SPIES SECT C- SOW.docx
DOCX document 1 MB Posted
- Attached to
- OVERHAUL SURVEYBOAT SPIES
- Solicitation number
- W912BU20R0057
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UPDATED-SPIES SECTB.doc | DOC document | |
| AMENDMENT 0003 - 20-R-0057-0003.pdf | ||
| SF30- 20R0057- P00002.pdf | ||
| SF-30 - AMENDMENT 0001 - OVERHAUL SURVEYBOAT SPIES.pdf | ||
| T20W163-850-002 HR SPIES Docking Diagram.pdf | ||
| T20W163-320-050 AC Electrical Distribution Schematic (Rev-).pdf | ||
| T20W163-320-030 12-24VDC Alarm Panel (Rev-).pdf | ||
| SPIES SECT M-SOW.doc | DOC document | |
| SPIES SECT B-SOW .doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
TABLE OF CONTENTS
| TP TECHNICAL PROVISIONS | …………………………………………………………2 | |
| TP-1 | SCOPE OF WORK | …………………………………………………………2 |
| TP 2 | DEFINITIONS | …………………………………………………………2 |
| TP-3 | STANDARDS | …………………………………………………………3 |
| TP-4 | CERTIFICATION AND CLASSIFICATION | …………………………3 |
| TP 5 | INSPECTIONS, TESTING AND TRIALS | …………………………………4 |
| TP 6 | WORKMANSHIP AND CONSTRUCTION STANDARDS | …………4 |
| H HULL SECTION ITEMS | ………………………………………………………..13 | |
| H-101 | DRYDOCKING | …………………………………………………..……13 |
| H-102 | UTILITIES AND SERVICES (UNIT PRICE) | ………………………..14 |
| H-200 | SURFACE PREPARATION & INSPECTION ….............................. | ..15 |
| H-201 | HULL ANODE REPLACEMENT………………...………………….……..17 | |
| H-202 | HULL PAINTING……………….…………………………………...……...17 | |
| H-301 | REPAIR DAY SHAPE MAST………..……………………………………..19 | |
| H-401 | REPAIR MARETRON ALARM SYSTEM | ………………………………..20 |
| H-501 WHEELHOUSE DOOR WINDOW TINTING………………...….………..21 | ||
| H-901 | REPLACE CUTLESS BEARINGS…….……………………………….…...22 |
| M MACHINERY SECTION ITEMS | ……………………………………………..…24 | ||
| M-101 PERFORM 3000 HOUR ENGINE SERVICE…...………….……..……..…24 | |||
| M-151 INSTALL ENGINE ROOM DAMPERS….…….…………………………..25 | |||
| M-901 | MISCELLANEOUS MAINTENANCE (IF DIRECTED) | ……………......26 |
PART I SECTION
TP TECHNICAL PROVISIONS
TP-1 SCOPE OF WORK
The contractor shall furnish all engineering, design, labor, services, equipment, parts and materials and perform the drydocking and repairs to the SURVEY VESSEL (S/V) H.R. SPIES listed in this contract.
Drawings, equipment or materials to be furnished by the Government will be specifically listed in the appropriate contract clause. Unless specifically listed, the contractor shall assume no drawings, equipment or materials will be furnished by the Government and shall bid accordingly.
TP-2 DEFINITIONS
The following definitions are applicable to phrases and acronyms used throughout this contract:
· Contracting Officer (KO) A person with authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
· Contracting Officer's Representative (COR) A member of the Philadelphia District contract management and quality assurance team authorized by the Contracting Officer to perform administrative and managerial duties. A copy of the COR's authority letter will be furnished to the Contractor at the time of award.
· Government Technical Representative (GTR) A member of the Philadelphia District quality assurance team who is not designated COR for the Contract.
· Government Furnished Material (GFM) Material, equipment, parts, supplies, or components furnished by the Government to the contractor for installation on the vessel.
· USACE Acronym for the U.S. Army Corps of Engineers.
· PSBr - Acronym for the Physical Support Branch of the Philadelphia District Corps of Engineers.
· QC - Quality Control. Quality Control is a function of the contractor.
· QA - Quality Assurance. Quality Assurance is a function of the Government.
· ABS Acronym for the American Bureau of Shipping
· USCG Acronym for the U.S. Coast Guard.
· CFR Acronym for the Code of Federal Regulations.
· ANSI Acronym for American National Standards Institute
· OSHA Acronym for Occupational Safety and Health Administration
· NFPA Acronym for National Fire Protection Association
TP-3 STANDARDS
All design, engineering, modifications and repairs to the vessel shall be performed in accordance with the criteria set forth in the latest issues of the following standards:
· U.S. Army Corps of Engineers, Publication No. EM 385-1-1, "Safety and Health Requirements Manual." Dated 30 November 2014.
· 46 CFR Subchapter T – “Rules and Regulations for Small Passenger Vessels (Under 100 Gross Tons)” [46 CFR 175 - 185].
· 46 CFR Subchapter S – “Subdivision and Stability Regulations” [46 CFR 170 - 171].
· United States Public Health Service (USPHS), Publication No. 393 "Handbook on Sanitation of Vessel Construction".
· USCG, Navigation Rules - Inland/International.
· Institute of Electrical and Electronic Engineers Standards, Publication No. IEEE-45 - Recommended Practice for Electrical Installation on Shipboard.
· Illuminating Engineering Society, "Recommended Practice for Marine Lighting."
· National Electric Code (NEC).
Note that these standards apply only to the engineering, design and workmanship performed by the contractor as part of this contract including removals, accesses and other work performed by the contractor incidental to the work required by the contract.
TP-4 CERTIFICATION AND CLASSIFICATION
The vessel is not certificated by the USCG.
The vessel is not classed by the ABS.
It is not intended as part of this contract that any classification or certification be achieved.
TP 5 INSPECTIONS, TESTING AND TRIALS
The contractor shall perform tests, trials and other operational performance demonstrations as necessary to validate that the work specified in this contract was completed in accordance with the requirements, and functions as it was intended.
The contractor shall provide reasonable advance notice (not less than 1 full working day) to the COR prior to any testing or trials. If the COR, after having received such notification, is not present at the designated time and place for the inspection or test, the contractor shall proceed with the inspection or test. Untimely notification will result in postponement or repetition of the test. Lack of notification will require retesting. All delays caused by improper notification are the responsibility of, and to the account of, the contractor.
The contractor shall furnish a competent and authorized individual to witness and document the results of all inspections or tests.
TP 6 WORKMANSHIP AND CONSTRUCTION STANDARDS
A GENERAL REQUIREMENTS FOR ACCESS
After careful planning and subject to the approval of the COR, the Contractor may cut and/or remove plating or framing members from the vessel for access to machinery, piping, wiring and equipment.
Under the same conditions, the Contractor may also remove piping, wiring, fixtures, fittings, etc., for access and clearance to perform required work.
At the completion of required work, all removals shall be replaced. Replacement shall consist of returning the removed equipment, piping, wiring, structural members and plating to their original locations and installation. Where parts, components or equipment are damaged as a result of the removals, the contractor shall replace them in kind. Installations shall be in accordance with the original construction drawings or the referenced standards (Refer to TP-3). Fit and finish shall be restored and damaged paint shall be renewed. All removed equipment shall be tested as part of the Tests and Trials required in Technical Provision (TP) 5 of this contract. Any removals for access shall be temporarily supported if lack of such support could cause failure or damage to adjacent systems, distortion of adjacent framing or plating, or result in a safety hazard.
B GENERAL REQUIREMENTS FOR HULL WORK
All new hull plating shall be fabricated from marine grade Aluminum plate 5086/5083.
Due regard shall be paid to details in both the design and construction of all new and/or modified structures, to prevent structural discontinuities and other stress concentrations. Where openings must be provided in the structure, adequate compensation shall be provided by the contractor.
Watertight integrity of all bulkheads and decks shall be maintained. Openings created by permanent removal or addition of piping, wiring or other materials shall be closed by means of watertight penetrations or insert plates of equal thickness flush welded to the bulkheads.
All welds shall be ground flush and smooth.
Sections of stiffeners, beams, girders, etc., shall be welded to the bulkheads to maintain continuity of structure.
Openings cut into decks and bulkheads shall be adequately compensated by bounding bar to maintain original strength.
All watertight, oil tight and weather tight work shall be tested for tightness prior to painting. Testing procedures, other than hydrostatic testing, shall be submitted to the COR for approval. Submittals shall include complete particulars on the testing procedure(s) proposed and, if air testing is used, the method of controlling the air pressure. Water used for testing shall be potable quality to prevent contamination of the compartments and piping.
C GENERAL REQUIREMENTS FOR FOUNDATIONS AND SUPPORTS
Suitable foundations shall be provided under all new units of machinery. Foundations shall be built up of plates and structural shapes to the dimensions required for satisfactory support, and shall assure rigidity, freedom from vibration and designed for secure containment of the equipment in the event of a crash stop.
Where dripping water or oil can be expected, the top plates of foundations shall project beyond the edges of the bed plates or bases of units being supported and formed into spill containment/drip pans. Flat bars welded around the edges of the top plates may be used to retain any leakage. Valved drains shall be provided at the ends or corners of the pans to facilitate fluid removal or recovery.
Foundations shall extend beyond the equipment fore and aft or transversely to distribute the load and to avoid excessive weight concentrations.
Doublers, insert plates, girders, headers and stanchions shall be fitted and under deck framing shall be reinforced to support units mounted on deck.
D GENERAL REQUIREMENTS FOR MATERIALS
All materials provided by the contractor shall be suitable for marine applications and shall be subject to approval of the COR/GTR.
All new hull plate shall be marine grade Aluminum plate 5086/5083.
All new extrusions, shapes and pipe greater than or equal to 3” shall be marine grade Aluminum 6061.
All new extrusions and pipe less than 3” shall be marine grade Aluminum 6063.
Fasteners shall be AISI type 304 or 316 stainless steel.
All fasteners shall be installed using non metallic gasket material when placed against an aluminum surface.
E GENERAL REQUIREMENTS FOR PIPING
All piping required in these specifications shall be designed and installed to obtain optimum operating conditions, and shall be compatible with the machinery or equipment serviced.
All piping, valves and fittings shall comply with material specifications of the design standards for that particular service.
Piping shall be run as directly as practical. Piping shall include valves, unions and fittings.
Unions and flanges shall be provided to facilitate installation and subsequent removal.
Flexible connections to machinery components shall be provided where vibration may be anticipated.
Piping shall not pass over switchboards and be kept clear of switchgear, wiring, etc.
All work shall be templated from the vessel.
Piping shall be secured by supports and hangers so as to avoid excessive strains; avoid the weight of the piping being transmitted to valves and fittings; minimize the effects of vibration, shock, pitching and rolling of the vessel; and permit proper thermal expansion and contraction. Provision may be made for expansion and contraction by changes in direction of pipe runs or by use of expansion bends, joints, loops or offsets.
Exhaust piping shall be welded for all sizes.
All burrs shall be removed from the ends of all piping after any cutting or threading. Pipe ends shall be dressed with a reamer before installation.
Valve type shall be consistent with the service. All valve materials shall be stainless steel.
An aluminum label plate shall be attached to the hand wheel of all new valves to indicate its function.
Where pipes are carried through watertight bulkheads, decks or tank tops, the watertight integrity of the structure shall be maintained.
Heat sensitive materials shall not be used in piping systems which penetrate watertight subdivisions.
All fastenings used to connect valves to shell connections shall be of stainless steel.
Where dissimilar metals occur, the contractor shall insulate to prevent electrolytic action.
F GENERAL REQUIREMENTS FOR MACHINERY SYSTEMS
Where new machinery and equipment is to be installed, or when existing machinery and equipment is relocated, the contractor shall mount the items on foundations as specified elsewhere herein.
All fastenings, bolts, (fitted or otherwise) studs, nuts, washers, gaskets, etc., shall be installed using anti seize compound furnished by the contractor unless otherwise specified.
Any defective or missing fasteners shall be renewed at Contractor's own expense.
Where detailed disassembly, assembly, or installation procedures appear in this specification, they are presented for the contractor's information and convenience in estimating the possible extent of the work to be done. The inclusion of these detailed procedures does not relieve the contractor of responsibility for doing all work necessary and in the proper manner for satisfactorily accomplishing the specified ultimate objective.
G GENERAL REQUIREMENTS FOR ELECTRICAL SYSTEMS
All electrical installations as set forth elsewhere in these specifications shall be in compliance with the referenced rules, regulations and standards, especially with regard to ambient and working temperature requirements.
Electric cable shall be capable of handling the required amperage.
Electrical installations shall be such so as to eliminate the possibility of mechanical injury or damage from the accumulation of dust, oil, vapors, steam, dripping liquids, etc.
New cable runs shall be supported at intervals of not more than 18" apart where vertical and 14" apart where horizontal. Straps, hangers, and standoffs shall be steel with stainless steel fasteners. Plastic type straps are permitted only behind sheathing/paneling. No cable runs will be permitted below the deck plates, except for bilge pump wiring. Cable penetrations, where required to be watertight, shall have approved kick plates, stuffing tubes, etc.
All electrical supplies and/or installations to meet CFR 46, Subchapters J and T, as well as all applicable NEMA, NEC and ANSI standards.
H GENERAL REQUIREMENTS FOR HOT WORK
Prior to any hot work commencing in any compartment, the compartment shall be pumped dry, cleaned, gas freed and made safe for entry and hot work in accordance with 29 CFR 1915, Occupational Safety and Health Standards for Shipyard Employment, and other applicable standards.
The COR/GTR shall be furnished a Marine Chemist certificate stating that each compartment gas freed by the contractor has been tested by an approved certified Marine Chemist and that the space is safe for hot work.
All spaces that have been certified by a Marine Chemist as safe for hot work, shall be checked daily by a competent person to ensure their continued state of being safe for hot work. A log containing the original Marine Chemist certificate and Daily checklist shall be kept at the gangway so that all who need to enter the space will have easy access to the knowledge of their current conditions.
The contractor shall provide and maintain proper ventilation of spaces in which hot work is required or men are required to enter. Disposal of material accumulated during gas freeing work shall be the responsibility of the contractor and shall be in accordance with all federal, state and local laws and all costs are to be included in the respective line item.
The contractor shall post and maintain a fire watch whenever any hot work is being performed. If work is being performed on a bulkhead, a fire watch shall be posted on both sides of the bulkhead and/or deck.
I GENERAL REQUIREMENTS FOR WELDING
All welding under this contract shall be done only by welders who have successfully passed the qualifications test of the ABS, the U.S. Navy or the USCG for aluminum welding.
The contractor shall bear the expense of conducting these tests, and shall certify by name to the COR those welders who have successfully passed the prescribed tests. The contractor shall require any welder to repeat these tests when, in the opinion of the COR or his appointed representative, the work of the welder indicates a reasonable doubt of his efficiency. In such cases the welder shall be recertified as above.
The electrodes used throughout the work shall be suitable for use with the parent metal at each weld. Electrodes shall be received on the job in unbroken packages bearing the manufacturers' label or be otherwise marked. Certified statements shall accompany each shipment of electrodes to the effect that sample pieces, representative of each kind and size in each shipment, have satisfactorily passed the tests required by the ABS, the USCG, and/or the U.S. Navy for aluminum welding.
Welding in this contract shall be done using the MIG process. All welding shall be smooth, tight and free from undercuts, porosity, craters and gas inclusions.
Shell and deck butts and flush seams shall be back chipped or gouged to sound metal from the closing side before welding.
All sharp and/or rough edges shall be ground smooth and all weld spatter shall be removed.
All welds for temporary dogs used during modifications are to be ground smooth.
Assembly of all welded joints before welding shall be such as to secure proper gaps in butt welds and metal contact in fillet welds. Welding shall not be used to close openings larger than stipulated for each plate thickness by the ABS.
All watertight seal welds shall be of "bead" type; no "weave" welding will be permitted.
Welding procedures, as to direction, length and number and sequence beads shall be carefully planned to minimize distortion and locked in stresses.
J GENERAL REQUIREMENTS FOR WORKMANSHIP
All parts of the work intended to join or bear upon others shall be cut or trimmed to fit neatly.
All faying surfaces shall be clean and smooth before bolting up. Shims or liners shall not be used for the purpose of overcoming a bad fit.
Lightening holes may be punched, sawn or sheared and all burrs and cutting slag shall be removed.
Weld spatter shall be removed from all plating and stiffeners.
All mounting holes shall be drilled and reamed. Holes in members having sharp curvature shall be avoided whenever possible.
All frames and longitudinals shall have limber holes and/or snipes of adequate size to allow water to flow to the lowest point of each compartment and to allow air to escape.
All joints or areas of connection between aluminum and dissimilar metals shall be properly insulated by gasket material.
All fastenings used for connecting aluminum shall be made of AISI type 304 or type 316 series stainless steel.
All labor shall be specially skilled for each kind of work, thorough, first class in every respect and under competent direction.
Where work of one trade joins, passes through or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damaging of previously acceptable construction shall be cause for rejection.
K GENERAL REQUIREMENTS FOR PAINTING
The contractor shall seal off all ventilation, antennas, engine room, exhaust, tank and fan vents or openings, and all other intake or exhaust venting/piping and cover all anodes, transducers, windows, propellers, propeller shafts, shaft bearings, rudders stocks, and other fixtures that could be damaged or introduce contamination into the vessel from the high pressure water washing, blasting, or painting. This protection shall be checked and maintained daily during performance of any blasting and painting operations.
All areas contaminated with grease, oil, lubricants or other foreign matter shall be cleaned with a solvent similar to DEVOE Devprep #88, 788 T 000.
Defective shell plate discovered during blasting shall be reported to the COR/GTR immediately.
All paints shall be from a single manufacturer and the paint system shall be applied in strict accordance with that manufacturer's guidelines and recommendations, including time between coats, proper application equipment, thinning and disposal of excess paint and thinner and cleaning of equipment.
All painting underwater surfaces shall be completed and accepted by the COR/GTR prior to refloating the vessel.
The contractor shall furnish the COR/GTR with a thickness gauge suitable for use on aluminum to verify proper wet/dry film thickness.
All paints used in the performance of this work shall be within the manufacturer’s specified closed container and “pot” shelf life.
All overspray of any new paint onto existing finished surfaces shall be removed and all surface repaired to original condition.
Colors shall conform to Federal Standard 595, in accordance with the following schedule, where applicable:
| AREA | COLOR AND FS595 NUMBER | ||
| Hull Exterior | Black/17038 | ||
| Deckhouse Exterior | Old Ivory/13695 | ||
| Decks & Housetop Deck | Red/10076 | ||
| Hull & Deckhouse Interior | White/27880 | ||
| Deck Fittings | Yellow/13655 | ||
| Hull Markings | White/27880 | ||
| Exterior Deck Coaming | Striping Red/11136 | ||
| Handrails & Stair Rails | Black/17038 | ||
| Antifouling 1st Coat | Manufacturer Contrasting Color | ||
| Antifouling 2nd Coat | Manufacturer’s Red |
L GENERAL REQUIREMENTS FOR DISPOSAL OF FLUIDS
All fluids, including, but not limited to, diesel fuel, lubricating oil, hydraulic fluid, antifreeze/coolant, bilge wastes, battery acid, penetrating and cutting oils, dye penetrants, and paint thinners removed from the vessel or generated by the contractor in the course of performing the required work shall be disposed of by the contractor in accordance with all Federal, State, Regional and Local laws, rules, regulations, and guidelines for the disposal of hazardous materials, this to include all fluids that shall be drained from equipment removed from the vessel for disposal or other disposition. All associated costs shall be included in the line item.
This also applies to any rags, clothing, equipment or other materials exposed or contaminated with such fluids.
M GENERAL REQUIREMENTS FOR CONFINED SPACES
The contractor shall comply with all requirements of Federal Law contained in 29 CFR 1910 and 29 CFR 1915 for entry into, monitoring of, rescue from and closure of confined spaces during the performance of the repair work performed as a part of this contract.
The contractor shall have a competent person on site whenever any work is being performed in a confined space and shall post required certificates in the immediate vicinity of the confined space and maintain a log of all inspections and certificates.
N GENERAL REQUIREMENTS FOR SAFETY
The contractor shall comply with the requirements of EM 385 1 1, “U.S. Army Corps of Engineers Safety and Health Requirements Manual” throughout the contract period. It can be found online at:
https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
PART I - SECTION C
H HULL SECTION ITEMS
H-101 DRYDOCKING
1. INTENT
It is the Intent of this work item to haul the vessel from the water and block the vessel while performing the underwater work in this Contract. The vessel will need to be fleeted on the blocks in order to achieve a 100% coating of the underwater painting system.
2. REFERENCES
Drawing T20W163-850-002 S/V H. R. SPIES Docking Diagram
3. DESCRIPTION OF WORK
Provide all labor, services and materials and perform the work required in this line item. Provide a certified crane, or a certified travel lift, etc. along with the qualified personnel and necessary equipment to haul the vessel out of the water and safely place it in a suitable cradle or on the requisite jack stands and blocks, that will allow for the underwater work to be completed. The S/V H.R. SPIES has the following principal dimensions:
| Overall Length: | 68 feet - 6 inches | |||
| Overall Beam: | 25 feet - 10 inches | |||
| Draft: | 4 feet - 8 inches | |||
| Maximum Vessel Weight: | 92,000 pounds |
Vessel is constructed of aluminum.
Provide and set blocks to support and distribute the weight of the vessel while out of water and to prevent movement of vessel, in accordance with Docking Diagram Drawing. Blocks should provide for a minimum of 36-inches clearance under the hulls.
Haul the vessel out of water and set on the blocks. Participate in the joint docking inspection.
Immediately after drydocking the vessel, and before the hull and any marine growth has had a chance to dry, the entire hull from the keel to 6” above the deep load line shall receive a fresh water high pressure wash at no less than 5000 psi.
Adjust the blocking for the washing, blasting and application of the paint system specified in Line Item H-202 of this contract. The Contractor shall fleet the vessel to ensure full hull coverage of the properly applied paint system.
Upon completion of all underwater related repairs and following the joint undocking inspection, return the vessel to the water.
All lay days, demurrage and other dock costs, including the costs of weekends and holidays, necessary to perform the repair work listed in this contract shall be included in the cost of this Line Item.
Estimate on 30 calendar days for dry-docking.
H-102 UTILITIES AND SERVICES (UNIT PRICE)
The contractor shall provide all labor, materials, and equipment and provide, adjust and maintain the drydock and pierside utilities and services specified in this work item for the duration of the contract.
2. REFERENCES
Drawing T20W163-320-050 AC Electrical Distribution Schematic
3. DESCRIPTION OF WORK
Services shall be connected and operating within 2 hours after arrival of the vessel at the contractor’s facility and shall continue until the vessel is accepted by the Contracting Officer’s Representative (COR)/Government Technical Representative (GTR).
Payment shall be made only for the actual number of days the vessel remains and UTILIZES services at the contractor’s facility.
Unit price shall cover all costs incidental to and charged direct to the job, and not otherwise included as overhead.
Utilities and Services shall consist of the following:
· WATER: Furnish fresh potable water for filling water tank and deck wash down. Potable water shall be lead-free and meet local municipal water standards. Provide certificate to COR indicating water to be safe for human consumption.
· SHORE POWER: Provide necessary labor to connect, maintain and disconnect shore power service for initial hook-up, re-blocking and moving vessel to pierside. Provide electrical service for the duration of the repair period.
Shore power service to be 50 amps (minimum), 120/240 VAC, 60 Hz, single phase.
The vessel contains a number of components and systems that are sensitive to voltage fluctuations. The contractor shall be responsible for removal, repair or replacement, reinstallation and testing of electrical equipment which fails while the ship is in the contractor’s possession due to voltage surge or fluctuation.
The vessel shall be grounded to earth via a grounding conductor when operating on shore power. Ensure the vessel is galvanically isolated from the shore (earth), using a galvanic isolator or an isolation transformer. Application and installation of this device shall be in accordance with ABYC E-8.20.
· TRASH REMOVAL: Provide receptacles, equipment and labor to collect and remove garbage and trash from the vessel. The trash bins shall be located near the gangway.
· CRANE SERVICE: Provide all forklift/crane service, labor and rigging equipment for moving supplies, provisions, spare parts, liferaft, and equipment on and off the vessel, and to and from the storage area. All other forklift/crane service directly related to repair work listed in this contract shall be included in the cost of that Work Item.
· GANGWAY: Provide a ladder, stairs or other stable and secure means for access to and from the vessel. Install (on opposite side of vessel from gangway) and maintain a separate ladder from the ground to the main deck for emergency egress during the docking period.
Estimate on 30 calendar days. Price per day.
H-200 SURFACE PREPARATION & INSPECTION
The intent of this line item is to remove all of the loose paint from the underwater hull of the vessel and inspect the condition of all of the aluminum. This inspection shall consist of both a visual inspection and audiogauging the vessel’s hull in order to compare results with original thickness at time of construction.
The Government requires the Contractor to provide the services of the proper Paint Representative (a certified representative for the particular manufacturer of the paint system used), for the duration of the paint work and may require them to be on site for critical evaluations and procedures as specified in these specifications. If not on site a Paint Representative Point of Contact name and phone number shall be Contractor provided for all inquiries related to the Project.
2. DESCRIPTION OF WORK
All blasting shall be done from above with the nozzles pointed down toward ground to prevent the spread of blast or water to the upper portion of the vessel.
Scaffolds, cherry pickers or other means shall be provided for use of personnel in blasting/power washing and painting.
Prior to blasting, precautions shall be taken to protect the hull, equipment, and machinery from flying grit, dust and water discharge. This also applies to blasting on other ships in the vicinity.
All open fans, vents, doors, hatches, antennas and wiring, windows, nameboards, castle, ship’s bell, electrical outlets, navigation lights, wipers, spot light, davits, winches, machinery and deck gear shall be sealed with plastic film or a suitable substitute prior to blasting and painting operations. As an option, equipment may be removed prior to blasting and reinstalled after the last coat of paint has dried.
Special care shall be taken to mask and fully protect the transducers, aluminum anodes, and other underwater equipment against abrasion, damage, and painting.
Any damage to the vessel or its components due to lack of or improper painting/blasting protection shall be repaired to original by the Contractor at no additional cost to the Government. The Contractor shall contact the COR to inspect and approve the blasting/painting protection prior to the start of the blasting process. It shall be the responsibility of the Contractor to maintain the blasting/painting protection for the duration of the blasting/painting process. At no time shall this be a cause for extension of contract time or additional cost to the Government.
The areas of the freeboard and underwater hull of the vessel shall be blasted clean using a hydro blast or alternative method of blasting aluminum that is approved by the Paint Manufacturer’s Representative and/or All American Marine Inc. (the vessel builder). It is imperative to obtain a good profile for paint adhesion while at the same time protecting the ¼” as-built plate thickness.
Care shall be taken to protect the Aft Rub Rail from damage due to blasting. Completely remove all oil, grease, dirt, rubber streaks, loose paint and foreign matter. All remaining paint should be tight and the surface should be sufficiently abraded to provide good adhesion and bonding of paint.
When the Contractor has completed the surface preparation of the underwater hull a joint inspection shall be conducted by the Contractor, the COR/GTR and if deemed necessary the Paint Representative.
At this point, prior to the paint application process, the Contractor shall take approximately 100 audiogauge shots of the hull. These readings shall be recorded and submitted to the COR/GTR in a report displaying the thickness and the associated location on the hull.
NOTE: Coordinate with Line Item No. H-202, Hull Painting.
H-201 HULL ANODE REPLACEMENT
It is the intent of this work item to inspect and replace all of the Vessel’s underwater hull sacrificial anodes.
2. DESCRIPTION OF WORK
The vessel has a total of twelve – (12) 12” x 6” hull anodes (CMDIVERA Aluminum), two-(2) spherical 3-1/2” shaft anodes (CMX15AL Aluminum) and two-(2) square collar 3-1/2” shaft anodes (CMC14A Aluminum).
The contractor shall perform a joint inspection of all hull and shaft anodes with the COR/GTR and provide a condition report to the COR, noting the position on the hull and the approximate percent wastage. This report is simply for historical records as all sacrificial anodes are being replaced.
All new anodes shall be the same size and material and type as the original. Square Collar 3-1/2” Shaft Anodes may need to be trimmed to fit in their present location due to the increased size (length) of the new Propeller’s Hubs.
NOTE: Coordinate installation of anodes with Line Item H-202, Hull Painting.
H-202 HULL PAINTING
NOTE: All of the manufacturers (E-Paint) and USACE preparation and environmental conditions must be met prior to beginning any operation. Surface temperature, humidity, wind conditions, dew point and wet-bulb readings shall be checked and recorded at least twice daily.
1. INTENT
The vessel is currently only painted from the keel to 6” above the deep load line. After completion of high pressure washing and following joint inspection, determination will be made as to how much of the underwater hull will be taken to bare metal or spot coated in areas where the paint no longer exists. The entire underwater hull from the keel to 6” above the deep load line’s paint coating system shall be restored or renewed, applying two epoxy barrier coats and two final coats of E-Paint SN-1 (Black) applied to the entire area, 4 mils dry, each coat.
2. GOVERNMENT FURNISHED MATERIAL
| E-Paint SN-1 (Black) | Qty – 15 gallons | |
| E-Paint Primer | Qty – 2 gallons |
3. DESCRIPTION OF WORK
The contractor shall furnish all necessary labor, materials (except those that are GFM), services and equipment and paint the underwater hull of the Survey Vessel H.R. SPIES in accordance with the following specifications.
All of the manufacturers and USACE preparation and environmental conditions must be met prior to beginning any operation. Surface temperature, humidity, wind conditions, dewpoint and wet-bulb readings shall be checked and recorded at least twice daily.
NOTE: Coordinate painting with acceptance from H-200, Surface Preparation and Inspection
A. PAINTING (Keel to 6” above Deep Load Line)
Artificial illumination shall be used on any area specified to be cleaned and painted, which cannot be clearly seen with eyes of normal vision at any time the work is being performed.
The hull from the keel to 6” above the deep load line shall be prepared and painted in accordance with the following specifications. Spot coating of all areas of bare metal using E-Paint Primer shall precede the full painting system to be restored to the vessel.
The primer EP Epoxy Primer 1000 shall be applied in two-(2) contrasting coats after final surface preparation and spot coating has been achieved in accordance with Manufacturer’s recommendations. Each application of this coating shall be applied with a minimum thickness of at least 4 mils.
All atmospheric condition requirements, such as Temperature and Relative Humidity for application, shall be strictly adhered to.
A hard, smooth foul release coating E-Paint SN-1 (Black), shall be provided on hulls and foils, up to 6 inches above the full load waterline. This coating shall be applied as the final two coatings and should be at least 4 mils dry, each coating. This application must be applied over the recommended Primer coats (EP Epoxy Primer 1000) and shall be applied within the required over-coating interval.
All atmospheric condition requirements, such as Temperature and Relative Humidity for application, shall be strictly adhered to.
B. Draft Marks
Draft marks at bow, stern and in surveying strut well shall be repainted. Draft marks are to be painted white, using one coat of E-Paint SN-1 (White), in four-(4) inch block numbers.
H-301 REPAIR DAY SHAPE MAST
It is the intent of this work item to repair the Day Shape Mast. The top 8’ of mast broke off of the remaining mast and structure. The broken 8’ piece is to be reinstalled with an additional support and finished in such a manner as to allow for the continued, proper operation of hoisting and lowering of the day shapes.
2. DESCRIPTION OF WORK
The Day Shape mast is designed as a fixed mast constructed of 2” aluminum pipe with a ¼” wall thickness. To the forward side of this mast is welded an aluminum ‘T’ that serves to support the mast and facilitate its use. The Day Shapes are fixed to a second aluminum pipe, snugly fit around the mast, which rides up and down the mast as needed to display the shapes.
The fact that the upper 8’ of mast no longer exists detracts from the intended line of sight from other vessels and needs to be restored. Because of the fact that the shapes are designed to slide freely up and down the mast the finished repair must provide for this continued free operation after the sections are rejoined.
The Contractor shall provide all labor, materials and equipment and accomplish the following:
The Contractor shall remove the line that runs through the mast used to raise and lower the Day Shapes. Both sides of the broken mast shall be dressed, prepped and beveled for rewelding. A small section of support pipe, approximately 1’ in length shall be inserted into the mast so that half of it remains in each of the two parts to be joined. This pipe should be a tight fit with the inside diameter of the existing mast and shall not impede the line used for raising and lowering the shapes. This small support pipe will be held in place by the final welding of the two pieces of the broken mast.
When the mast is restored to its full height the Contractor shall install an additional structural support, fabricated from 2” aluminum pipe with a ¼” wall thickness to extend from the forward, athwartship pipe on the antenna platform approximately 28” forward of the mast to the ‘T’ mast support, approximately 36” above the newly repaired split line. This pipe shall be fixed at each end using welded gusset plates.
When all of the work is completed to the Day Shape Mast’s newly welded split line, this weld shall be ground smooth and the operating assembly reconnected. The Day Shapes shall be raised and lowered and properly tested to the satisfaction of the Vessel’s Operator and the COR/GTR.
H-401 REPAIR MARETRON ALARM SYSTEM
1. INTENT
It is the intent of this work item to have the Maretron Alarm System completely inspected, repaired, programmed and tested to ensure all facets of the system are operating correctly. It may be necessary to have a Maretron Representative perform the work or assist through ‘reach back’ to correct system deficiencies. Maretron Technical Support 866.550.9100.
Upon completion of the satisfactory testing of all of the system functions it is also intended to have the Representative performing the work provide training to the pertinent USACE crew in the proper operation of the system and all of its features.
2. DESCRIPTION OF WORK
At present there are several elements of the Maretron Alarm System that are not functioning properly. These items are as follows:
· There is an open window alarm that can’t be located.
· The existing SmallPC.com Touch Screen no longer accepts touch commands
· The A/C Power Available Sensor is inoperative
All sliding windows have a magnetic pickup attached that indicates whether there is an intrusion after the alarm is set. One of these magnetic pickups is not functioning properly or has a shorted wire connection. There are six-(6) sliding windows on each of the two levels of the superstructure for a total of twelve-(12) alarmed windows.
Contractor to locate the source of the Window Alarm failure and replace magnetic pickup or correct the electrical wiring problem.
The existing Touch Screen Panel, located at the Helm, will not respond to touch commands. The Contractor shall either reprogram or replace the screen to restore this system capability.
The A/C Power Available Sensor continues to give a false signal which triggers an alert to the proper USACE Point of Contact that the vessel’s A/C Power has failed and requires travel to the vessel to reset vital systems. The Contractor shall verify that the components are all in good operating condition and shall replace any component found to be defective. It is assumed that there is either a failed part, a loose connection or a programming malfunction.
The Contractor shall inspect and test all facets of the Maretron System, working with Maretron Technical Support, update all software and ensure that the entire system is operating as it should. Upon testing to the satisfaction of the Vessel operator, the COR/GTR, the Contractor shall give a brief training to all pertinent USACE crew in the proper operation of the system and all of its features.
H-501 WHEELHOUSE DOORS WINDOW TINTING
1. INTENT
It is the intent of this work item to tint both of the Pilot House Door Windows.
2. DESCRIPTION OF WORK
The Contractor shall coordinate with the Vessel Operator and COR/GTR and provide samples of the proposed tint from which a selection can be made. The windows are 22-1/2” high by 21-1/2” wide. Both windows are to have the tinting applied to the inside and be free of wrinkles and aberrations.
H-901 REPLACE CUTLESS BEARINGS
1. INTENT
It is the intent of this work item to replace all four-(4) Shaft Cutless Bearings with Government Furnished (GFM) bearings. Cutless Bearings are Johnson Duramax Non-Metalic, style Mandy units.
2. GOVERNMENT FURNISHED MATERIAL
Johnson Duramax Cutless Bearings - Mandy Qty – (4)
3. DESCRIPTION OF WORK
The Contractor shall make all removals necessary to remove both the Port & Starboard shafts. It may be required to remove both the Port and Starboard Rudders, the Port and Starboard Propellers, as well as additional removals in order to remove the shafts.
The Contractor shall then perform an inspection of the four-(4) Cutless Bearings, taking measurements at eight-(8), equally spaced points, of remaining stave thickness and provide a report to the COR/GTR. This report is intended to be used for historical information and future evaluations.
The Contractor shall then remove all four-(4) Cutless Bearings and clean and prep the evacuated areas in preparation for installation of new Cutless Bearings.
The Contractor shall then install the new Government furnished bearings and restore all removals.
PART II - SECTION C
M MACHINERY SECTION ITEMS
M-101 PERFORM 3000 HR ENGINE SERVICE
1. INTENT
It is the intent of this work item to perform a 3,000 hour routine maintenance, of two-(2) Caterpillar C-18 Engines, using a Factory Authorized Caterpillar Representative. The Engine Serial Numbers are as follows:
| Port Engine | JLE05407 | |
| Starboard Engine | JLE05411 |
2. DESCRIPTION OF WORK
Provide the services of an authorized Caterpillar Service Technician to perform service and maintenance on both CAT-C18 engines. The previous maintenance was performed at 1000 hours. The engines currently have 2700 service hours.
The contractor shall furnish all parts, equipment, labor, travel, material and inspection services necessary to inspect, service, and maintain the two Caterpillar C-18 engines as outlined in the OEM maintenance manual. The following is a list of recommended maintenance from the manual, but may be expanded based on Caterpillar evaluation and recommendations:
Cooling System
· Aftercooler Core – Clean/Test
· Auxiliary Water Pump (Bronze Impeller) – Inspect
· Cooling System Coolant (DEAC) – Change
· Cooling System Water Temperature Regulator – Replace
· Auxiliary Water Pump (Rubber Impeller) – Inspect
· Heat Exchanger - Inspect
Engine
· Engine Oil & Filter – Change
· Closed Crankcase Vent (CCV) Fumes Disposal Filter – Replace
· Crankcase Vibration Damper – Inspect
· Engine Speed/Timing Sensor – Clean/Inspect
· Engine Valve Lash – Inspect/Adjust
· Engine Valve Rotators – Inspect
· Fuel Injectors – Inspect/Adjust
· Starting Motor – Inspect
· Engine Crankcase Breather – Clean/Inspect
· Fuel System Primary Filter (Water Separator) Element – Replace
· Fuel Sys Secondary Filter – Replace
· Engine Air Cleaner Element – Replace
· Turbocharger – Inspect
Auxiliary Systems
· Motor Mounts – Inspect
· Battery Electrolyte Level – Inspect
· Belts – Inspect/Adjust/Replace
· Hoses and Clamps – Inspect/Replace
NOTE: The vessel has a critical schedule to maintain and cannot afford to extend beyond the period of performance. For this reason some elements of the recommended maintenance as prescribed in the OEM maintenance manual may not be performed unless deemed absolutely necessary by Caterpillar.
Replacements shall include, but are not limited to, belts, crank case ventilation filter, jacket water regulator, zincs, sea water pump impeller, and all engine fluids, and filters. Inspections shall include but not limited to the heat exchanger, condensate drain valves, engine mounts, starter, block heater, and hoses. Adjust intake and exhaust valves.
M-151 REPLACE ENGINE ROOM LOUVERS
1. INTENT
It is the intent of this work item to install Government Furnished Material (GFM) A60 fire dampers in conjunction with existing moisture eliminating dampers at both intakes into the Port and Starboard Engine Rooms.
2. REFERENCES
| Drawing 174329 Moisture Eliminator and Damper Assembly |
| T20W163-320-030 12-24 VDC Alarm Panel |
3. GOVERNMENT FURNISHED MATERIAL
| Delta T Rectangular Damper | Qty – (2) |
| Delta T Damper Actuator | Qty – (2) |
4. DESCRIPTION OF WORK
The Contractor shall completely remove the Port and Starboard Moisture Eliminator Louvers taking care to minimize damage to the insulation inside the Engine Rooms.
The Contractor shall mount the Damper/Actuator assemblies onto the inside of the Moisture Eliminators and reinstall the combined assemblies back into their existing openings. All insulation shall be trimmed and cut to suit. All foil tape, fit and finish shall be restored to pre-removal conditions.
Power to the actuators shall be supplied from a new Circuit Breaker in the Main DC panel at the Main Deck Switchboard and fed through the fire extinguisher shutdown relay. All cable runs and connections shall be installed as displayed on reference drawing T20W163-320-030 12-24 VDC Alarm Panel.
After reassembly the units will be tested for proper operation during Sea Trials.
M-901 MISCELLANEOUS MAINTENANCE (IF DIRECTED)
It is the intent of this work item to provide pre-priced funding for Labor & Materials to accomplish emergent work that may need to be accomplished.
2. DESCRIPTION OF WORK
A. Provide the services of journeymen level mechanics, shipfitters, welders, inside and outside machinists, pipefitters, marine chemists, laggers & insulators, carpenters & joiners, electricians, laborers, burners, riggers, painters and all other shipyard trades to perform work to the ship's equipment for the entire duration of the repair period.
Work items will be described in writing on a Government 2-Way Memo Form and shall be based on a joint survey with the contractor. Only the COR/Government Technical Representative is authorized to issue 2-Way memos. Work items will be priced and agreed upon prior to the initiation of any work. See Section H - Special Contract Requirements, Paragraph H-11, entitled "Change Proposals", for requirements of 2-Way Memo submission. The contractor, in connection with any proposal he makes, or the Government requests for a change shall furnish a total, lump sum price together with a price breakdown itemized as required. Unless otherwise directed, the breakdown shall set forth separately the following:
(a) Materials: Quantity computations and materials pricing (support by invoices or price quotes or define as estimated).
(b) Labor: Provide manhours by trade as agreed upon by the Contracting Officer's Representative.
(c) Equipment: Define equipment to be employed and hours used, both effective and noneffective. If equipment is part of an overall markup or labor costs, define as such. Provide rates used for equipment listed separately.
(d) Subcontract Costs: Contractor shall submit vouchers of the subcontractor's costs unless waived by the Contracting Officer's Representative.
(e) Miscellaneous: Any portions of the proposal for estimated costs for changes not covered in (a) to (d) above, shall be defined and set forth separately.
ESTIMATE ON 80 LABOR HOURS. PRICE PER HOUR.
The HOURLY RATE bid for this item shall include overhead, profit, general and administration costs, and any additional costs or premium time incurred for weekends and holidays including insurance.
The Contractor shall have available at the yard where the work is performed, an ESTIMATOR (or other authorized person) to survey any work that may be found necessary. The estimator shall be made available the same day that the additional work is found (including weekends) and shall submit an estimate of the cost within 24 hours.
B. NOTE: FOR BIDDING PURPOSES, material costs involved in the maintenance and repair work performed shall be estimated on the basis of one-hundred percent (100%) of the total labor cost worked in paragraph (A)(1), above.
EXAMPLE: The material costs for 100 labor hours at $40/hour shall be $4,000.00.
Actual material and services costs will be paid on the basis of Contractor's purchase orders for required material. Copies of all purchase orders shall be furnished to the Contracting Officer's Representative. Estimate material and services price, as per paragraph (B), above.
All profit shall be based on the OCE weighted Guideline Method.
C. BURDEN CHARGES: The contractor shall insert in the space the percentage burden that will be charged when materials, subcontractor services, equipment rental and any other miscellaneous charge is activated under this Clause. This burden charge shall include profit, material handling, subcontractor handling, general and administrative charges, insurance, overhead and any other charges normally added onto these items. No other such charges or mark-ups will be allowed when activating work under this Clause.
The percentage amount to be charged by the contractor for any materials, subcontractor services equipment rental, and any other miscellaneous charges that are activated under this Clause shall be annotated in Section B. This rate shall remain in effect for the entire dollar amount of the material, services and subcontractor costs bid in Section B.