W921BU25BA009-Dwgs.pdf
PDF 8 MB Posted
- Solicitation number
- W912BU25BA009
About this file
The document is a set of engineering drawings for the Indian River Inlet Beach Nourishment project by the U.S. Army Corps of Engineers Philadelphia District. The project involves beach renourishment of the north beach of Indian River Inlet in Sussex County, Delaware, spanning approximately 5,000 linear feet. The beach fill aims to provide flood and coastal storm damage reduction for Delaware Seashore State Park, Route 1, and the Route 1 bridge.
The technical drawings detail the project's design specifications, including a 60-foot berm at 9.2 ft NAVD elevation with a 1V:10H slope, borrow areas in the Indian River Ebb Shoal, and cross-sectional views of the proposed beach profile. The contract will involve dredging sand from two designated borrow areas (Area A and Area B), with specific requirements for dredging sequence and depth. The project is estimated to cost between $5-10 million, with a 120-calendar day completion timeline from the Notice to Proceed, and is classified under NAICS code 237990 for Heavy and Civil Engineering Construction.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
®US Army Corps of Engineers
DISTRICT
SOLICITATION NO:
CONTRACT NO:
ISSUE/SUBMITTAL DATE:
A
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T D
R
AW
N B
Y:
SU
BM
IT
TE
D B
Y:
D
ES
IG
N
ED
B
Y:
PL
O
T
SC
AL
E:
C H
EC
KE
D B
Y:
2 3 4 5 6 7 8 9 10 11
B
C
E
F
G
H
I
J
D
T.
F
AT
ZI
NG
ER
RT
A
AS
S
HO
W
N
D.
N
EL
SO
N
J.
SC
HW
AR
TZ
J.
SC
HW
AR
TZ
PH
IL
AD
EL
PH
IA
-W
2B U2
5B A0
AP
RI
L 2
CO
VE
R
SH
EE
T.
dw g
CO
VE
R
SH
EE
T
IN
DI
AN
R
IV
ER
IN
LE
T
- N
OR
TH
B
EA
CH
BE
AC
H
NO
UR
IS
HM
EN
T
DE
LA
W
AR
E
SU
SS
EX
C
OU
NT
Y
G-001
PHILADELPHIA
W912BU25BA0009
APRIL 2025
SUSSEX COUNTY
DELAWARE
BEACH NOURISHMENT
INDIAN RIVER INLET - NORTH BEACH
PHILADELPHIA
SUBMITTED:
APPROVED:
CHIEF, ENGINEERING AND CONSTRUCTION DIVISION
CHIEF, ENGINEERING BRANCH
TRAVIS T. FATZINGER, P.E.
THIS PROJECT WAS DESIGNED BY THE
PHILADELPHIA DISTRICT OF THE U.S.
ARMY CORPS OF ENGINEERS. THE
INITIALS OR SIGNATURES AND
REGISTRATION DESIGNATIONS OF
INDIVIDUALS APPEAR ON THESE
PROJECT DOCUMENTS WITHIN THE
SCOPE OF THEIR EMPLOYMENT AS
REQUIRED BY ER 1110-1-8152. ANDREW J. SCHWAIGER, P.E.
N.T.S.
LOCATION MAP
N.T.S.
N
OF PROJECT
LOCATION
N
VICINITY MAP
N.T.S.
OF WORK
LOCATION
A
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T D
R
AW
N B
Y:
SU
BM
IT
TE
D B
Y:
D
ES
IG
N
ED
B
Y:
PL
O
T
SC
AL
E:
C H
EC
KE
D B
Y:
2 3 4 5 6 7 8 9 10 11
B
C
E
F
G
H
I
J
D
PHILADELPHIA
G-002
SU
SS
EX
C
OU
NT
Y
DE
LA
W
AR
E
BE
AC
H
NO
UR
IS
HM
EN
T
IN
DI
AN
R
IV
ER
IN
LE
T
- N
OR
TH
B
EA
CH
DR
AW
IN
G
IN
DE
X
SH
EE
T
DR
AW
IN
G
IN
DE
X
SH
EE
T.
dw g
AP
RI
L 2
W
2B U2
5B A0
PH
IL
AD
EL
PH
IA
J.
SC
HW
AR
TZ
J.
SC
HW
AR
TZ
D.
N
EL
SO
N
AS
S
HO
W
N
RT
A
T.
F
AT
ZI
NG
ER
DRAWING INDEX
SHEET ID DESCRIPTION
GENERAL
G-001 COVER SHEET
G-002 DRAWING INDEX SHEET
G-101 GENERAL PLAN
G-102 SURVEY CONTROL DATA & CONTRACTOR WORK LIMIT
CIVIL
C-001 GENERAL INFORMATION SHEET
C-101 PLAN - STA. 0+00.0 TO STA. 12+08.0
C-102 PLAN - STA. 12+08.0 TO STA. 43+41.5
C-103 PLAN - STA. 43+41.5 TO STA. 55+00.0
C-104 IRI EBB SHOAL - BORROW AREA PLAN
C-301 TYPICAL SECTIONS - BEACH NOURISHMENT
C-302 CROSS SECTIONS - STA. 1+98 TO STA. 50+00
IN
DI
AN
R
IV
ER
IN
LE
T
SEE SHEET C-103
SEE SHEET C-102
SEE SHEET C-101
ATLANTIC OCEAN
MHW
MHW
MHW MHW MHW MHW
U.S.
COAST
GUARD
STATION
PROJECT LIMIT
STA. 55+00
PROJECT LIMIT
STA. 0+00
TEMPORARY
ACCESS ROAD
CONTRACTOR
STAGING
AREA
INDIAN RIVER INLET EBB
SHOAL BORROW AREA
(SEE SHEET C-104)
AREA A
AREA B
0+00 5+00
10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00 50+00 55+00
A
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T D
R
AW
N B
Y:
SU
BM
IT
TE
D B
Y:
D
ES
IG
N
ED
B
Y:
PL
O
T
SC
AL
E:
C H
EC
KE
D B
Y:
2 3 4 5 6 7 8 9 10 11
B
C
E
F
G
H
I
J
D
PHILADELPHIA
G-101
SU
SS
EX
C
OU
NT
Y
DE
LA
W
AR
E
BE
AC
H
NO
UR
IS
HM
EN
T
IN
DI
AN
R
IV
ER
IN
LE
T
- N
OR
TH
B
EA
CH
GE
NE
RA
L P
LA
N
GE
NE
RA
L P
LA
N.
dw g
AP
RI
L 2
W
2B U2
5B A0
PH
IL
AD
EL
PH
IA
J.
SC
HW
AR
TZ
J.
SC
HW
AR
TZ
D.
N
EL
SO
N
AS
S
HO
W
N
RT
A
NOTES:
1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.
2. FOR SURVEY CONTROL DATA, SEE SHEET G-102.
3. FOR TYPICAL SECTIONS, SEE SHEET C-301.
4. FOR CROSS SECTIONS, SEE SHEET C-302.
5. SEE SHEET G-102 FOR CONTRACTOR WORK LIMIT.
T.
F
AT
ZI
NG
ER
500'500' 00250'
SCALE: 1" = 500'-0"A1 GENERAL PLANA1 GENERAL PLAN
IR
IR
IR
0 IR
8 IR
6 IR
4 IR
2 IR
ST
A.
+9
ST
A.
+9
ST
A.
+9
ST
A.
9+
ST
A.
5+
ST
A.
1+
ST
A.
+9
ST
A.
+0
TEMPORARY
ACCESS ROAD
STA. 9+37.42
N 222850.16 E 757193.83
STA. 0+00.00
N 221948.50 E 757450.29
STA. 55+00.00
N 227392.32
E 756762.67CONTRACTOR
STAGING AREA
4 5
8 9
10 11
13 14
0+00
5+00
10+00 15+00
20+00 25+00
30+00 35+00
40+00 45+00
50+00 55+00
MONITORING
LINE (TYP)
SURVEY &
CONSTR.
CONTRACTOR WORK LIMIT
POINT NUMBER
NORTHING
221965.2
221925.7
221915.3
222107.4
222185.3
222176.4
222205.5
222229.9
222253.3
222264.7
222404.8
222397.0
222596.9
222693.7
222752.7
222763.6
222636.4
222484.0
222503.2
222689.2
223100.4
223272.4
223471.1
223794.9
224464.8
225261.2
226115.2
226853.0
227353.3
227364.4
227364.4
EASTING
757626.6
757243.4
757091.8
757064.1
757053.7
756979.7
756972.1
756958.8
756934.6
756911.3
756892.8
756833.8
756808.0
756767.8
756731.8
756750.5
756824.4
756841.7
757011.5
756965.4
756895.1
756866.3
756833.9
756766.0
756641.9
756563.5
756467.7
756391.4
756340.4
756461.9
756461.9
NOTES:
1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.
A
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T D
R
AW
N B
Y:
SU
BM
IT
TE
D B
Y:
D
ES
IG
N
ED
B
Y:
PL
O
T
SC
AL
E:
C H
EC
KE
D B
Y:
2 3 4 5 6 7 8 9 10 11
B
C
E
F
G
H
I
J
D
PHILADELPHIA
G-102
SU
SS
EX
C
OU
NT
Y
DE
LA
W
AR
E
BE
AC
H
NO
UR
IS
HM
EN
T
IN
DI
AN
R
IV
ER
IN
LE
T
- N
OR
TH
B
EA
CH
SU
RV
EY
C
ON
TR
OL
D
AT
A
CO
NT
RA
CT
OR
W
OR
K
LIM
IT
G-
2 S
UR
VE
Y
CO
NT
RO
L D
AT
A.
dw g
AP
RI
L 2
W
2B U2
5B A0
PH
IL
AD
EL
PH
IA
J.
SC
HW
AR
TZ
J.
SC
HW
AR
TZ
D.
N
EL
SO
N
AS
S
HO
W
N
RT
A
CROSS SECTION SURVEY LINE CONTROL
PROFILE ID EASTING NORTHING AZIMUTH (°)
IR102 757396.66 222137.87 84.575
IR106 757287.21 222522.60 84.575
IR110 757188.40 222909.34 84.575
IR118 757112.76 223705.75 84.575
IR126 757037.13 224502.17 84.575
IR134 756961.49 225298.59 84.575
IR142 756885.86 226095.00 84.575
IR150 756810.22 226891.42 84.575
T.
F
AT
ZI
NG
ER
0200' 200'100' SCALE: 1" = 200'-0"A1 SURVEY & CONSTRUCTION BASELINEA1 SURVEY & CONSTRUCTION BASELINE
BEFORE AND AFTER DREDGE ORIGIN POINTS
STATION PROFILE ORIGIN POINTS AZIMUTH
00+00 N221948.50 E757450.29 84.577° 01+00 N222044.69 E757422.93 84.577° 02+00 N222140.87 E757395.57 84.577° 03+00 N222237.06 E757368.22 84.577° 04+00 N222333.24 E757340.86 84.577° 05+00 N222429.43 E757313.50 84.577° 06+00 N222525.61 E757286.14 84.577° 07+00 N222621.80 E757258.78 84.577° 08+00 N222717.98 E757231.43 84.577° 09+00 N222814.17 E757204.07 84.577° 10+00 N222912.46 E757187.92 84.577° 11+00 N223012.01 E757178.47 84.577° 12+00 N223111.56 E757169.02 84.577° 13+00 N223211.12 E757159.57 84.577° 14+00 N223310.67 E757150.12 84.577° 15+00 N223410.22 E757140.67 84.577° 16+00 N223509.77 E757131.22 84.577° 17+00 N223609.33 E757121.77 84.577° 18+00 N223708.88 E757112.32 84.577° 19+00 N223808.43 E757102.87 84.577° 20+00 N223907.98 E757093.42 84.577° 21+00 N224007.54 E757083.97 84.577° 22+00 N224107.09 E757074.52 84.577° 23+00 N224206.64 E757065.07 84.577° 24+00 N224306.19 E757055.62 84.577° 25+00 N224405.74 E757046.17 84.577° 26+00 N224505.30 E757036.72 84.577° 27+00 N224604.85 E757027.27 84.577° 28+00 N224704.40 E757017.82 84.577° 29+00 N224803.95 E757008.37 84.577° 30+00 N224903.51 E756998.92 84.577° 31+00 N225003.06 E756989.47 84.577° 32+00 N225102.61 E756980.02 84.577° 33+00 N225202.16 E756970.57 84.577° 34+00 N225301.72 E756961.12 84.577°
BEFORE AND AFTER DREDGE ORIGIN POINTS
STATION PROFILE ORIGIN POINTS AZIMUTH
35+00 N225401.27 E756951.67 84.577° 36+00 N225500.82 E756942.22 84.577° 37+00 N225600.37 E756932.77 84.577° 38+00 N225699.93 E756923.32 84.577° 39+00 N225799.48 E756913.87 84.577° 40+00 N225899.03 E756904.42 84.577° 41+00 N225998.58 E756894.97 84.577° 42+00 N226098.13 E756885.52 84.577° 43+00 N226197.69 E756876.07 84.577° 44+00 N226297.24 E756866.62 84.577° 45+00 N226396.79 E756857.17 84.577° 46+00 N226496.34 E756847.72 84.577° 47+00 N226595.90 E756838.27 84.577° 48+00 N226695.45 E756828.82 84.577° 49+00 N226795.00 E756819.37 84.577° 50+00 N226894.55 E756809.92 84.577°
X-1011
VIEW NAME
MATCHLINE MATCHLINE
RE: X-XXX RE: X-XXX
X-101
X:XXXX
META
E XXXX
N XXXX
R=XXX'
LOCATION/IDENTFICATION OF UNDER
WATER CULTURAL ANTIQUITY W/
EXCLUSION ZONE
TEMPORARY ACCESS ROAD
SURVEY BASELINE
OUTFALL PIPE
BEACH PATROL DUNE CROSSOVER
BP
STATION
OFFSET
OFFSET
STATION
STONE GROIN
APPROX. LOCATION OF UNDER
WATER HAZARD
40+00
VIBRACORE BORING DESIGNATION
FILL SLOPE AND BERM LINE
TIMBER GROIN
VEGETATION
LIMIT OF DISTURBANCELOD
SAND FENCE, STRAIGHT
SAND FENCE, ZIG ZAG
FENCE LINE, METAL POST
CHAIN LINK FENCE
HANDRAIL
STEEL SHEET PILE
MEAN TIDE LINE
MEAN LOW WATER LINE
MEAN HIGH WATER LINE
LWL LANDWARD WORK LIMIT
CONTRACTOR STAGING AREA
CONTRACTOR WORK LIMIT POINT
REFERENCE NUMBER/POINT LOCATIONXXX
20' CONTOUR LINE
CONTRACTOR WORK LIMITCWL
TIDAL REFERENCE (LOCATION)
MLW
NAVD 88
-2 .25
+1 .56
MHW
GENERAL NOTES:
1. ELEVATIONS ARE EXPRESSED IN FEET AND TENTHS OF A FOOT AND REFER TO THE NORTH AMERICAN VERTICAL DATUM (NAVD) 1988.
2. HORIZONTAL CONTROL IS REFERENCED TO THE DELAWARE STATE PLANE COORDINATE SYSTEM (NAD 1983).
3. THE CONTRACTOR SHALL STAGE AND ACCESS THE SITE FROM THE LOCATIONS SHOWN ON SHEET G-101 AND G-102. SEE SPECIFICATIONS FOR FENCING AND SIGNAGE REQUIREMENTS. SIGNAGE, FENCING, AND OTHER RELATED INSTALLATIONS MAY HAVE TO SATISFY LOCAL REGULATIONS AND/OR PROPERTY USE AGREEMENTS. OFFSET DISTANCES FROM EXISTING CONCRETE PIER COLUMNS
TO BE CONFIRMED WITH LOCAL OFFICIALS.
4. THE EXISTING SITE CONDITION SURVEYS CAN ONLY BE CONSIDERED REPRESENTATIVE OF THE CONDITIONS AT THAT TIME THEY WERE TAKEN. THE SURVEY DATA BELOW ELEVATION 5 WAS TAKEN JULY 2024. DNREC CONDUCTED AN EMERGENCY BEACH FILL PROJECT SUBSEQUENT TO THE 2024 SURVEY BEING CONDUCTED. THE SURVEY ABOVE ELEVATION 5 IS REPRESENTATIVE OF THE AS BUILT CONDITION OF THE DNREC REPAIR AND OCCURRED IN 2025. UPON RECEIPT AND ACCEPTANCE OF THE PRE CONSTRUCTION SURVEY THE TEMPLATE WILL BE REVISED. THE MHW LINE SHOWN IN THE PLAN VIEW IS BASED ON THE JULY 2024 SURVEY.
5. THE CONTRACTOR SHALL NOT DAMAGE ANY AREAS OF THE EXISTING DUNE WITHIN THE CONTRACTOR WORK LIMIT.
6. SEE SPECIFICATIONS FOR SURVEY CONTROL POINT INFORMATION.
7. THE AERIAL WAS TAKEN ON MARCH 21 2021, AND CAN ONLY BE CONSIDERED REPRESENTATIVE OF THE CONDITIONS OCCURRING AT THAT TIME. DNREC CONDUCTED AN EMERGENCY BEACHFILL PROJECT SUBSEQUENT TO THE AERIAL BEING TAKEN.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR LAYING OUT THE WORK AND FIELD VERIFYING ALL MEASUREMENTS AND GRADE PRIOR TO
CONSTRUCTION.
9. DIMENSIONS AND/OR ELEVATIONS MARKED PLUS OR MINUS (+/-) ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY ACTUAL
DIMENSIONS IN THE FIELD.
10. THE CONTRACTOR SHALL MAKE HIS OWN INTERPRETATION OF THE CHARACTER AND CONDITION OF THE MATERIALS WHICH WILL BE ENCOUNTERED BETWEEN THE VIBRACORE LOCATIONS. THE CONTRACTOR, AT HIS OWN EXPENSE, MAY MAKE ADDITIONAL SURVEYS AND INVESTIGATIONS AS NECESSARY TO DETERMINE CONDITIONS WHICH WILL AFFECT THE PERFORMANCE OF THE WORK.
11. OFFSETS REFLECT A PERPENDICULAR OFFSET (90 DEGREES) FROM THE B/L LISTED AS L, (LEFT) OR R (RIGHT), UNLESS OTHERWISE
NOTED.
12. THE EXISTING STEEL SHEET PILE WALL LOCATED ALONG THE WESTERN LIMIT OF THE WORK AREA MUST BE PROTECTED FROM DAMAGE FROM EARTHMOVING EQUIPMENT DURING DUNE CONSTRUCTION. THE CONTRACTOR MUST MAINTAIN A CONSISTENT GROUND ELEVATION ON EITHER SIDE OF THE SHEET PILE WALL DURING EARTHWORK ACTIVITY TO PREVENT UNBALANCED LOADING ON THE WALL. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO INSTALLED SHEETPILE FROM DELDOT.
CLOUD
REVISION & AMENDMENT
CLOUD AND SYMBOL
REVISION SYMBOL
(NUMERIC)
AMENDMENT SYMBOL
(ALPHA)
1 a
SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
HORIZONTAL AND VERTICAL CONTROL
MARKER
LINE TYPE LEGENDBEACHFILL PLAN SYMBOLS LEGEND
FENCE LINE, WOOD POST
SCALE=NTS
SEAWARD EDGE OF BERM
STATION OFFSET
DUNE CENTERLINE
STATION OFFSET
VIEW TITLE SYMBOL SECTION CUT SYMBOL
VIEW IDENTIFICATION NUMBER
VIEW NAME
DIRECTION OF VIEW
CALLOUT SYMBOL
CALLOUT AREA VIEW
MATCHLINE SYMBOL
CALLOUT IDENTIFICATION
NUMBER
DETAIL SHEET
REF NUMBER
DRAWING SHEET
MATCHING REFERNECE
NUMBER
DRAWING SHEET SYMBOLS
GRAPHIC BAR SCALE SYMBOLS
PRIMARY
SCALE
EXTENSION
SCALE
X
SECTION IDENTIFICATION NUMBER
DETAIL SHEET
REF NUMBER
X X X X
PRIMARY
SCALE
EXTENSION
SCALE
V: X X X X X
X X X XH: X
SCALE IN FEET/METERS
(SINGLE SCALE, SCALE BAR)
SCALE IN FEET/METERS
(HORIZONTAL/VERTICAL SCALE BAR)
DIRECTION OF MAGNETIC
NORTH NNORTH
PLAN
MAGNETIC
NORTH
PLAN
NORTH
NORTH SYMBOLS
ABBREVIATIONS
ABBRV DESCRIPTION ABBRV DESCRIPTION ABBRV DESCRIPTION
AD AREA DRAIN EXT EXTERIOR PIV POST INDICATOR VALVE
ADDL ADDITIONAL FDN FOUNDATION PSF POUNDS PER SQUARE FOOT
BC BOTTOM OF CURB FF FINISHED FLOOR PSI POUNDS PER SQUARE INCH
BD BOARD FFE FINISHED FLOOR ELEVATION PT POINT OF TANGENCY
BIT BITUMINOUS FIN FINISH PVC POLYVINYL CHLORIDE
BL or BASE LINE FL FLOOR PVI POINT OF VERTICAL INFLECTION
BLDG BUILDING FM FORCE MAIN R, RAD RADIUS
BMP BEST MANAGEMENT PRACTICE FT FOOT, FEET REINF REINFORCEMENT
BOT BOTTOM FTG FOOTING ROW RIGHT OF WAY
BW BOTTOM OF WALL G GROUND RT RIGHT
BVCE BEGINNING OF VERTICAL CURVE ELEVATION GOVT GOVERNMENT S SOUTH
BVCS BEGINNING OF VERTICAL CURVE STATION GR GRADE SCH SCH
CB CATCH BASIN HDPE HIGH DENSITY POLYETHYLENE SECT SECTION
CC or C-C CENTER TO CENTER HORIZ HORIZONTAL SF SQUARE FEET, SILT FENCE CL or CENTERLINE HP HIGH POINT SPEC SPECIFICATION
CMP CORRUGATED METAL PIPE HS HIGH STRENGTH SQ SQUARE
CMU CONCRETE MASONRY UNIT HT HEIGHT SST STAINLESS STEEL
CO CLEAN OUT ID INSIDE DIAMETER STA STATION
COL COLUMN IN INCH STRU or STRUC STRUCTURE, STRUCTURAL
CONC CONCRETE INSUL INSULATION, INSULATED SUSP SUSPENDED
CONSTR CONSTRUCTION INT INTERIOR TEMP TEMPORARY
CONT CONTINUOUS INV INVERT TC TOP OF CURB
COR CONTRACTING OFFICER'S REPRESENTATIVE LL LIVE LOAD TD TRENCH DRAIN
CTRL CONTROL LP LOW POINT TDO TRENCH DRAIN OUTLET
CWL CONTRACTOR WORK LIMIT LT LEFT, LIGHT TELE TELEPHONE
DGA DENSE GRADED AGGREGATE LVC LENGTH OF VERTICAL CURVE TG TOP OF GRATE
DIA DIAMETER JCT JUNCTION TOPO TOPOGRAPHY
DIM DIMENSION MATL MATERIAL TW TOP OF WALL
DIP DUCTILE IRON PIPE MAX MAXIMUM TYP TYPICAL
DWG DRAWING MHW MEAN HIGH WATER UD UNDERDRAIN
E EAST MIN MINIMUM UDO UNDERDRAIN OUTLET PIPE
EA EACH MISC MISCELLANEOUS UE UNDERGROUND ELECTRIC
ECM EROSION CONTROL MAT MLLW MEAN LOWER LOW WATER UGND UNDERGROUND
EL or ELEV ELEVATION MLW MEAN LOW WATER UOP UNDERDRAIN OUTLET PIPE
ELEC ELECTRIC N NORTH UXO UNEXPLODED ORDINANCE
ELL ELLIPTICAL NLT NOT LESS THAN VC VERTICAL CURVE
EOP EDGE OF PAVEMENT NTS NOT TO SCALE VOL VOLUME
EOS EDGE OF SHOULDER OC ON CENTER VERT VERTICAL
EQ EQUAL, EQUALITY OD OUTSIDE DIAMETER W/ WITH
EQUIP EQUIPMENT OH OVERHEAD W WEST
EW or E-W EACH WAY OPP OPPOSITE WL WATER LEVEL EXIST or EX EXISTING PC POINT OF CURVE WS WATER SURFACE
EXP EXPANSION, EXPOSED PD PAVEMENT DRAIN WSEL WATER SURFACE ELEVATION
EXP JT EXPANSION JOINT PI POINT OF INFLECTION W/O WITHOUT
VIBRACORE BORING DESIGNATION
BORROW AREA LIMITS
A
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T D
R
AW
N B
Y:
SU
BM
IT
TE
D B
Y:
D
ES
IG
N
ED
B
Y:
PL
O
T
SC
AL
E:
C H
EC
KE
D B
Y:
2 3 4 5 6 7 8 9 10 11
B
C
E
F
G
H
I
J
D
PHILADELPHIA
C-001
SU
SS
EX
C
OU
NT
Y
DE
LA
W
AR
E
BE
AC
H
NO
UR
IS
HM
EN
T
IN
DI
AN
R
IV
ER
IN
LE
T
- N
OR
TH
B
EA
CH
GE
NE
RA
L I
NF
OR
MA
TI
ON
S
HE
ET
GE
NE
RA
L I
NF
OR
MA
TI
ON
S
HE
ET
.dw g
AP
RI
L 2
W
2B U2
5B A0
P
H
IL
A D
E
LP
H
IA
J.
SC
HW
AR
TZ
J.
SC
HW
AR
TZ
D.
N
EL
SO
N
AS
S
HO
W
N
RT
A
T.
F
AT
ZI
NG
ER
IN
DI
AN
R
IV
ER
IN
LE
T
MHW
MHW
MHW
MHW
MHW
MHW
MHW
MHW
PROJECT LIMIT
STA. 0+00
TEMPORARY
ACCESS ROAD
STA. 9+37.42
N 222850.16 E 757193.83
STA. 0+00.00
N 221948.50 E 757450.29
CONTRACTOR STAGING AREA
NEW SR1 BRIDGE
ATLANTIC OCEAN
EXIST. BRIDGE
PIER
EXIST.
BRIDGE
PLYON
EXIST. CONCRETE
PLATFORM ON 4 SQ.
CONC. COLUMN
TO REMAIN
SEAWARD
EDGE OF
BERM
TOE OF
SLOPE
APPROXIMATE LOCATION OF EXISTING JETTY
(PARTIALLY SUBMERGED)
SURVEY & CONSTR.
SEE NOTE 6
APPROXIMATE LOCATION OF
DELDOT SHEET PILE
℄ OF DUNE
STA 1+87.49
OFF 56.95 ' R
STA 9+97.01
OFF 138.70 ' R
STA 2+31.80
OFF 183.23 ' L
STA 6+25.46
OFF 154.28 ' L
STA 7+42.01
OFF 227.66 ' L
STA 5+76.92
OFF 108.86 ' R
STA 5+76.92
OFF 108.86 ' R
STA 5+76.92
OFF 108.86 ' R
STA 5+76.92
OFF 108.86 ' R
STA 8+39.29
OFF 212.91 ' L
STA 6+42.92
OFF 232.57 ' L
STA 8+39.29
OFF 212.91 ' L
STA 9+37.36
OFF 203.18 ' L
SEAWARD
EDGE OF DUNE
LANDWARD
TOE OF DUNE
0+00 1+00
2+00 3+00
4+00 5+00
6+00 7+00
8+00 9+00 10+00 11+00 12+00
STA 2+31.80
OFF 183.23 ' L
STA 2+31.80
OFF 183.23 ' L
STA 1+87.49
OFF 56.95 ' RSTA 0+05.52
OFF 32.90 ' R
SEE NOTE 7
0+00
5+00
10+00
A
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T D
R
AW
N B
Y:
SU
BM
IT
TE
D B
Y:
D
ES
IG
N
ED
B
Y:
PL
O
T
SC
AL
E:
C H
EC
KE
D B
Y:
KEY PLAN
2 3 4 5 6 7 8 9 10 11
B
C
E
F
G
H
I
J
D
PHILADELPHIA
C-101
SU
SS
EX
C
OU
NT
Y
DE
LA
W
AR
E
BE
AC
H
NO
UR
IS
HM
EN
T
IN
DI
AN
R
IV
ER
IN
LE
T
- N
OR
TH
B
EA
CH
PL
AN
ST
A.
0+
.0
TO
S
TA
. 1
2+
.0
PL
AN
ST
A.
0+
.0
TO
S
TA
. 1
2+
.0.
dw g
AP
RI
L 2
W
2B U2
5B A0
PH
IL
AD
EL
PH
IA
J.
SC
HW
AR
TZ
J.
SC
HW
AR
TZ
D.
N
EL
SO
N
AS
S
HO
W
N
RT
A
T.
F
AT
ZI
NG
ER
NOTES:
1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.
2. FOR SURVEY CONTROL DATA, SEE SHEET G-102.
3. FOR TYPICAL SECTIONS, SEE SHEET C-301.
4. FOR CROSS SECTIONS, SEE SHEET C-302.
5. SEE SHEET G-102 FOR CONTRACTOR WORK LIMIT.
6. EXTEND DUNE BACK SLOPE OF THE FEDERAL DUNE TO MEET THE
EXISTING DUNE BASED ON PRECONSTRUCTION SURVEYS.
7. UNIFORMLY GRADE FROM THE CREST OF EXISTING JETTY TO THE BERM
WITH A MAX SLOPE OF 10:1 H:V.
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
C -1
R
E:
C
-1
100'100' 050' SCALE: 1" = 100'-0"A1 PLAN - STA. 0+00.0 - STA. 12+08.0A1 PLAN - STA. 0+00.0 - STA. 12+08.0
ATLANTIC OCEAN
MHW
MHW
MHW
MHW
MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW MHW
IR-1
DCS-NO.14
COASTAL HIGHWAY - DELAWARE STATE ROUTE 1
SURVEY & CONSTR.
SURVEY &
CONSTR.
SEAWARD
EDGE OF
BERM
TOE
OF
SLOPE
℄ OF DUNE
APPROXIMATE LOCATION OF
DELDOT SHEET PILE
HAVEN RD
INLET RD
STA 17+95.37
OFF 94.76 ' R
STA 25+97.00
OFF 7.28 ' L
STA 33+97.00
OFF 19.32 ' L
STA 41+97.00
OFF 34.24 ' L
STA 17+96.99
OFF 229.95 ' L
STA 25+96.85
OFF 227.98 ' L
STA 33+96.99
OFF 214.56 ' L
STA 41+96.84
OFF 202.05 ' L
SEAWARD
EDGE OF DUNE
LANDWARD
TOE OF DUNE
12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00
15+00
20+00
25+00
30+00
35+00
40+00
SEE NOTE 6
A
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T D
R
AW
N B
Y:
SU
BM
IT
TE
D B
Y:
D
ES
IG
N
ED
B
Y:
PL
O
T
SC
AL
E:
C H
EC
KE
D B
Y:
KEY PLAN
2 3 4 5 6 7 8 9 10 11
B
C
E
F
G
H
I
J
D
PHILADELPHIA
C-102
SU
SS
EX
C
OU
NT
Y
DE
LA
W
AR
E
BE
AC
H
NO
UR
IS
HM
EN
T
IN
DI
AN
R
IV
ER
IN
LE
T
- N
OR
TH
B
EA
CH
PL
AN
ST
A.
+0 8.0
T O
ST
A.
+4
1.5
PL
AN
ST
A.
+0 8.0
T O
ST
A.
+4
1.5 .dw g
AP
RI
L 2
W
2B U2
5B A0
PH
IL
AD
EL
PH
IA
J.
SC
HW
AR
TZ
J.
SC
HW
AR
TZ
D.
N
EL
SO
N
AS
S
HO
W
N
RT
A
T.
F
AT
ZI
NG
ER
NOTES:
1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.
2. FOR SURVEY CONTROL DATA, SEE SHEET G-102.
3. FOR TYPICAL SECTIONS, SEE SHEET C-301.
4. FOR CROSS SECTIONS, SEE SHEET C-302.
5. SEE SHEET G-102 FOR CONTRACTOR WORK LIMIT.
6. EXTEND DUNE BACK SLOPE OF THE FEDERAL DUNE TO MEET THE
EXISTING DUNE BASED ON PRECONSTRUCTION SURVEYS.
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
C -1
R
E:
C
-1
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
C -1
R
E:
C
-1
SCALE: 1" = 100'-0"A1 PLAN - STA. 12+08.0 TO STA. 43+41.5A1 PLAN - STA. 12+08.0 TO STA. 43+41.5
MHW MHW MHW MHW
PROJECT LIMIT
STA. 55+00
STA. 55+00.00
N 227392.32 E 756762.67
SAVAGES DITCH RD
DELAWARE SEASHORE STATE PARK
ATLANTIC OCEAN
DELAWARE STATE ROUTE 1
SEAWARD
EDGE OF
BERM
TOE OF
SLOPE
GRADE FILL INTO EXISTING BERM AND
DUNE. LENGTH OF TAPER MAY BE
ADJUSTED BASED ON PRECONSTRUCTION
SURVEYS
℄ OF DUNE
STA. 50+95
OFF 150 FT L
SURVEY & CONSTR.
SEE NOTE 6
STA 50+00.00
OFF 0.00 '
STA 49+97.86
OFF 211.10 ' L
SEAWARD
EDGE OF DUNE
LANDWARD
TOE OF DUNE
44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00
45+00
50+00
55+00
A
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T D
R
AW
N B
Y:
SU
BM
IT
TE
D B
Y:
D
ES
IG
N
ED
B
Y:
PL
O
T
SC
AL
E:
C H
EC
KE
D B
Y:
KEY PLAN
2 3 4 5 6 7 8 9 10 11
B
C
E
F
G
H
I
J
D
PHILADELPHIA
C-103
SU
SS
EX
C
OU
NT
Y
DE
LA
W
AR
E
BE
AC
H
NO
UR
IS
HM
EN
T
IN
DI
AN
R
IV
ER
IN
LE
T
- N
OR
TH
B
EA
CH
PL
AN
ST
A.
+4 1.5
T O
ST
A.
+0
0.0
PL
AN
ST
A.
+4 1.5
T O
ST
A.
+0
0.0 .dw g
AP
RI
L 2
W
2B U2
5B A0
PH
IL
AD
EL
PH
IA
J.
SC
HW
AR
TZ
J.
SC
HW
AR
TZ
D.
N
EL
SO
N
AS
S
HO
W
N
RT
A
T.
F
AT
ZI
NG
ER
NOTES:
1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.
2. FOR SURVEY CONTROL DATA, SEE SHEET G-102.
3. FOR TYPICAL SECTIONS, SEE SHEET C-301.
4. FOR CROSS SECTIONS, SEE SHEET C-302.
5. SEE SHEET G-102 FOR CONTRACTOR WORK LIMIT.
6. EXTEND DUNE BACK SLOPE OF THE FEDERAL DUNE TO MEET THE
EXISTING DUNE BASED ON PRECONSTRUCTION SURVEYS.
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
R E:
C -1
R
E:
C
-1
SCALE: 1" = 100'-0"A1 PLAN - STA. 43+41.5 TO STA. 50+00.0A1 PLAN - STA. 43+41.5 TO STA. 50+00.0
PERMITTED BORROW AREA
AREA A
AREA B
KHV-103
KHV-105
KHV-104
KHV-230
KHV-231
AREA NOT AVAILABLE
FOR CONTRACT
AREA NOT AVAILABLE
FOR CONTRACT
COORDINATES
POINT NUMBER
NORTHING
222524.4
222836.5
221275.4
220963.6
222704.5
221179.7
221166.1
222682.9
221119.5
221816.3
222271.1
EASTING
759312.7
764643.8
764794.8
759462.9
762388.3
763158.5
762925.8
762019.8
762128.9
761745.7
761061.3
A
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T D
R
AW
N B
Y:
SU
BM
IT
TE
D B
Y:
D
ES
IG
N
ED
B
Y:
PL
O
T
SC
AL
E:
C H
EC
KE
D B
Y:
KEY PLAN
2 3 4 5 6 7 8 9 10 11
B
C
E
F
G
H
I
J
D
PHILADELPHIA
C-104
SU
SS
EX
C
OU
NT
Y
DE
LA
W
AR
E
BE
AC
H
NO
UR
IS
HM
EN
T
IN
DI
AN
R
IV
ER
IN
LE
T
- N
OR
TH
B
EA
CH
IR
I E
BB
S
HO
AL
BO
RR
OW
A
RE
A
PL
AN
C-
4 I
RI
E
BB
S
HO
AL
BO
RR
OW
A
RE
A
PL
AN
.dw g
AP
RI
L 2
W
2B U2
5B A0
PH
IL
AD
EL
PH
IA
J.
SC
HW
AR
TZ
J.
SC
HW
AR
TZ
D.
N
EL
SO
N
AS
S
HO
W
N
RT
A
T.
F
AT
ZI
NG
ER
NOTES:
1. THE SOUNDINGS DEPICTED ON THIS MAP REPRESENT THE RESULTS OF
CLASS 1 SURVEYS CONDUCTED IN JULY 2024 AND CAN ONLY BE
CONSIDERED AS INDICATIVE OF THE BATHYMETRY AS IT EXISTED AT
THAT TIME.
2. VERTICAL REFERENCE - NAVD 88.
NOOA TIDAL EPOCH- 1983 - 2001
3. HORIZONTAL REFERENCE - NAD 83 DELAWARE STATE PLANE, ZONE 0700,
U.S. FOOT.
4. THE POSITIONS OF THE AIDS TO NAVIGATION ARE PROVIDED FOR
INFORMATION ONLY, AND SHOULD NOT BE USED FOR NAVIGATION.
5. VIBRACORE LOGS AND SIEVE CURVES FOR THE VIBRACORES SHOWN ON
THIS PLAN CAN BE FOUND IN THE SPECIFICATIONS.
6. DREDGING SHALL BEGIN IN THE INDIAN RIVER INLET EBB SHOAL
BORROW AREA A. THE CONTRACTOR SHALL DREDGE ALL MATERIAL TO
WITHIN ONE FOOT ABOVE THE MAXIMUM CONTRACT DEPTH. DREDGING
IN THE INDIAN RIVER INLET EBB SHOAL BORROW AREA A SHALL BE
CONTINUOUS UNTIL ALL MATERIAL HAS BEEN REMOVED TO THE
SPECIFIED DEPTH OF THAT BORROW AREA PRIOR TO MOVING TO
BORROW AREA B. DREDGING IN BORROW AREA B MAY BE CONDUCTED
AFTER COMPLETING OF DREDGING OPERATIONS IN BORROW AREA A, AS
APPROVED BY THE CONTRACTING OFFICER.
NORTH
PLAN
0200' 200'100' SCALE: 1" = 200'-0"A1 PLAN - IRI EBB SHOAL - BORROW AREAA1 PLAN - IRI EBB SHOAL - BORROW AREA
6004002000
-10
-5
-10
-5
-15 -15
700500300100300 100 -25
-20
-25
-20
TYPICAL SECTION WITH EXTENDED DUNE WIDTH TO CONNECT TO EXISTING DUNE
SURVEY AND CONSTR.
DUNE
CREST
EL +16.00
APPROXIMATE
LOCATION OF
EXISTING
SHEETPILE
CONTRACTOR TO
FIELD VERIFY
(SEE NOTE 5)
25'
VARIES
SEE PLAN
BERM ELEV +9.20
MHW EL +1.56 ft NAVD88
MLW EL -2.25 ft NAVD881
SEAWARD EDGE
OF BERM
TOE OF FILL VARIES
(SEE PLAN AND CROSS
SECTIONS)
DUNE WIDTH
EXTENDED
TO TIE INTO
EXISTING
DUNE, SEE
NOTE 8
EXISTING BEACH CROSS
SECTION (VARIES)
SEAWARD TOE
OF DUNE (TYP)
LANDWARD
TIE IN POINT
CWL, (TYP)
SEE NOTE 7
6004002000
-10
-5
-10
-5
-15 -15
500300100300 100
-25
-20
-25
-20
MHW EL +1.56 ft NAVD88
MLW EL -2.25 ft NAVD88
CREST
EL +16.00
25'
VARIES
SEE PLAN
SEAWARD TOE
OF DUNE (TYP) BERM ELEV +9.20
SEAWARD EDGE
OF BERM
TOE OF FILL VARIES
(SEE PLAN AND CROSS
SECTIONS)
LANDWARD TOE
OF DUNE & CWL, (TYP)
SEE NOTE 7
APPROXIMATE
LOCATION OF
EXISTING
SHEETPILE
CONTRACTOR TO
FIELD VERIFY
(SEE NOTE 5)
EXISTING BEACH CROSS
SECTION (VARIES)
NOTES:
1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.
2. SEE SHEET G-102 FOR PROFILE ORIGIN POINTS.
3. THE CROSS SECTIONS ARE SHOWN LOOKING BACK STATION ALONG THE SURVEY AND CONSTRUCTION BASELINE.
4. THE MAX SLOPE FOR THE TIE IN TO EXISTING DUNE SHALL BE 3H:1V.
5. THE EXISTING STEEL SHEET PILE WALL LOCATED ALONG THE WESTERN LIMIT OF THE WORK AREA MUST BE PROTECTED FROM DAMAGE FROM EARTHMOVING EQUIPMENT DURING DUNE CONSTRUCTION. THE CONTRACTOR MUST MAINTAIN A CONSISTENT GROUND ELEVATION ON EITHER SIDE OF THE SHEET PILE WALL DURING EARTHWORK ACTIVITY TO PREVENT UNBALANCED LOADING ON THE WALL. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO
INSTALLED SHEETPILE FROM DELDOT.
6. EXACT LOCATION OF EXISTING SHEET PILE TO BE LOCATED BY CONTRACTOR, BETWEEN APPROXIMATE STA 8+46 AND
STA 22+36.
7. DUNES SHALL BE CONSTRUCTED IN 3' THICK MAXIMUM HORIZONTAL LIFTS. EACH LIFT SHALL BE COMPACTED BY A
MINIMUM OF 3 PASSES OF A D6 OR LARGER DOZER WITH COMPLETE OVERLAPPING COVERAGE.
8. THE EXTENT OF DUNE REPAIR WILL BE DETERMINED AFTER RECEIPT AND ACCEPTANCE OF THE PRE CONSTRUCTION
SURVEY.
A
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T D
R
AW
N B
Y:
SU
BM
IT
TE
D B
Y:
D
ES
IG
N
ED
B
Y:
PL
O
T
SC
AL
E:
C H
EC
KE
D B
Y:
2 3 4 5 6 7 8 9 10 11
B
C
E
F
G
H
I
J
D
PHILADELPHIA
C-301
SU
SS
EX
C
OU
NT
Y
DE
LA
W
AR
E
BE
AC
H
NO
UR
IS
HM
EN
T
IN
DI
AN
R
IV
ER
IN
LE
T
- N
OR
TH
B
EA
CH
TY
PI
CA
L S
EC
TI
ON
S
- B
EA
CH
N
OU
RI
SH
ME
NT
TY
PI
CA
L S
EC
TI
ON
S
- B
EA
CH
N
OU
RI
SH
ME
NT
.dw g
AP
RI
L 2
W
2B U2
5B A0
PH
IL
AD
EL
PH
IA
J.
SC
HW
AR
TZ
J.
SC
HW
AR
TZ
D.
N
EL
SO
N
AS
S
HO
W
N
RT
A
T.
F
AT
ZI
NG
ER
H:
V:
SCALE IN FEETD1 TYPICAL SECTION - STA. 15+00 TO STA. 18+00D1 TYPICAL SECTION - STA. 15+00 TO STA. 18+00
200100
H:
V:
SCALE IN FEETG1 TYPICAL SECTION - STA. 0+60 TO STA. 15+00 & STA. 18+00 TO STA. 50+95G1 TYPICAL SECTION - STA. 0+60 TO STA. 15+00 & STA. 18+00 TO STA. 50+95
200100
-10
-5
200400
-10
-5
-15 -15
500300100300 100
-20
-25
-20
STA. 1+98 (IR 102)
6004002000
-10
-5
-10
-5
-15 -15
500300100300 100
-20
-25
-20
STA. 17+97 (IR 118)
6004002000
-10
-5
200400
-10
-5
-15 -15
500300100300 100
-20
-25
-20
STA. 25+97 (IR 126)
STA. 5+97 (IR 106)
6004002000
-10
-5
-10
-5
-15 -15
700500300100300 100 -25
-20
-25
-20
STA. 9+97 (IR 110)
6004002000
-10
-5
200400
-10
-5
-15 -15
500300100300 100
-20
-25
-20
STA. 33+97 (IR 134)
6004002000200 700500300100300 100
-10
-5
-10
-5
-15 -15
500300100300 100
SURVEY AND CONSTR.
-25
-20
-25
-20
STA. 41+47 (IR 142)
-10
-5
-15
SURVEY AND CONSTR.
-25
-20
STA. 50+00 (IR 150)
MHW EL +1.56 ft NAVD88
MLW EL -2.25 ft NAVD88
MHW EL +1.56 ft NAVD88
MLW EL -2.25 ft NAVD88
MHW EL +1.56 ft NAVD88
MLW EL -2.25 ft NAVD88
MHW EL +1.56 ft NAVD88
MLW EL -2.25 ft NAVD88
MHW EL +1.56 ft NAVD88
MLW EL -2.25 ft NAVD88
MHW EL +1.56 ft NAVD88
MLW EL -2.25 ft NAVD88
MHW EL +1.56 ft NAVD88
MLW EL -2.25 ft NAVD88
MHW EL +1.56 ft NAVD88
MLW EL -2.25 ft NAVD88
-10
-5
-15
-25
-20
6004002000200 500300100300 100400
EXISTING BEACH CROSS
SECTION BELOW ELEV. 5
FROM JULY 2024 (TYP)
DUNE℄
DUNE℄
-10
-5
-15
-25
-20
-10
-5
-15
-25
-20
EXISTING BEACH CROSS SECTION
ABOVE ELEV. 5 FROM 2025
ASBUILT TOPO SURVEY (TYP)
A
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T D
R
AW
N B
Y:
SU
BM
IT
TE
D B
Y:
D
ES
IG
N
ED
B
Y:
PL
O
T
SC
AL
E:
C H
EC
KE
D B
Y:
2 3 4 5 6 7 8 9 10 11
B
C
E
F
G
H
I
J
D
PHILADELPHIA
C-302
SU
SS
EX
C
OU
NT
Y
DE
LA
W
AR
E
BE
AC
H
NO
UR
IS
HM
EN
T
IN
DI
AN
R
IV
ER
IN
LE
T
- N
OR
TH
B
EA
CH
CR
OS
S
SE
CT
IO
NS
ST
A.
1+
T O
ST
A.
+0
C-
2 C
RO
SS
S
EC
TI
ON
S.
dw g
AP
RI
L 2
W
2B U2
5B A0
PH
IL
AD
EL
PH
IA
J.
SC
HW
AR
TZ
J.
SC
HW
AR
TZ
D.
N
EL
SO
N
AS
S
HO
W
N
RT
A
NOTES:
1. FOR GENERAL NOTES AND LEGEND, SEE SHEET C-001.
2. THE EXISTING SITE CONDITION SURVEYS CAN ONLY BE CONSIDERED REPRESENTATIVE OF THE
CONDITIONS AT THAT TIME THEY WERE TAKEN. THE SURVEY DATA BELOW ELEVATION 5 WAS
TAKEN JULY 2024. DNREC CONDUCTED AN EMERGENCY BEACH FILL PROJECT SUBSEQUENT TO
THE 2024 SURVEY BEING CONDUCTED. THE SURVEY ABOVE ELEVATION 5 IS REPRESENTATIVE OF THE AS BUILT CONDITION OF THE DNREC REPAIR AND OCCURRED IN 2025. UPON RECEIPT AND
ACCEPTANCE OF THE PRE CONSTRUCTION SURVEY THE TEMPLATE WILL BE REVISED.
3. THE EXTENT OF DUNE REPAIR WILL BE DETERMINED AFTER RECEIPT AND ACCEPTANCE OF THE
PRE CONSTRUCTION SURVEY.
T.
F
AT
ZI
NG
ER
H:
V:
SCALE IN FEETB1 CROSS SECTION - STA. 1+98 TO STA. 50+00B1 CROSS SECTION - STA. 1+98 TO STA. 50+00
200100
| Sheets and Views |
| G-001 COVER SHEET |
| G-002 DRAWING INDEX SHEET |
| G-101 GENERAL PLAN |
| G-102 SURVEY CONTROL DATA & CONTRACTOR WORK LIMIT |
| C-001 GENERAL INFORMATION SHEET |
| C-101 PLAN - STA. 0+00.0 TO STA. 12+08.0 |
| C-102 PLAN - STA. 12+08.0 TO STA. 43+41.5 |
| C-103 PLAN - STA. 43+41.5 TO STA. 55+00.0 |
| C-104 IRI EBB SHOAL - BORROW AREA PLAN |
| C-301 TYPICAL SECTIONS - BEACH NOURISHMENT |
| C-302 CROSS SECTIONS - STA. 1+98 TO STA. 50+00 |
| 2025-04-28T11:51:08-0400 | |
| MOFFATT.BARBARA.F.1228997893 |
| 2025-04-28T16:02:14-0400 | |
| FATZINGER.TRAVIS.T.1249188502 |
File details come from the government source that posted it. Updated .