA B MAY BE CONDUCTED

AFTER COMPLETING OF DREDGING OPERATIONS IN BORROW AREA A, AS

APPROVED BY THE CONTRACTING OFFICER.

NORTH

PLAN

0200' 200'100' SCALE: 1" = 200'-0"A1 PLAN - IRI EBB SHOAL - BORROW AREAA1 PLAN - IRI EBB SHOAL - BORROW AREA

6004002000

-10

-5

-10

-5

-15 -15

700500300100300 100 -25

-20

-25

-20

TYPICAL SECTION WITH EXTENDED DUNE WIDTH TO CONNECT TO EXISTING DUNE

SURVEY AND CONSTR.

DUNE

CREST

EL +16.00

APPROXIMATE

LOCATION OF

EXISTING

SHEETPILE

CONTRACTOR TO

FIELD VERIFY

(SEE NOTE 5)

25'

VARIES

SEE PLAN

BERM ELEV +9.20

MHW EL +1.56 ft NAVD88

MLW EL -2.25 ft NAVD881

SEAWARD EDGE

OF BERM

TOE OF FILL VARIES

(SEE PLAN AND CROSS

SECTIONS)

DUNE WIDTH

EXTENDED

TO TIE INTO

EXISTING

DUNE, SEE

NOTE 8

EXISTING BEACH CROSS

SECTION (VARIES)

SEAWARD TOE

OF DUNE (TYP)

LANDWARD

TIE IN POINT

CWL, (TYP)

SEE NOTE 7

6004002000

-10

-5

-10

-5

-15 -15

500300100300 100

-25

-20

-25

-20

MHW EL +1.56 ft NAVD88

MLW EL -2.25 ft NAVD88

CREST

EL +16.00

25'

VARIES

SEE PLAN

SEAWARD TOE

OF DUNE (TYP) BERM ELEV +9.20

SEAWARD EDGE

OF BERM

TOE OF FILL VARIES

(SEE PLAN AND CROSS

SECTIONS)

LANDWARD TOE

OF DUNE & CWL, (TYP)

SEE NOTE 7

APPROXIMATE

LOCATION OF

EXISTING

SHEETPILE

CONTRACTOR TO

FIELD VERIFY

(SEE NOTE 5)

EXISTING BEACH CROSS

SECTION (VARIES)

NOTES:

1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.

2. SEE SHEET G-102 FOR PROFILE ORIGIN POINTS.

3. THE CROSS SECTIONS ARE SHOWN LOOKING BACK STATION ALONG THE SURVEY AND CONSTRUCTION BASELINE.

4. THE MAX SLOPE FOR THE TIE IN TO EXISTING DUNE SHALL BE 3H:1V.

5. THE EXISTING STEEL SHEET PILE WALL LOCATED ALONG THE WESTERN LIMIT OF THE WORK AREA MUST BE PROTECTED FROM DAMAGE FROM EARTHMOVING EQUIPMENT DURING DUNE CONSTRUCTION. THE CONTRACTOR MUST MAINTAIN A CONSISTENT GROUND ELEVATION ON EITHER SIDE OF THE SHEET PILE WALL DURING EARTHWORK ACTIVITY TO PREVENT UNBALANCED LOADING ON THE WALL. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO

INSTALLED SHEETPILE FROM DELDOT.

6. EXACT LOCATION OF EXISTING SHEET PILE TO BE LOCATED BY CONTRACTOR, BETWEEN APPROXIMATE STA 8+46 AND

STA 22+36.

7. DUNES SHALL BE CONSTRUCTED IN 3' THICK MAXIMUM HORIZONTAL LIFTS. EACH LIFT SHALL BE COMPACTED BY A

MINIMUM OF 3 PASSES OF A D6 OR LARGER DOZER WITH COMPLETE OVERLAPPING COVERAGE.

8. THE EXTENT OF DUNE REPAIR WILL BE DETERMINED AFTER RECEIPT AND ACCEPTANCE OF THE PRE CONSTRUCTION

SURVEY.

A

®US Army Corps of Engineers

DISTRICT

D

AT

E

SO

LI

C

IT

AT

IO

N N

U M

BE

R

FI

LE

N

AM

E:

M

AR

K

D W

G . S

IZ

E:

C O

N

TR

AC

T

N U

M

BE

R

SHEET NUMBER

BY

D

ES

C

R

IP

TI

O

N

AC

TI

ON

"X

IS

SU

E/

SU

BM

IT

TA

L

D

AT

E:

U.

S.

A

RM

Y

CO

RP

S

OF

E

NG

IN

EE

RS

D

IS

TR

IC

T D

R

AW

N B

Y:

SU

BM

IT

TE

D B

Y:

D

ES

IG

N

ED

B

Y:

PL

O

T

SC

AL

E:

C H

EC

KE

D B

Y:

2 3 4 5 6 7 8 9 10 11

B

C

E

F

G

H

I

J

D

PHILADELPHIA

C-301

SU

SS

EX

C

OU

NT

Y

DE

LA

W

AR

E

BE

AC

H

NO

UR

IS

HM

EN

T

IN

DI

AN

R

IV

ER

IN

LE

T

- N

OR

TH

B

EA

CH

TY

PI

CA

L S

EC

TI

ON

S

- B

EA

CH

N

OU

RI

SH

ME

NT

TY

PI

CA

L S

EC

TI

ON

S

- B

EA

CH

N

OU

RI

SH

ME

NT

.dw g

AP

RI

L 2

W

2B U2

5B A0

PH

IL

AD

EL

PH

IA

J.

SC

HW

AR

TZ

J.

SC

HW

AR

TZ

D.

N

EL

SO

N

AS

S

HO

W

N

RT

A

T.

F

AT

ZI

NG

ER

H:

V:

SCALE IN FEETD1 TYPICAL SECTION - STA. 15+00 TO STA. 18+00D1 TYPICAL SECTION - STA. 15+00 TO STA. 18+00

200100

H:

V:

SCALE IN FEETG1 TYPICAL SECTION - STA. 0+60 TO STA. 15+00 & STA. 18+00 TO STA. 50+95G1 TYPICAL SECTION - STA. 0+60 TO STA. 15+00 & STA. 18+00 TO STA. 50+95

200100

-10

-5

200400

-10

-5

-15 -15

500300100300 100

-20

-25

-20

STA. 1+98 (IR 102)

6004002000

-10

-5

-10

-5

-15 -15

500300100300 100

-20

-25

-20

STA. 17+97 (IR 118)

6004002000

-10

-5

200400

-10

-5

-15 -15

500300100300 100

-20

-25

-20

STA. 25+97 (IR 126)

STA. 5+97 (IR 106)

6004002000

-10

-5

-10

-5

-15 -15

700500300100300 100 -25

-20

-25

-20

STA. 9+97 (IR 110)

6004002000

-10

-5

200400

-10

-5

-15 -15

500300100300 100

-20

-25

-20

STA. 33+97 (IR 134)

6004002000200 700500300100300 100

-10

-5

-10

-5

-15 -15

500300100300 100

SURVEY AND CONSTR.

-25

-20

-25

-20

STA. 41+47 (IR 142)

-10

-5

-15

SURVEY AND CONSTR.

-25

-20

STA. 50+00 (IR 150)

MHW EL +1.56 ft NAVD88

MLW EL -2.25 ft NAVD88

MHW EL +1.56 ft NAVD88

MLW EL -2.25 ft NAVD88

MHW EL +1.56 ft NAVD88

MLW EL -2.25 ft NAVD88

MHW EL +1.56 ft NAVD88

MLW EL -2.25 ft NAVD88

MHW EL +1.56 ft NAVD88

MLW EL -2.25 ft NAVD88

MHW EL +1.56 ft NAVD88

MLW EL -2.25 ft NAVD88

MHW EL +1.56 ft NAVD88

MLW EL -2.25 ft NAVD88

MHW EL +1.56 ft NAVD88

MLW EL -2.25 ft NAVD88

-10

-5

-15

-25

-20

6004002000200 500300100300 100400

EXISTING BEACH CROSS

SECTION BELOW ELEV. 5

FROM JULY 2024 (TYP)

DUNE℄

DUNE℄

-10

-5

-15

-25

-20

-10

-5

-15

-25

-20

EXISTING BEACH CROSS SECTION

ABOVE ELEV. 5 FROM 2025

ASBUILT TOPO SURVEY (TYP)

A

®US Army Corps of Engineers

DISTRICT

D

AT

E

SO

LI

C

IT

AT

IO

N N

U M

BE

R

FI

LE

N

AM

E:

M

AR

K

D W

G . S

IZ

E:

C O

N

TR

AC

T

N U

M

BE

R

SHEET NUMBER

BY

D

ES

C

R

IP

TI

O

N

AC

TI

ON

"X

IS

SU

E/

SU

BM

IT

TA

L

D

AT

E:

U.

S.

A

RM

Y

CO

RP

S

OF

E

NG

IN

EE

RS

D

IS

TR

IC

T D

R

AW

N B

Y:

SU

BM

IT

TE

D B

Y:

D

ES

IG

N

ED

B

Y:

PL

O

T

SC

AL

E:

C H

EC

KE

D B

Y:

2 3 4 5 6 7 8 9 10 11

B

C

E

F

G

H

I

J

D

PHILADELPHIA

C-302

SU

SS

EX

C

OU

NT

Y

DE

LA

W

AR

E

BE

AC

H

NO

UR

IS

HM

EN

T

IN

DI

AN

R

IV

ER

IN

LE

T

- N

OR

TH

B

EA

CH

CR

OS

S

SE

CT

IO

NS

ST

A.

1+

T O

ST

A.

+0

C-

2 C

RO

SS

S

EC

TI

ON

S.

dw g

AP

RI

L 2

W

2B U2

5B A0

PH

IL

AD

EL

PH

IA

J.

SC

HW

AR

TZ

J.

SC

HW

AR

TZ

D.

N

EL

SO

N

AS

S

HO

W

N

RT

A

NOTES:

1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.

2. THE EXISTING SITE CONDITION SURVEYS CAN ONLY BE CONSIDERED REPRESENTATIVE OF THE

CONDITIONS AT THAT TIME THEY WERE TAKEN. THE SURVEY DATA BELOW ELEVATION 5 WAS

TAKEN JULY 2024. DNREC CONDUCTED AN EMERGENCY BEACH FILL PROJECT SUBSEQUENT TO

THE 2024 SURVEY BEING CONDUCTED. THE SURVEY ABOVE ELEVATION 5 IS REPRESENTATIVE OF THE AS BUILT CONDITION OF THE DNREC REPAIR AND OCCURRED IN 2025. UPON RECEIPT AND

ACCEPTANCE OF THE PRE CONSTRUCTION SURVEY THE TEMPLATE WILL BE REVISED.

3. THE EXTENT OF DUNE REPAIR WILL BE DETERMINED AFTER RECEIPT AND ACCEPTANCE OF THE

PRE CONSTRUCTION SURVEY.

T.

F

AT

ZI

NG

ER

H:

V:

SCALE IN FEETB1 CROSS SECTION - STA. 1+98 TO STA. 50+00B1 CROSS SECTION - STA. 1+98 TO STA. 50+00

200100

Sheets and Views
G-001 COVER SHEET
G-002 DRAWING INDEX SHEET
G-101 GENERAL PLAN
G-102 SURVEY CONTROL DATA & CONTRACTOR WORK LIMIT
C-001 GENERAL INFORMATION SHEET
C-101 PLAN - STA. 0+00.0 TO STA. 12+08.0
C-102 PLAN - STA. 12+08.0 TO STA. 43+41.5
C-103 PLAN - STA. 43+41.5 TO STA. 55+00.0
C-104 IRI EBB SHOAL - BORROW AREA PLAN
C-301 TYPICAL SECTIONS - BEACH NOURISHMENT
C-302 CROSS SECTIONS - STA. 1+98 TO STA. 50+00
2025-04-28T11:51:08-0400
MOFFATT.BARBARA.F.1228997893
2025-04-28T16:02:14-0400
FATZINGER.TRAVIS.T.1249188502

File details come from the government source that posted it. Updated .