T20W163-850-002 HR SPIES Docking Diagram.pdf

PDF 416 KB Posted

Attached to
OVERHAUL SURVEYBOAT SPIES
Solicitation number
W912BU20R0057
Issued by

View the file

Other files

File Type Posted
UPDATED-SPIES SECTB.doc DOC document
AMENDMENT 0003 - 20-R-0057-0003.pdf PDF
SF30- 20R0057- P00002.pdf PDF
SF-30 - AMENDMENT 0001 - OVERHAUL SURVEYBOAT SPIES.pdf PDF
T20W163-320-050 AC Electrical Distribution Schematic (Rev-).pdf PDF
T20W163-320-030 12-24VDC Alarm Panel (Rev-).pdf PDF
SPIES SECT M-SOW.doc DOC document
SPIES SECT C- SOW.docx DOCX document
SPIES SECT B-SOW .doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Profile View

Baseline

14'-0"

26'-0"

35'-0"

42'-0"

1'-6"

11'-2"

10'-6"

No Blocking in this area No Blocking in this area

Blocking BlockingFoil between hulls

Blocking

24'-7"

52'-2"

31'-6"

6'-6"

Min block height of 28"

3' -2

Longitudinal Center of gravity in lightship condition Mass 92000 lb

DescriptionRev Date Checked

Init.

RLFIssued for Reference30 Nov 16

PROJECT:

TITLE:

STATUS:

APPROVAL TEKNICRAFT:

PLOT SIZE:SCALE: REV: DRAWING No:

USACE REF No.:

Rev.Rev.

Docking Diagram USACE REF No.:

TBD

Hull Number:

TD20-46AA

PO Box 160, Beachlands Auckland, New Zealand

Tel: +64 9 536 5070 design@teknicraft.com www.teknicraft.com

1"=6'

NDW

File details come from the government source that posted it. Updated .