Q&A_W912BU19Q0023.pdf
PDF 86 KB Posted
- Attached to
- Shipyard Overhaul of S/V Reconnaissance
- Solicitation number
- W912BU19Q0023
About this file
Q&A W912BUQ0023
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A_W912BU19Q0023_update_9-18-2019.pdf | ||
| Combined_synopsis-solicitation_W912BU19Q0023_REV_3.docx | DOCX document | |
| Combined_synopsis-solicitation_W912BU19Q0023_REV_2.docx | DOCX document | |
| Combined_synopsis-solicitation_W912BU19Q0023_REV_1.docx | DOCX document | |
| N47900_REV_0_FUEL_SYSTEM.pdf | ||
| N47900_REV_0_GENERAL_ARRANGEMENT.pdf | ||
| N47900_Rev_0_ELECTRICAL_SYSTEMS.pdf | ||
| N47900_REV_0_HULL_STRUCTURE.pdf | ||
| Price_Schedule_for_the_2019_Overhaul_of_Survey_Vessel_Reconnaissance.doc | DOC document | |
| SOW_SV_RECONNAISANCE.pdf | ||
| Combined_synopsis-solicitation_W912BU19Q0023.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A Shipyard Overhaul of S/V Reconnaissance
W912BU19Q0023
1. Section H-921 - What material is the equipment survey rack?
The equipment rack is 'off the shelf' Steel rack.
2. Section M-151 - Are the fuel valves to be located inside or outside of the main cabin?
The fuel valves will be located below deck, aft of the main cabin in a dry void space, operated by levers/knobs mounted on the aft bhd of the main cabin (in the weather).