Price_Schedule_for_the_2019_Overhaul_of_Survey_Vessel_Reconnaissance.doc

DOC document 51 KB Posted

Attached to
Shipyard Overhaul of S/V Reconnaissance
Solicitation number
W912BU19Q0023
Issued by

About this file

Attachment 2: Price Schedule for the 2019 Overhaul of Survey Vessel Reconnaissance

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

FOR THE 2019 OVERHAUL OF

SURVEY VESSEL RECONNAISSANCE

Drydock and perform repairs to Surveyboat RECONNAISSANCE of the USACE PHILADELPHIA DISTRICT in accordance with the attached plans and specifications:

ITEM

UNIT

TOTAL

NUMBER

ITEM

QTY

UNIT

PRICE

PRICE

REPAIRS TO S/V RECONNAISSANCE

VSSL

XXXX

XXXXX

0001A 0001B 0001C 0001D 0001E 0001F 0001G 0001H 0001I

0001IA

0001IB

0001IC

0001J

0001KA

0001KB

0001KC

H-101 DRYDOCKING AND REPAIRS The contractor may not start this item until he receives a Notice To Proceed for this item.

H-102 Utilities and Services

H-200 Surface Preparation, Inspection & Audiogaging H-201 Hull Anode Replacement H-202 Hull Painting H-203 Installation of Deck Non-Skid H-401 Installation of Plugs at WT BHD Penetrations H-501 Installation of Main Cabin Gutter System

H-921 Miscellaneous Deck Department Items

Window Latches

Modify Survey Eqpt Rack

Modify Seat Tracks

M-151 Install Emergency Fuel Cut-Off Valves

M-901 Misc Maintenance (If Directed)

A. LABOR

M-901 Misc Maintenance (If Directed)

B. MATERIALS

M-901 Misc Maintenance (INSERT % RATE)

C. BURDEN CHARGES

TOTAL FOR ITEM 0001

JB

DY

JB

JB

JB

JB

JB

JB

JB

JB

JB

JB

HR

LS

TOT

INSERT LOCATION OF THE SHIPYARD WHERE THE WORK WILL BE PERFORMED:

All Offerors will have their proposal surcharged (calculated after receipt of all proposals at $50 per nautical mile. Shipyard location will be used as part of evaluation factor, Mileage Surcharge, found in FAR 52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014).

The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the additional quantities. An offer is unbalanced when it is based on prices significantly overstated for other work.

B-2

File details come from the government source that posted it.