W912BU25BA009-AM0001-Specs.pdf

PDF 242 KB Posted

Attached to
W912BU25BA009 - Indian River Inlet Beach Renourishment
Solicitation number
W912BU25BA009
Issued by

About this file

This document is an Amendment (No. 0001) to a federal solicitation for the Indian River Inlet North Shore Emergency Beachfill project (IFB W912BU25BA009). The amendment modifies several technical specifications, including updates to Sections 01 11 00 (Summary of Work), 01 33 00 (Submittal Requirements), 01 71 23 (Survey Requirements), and 35 31 00 (Beachfill), as well as replacing drawing C-104.

The project involves placing approximately 300,000 cubic yards of beachfill material along the Indian River Inlet north shore to construct a beach berm and dune system for coastal protection of Route 1. The contract includes a Base Bid and 4 Options, with potential additional placements of 100,000 cubic yards (Option 1) and three additional 50,000 cubic yard options. The approved borrow area is the Indian River Inlet Ebb Shoal (Areas A and B), and mechanical/bucket dredges are not allowed. Pre-placement condition surveys will determine the exact location and quantity of beachfill material, which will be a factor in awarding options for additional quantities.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment No. 0001

IFB W912BU25BA009

14. DESCRIPTION OF AMENDMENT (continued)

a. TECHNICAL SPECIFICATIONS:

(1) SECTION 01 11 00 – SUMMARY OF WORK: Please delete this section in its entirety, and substitute the revised Section 01 11 00, annotated Amendment No. 0001, attached hereto.

(2) SECTION 01 33 00 – SUBMITTAL REQUIREMENTS: Please delete pages 01 33 00-17 to 01 33 00-22 in their entirety and substitute the revised pages 01 33 00-17 to 01 33 00-22, annotated as Amendment No. 0001, attached hereto.

(3) SECTION 01 71 23 – SURVEY REQUIREMENTS: Please delete this section and substitute the revised Section 01 71 23, annotated Amendment No. 0001, attached hereto.

(4) SECTION 35 31 00 – BEACHFILL: Please delete this section and substitute the revised Section 35 31 00, annotated Amendment No. 0001, attached hereto.

b. DRAWINGS: Please delete drawing C-104 in its entirety and substitute the revised sheet of the same number, with the latest revision date of 17 June 2025, attached hereto.

c. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0001. Failure to acknowledge all amendments may be cause for rejection of the Bidder.

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 SCOPE

This section presents a general description of the work to be accomplished under this contract at Indian River Inlet (IRI), in Delaware.

1.2 DESCRIPTION OF WORK

The contract work consists of placement of satisfactory beachfill material on Indian River Inlet North Shore to construct a beach berm and dune system along the Delaware coast, on the north side of Indian River Inlet, for coastal protection of Route 1.

a. Contract includes a Base Bid and 4 Options

b. The Base bid work includes the placement of approximately 300,000 cubic yards of satisfactory beachfill material along IRI north shore.

c. Option 1 includes the placement of 100,000 cubic yards of satisfactory beachfill material along IRI north shore.

d. Options 2, 3 and 4 each include the placement of 50,000 cubic yards of sand along IRI north shore shore.

e. The approved borrow area available for use under this contract is the Indian River Inlet Ebb Shoal, consisting of Area A and Area B.

Obtain all beachfill material for the work under this contract solely from this approved inlet borrow area. Beachfill material from any other source including trucking from upland sources will not be considered under this contract.

f. The use of mechanical/bucket dredges will not be allowed under this contract.

Pre-placement condition surveys, as specified in Section 01 71 23 SURVEY REQUIREMENTS, will determine the exact location and quantity of beachfill material required within the limits indicated, and will be a determining factor in award of options for additional quantities of beachfill. Where options for additional beachfill are awarded, the additional beachfill will be placed immediately after the initial quantity.

1.3 CONTRACTOR ACCESS

Access to the work site is available by land and water. Access to the shorefront shall be at the locations indicated on the drawings. Access to the inlet borrow area is by water only. Conduct all investigations necessary to establish the specific routes to be used for the contract work. Compliance with all applicable Federal, State, County, and local regulations regarding weight limitations and other vehicle restrictions regarding the use of these routes is solely the responsibility of the Contractor.

Document the original conditions of the access area and route by taking detailed photographs of those areas prior to starting work. See Section

SECTION 01 11 00 Page 1

01 32 33 CONSTRUCTION PHOTOGRAPHY for requirements.

Any damage to the roads due to truck traffic or other Contractor operations shall be repaired, subject to the Contracting Officer's approval, at no additional cost to the Government.

1.4 CONTRACTOR'S WORK LIMIT

The Contractor's Work Limit is as shown on the contract drawings. Do not enter upon, affect, or damage, in any way, areas and structures outside that limit of work. Execute work with extreme care and diligence to prevent damage to any existing utilities or structures. Any existing utilities or structures damaged by contractor operations, regardless of whether intentional or accidental, shall be repaired and restored to original conditions, at no additional cost to the Government.

1.5 WORK HOURS

The Contractor may perform beachfill work 24 hours per day, 7 days per week, to complete the beachfill contract work. Equip land-based equipment with noise suppression equipment, if so directed by the Contracting Officer, at no additonal cost to the Government.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

SECTION 01 11 00 Page 2

SU

BM

IT

TA

L

FO

R M

,J an

PR

EV

IO

U

S

ED

IT

IO

N

IS

O

BS

O

LE

TE

PA

G E

O

F

PA

G

ES

In di an R iv er

In le t N or th S ho re

E m er ge nc y

Be ac hf ill

SD

-0

Pr ec on st ru ct io n Su bm itt al s

1.

FI

O

Ev id en ce

O f I ns ur an ce

SD

-1

C lo se ou t S ub m itt al s 1.

FI

O C er tif ie d

Pa yr ol ls

SD

-0

Pr ec on st ru ct io n Su bm itt al s

1.

G C

O R

Pr oj ec t S ch ed ul er

Q ua lif ic at io ns 3.

4.

G C

O R

Pr el im in ar y

Pr oj ec t S ch ed ul e

3.

4.

G

C O

R In iti al

P ro je ct

S ch ed ul e 3.

6.

G C

O R

Pe rio di c

Sc he du le

U pd at e

SD

-0

Pr ec on st ru ct io n Su bm itt al s

1.

G D

O Ae ria l P ho to gr ap hy Q ua lif ic at io ns

1.

5.

G

C O

R C on st ru ct io n

Ph ot og ra ph y

Pl an

1.

5.

G

C O

R G eo -re fe re nc ed

A er ia l I m ag er y

M is si on a nd

C ap ab ilit y Pl an 3.

G

C O

R Pr e- C on st ru ct io n

Ph ot og ra ph s

3.

3.

G

D O

Pr e-

Be ac hf ill

G eo

-re fe re nc ed Ae ria l I m ag er y

SD

-0

C er tif ic at es 3.

G

C O

R Pr og re ss C on st ru ct io n

Ph ot og ra ph s

3.

G C

O R

Po st

-C on st ru ct io n Ph ot og ra ph s 3.

3.

G C

O R

Po st

-B ea ch fil l G eo

-re fe re nc ed Ae ria l I m ag er y

3.

G D

O Ae ria l O bl iq ue s

3.

G C

O R

Fl ig ht R eq ue st

SD

-0

Pr ec on st ru ct io n

Su bm itt al s

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

AC

T N

O

TI

TL

E

AN

D L

O C

AT

IO

N C

O N

TR

AC

TO

R

C O

N

TR

AC

TO

R

SC

H

ED

U

LE

D

AT

ES

C O

N

TR

AC

TO

R

AC

TI

O

N

AP

PR

O

VI

N

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D

ES

C R

IP

TI

O N

IT

EM

S U

BM

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R

SU

BM

IT

AP

PR

O

VA

L N

EE

D

ED

BY

M

AT

ER

IA

L N

EE

D

ED

BY

A C T I O N C O D E

D

AT

E O

F

AC

TI

O

N

D

AT

E

FW

D

TO

A

PP

R

AU

TH

D

AT

E R

C D

FR

O

M C

O N

TR

D

AT

E

FW

D

TO

O

TH

ER

R

EV

IE

W

ER

D

AT

E R

C D

FR

O

M O

TH

R

EV

IE

W

ER

A C T I O N C O D E

D

AT

E O

F

AC

TI

O

N

M

AI

LE

D

TO

C

O N

TR

D

AT

E R

C D

FR

M

A

PP

R

AU

TH

R

EM

AR

KS

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r)

Amendment No. 0001

Section 01 30 00 Page 17

IT

TA

L

FO

R M

,J an

PR

EV

IO

U

S

ED

IT

IO

N

IS

O

BS

O

LE

TE

PA

G E

O

F

PA

G

ES

In di an R iv er

In le t N or th S ho re

E m er ge nc y

Be ac hf ill

1.

G C

O R

Su bm itt al

R eg is te r

SD

-0

Pr ec on st ru ct io n

Su bm itt al s 1.

G

D O

Ac ci de nt

P re ve nt io n

Pl an

(A

PP

1.

G

D O

D iv e O pe ra tio ns

P la n

SD

-0

Te st

R ep or ts

1.

.2 G

D O

Ac ci de nt

R ep or ts

1.

.3

FI

O

LH

E In sp ec tio n

R ep or ts

1.

G D

O M on th ly E xp os ur e

R ep or ts

SD

-0

C er tif ic at es

FI

O C ra ne

O pe ra to rs /R ig ge rs 1.

G

D O

Ac tiv ity H az ar d An al ys is (A

H A)

1.

.4

FI

O C er tif ic at e of

C om pl ia nc e

1.

FI

O

H ot

W or k Pe rm it

1.

.1

FI

O H ot W or k

Pe rm it 1.

FI

O Li ce ns e C er tif ic at es 1.

.1

G D

O Po rta bl e G au ge

O pe ra tio ns Pl an ni ng W or ks he et

1.

.1 G

D O

R ad io gr ap hy

O pe ra tio n Pl an ni ng W or k

Sh ee t 1.

.4

G D

O St an da rd L ift P la n

SD

-0

C er tif ic at es 1.

5.

G D

O Sa fe P ra ct ic es

M an ua l

1.

5.

G

D O

D iv in g

O pe ra tio ns P la n

1.

5.

G

D O

Ac tiv ity H az ar d An al ys is (A

H A)

1.

5.

G

D O

Em er ge nc y M an ag em en t P la n 1.

5.

G D

O D ec om pr es si on

P la n

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

AC

T N

O

TI

TL

E

AN

D L

O C

AT

IO

N C

O N

TR

AC

TO

R

C O

N

TR

AC

TO

R

SC

H

ED

U

LE

D

AT

ES

C O

N

TR

AC

TO

R

AC

TI

O

N

AP

PR

O

VI

N

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D

ES

C R

IP

TI

O N

IT

EM

S U

BM

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R

SU

BM

IT

AP

PR

O

VA

L N

EE

D

ED

BY

M

AT

ER

IA

L N

EE

D

ED

BY

A C T I O N C O D E

D

AT

E O

F

AC

TI

O

N

D

AT

E

FW

D

TO

A

PP

R

AU

TH

D

AT

E R

C D

FR

O

M C

O N

TR

D

AT

E

FW

D

TO

O

TH

ER

R

EV

IE

W

ER

D

AT

E R

C D

FR

O

M O

TH

R

EV

IE

W

ER

A C T I O N C O D E

D

AT

E O

F

AC

TI

O

N

M

AI

LE

D

TO

C

O N

TR

D

AT

E R

C D

FR

M

A

PP

R

AU

TH

R

EM

AR

KS

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r)

Amendment No. 0001

Section 01 30 00 Page 18

IT

TA

L

FO

R M

,J an

PR

EV

IO

U

S

ED

IT

IO

N

IS

O

BS

O

LE

TE

PA

G E

O

F

PA

G

ES

In di an R iv er

In le t N or th S ho re

E m er ge nc y

Be ac hf ill

1.

5.

G

D O

D iv e Pe rs on ne l Q ua lif ic at io ns

1.

5.

G

D O

Eq ui pm en t/A ir

Q ua lit y

C er tif ic at io ns 1.

7.

G D

O D ai ly

L og s

SD

-0

Pr ec on st ru ct io n

Su bm itt al s 3.

G

D O

C on tra ct or Q ua lit y C on tro l ( C

Q C

Pl an

SD

-0

Te st

R ep or ts

3.

9.

FI

O Ve rif ic at io n St at em en t (

D ai ly R ep or ts

SD

-0

Pr ec on st ru ct io n Su bm itt al s

1.

G C

O R

C on st ru ct io n Si te P la n

3.

5.

G

C O

R Tr af fic

C on tro l P la n

2.

2.

G

C O

R H au l R oa d

Pl an

1.

8.

1.

G C

O R

C on tra ct or C om pu te r

C yb er se cu rit y C om pl ia nc e St at em en ts

1.

8.

G

C O

R C on tra ct or

T em po ra ry N et w or k

C yb er se cu rit y C om pl ia nc e St at em en ts

SD

-0

Sh op D ra w in gs

2.

1.

G

C O

R Si gn L eg en d O rd er s

SD

-0

Pr ec on st ru ct io n

Su bm itt al s 1.

G

D O

Q ua lif ic at io ns 1.

7.

G D

O C er tif ie d

Li fe gu ar ds

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

AC

T N

O

TI

TL

E

AN

D L

O C

AT

IO

N C

O N

TR

AC

TO

R

C O

N

TR

AC

TO

R

SC

H

ED

U

LE

D

AT

ES

C O

N

TR

AC

TO

R

AC

TI

O

N

AP

PR

O

VI

N

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D

ES

C R

IP

TI

O N

IT

EM

S U

BM

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R

SU

BM

IT

AP

PR

O

VA

L N

EE

D

ED

BY

M

AT

ER

IA

L N

EE

D

ED

BY

A C T I O N C O D E

D

AT

E O

F

AC

TI

O

N

D

AT

E

FW

D

TO

A

PP

R

AU

TH

D

AT

E R

C D

FR

O

M C

O N

TR

D

AT

E

FW

D

TO

O

TH

ER

R

EV

IE

W

ER

D

AT

E R

C D

FR

O

M O

TH

R

EV

IE

W

ER

A C T I O N C O D E

D

AT

E O

F

AC

TI

O

N

M

AI

LE

D

TO

C

O N

TR

D

AT

E R

C D

FR

M

A

PP

R

AU

TH

R

EM

AR

KS

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r)

Amendment No. 0001

Section 01 30 00 Page 19

IT

TA

L

FO

R M

,J an

PR

EV

IO

U

S

ED

IT

IO

N

IS

O

BS

O

LE

TE

PA

G E

O

F

PA

G

ES

In di an R iv er

In le t N or th S ho re

E m er ge nc y

Be ac hf ill

1.

G D

O Su rv ey in g

Pr oc ed ur es a nd Eq ui pm en t

SD

-0

C er tif ic at es 3.

G

D O

Sw im m in g H az ar d As se ss m en t 3.

2.

G D

O Lo ca tio n of

S ur ve y

Li ne s 3.

6.

G D

O Pr e- Pl ac em en t C on di tio n

Su rv ey s

3.

.1 .1

G D

O Pr e- Pl ac em en t C on di tio n

Su rv ey s

3.

.1 .3

G D

O Be fo re

-D re dg in g Bo rro w

A re a Su rv ey s 3.

9.

G D

O Af te r-D re dg in g

Su rv ey O f B or ro w

Ar ea

A 3.

.1

.3 G

D O

Af te r-D re dg in g Bo rro w

A re a Su rv ey s 3.

8.

G D

O Be fo re

-B ea ch fil l S ur ve ys

3.

.1 .2

G D

O Be fo re

-B ea ch fil l S ur ve ys

3.

8.

G

D O

Af te r-B ea ch fil l S ur ve ys

3.

.1 .2

G D

O Af te r-B ea ch fil l S ur ve ys 3.

FI

O Su rv ey

L og s 3.

6.

G D

O Po st -P la ce m en t C on di tio n Su rv ey s 3.

.1

.1 G

D O

Po st

-P la ce m en t C on di tio n

Su rv ey s

3.

FI

O

Ph ot og ra ph ic

D oc um en ta tio n of

Su rv ey s

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

AC

T N

O

TI

TL

E

AN

D L

O C

AT

IO

N C

O N

TR

AC

TO

R

C O

N

TR

AC

TO

R

SC

H

ED

U

LE

D

AT

ES

C O

N

TR

AC

TO

R

AC

TI

O

N

AP

PR

O

VI

N

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D

ES

C R

IP

TI

O N

IT

EM

S U

BM

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R

SU

BM

IT

AP

PR

O

VA

L N

EE

D

ED

BY

M

AT

ER

IA

L N

EE

D

ED

BY

A C T I O N C O D E

D

AT

E O

F

AC

TI

O

N

D

AT

E

FW

D

TO

A

PP

R

AU

TH

D

AT

E R

C D

FR

O

M C

O N

TR

D

AT

E

FW

D

TO

O

TH

ER

R

EV

IE

W

ER

D

AT

E R

C D

FR

O

M O

TH

R

EV

IE

W

ER

A C T I O N C O D E

D

AT

E O

F

AC

TI

O

N

M

AI

LE

D

TO

C

O N

TR

D

AT

E R

C D

FR

M

A

PP

R

AU

TH

R

EM

AR

KS

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r)

Amendment No. 0001

Section 01 30 00 Page 20

IT

TA

L

FO

R M

,J an

PR

EV

IO

U

S

ED

IT

IO

N

IS

O

BS

O

LE

TE

PA

G E

O

F

PA

G

ES

In di an R iv er

In le t N or th S ho re

E m er ge nc y

Be ac hf ill

3.

G D

O M et ad at a

SD

-1

C lo se ou t S ub m itt al s 3.

G

D O

As -B ui lt

D ra w in gs 3.

G

D O

R ec or d

D ra w in gs 3.

G

D O

Fi na l A pp ro ve d Sh op D ra w in gs

.2

SD

-0

C er tif ic at es 1.

G

N at io na l D re dg in g Q ua lit y M an ag em en t P ro gr am

C er tif ic at io n

.3

SD

-0

C er tif ic at es

1.

G N at io na l D re dg in g

Q ua lit y

M an ag em en t P ro gr am C er tif ic at io n

SD

-0

Pr ec on st ru ct io n Su bm itt al s

1.

6.

G

D O

Bo rro w A re a

1.

G C

O R

D eb ris P re ve nt io n Pl an 1.

G

D O

W or k Pl an 3.

2.

G C

O R

Pu m po ut

P la n 3.

2.

G C

O R

G ra de S ta ke

R ec ov er y Pl an 1.

G

C O

R D re dg e An d At te nd an t P la nt

D at a Sh ee t

SD

-0

Te st R ep or ts 3.

3.

G C

O R

D ai ly R ep or t o f O pe ra tio ns

3.

3.

G

D O

Te st

R es ul ts

3.

3.

G

D O

Te st

R es ul ts

1.

FI

O

Fu el

U sa ge

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

AC

T N

O

TI

TL

E

AN

D L

O C

AT

IO

N C

O N

TR

AC

TO

R

C O

N

TR

AC

TO

R

SC

H

ED

U

LE

D

AT

ES

C O

N

TR

AC

TO

R

AC

TI

O

N

AP

PR

O

VI

N

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D

ES

C R

IP

TI

O N

IT

EM

S U

BM

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R

SU

BM

IT

AP

PR

O

VA

L N

EE

D

ED

BY

M

AT

ER

IA

L N

EE

D

ED

BY

A C T I O N C O D E

D

AT

E O

F

AC

TI

O

N

D

AT

E

FW

D

TO

A

PP

R

AU

TH

D

AT

E R

C D

FR

O

M C

O N

TR

D

AT

E

FW

D

TO

O

TH

ER

R

EV

IE

W

ER

D

AT

E R

C D

FR

O

M O

TH

R

EV

IE

W

ER

A C T I O N C O D E

D

AT

E O

F

AC

TI

O

N

M

AI

LE

D

TO

C

O N

TR

D

AT

E R

C D

FR

M

A

PP

R

AU

TH

R

EM

AR

KS

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r)

Amendment No. 0001

Section 01 30 00 Page 21

IT

TA

L

FO

R M

,J an

PR

EV

IO

U

S

ED

IT

IO

N

IS

O

BS

O

LE

TE

PA

G E

O

F

PA

G

ES

In di an R iv er

In le t N or th S ho re

E m er ge nc y

Be ac hf ill

3.

2.

G

C O

R Ad ju st ed C on st ru ct io n

Te m pl at e 1.

6.

G D

O D ai ly

D re dg e

Lo ca tio n

1.

6.

G

D O

M ap s of

D re dg e

Po si tio n

1.

G C

O R

Bi w ee kl y D re dg in g

Q ua lit y

M an ag em en t(D

Q M

) D at a 1.

6.

G C

O R

D re dg e

Tr ac k Li ne s

1.

G C

O R

M on th ly

P ro gr es s R ep or t 1.

G

C O

R Fi na l P ro du ct io n In fo rm at io n

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

AC

T N

O

TI

TL

E

AN

D L

O C

AT

IO

N C

O N

TR

AC

TO

R

C O

N

TR

AC

TO

R

SC

H

ED

U

LE

D

AT

ES

C O

N

TR

AC

TO

R

AC

TI

O

N

AP

PR

O

VI

N

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D

ES

C R

IP

TI

O N

IT

EM

S U

BM

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R

SU

BM

IT

AP

PR

O

VA

L N

EE

D

ED

BY

M

AT

ER

IA

L N

EE

D

ED

BY

A C T I O N C O D E

D

AT

E O

F

AC

TI

O

N

D

AT

E

FW

D

TO

A

PP

R

AU

TH

D

AT

E R

C D

FR

O

M C

O N

TR

D

AT

E

FW

D

TO

O

TH

ER

R

EV

IE

W

ER

D

AT

E R

C D

FR

O

M O

TH

R

EV

IE

W

ER

A C T I O N C O D E

D

AT

E O

F

AC

TI

O

N

M

AI

LE

D

TO

C

O N

TR

D

AT

E R

C D

FR

M

A

PP

R

AU

TH

R

EM

AR

KS

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r)

Amendment No. 0001

Section 01 30 00 Page 22

SECTION 01 71 23

SURVEY REQUIREMENTS

PART 1 GENERAL

1.1 SCOPE OF SECTION

The work covered by this section consists of furnishing all labor, materials, plant and equipment, and performing all operations required in conducting staking and flagging, pre-placement and post-placement condition surveys, before- and after- beachfill placement surveys, and, before- and after-dredging surveys of the Indian River Inlet ebb shoal borrow area.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 1110-2-1003 (2013) Hydrographic Surveying

EM 1110-1-1005 (2007) Engineering and Design - Control and Topographic Surveying

ER 1110-2-8164 (2017) Engineering and Design - Policies, Guidance, and Requirements for Hydrographic Surveying and Mapping Digital Products

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only (FIO).

When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Qualifications; G,DO Certified Lifeguards; G,DO Surveying Procedures and Equipment; G,DO

SD-07 Certificates

Swimming Hazard Assessment; G,DO Location of Survey Lines; G,DO Pre-Placement Condition Surveys; G,DO Before-Dredging Borrow Area Surveys; G,DO After-Dredging Survey Of Borrow Area A; G,DO After-Dredging Borrow Area Surveys; G,DO Before-Beachfill Surveys; G,DO After-Beachfill Surveys; G,DO Survey Logs

SECTION 01 71 23 Page 1

Post-Placement Condition Surveys; G,DO Photographic Documentation of Surveys Metadata; G,DO

1.4 SURVEYING PROCEDURES AND EQUIPMENT

Submit all surveying procedures, methods, and equipment for topographic surveys, hydrographic surveys, and tidal monitoring, to the Government Survey Point of Contact, prior to the start of any surveying work. All survey equipment, including vessels, shall be owned or leased by an independent survey company, unless otherwise approved by the Government.

1.5 HYDROGRAPHIC SURVEYS

Conduct hydrographic surveys in accordance with USACE Performance Standards as defined in the Hydrographic Surveying Manual EM 1110-2-1003. Perform surveys using single transducer sounding techniques, multi-beam sweep type surveys or both. Obtain bottom soundings using a single beam fathometer operating at a frequency ranging from 190 to 210 Khz. When utilizing multi-beam technology, the operating frequency shall range from 180 to 250 Khz. Calibrate all fathometers in accordance with the procedures outlined in EM 1110-2-1003. Include raw data with submittals.

1.6 TOPOGRAPHIC SURVEYS

a. Perform all topographic surveys in accordance with EM 1110-1-1005.

Conduct all topographic and wading surveys utilizing real time kinematic GPS or an electronic total station with a data collector. Record a three-dimensional raw electronic position for each data point. Include raw data with submittals.

b. A minimum of 2 personnel shall be present while conducting topographic surveys in the active work zone to ensure a proper lookout for moving equipment.

1.7 SURVEYING RESTRICTIONS

1.7.1 Swimming

a. Swimming is an acceptable survey method in the surf zone for this contract provided the following conditions are met:

(1) No swimmer shall enter the water if the wave heights exceeding 6 feet or any other condition or combination of conditions exist that the certified lifeguard, SSHO, COR or Survey POC deem unsafe.

(2) Two certified lifeguards (certified by the Red Cross or United States Lifesaving Association) with experience in coastal environments shall be present for all data acquisition by a swimmer. One lifeguard shall swim to acquire survey data and the other lifeguard shall serve as an observer. The survey swimmer shall enter the water with a survey rod or light survey equipment and the other swimmer (observing lifeguard) shall remain onshore, directing the survey swimmer and observing them at all times for signs of distress or danger. The standby swimmer shall be equipped for immediate entry into the water and shall move parallel to shore and maintain visible contact with the survey swimmer to ensure the shortest distance to the survey swimmer at all times.

SECTION 01 71 23 Page 2

(3) Methods "c.(1)(b)" and "c.(1)(c)" in Section 5 of ER 1110-2-8164 will not be permitted for volume computation (AD/BD) or pre-placement or post-placement surveys.

b. Submit qualifications of the certified lifeguards with experience in coastal environments to the District Safety Office, prior to commencing survey work. This shall include First Aid/CPR certifications. The certifications shall be producible to the GDA at all times.

1.7.2 Surf Zone Data Collection

In order to ensure proper data overlap and full profiles without the use of swimmers, a device may be used for the surf zone data collection such as a sea sled or CRAB. The device shall utilize direct measurement with real time kinematic GPS or an electronic total station/prism with data collector. The device will be considered a method of hydrographic surveying and will be held to the same time constraints and tolerances.

1.8 QUALIFICATIONS

Perform all surveys using an independent survey company, and all surveys (topographic, wading and hydrographic) shall be performed by the same company. Perform all topographic surveys under the direction and supervision of a Professional Licensed Surveyor with a minimum 5 years current experience in beach profiling. Conduct all hydrographic surveys under the direction and supervision of an NSPS-THSOA Certified Hydrographer, or by a Professional Licensed Surveyor with a minimum of 5 years documented experience in a hydrographic surveying environment similar in nature to the surveys required under this Contract. Surveyors shall be State of Delaware licensed surveyors. The licensed surveyors shall be onsite a minimum of 10 percent of the onsite survey time. Submit qualifications of the independent licensed surveyor(s) for topographic and hydrographic surveying to the Government Survey Point of Contact prior to commencing any survey work.

1.9 QUALITY ASSURANCE

Quality assurance will be conducted by the District Survey Office on a minimum of 10 percent of the Contractor's survey work. To accomplish this, the District survey office will either re-survey areas or observe the Contractor in conducting their surveys or inspect submitted raw and processed data.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 SWIMMING HAZARD ASSESSMENT

When swimming is required, perform a swimming hazard assessment by a minimum of the SSHO, swimmers, and the Contractor's survey supervisor.

After all are in agreement that conditions are safe, swimming surveys may be performed. Record the swimming hazard assessment and submit with the daily QC report. Include in the assessment existing water conditions, hand signals, and emergency procedures.

SECTION 01 71 23 Page 3

3.2 GENERAL SURVEY REQUIREMENTS

Conduct all surveys required to demonstrate that the construction is in compliance with the specified placement tolerances and the lines, grades, and elevations shown on the drawings. Conduct all surveys for payment purposes as specified in Contract Clause QUANTITY SURVEYS.

Submit data in the formats specified herein. Include the photographic documentation of the surveys, as specified herein.

3.2.1 Hydrographic Surveying Techniques

Survey hydrographic or offshore portions of beach profile lines using a towed sea sled, direct measurement methodologies, or hydrographic techniques with Real Time Kinematic capabilities. If a towed sea sled method is used, obtain horizontal and vertical positioning utilizing RTK/GPS capabilities to obtain orthometric heights in the required datum, NAVD88. Use the latest NGS separation model to ensure accuracy levels are met. Update rates from the GPS receiver to the data collection processor, shall be collected at a minimum interval of 5 Hz. to a maximum interval of 20 Hz, to minimize the latency error. Augment RTK data with heave information to smooth the vertical position in the post-processing of the data. Locate the GPS base station within 6.2 miles (10 km) of the hydrographic line being surveyed. Conduct topographic and hydrographic portions of the survey at tidal stages to ensure overlap is obtained.

3.2.2 Location of Survey Lines

Submit the locations of the survey lines, in .lnw and .dxf format, prior to any data collection for before- and after-dredging borrow area surveys and before- and after-beachfill surveys.

3.2.3 Vertical and Horizontal Datums

Utilize North American Vertical Datum (NAVD) 1988 Geoid 18 as the vertical datum for elevation and depth references for all surveys. Utilize Delaware State Plane Coordinate System (NAD 1983) as the horizontal reference datum.

3.2.4 Tolerances

Conduct topographic surveys utilizing procedures and methodology that meet or exceed accuracy tolerances of +/- 0.20 feet in the vertical and +/- 1.0 feet in the horizontal. Conduct hydrographic surveys utilizing procedures and methodology that meet or exceed accuracy tolerances of +/- 0.20 feet in the vertical and +/- 3.0 feet in the horizontal. Horizontally, keep the vessel within +/- 25 ft of the profile line. Take complete notes in areas where obstructions are present, explaining the offset.

3.2.5 Overlap of Survey Techniques

Survey lines requiring multiple collection methods shall have a minimum of 25 feet of overlap and 10 points recorded in each method recorded. Include all recorded points in the final submittal with attributes indicating the recording method attached. Survey points shall be within 25 feet lateral distance of the planned profile line and overlap points shall be within 25 feet lateral distance of the adjoining overlap point.

SECTION 01 71 23 Page 4

3.2.5.1 Pre-Placement And Post-Placement Condition Surveys

Schedule the hydrographic/wading/topographic portions of the survey profiles so that a minimum amount of time transpires between data collection of each portion of the survey lines. Survey the hydrographic and wading segments within a maximum time period of 2 days for each profile line. If topographic surveys of the upper beach profile are performed separate from the nearshore wading surveys, survey topographic and wading segments within a maximum time period of 5 days for each profile line. For the purpose of this contract, the "Upper Beach" is defined as +6 feet NAVD88 and above. If topographic surveys are performed separate from wading surveys, develop the composite profile from the wading survey in the region of overlap. If significant differences in elevation between survey segments are observed at locations where segments overlap, submit such information to the District Office for assessment, while still at the site. Significant differences between segments shall be defined as elevation differences greater than 1 foot over a distance of 10 feet or greater along a profile line, and occurring on two or more adjacent profile lines.

3.2.5.2 Before- and After-Beachfill Surveys

Schedule the hydrographic/wading/topographic portions of the survey profiles so that a minimum amount of time transpires between data collection of each portion of the survey lines. Survey the hydrographic, wading and topographic segments within a maximum time period of 48 hours for each line. If topographic surveys are performed separate from wading surveys, develop the composite profile from the wading survey in the region of overlap. If significant differences in elevation between survey segments are observed at locations where segments overlap, submit such information to the District Office for assessment, while still at the site. Significant differences between segments shall be defined as elevation differences greater than 1 foot over a distance of 10 feet or greater along a profile line, and occurring on two or more adjacent profile lines.

3.3 SURVEY CONTROL

a. Survey control descriptions are provided in Appendix A30 and https://rsgisias.crrel.usace.army.mil/apexcrrel/f?p=493:4. Survey the control network utilizing surveying procedures and methodology that meet or exceed accuracy tolerances of +/- 0.10 feet in the vertical and +/- 0.10 feet in the horizontal.

b. USACE-NAP survey control networks are periodically adjusted and updated. This process results in changes to control monuments and coordinates. It does not change the coordinates of the survey baseline.

The survey baseline coordinates and the coordinates of the physical monument may vary. It should be assumed that the survey control network and the survey baseline are independent entities. The physical monument may or may not be on the survey baseline. Establish the relationship between the supplied physical monumentation and the survey baseline.

c. If the name of the survey control point includes stationing or numbers of any kind, the station name should not be assumed to be exact stationing on the survey baselines or profile lines. Coordinates shown on the Survey Control Sheets (DA Form 1959) will govern. Station naming often refers to historic project information and standard calculations must be performed based on coordinates in order to derive the specific relationship between

SECTION 01 71 23 Page 5 the control point and the survey baseline.

d. Stake and flag all temporary bench marks or control points set within the work limits and clearly label the elevation of the point on the stake.

3.4 SURVEY LOGS

Prepare survey logs in digital spreadsheet form describing all survey progress and activity for pre- and post-placement condition surveys and for before- and after-dredging surveys and submit daily, by email, to the Philadelphia District Survey Point of Contact and the COR. The spreadsheet shall be an ongoing log describing all survey lines that have been started as well as completed.

3.5 STAKING AND FLAGGING

3.5.1 Contractor Work Limit

Stake and flag, every 50 feet, the Contractor's landward work limit, subject to Government approval.

3.5.2 Construction Baseline

Stake and flag, every 100 feet, a survey baseline, located such that it provides easy reference by QA and QC personnel. The location of the survey baseline is subject to the approval of the COR. This survey baseline is shown on the contract drawings.

3.5.3 Centerline of Dune

Stake and flag, every 100 feet, the centerline of the dune, as indicated on the contract drawings, for easy reference by QA and QC personnel.

3.5.4 Groins and Outfalls

Stake and flag, the limits of existing groins, outfalls and other structures as directed by, and subject to the approval of the COR.

3.6 PRE-PLACEMENT AND POST-PLACEMENT CONDITION SURVEYS

3.6.1 Pre-Placement Condition Surveys

The beachfill area conditions are dynamic in nature. Conditions existing during the preparation of this contract may not be an accurate representation of the beachfill area conditions existing at the commencement of beachfill operations. Consequently, the Contractor must obtain and submit pre-placement condition survey profiles, in accordance with Section 01 71 23 SURVEY REQUIREMENTS. Upon receipt of pre-placement condition surveys, the Government will issue revised drawings indicating adjusted beachfill locations, template, profiles and sections. Commence beachfill work after pre-placement surveys have been submitted and approved, and revised drawings have been issued .

3.6.2 Post-Placement Condition Surveys

Complete post-placement condition surveys and submit for Government review not later than 30 calendar days after acceptance of final beachfill.

Obtain post-placement condition survey profiles, as specified herein.

SECTION 01 71 23 Page 6

3.6.3 Completion Time Requirements

a. Commence beachfill operations no more than 21 calendar days after completion of pre-placement condition surveys, subject to the approval of these surveys. Prior to commencement of beachfill operations, allow the Government a maximum of 14 calendar days for review and approval of these surveys, and potential revisions to the contract drawings.

Beachfill, once started in an area, shall be continuously placed in that area until that area is completed. An area is defined by each individual Beachfill line item on the Bidding Schedule and will be verified by the COR upon completion and approval of pre-placement condition surveys and the award of options, if applicable. Any changes to the extents of an area must be approved by the COR prior to beachfill starting in each area. Re-collect pre-placement condition surveys in the event beachfill operations are not started within the time specified above. The Government will consider Before-Beachfill Surveys as part of beachfill operations.

b. Complete and submit for Government review, post-placement condition surveys not later than 30 calendar days after acceptance of final beachfill. Submit data in the formats specified herein. Include the photographic documentation of the surveys, as specified herein.

3.6.4 Locations of Survey Lines

Take pre-placement and post-placement condition surveys at the locations of the profiles shown on the drawings.

3.6.5 Description of Required Survey Lines

The survey profiles shall be long lines, and shall extend from the survey baseline to a depth of -30 feet NAVD88 or 2,500 feet feet seaward, whichever occurs first. The origin of the new profile lines shall be the survey baseline, as shown on sections on the contract drawings.

3.6.6 Intervals Required

Take elevations along the profiles at a maximum of 10 foot intervals, and take additional elevations at breaks in grade and as necessary to describe all hydrographic and topographic features.

3.6.7 Quality Control

Data from previous surveys will be provided to the Contractor in advance of the pre-placement surveys. Overlay the previous surveys with pre-placement surveys as a quality control measure. If previous surveys are not available, this requirement will be waived.

3.7 PHOTOGRAPHIC DOCUMENTATION OF SURVEYS

a. During the completion of the pre-placement condition surveys, take digital color photographs at each profile line to provide visual documentation of the beach. Take digital photographs from a point on the profile line located approximately halfway between the water line and the seaward toe of the existing dune. Take the photographs in three directions. Take the first photograph facing perpendicular to the profile line azimuth. The direction of the first photograph shall be defined by facing the ocean while standing on the profile line, then turning counterclockwise approximately 90 degrees (generally facing a northeasterly

SECTION 01 71 23 Page 7 direction along the coast of Delaware. Take the second parallel to the profile line azimuth and facing seaward. Take the third parallel to the profile line azimuth and facing landward. Document any obstructions along the profile line azimuth which preclude collection of data with additional digital photographs.

b. During the completion of pre-placement surveys, take digital color photographs of the dune crest at each profile line to provide visual documentation of the dune. Take digital photographs from a point on the dune crest that intersects with the pre-placement profile line. Take the photographs in two directions. Take the first photograph facing a northeasterly direction parallel to the dune alignment. Take the second facing a southwesterly direction parallel to the dune alignment. Document any obstructions along the profile line azimuth which preclude collection of data with additional digital photographs.

c. Submit digital files and a brief report documenting the surveys, weather conditions, beach conditions and field notes.

3.8 BEFORE- AND AFTER-BEACHFILL SURVEYS

3.8.1 Completion Time Requirements

a. See time requirements specified under Paragraph "PRE-PLACEMENT AND POST-PLACEMENT CONDITION SURVEYS" for commencement of beachfill operations.

b. Complete after-beachfill surveys of a particular location no more than 14 calendar days after the commencement of the before-beachfill surveys. (14-day max performance period)

c. In addition, do not commence the after-beachfill surveys sooner than 24 hours after the final placement of beachfill in a particular location. (24-hour min waiting period)

d. Upon agreement between the COR, vessel operator, and SSHO, that the sea conditions are too rough to safely operate the hydrographic survey vessel to obtain the after-beachfill surveys, a time extension may be granted until the sea conditions improve.

e. Submit the before-beachfill surveys data of a particular location with both the after-beachfill surveys data and the specified beachfill template data of that same location. Submit before- and after-beachfill survey data every 14 calendar days unless requested more often by the Contracting Officer. Submit plan view and cross-section drawings on a daily basis.

3.8.2 Locations of Survey Lines

Take survey profiles at 100-foot intervals. Survey lines for quantity surveys shall be perpendicular to the seaward edge of berm referenced to the survey baseline. Submit locations of survey lines prior to any data collection.

3.8.3 Description of Required Survey Lines

Extend survey profiles 1,200 feet from the survey baseline or the seaward work limit, whichever is further seaward.

SECTION 01 71 23 Page 8

3.8.4 Intervals Required

Take elevations along the profiles at a maximum of 10 foot intervals, and take additional elevations at breaks in grade and as necessary to describe all hydrographic and topographic features.

3.9 BEFORE- AND AFTER-DREDGING SURVEYS OF THE BORROW AREA

3.9.1 Completion Time Requirements

Commence dredging operations in the Inlet Ebb Shoal Borrow Area, beginning in Area A, not more than 15 calendar days after Government approval of before-dredging surveys. Conduct after-dredging survey of Borrow Area A no more than 10 calendar days after completion of dredging at that location.

Submit after-dredging survey of Borrow Area A for Government review. Upon approval of the survey the COR will authorize work in Borrow Area B.

Conduct after-dredging survey of both areas no more than 10 calendar days after completion of dredging in Area B. Submit Before- and After-dredging survey data of the borrow areas within 5 business days after completion of each survey performed.

3.9.2 Locations of Survey Lines

Take before- and after-dredging survey profiles of the borrow area at maximum intervals of 200-feet, starting 200 feet west of and parallel to the western limit of the borrow area and continuing 200 feet east of and parallel to the eastern limit of the borrow area. Extend before-dredging surveys as required to include the borrow area access limits shown on the contract drawings. In addition, survey 500-foot-interval quality control lines, perpendicular to and through all of the cross-section lines, starting 200 feet south of and parallel to the southern limit of the borrow area and continuing 200 feet north of and parallel to the northern limit of the borrow area. For the purpose of this description, the near shore perimeter line of the borrow area will be considered the western limit and the offshore perimeter line will be considered the eastern limit.

Following accordingly, the southern and northern limits of the borrow area will be the borrow area perimeter lines that are, essentially, perpendicular to the western and eastern limits.

3.9.3 Intervals Required

Take elevations along the cross-section at maximum intervals of 25 feet, and take additional elevations at breaks in grade and as necessary to describe all hydrographic features.

3.10 DATA SUBMISSION

3.10.1 General

Record all survey data digitally in ASCII text format. Submit digital files via an electronic file sharing system as specified in Section 01 33 00 SUBMITTAL PROCEDURES, with email notification to the COR. If file size exceeds electronic file sharing system deliver all data and supplemental products on USB 3.0 portable external hard drives using one of the following HDD models: Western Digital My Passport Ultra, Seagate Expansion or Seagate Backup Plus Slim or other approved equal. Hard drives shall not require an external power source. Hard drives shall become the property of the Government. Data collected and produced shall become the property of

SECTION 01 71 23 Page 9 the Government. Submit all survey data in all of the following formats:

3.10.1.1 Pre-Placement Condition Surveys and Post-Placement Condition Surveys:

a. Distance Offset from Baseline Format: ASCII files, as shown on attached sheets.

b. XYZ format: ASCII files, as shown on attached sheets.

c. Nine-column XYZ Format, as shown on the attached sheets.

d. BMAP Free Format: ASCII files using distances offset from the baseline (X) and elevation (Z1), as shown on attached sheets.

e. Plotted and electronic profile drawings in AutoCAD version compatible with 2012 format for each profile survey taken. These profiles shall be overlaid on the contract drawing profiles for comparison purposes. The grid spacing shall be 10 feet in the vertical and 50 feet in the horizontal. Each drawn profile shall show the station that it was taken from. Submit printed copy and electronic files in both AutoCAD and Portable Document Format

(PDF).

3.10.1.2 Before-Beachfill Surveys and After-Beachfill Surveys

a. Distance Offset from Baseline Format: ASCII files, as shown on the attached sheets.

b. XYZ format: ASCII files, as shown on attached sheets.

c. Nine-column XYZ Format, as shown on the attached sheets.

d. One ASCII file containing the following for all profile lines:

date, profile ID, survey origin, and grid azimuth with respect to the horizontal reference coordinate system.

e. BMAP Free Format: ASCII files using distances offset from the baseline (X) and elevation (Z1), as shown on attached sheet.

f. Plotted and electronic profile drawings in an AutoCAD version compatible with 2012 format for each profile survey taken.

Overlay these profiles on the contract drawing profiles and include the specified beachfill template for that location for comparison purposes. The grid spacing shall be 10 feet in the vertical and 50 feet in the horizontal. Each drawn profile shall show the station that it was taken from. Submit printed copy and electronic files in both AutoCAD and Portable Document Format

(PDF).

g. Compile all survey data previously submitted with each new before/after beachfill survey disc submittal.

3.10.1.3 Before-Dredging Borrow Area Surveys and After-Dredging Borrow Area Surveys

a. XYZ format: ASCII files, as shown on attached sheets.

b. Plotted and electronic drawings of the 2 foot interval contour

SECTION 01 71 23 Page 10 lines representing the bathymetric surface with the limits of borrow area delineated in an AutoCAD version compatible with 2012 format. The contour surface shall be a TIN (Triangulated Irregular Network) surface that is elevation referenced within the drawing. Surveys shall include the entire borrow area and extend beyond the borrow area perimeter as specified in paragraph above titled "BEFORE- AND AFTER-DREDGING SURVEYS OF THE BORROW AREA", for both the before- and after-dredging surveys. Submit printed copy and electronic files in both AutoCAD and PDF formats.

3.11 DISCREPANCIES

In the event of any discrepancies that cannot be resolved by the District Office quality assurance review of the Contractor's data, the COR may request an additional survey be performed by the Philadelphia District Survey Section. The results of the Government survey will be considered in the final determination made by the Contracting Officer to resolve any conflicts.

3.12 METADATA SUBMISSION

a. Provide metadata file(s) for all geospatial data produced under this Contract that are compatible with ESRI ArcGIS applications. (Information on ESRI ArcGIS is available at the following link: http://www.esri.com.)

The metadata file(s) must comply with Federal Geographic Data Committee (FGDC) Content Standards for Digital Geospatial Metadata Version 2.0 or higher. If another metadata generation tool is used, the ".txt" or ".doc" file types will be sufficient, however the ".xml" alternative file type would be preferred.

b. Geospatial data is defined as information that identifies the geographic location and characteristics of natural or constructed features and boundaries on the earth, which also includes aerial photography.

Geospatial data affected by these requirements are those generated for use in a: Geographic Information System (GIS); Land Information System (LIS);

remote Sensing or Image processing system; Computer-Aided Design and Drafting (CADD) system; Automated Mapping/Facilities Management (AM/FM) system and other computer systems that employ or reference data using either absolute, relative or assumed coordinates.

c. Provide digital FGDC compliant metadata file(s) for each deliverable product and data set outlined in these specifications.

Metadata standards can be found at http://www.fgdc.gov/metadata.

d. Submit metadata within 14 business days after completion of beachfill placement operations.

3.13 MEASUREMENT AND PAYMENT

No separate measurement or payment will be made for the work specified in this section and all costs in connection therewith shall be included in the costs of all the Bid Items titled, "Beachfill".

SECTION 01 71 23 Page 11

SURVEY DATA FORMATS

a. Distance Offset from Baseline Format (Comma Delimited)

7202.13 Station in feet (Do not include "+")

s sf1 Program requirement (Shall be the same for all stations) 58,5.9 Offset Right Landward, Elevation 50,6.3 " 30,7.5 " 17,6.0 " 10,4.6 " 5,4.0 " -15,1.7 Offset Left Seaward, Elevation -25,0.7 " -40,-0.8 " -50,-0.9 " -100,-1.1 " -250,-0.4 " -600,-0.7 " -1500,-3.2 " E End of Profile

7729.45 Station in feet (Do not include "+")

s sf1 Program requirement (Shall be the same for all stations) Etc.

SECTION 01 71 23 Page 12

b. XYZ Format or Easting, Northing, and Elevation Format (Comma Delimited)

Save data for each profile line in a separate ASCII file titled "profile_id.asc", where profile_id corresponds to the profile IDs as indicated on the project drawings, be they stations or profile line numbers. If stations are used, do not include "+" symbol. The profile data in these files shall be a composite of all survey methods utilized for each line. Process data in overlap areas to ensure accuracy requirements are met and smooth transitions are achieved between segments. Order profile points from most landward to most seaward. Include in the first line of the file, the profile ID and the date of the hydrographic portion of the survey. Include in the remaining lines, Easting, Northing and Elevation values in comma delimited format for all data points on the composite profile line. The format shall be as follows:

File Name: CM020.asc

File Contents:

CM020, 20110818 Profile ID and date of hydrographic portion 382475.74,30975.42,-37.3 Easting, Northing, and Elevation 382475.85,30974.85,-37.3 " 382476.06,30973.78,-37.4 " 382476.16,30973.25,-37.4 " 382476.28,30972.59,-37.5 " 382476.38,30972.10,-37.5 " 382476.50,30971.45,-37.4 " 382476.60,30970.98,-37.6 " 382476.73,30970.35,-37.4 " 382476.83,30969.84,-37.6 " 382476.96,30969.22,-37.3 " 382477.07,30968.68,-37.5 " 382477.20,30968.06,-37.3 " 382477.30,30967.52,-37.4 " 382477.40,30966.88,-37.2 " 382477.48,30966.32,-37.1 "

SECTION 01 71 23 Page 13

c. Nine-column XYZ Format

One ASCII file containing all data points for all profiles and having a descriptive header at the top of the file followed by a record of nine comma delimited fields for each data point including the following information: Profile ID, Date, Time, Point Number, Easting (X), Northing (Y), Elevation (Z), survey type (TOPO, WADING, or HYDRO), and description (as appropriate). The following is a sample data file format:

(DESCRIPTIVE HEADER)

CAPE MAY POINT, NEW JERSEY

BEACH PROFILE DATA

July 2012

VERTICAL DATA REFERENCED TO NAVD88, U.S. SURVEY FOOT

HORIZONTAL DATA REFERENCED TO NAD83, NEW JERSEY MERCATOR - ZONE 2900, U.S.

SURVEY FOOT

DESCRIPTION LEGEND (SAMPLE):

STREET = STREET OR SHOULDER

ROAD_BED = GRASSY SHOULDER OR EDGE OF ROAD

PK_NAIL = ON STATION, RANGE 0.0, PK NAIL MARKER

SEAWALL = CONCRETE EXTENT

BASE_DUNE = WINDWARD/SEAWARD TOE OF DUNE

VEG_DUNE = VEGETATION AND/OR DUNE SLOPE

TOP_DUNE = CREST OF DUNE

THICK_VEG = MODERATE TO EXTREMELY DENSE VEGETATION

VEG_G = SPARSE TO MODERATE VEGETATION

FENCE = TYPICAL WIRE AND WOOD BEACH FENCE

G = SPARSE TO NIL VEGETATION, GRAVEL OR SAND

RIPRAP = EDGE TO EDGE, EXTENT OF ROCK

BERM = NOTICEABLE HIGH TIDE LIMIT

BEACH_FACE = BETWEEN BERM AND SWASH ZONE

SWASH_ZONE = WAVE BREAK AREA, TIDE DURING COLLECTION

DATA TYPE LEGEND

TOPO = RTK TOPOGRAPHIC DATA COLLECTION

WADING = WADING CONVENTIONAL LEVEL DATA COLLECTION

HYDRO= RTK ECHO SOUNDER COLLECTION (ELEVATION)

PROFILE ID, DATE, TIME (EST), POINT #, EASTING (X), NORTHING (Y), ELEVATION

(Z), TYPE, DESCRIPTION

(START OF DATA)

V020, 20040417, 1107, 10001, 385926.7, 40466.0, 10.9, TOPO, THICK_VEG

V020, 20040417, 1108, 10002, 385931.4, 40457.2, 10.8, TOPO, VEG_DUNE

V021, 20040417, 1037, 9801, 384943.2, 40330.6, -8.3, HYDRO, SOUNDING

V021, 20040417, 1038, 9802, 384946.7, 40320.6, -8.2, HYDRO, SOUNDING

Etc.

SECTION 01 71 23 Page 14

b. BMAP Free Format

Format Description:

One ASCII file containing all data points for all cross sections.

For each cross section in the file, the format includes:

1. One profile header line including three fields separated by a space:

(a) Profile ID;

(b) Survey descriptor: "Preplacement"; "BD"; "AD"; or "Postplacement";

(c) Date of data collection in "YYYYMMDD" format

Note: Use Profile IDs listed in drawings for pre/post placement surveys;

Use station in "xxx+xx" format as Profile ID for BD/AD profile surveys

2. One line listing the integer number of points "N" in the profile

3. "N" lines including two fields separated by a space:

(a) distance from baseline (positive offshore, in ft);

(b) elevation (relative to NAVD 88, ft)

Notes:

a. Points within a cross-section should be sorted such that distances from baseline are listed in ascending order

b. No two points within a cross-section may have the same distance from baseline (adjacent points should be separated by distance of at least 0.1 ft)

c. The file should include no blank lines between data lines within a cross-section or between sequential cross-sections

Format Notation:

The format for each cross-section is represented notationally as:

"Profile Header" : Line 1 -- text line including profile ID; survey descriptor; survey date

"N" : Line 2 -- integer number of points in the cross section

"Xi" "Zi" : Lines 3 to N+2 -- X,Z data pair (distance offshore from baseline, elevation) separated by a space (listed in "i" rows from 1 to N)

Format Example:

The following is a sample data file format:

IRI150 BD 20240512

827.4 9.62

840.3 8.61

848.6 6.60

859.7 5.49

871.4 4.29

IRI150 BD 20240512

635.0 7.48

SECTION 01 71 23 Page 15

640.3 8.75

649.3 7.33

657.2 6.94

663.8 6.51

671.9 6.36

SECTION 01 71 23 Page 16

SECTION 35 31 00

BEACHFILL

PART 1 GENERAL

1.1 SCOPE OF SECTION

The work covered by this section consists of furnishing all labor, materials, plant and equipment and performing all operations required for removal of the beachfill material from the borrow area located in the Indian River Inlet ebb shoal and placing the material on the beach within the limits shown on the drawings.

1.2 REFERENCES

The following publications form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D2487 (2017; E 2020) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)

ASTM D6913/D6913M (2017) Standard Test Methods for Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

33 CFR 156 (2010) Navigation and Navigable Waters, Oil and Hazardous Material Transfer Operations

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction…

This is the start of the file's text. The full file is on GovTribe.