AMENDMENT 0003 - 20-R-0057-0003.pdf

PDF 285 KB Posted

Attached to
OVERHAUL SURVEYBOAT SPIES
Solicitation number
W912BU20R0057
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

PLANS AND SPECIFICATIONS

PLANS AND SPECIFICATIONS

FOR THE 2020 OVERHAUL OF

64’ SURVEY VESSEL H.R. SPIES

B-3

Drydock and perform repairs to Surveyboat SPIES of the USACE PHILADELPHIA

DISTRICT in accordance with the attached plans and specifications:

ITEM UNIT TOTAL

NUMBER ITEM

QTY

UNIT PRICE PRICE

0001 REPAIRS TO S/V H.R. SPIES

1 VSSL XXXX XXXXX

0001A

0001B

0001C

0001D

0001E

0001F

0001G

H-101 DRYDOCKING AND REPAIRS

The contractor may not start this item until he receives a Notice To Proceed for this item.

H-102 Utilities and Services

H-200 Surface Preparation & Inspection

H-201 Hull Anode Replacement

H-202 Hull Painting

H-301 Repair Day Shape Mast

H-401 Repair Maretron Alarm System

JB

DY

B-4

0001H

0001I

0001J

0001K

0001LA

0001LB

0001LC

H-501 Wheelhouse Door Window Tinting

H-901 Replace Cutless Bearings

M-101 Main Engine Service (3,000 Hour)

M-151 Install Engine Rm Dampers

M-901 Misc Maintenance (If Directed)

A. LABOR

M-901 Misc Maintenance (If Directed)

B. MATERIALS

M-901 Misc Maintenance (INSERT % RATE)

C. BURDEN CHARGES

TOTAL FOR ITEM 0001

TOTAL

JB

JB

HR

It is the intent of the Philadelphia District, USACE to issue a Notice to Proceed to enter the Shipyard between 30 Sep, 2020 and 30 Dec, 2020. Delivery of the Vessel after Notice to Proceed will initiate the Period of Performance, which is 30 calendar days after delivery.

INSERT LOCATION OF THE SHIPYARD WHERE THE WORK WILL BE PERFORMED:

W912BU20R0057

The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly overstated for other work.

(52.217-5)

Refer to Contract Section M for Evaluation and Award criteria.

The following have been deleted:

PLANS AND SPECIFICATIONS

(End of Summary of Changes)

PLANS AND SPECIFICATIONS

File details come from the government source that posted it. Updated .