W912BU-16-B-0014-Specs.pdf
PDF 39 MB Posted
- Attached to
- Initial Construction, Beachfill, Manasquan Inlet to Barnegat Inlet, Ocean County, New Jersey
- Solicitation number
- W912BU16B0014
About this file
Specifications - 16B0014
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB W912BU-16-B-0014
US Army Corps of Engineers Philadelphia District
BEACHFILL
INITIAL CONSTRUCTION
Manasquan Inlet to Barnegat Inlet Ocean County, New Jersey
Construction Solicitation and Specifications
26 September 2016
This page was intentionally left blank for duplex printing.
26 SEPTEMBER 2016
INVITATION NO. W912BU-16-B-0014
PHILADELPHIA DISTRICT
CORPS OF ENGINEERS
INVITATION FOR BIDS
FOR
BEACHFILL
INITIAL CONSTRUCTION
MANASQUAN INLET TO BARNEGAT INLET
OCEAN COUNTY, NEW JERSEY
I. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE EQUAL OPPORTUNITY CLAUSE
WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.
II. BIDDERS ARE REQUIRED TO COMPLETE THE REPRESENTATION AND CERTIFICATIONS
PORTION OF SECTION 00 45 00 OF THIS SOLICITATION AND SUBMIT THIS WITH THEIR
BID.
III. ALL QUESTIONS PERTAINING TO THIS PROCUREMENT MUST BE RECEIVED NO LATER
THAN 05:00 P.M., ON 12 OCTOBER 2016. RESPONSES MAY NOT BE PROVIDED TO REQUEST
FOR INFORMATION (RFI'S) RECEIVED AFTER THIS CUTOFF DATE.
IV. THERE WILL NOT BE A GOVERNMENT CONDUCTED SITE VISIT FOR THIS PROJECT. THE
PROSPECTIVE BIDDERS ARE ENCOURAGED TO VISIT THE SITE OF THE WORK AT THEIR
CONVENIENCE IN ORDER TO ACQUAINT THEMSELVES WITH THE SITE CONDITIONS AND ANY
PROBLEMS INCIDENT TO THE PROSECUTION OF THE WORK.
V. ADVISORY FOR POTENTIAL BIDDERS REGARDING REAL ESTATE INTEREST NEEDED FOR
PERFORMANCE:
THIS SOLICITATION IS BEING ISSUED PRIOR THE AGENCY’S RECEIPT OF THE REAL
ESTATE INTEREST NECESSARY TO PERFORM THE WORK AS DESCRIBED IN THIS
SOLICITATION. BIDS CAN NOT BE OPENED NOR CAN AN AWARD BE MADE UNTIL THE
AGENCY HAS SECURED THE REAL ESTATE INTEREST REQUIRED TO PERFORM THE WORK.
ERGO, BIDS WILL NOT BE OPENED ON THE DATE INDICATED IN THE SOLICITATION
UNLESS THE REAL ESTATE INTEREST ISSUES HAVE BEEN RESOLVED.
A FULL RISK ASSESSMENT HAS BEEN COMPLETED TO EVALUATE THE PROBABILITY OF
FINALIZING THE ACQUISITION OF THE REAL ESTATE INTEREST PRIOR TO BID
OPENING. BASED UPON THAT RISK ASSESSMENT AND THE LIKELIHOOD OF A TIMELY
RESOLUTION TO THE REAL ESTATE ISSUES, THE DECISION HAS BEEN MADE TO
PROCEED WITH THE SOLICITATION. HOWEVER, ALL POTENTIAL BIDDERS ARE ADVISED
THAT THERE IS NO GUARANTEE THAT THE OUTSTANDING ISSUES WILL BE RESOLVED,
NOR IS THERE A GUARANTEE THAT A CONTRACT WILL BE AWARDED PURSUANT TO THIS
SOLICITATION.
W912BU-16-B-0014
MTC-1
MAIN TABLE OF CONTENTS
SECTION TITLE .
0010 00 SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
00 45 00 REPRESENTATIONS & CERTIFICATIONS
00 45 05 SMALL BUSINESS SUBCONTRACTING PLAN
00 50 00 CONTRACTING FORMS AND SUPPLEMENTS
(PRE-AWARD SURVEY SUBMITTAL REQUIREMENTS)
00 70 00 CONTRACT CLAUSES
00 73 00 SPECIAL CLAUSES
00 73 05 CONTRACT ADMINISTRATION
SPECIFICATIONS
PROJECT TITLE: Beachfill -- Initial Construction, Manasquan Inlet to Barnegat Inlet, Ocean County, New
Jersey ISSUE DATE: September 26, 2016
BID OPENING DATE: October 26, 2016; 11:00 AM, local time
THIS IS AN UNRESTRICTED PROCUREMENT.
X
DENISE M DETITTA 215-656-6775
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
26-Sep-2016
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______ 10 calendar days and complete it within ________ 490 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ 0 copies to perform the work required are due at the place specified in Item 8 by ___11:00 am________ local time _OCT 26, 2016 (date)_____________. If thi s is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTR DIV-CONTRACTS BR
USAED, PHILA DISTRICT
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX: TEL: TEL: FAX:
See FAR 52.211-10
20B. SIGNATURE
(REV. 4-85) STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE 27. PAYMENT WILL BE MADE BY: 26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror)OFFER
00 10 00-3
BIDDING SCHEDULE
(To be attached to SF 1442)
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount
BASE BID:
1. Mobilization and Demobilization 1 JOB LS $____________
BOROUGH OF MANTOLOKING - FROM STATION 207+68 TO STATION 277+58:
2. Demolition 1 JOB LS $____________
3. Structures Monitoring 1 JOB LS $____________
4. Beachfill 1,607,000 CY $______ $____________
5. Pedestrian Crossover 8,433 SF $______ $____________
6. ADA Accessible Crossover 5,170 SF $______ $____________
7. Vehicle Crossover 3,231 SF $______ $____________
8. Sand Fence 7,192 LF $______ $____________
9. Split Rail Fence 2,167 LF $______ $____________
10. Post and Rail Fence 810 LF $______ $____________
11. Berm Stabilization Mat 480 SF $______ $____________
12. Dune Grass Planting - 18” O.C. 62,293 SY $______ $____________
13. Dune Grass Planting - 24” O.C. 29,137 SY $______ $____________
14. Name the State of New Jersey and the Borough of Mantoloking as “Additional Insured” under General Liability Insurance 1 JOB LS $____________
BRICK TOWNSHIP – FROM STATION 277+58 TO STATION 371+64:
15. Demolition 1 JOB LS $____________
16. Structures Monitoring 1 JOB LS $____________
17. Beachfill 1,573,000 CY $______ $____________
18. Pedestrian Crossover 11,138 SF $______ $____________
19. ADA Accessible Crossover 11,138 SF $______ $____________
20. Vehicle Crossover 8,231 SF $______ $____________
21. Sand Fence 9,365 LF $______ $____________
22. Split Rail Fence 3,275 LF $______ $____________
23. Post and Rail Fence 2,140 LF $______ $____________
24. Berm Stabilization Mat 1,755 SF $______ $____________
25. Dune Grass Planting - 18” O.C. 82,834 SY $______ $____________
26. Dune Grass Planting - 24” O.C. 33,138 SY $______ $____________
00 10 00-4
27. Name the State of New Jersey and Brick Township as “Additional Insured” under General Liability Insurance 1 JOB LS $____________
TOMS RIVER TOWNSHIP (NORTH) - FROM STATION 371+64 TO STATION 449+81:
28. Demolition 1 JOB LS $____________
29. Structures Monitoring 1 JOB LS $____________
30. Beachfill 1,139,000 CY $______ $____________
31. Graded Sand Crossover with Stabilization Mats 33,186 SF $______ $____________
32. ADA Accessible Dune Crossover 3,370 SF $______ $____________
33. Vehicle Dune Crossover 3,447 SF $______ $____________
34. Sand Fence 7,759 LF $______ $____________
35. Split Rail Fence 6,885 LF $______ $____________
36. Post and Rail Fence 709 LF $______ $____________
37. Berm Stabilization Mat 570 SF $______ $____________
38. Dune Grass Planting - 18” O.C. 65,568 SY $______ $____________
39. Dune Grass Planting - 24” O.C. 39,624 SY $______ $____________
40. Name the State of New Jersey and Toms River Township as “Additional Insured” under General Liability Insurance 1 JOB LS $____________
BOROUGH OF LAVALLETTE - FROM STATION 449+81 TO STATION 526+37:
41. Demolition 1 JOB LS $____________
42. Structures Monitoring 1 JOB LS $____________
43. Beachfill 1,410,000 CY $______ $____________
44. Pedestrian Crossover 83,733 SF $______ $____________
45. ADA Accessible Crossover 21,131 SF $______ $____________
46. Vehicle Crossover 19,020 SF $______ $____________
47. Sand Fence 7,481 LF $______ $____________
48. Split Rail Fence 18,787 LF $______ $____________
49. Post and Rail Fence 4,353 LF $______ $____________
50. Berm Stabilization Mat 3,510 SF $______ $____________
51. Dune Grass Planting - 18” O.C. 65,901 SY $______ $____________
52. Dune Grass Planting - 24” O.C. 34,027 SY $______ $____________
53. Name the State of New Jersey and the Borough of Lavallette as “Additional Insured” under General Liability Insurance 1 JOB LS $____________
00 10 00-5
TOMS RIVER TOWNSHIP (SOUTH) - FROM STATION 526+37 TO STATION 567+09:
54. Demolition 1 JOB LS $____________
55. Structures Monitoring 1 JOB LS $____________
56. Beachfill 1,236,000 CY $______ $____________
57. Graded Sand Crossover with Stabilization Mats 14,680 SF $______ $____________
58. ADA Accessible Crossover 6,990 SF $______ $____________
59. Vehicle Crossover 8,443 SF $______ $____________
60. Timber Bulkhead 320 LF $______ $____________
61. Sand Fence 4,038 LF $______ $____________
62. Split Rail Fence 4,189 LF $______ $____________
63. Post and Rail Fence 1,433 LF $______ $____________
64. Berm Stabilization Mat 1,140 SF $______ $____________
65. Dune Grass Planting - 18” O.C. 35,125 SY $______ $____________
66. Dune Grass Planting - 24” O.C. 32,795 SY $______ $____________
BOROUGH OF SEASIDE HEIGHTS - FROM STATION 567+09 TO STATION 608+70:
67. Demolition 1 JOB LS $____________
68. Structures Monitoring 1 JOB LS $____________
69. Beachfill 660,000 CY $______ $____________
70. Pedestrian Crossover 4,999 SF $______ $____________
71. ADA Accessible Crossover 23,816 SF $______ $____________
72. Vehicle Crossover 11,912 SF $______ $____________
73. Timber Bulkhead 570 LF $______ $____________
74. Steel Sheetpile Bulkhead 200 LF $______ $____________
75. Sand Fence 4,029 LF $______ $____________
76. Split Rail Fence 2,247 LF $______ $____________
77. Post and Rail Fence 4,759 LF $______ $____________
78. Berm Stabilization Mat 9,180 SF $______ $____________
79. Dune Grass Planting - 18” O.C. 25,575 SY $______ $____________
80. Dune Grass Planting - 24” O.C. 20,833 SY $______ $____________
81. Name the State of New Jersey and the Borough of Seaside Heights as “Additional Insured” under General Liability Insurance 1 JOB LS $____________
BOROUGH OF SEASIDE PARK - FROM STATION 608+70 TO STATION 698+01:
82. Demolition 1 JOB LS $____________
83. Structures Monitoring 1 JOB LS $____________
84. Beachfill 931,000 CY $______ $____________
00 10 00-6
85. Pedestrian Crossover 27,466 SF $______ $____________
86. ADA Accessible Crossover 10,517 SF $______ $____________
87. Vehicle Crossover 3,928 SF $______ $____________
88. Sand Fence 8,432 LF $______ $____________
89. Split Rail Fence 5,616 LF $______ $____________
90. Post and Rail Fence 2,058 LF $______ $____________
91. Berm Stabilization Mat 2,001 SF $______ $____________
92. Dune Grass Planting - 18” O.C. 77,396 SY $______ $____________
93. Dune Grass Planting - 24” O.C. 26,571 SY $______ $____________
94. Name the State of New Jersey and the Borough of Seaside Park as Additional Insured” under General Liability Insurance 1 JOB LS $____________
TOTAL ESTIMATED BASE BID AMOUNT $__________________
OPTION WORK
OPTION 1
BOROUGH OF POINT PLEASANT BEACH - FROM STATION 0+00 TO STATION 38+50:
95. Demolition 1 JOB LS $____________
96. Structures Monitoring 1 JOB LS $____________
97. Beachfill 59,000 CY $______ $____________
98. Graded Sand Crossover with Stabilization Mats 6,206 SF $______ $____________
99. ADA Accessible Dune Crossover 2,600 SF $______ $____________
100. Vehicle Crossover 8,547 SF $______ $____________
101. Sand Fence 4,095 LF $______ $____________
102. Split Rail Fence 2,344 LF $______ $____________
103. Post and Rail Fence 512 LF $______ $____________
104. Berm Stabilization Mat 298 SF $______ $____________
105. Dune Grass Planting - 18” O.C. 16,273 SY $______ $____________
106. Dune Grass Planting - 24” O.C. 15,959 SY $______ $____________
107. Name the State of New Jersey and the Borough Of Point Pleasant Beach as “Additional Insured” under General Liability Insurance 1 JOB LS $____________
TOTAL ESTIMATED OPTION 1 TOTAL $_________________
OPTION 2
BOROUGH OF POINT PLEASANT BEACH - FROM STATION 38+50 TO STATION 94+42:
108. Demolition 1 JOB LS $____________
109. Structures Monitoring 1 JOB LS $____________
00 10 00-7
110. Beachfill 464,000 CY $______ $____________
111. Graded Sand Crossover with Stabilization Mats 13,298 SF $______ $____________
112. ADA Accessible Crossover 6,912 SF $______ $____________
113. Vehicle Crossover 4,487 SF $______ $____________
114. Timber Bulkhead 40 LF $______ $____________
115. Sand Fence 5,678 LF $______ $____________
116. Split Rail Fence 4,318 LF $______ $____________
117. Post and Rail Fence 413 LF $______ $____________
118. Berm Stabilization Mat 899 SF $______ $____________
119. Dune Grass Planting - 18” O.C. 46,558 SY $______ $____________
120. Dune Grass Planting - 24” O.C. 33,067 SY $______ $____________
121. Name the State of New Jersey and the Borough Of Point Pleasant Beach as “Additional Insured” under General Liability Insurance 1 JOB LS $____________
TOTAL ESTIMATED OPTION 2 TOTAL $_________________
BOROUGH OF POINT PLEASANT BEACH - FROM STATION 0+00 TO STATION 94+42:
122. OPTION 3 - Beachfill 59,000 CY $______ $____________
123. OPTION 4 - Beachfill 33,000 CY $______ $____________
124. OPTION 5 - Sea Avenue Pump Station Force Main 1 JOB LS $____________
OPTION 6
BOROUGH OF BAY HEAD - FROM STATION 94+42 TO STATION 162+36:
125. Demolition 1 JOB LS $____________
126. Structures Monitoring 1 JOB LS $____________
127. Beachfill 1,412,000 CY $______ $____________
128. Pedestrian Crossover 17,325 SF $______ $____________
129. ADA Accessible Crossover 4,473 SF $______ $____________
130. Vehicle Crossover 5,285 SF $______ $____________
131. Timber Sheeting 1 JOB LS $____________
132. Sand Fence 6,634 LF $______ $____________
133. Split Rail Fence 4,104 LF $______ $____________
134. Post and Rail Fence 914 LF $______ $____________
135. Berm Stabilization Mat 570 SF $______ $____________
136. Dune Grass Planting - 18” O.C. 58,372 SY $______ $____________
137. Dune Grass Planting - 24” O.C. 30,940 SY $______ $____________
00 10 00-8
139. Name the State of New Jersey and the Borough of Bay Head as “Additional Insured” under General Liability Insurance 1 JOB LS $____________
TOTAL ESTIMATED OPTION 6 TOTAL $_________________
BOROUGH OF BAY HEAD - FROM STATION 94+42 TO STATION 162+36:
140. OPTION 7 - Beachfill 159,000 CY $______ $____________
141. OPTION 8 - Beachfill 88,000 CY $______ $____________
OPTION 9
BOROUGH OF MANTOLOKING - FROM STATION 162+36 TO STATION 182+69:
142. Demolition 1 JOB LS $____________
143. Structures Monitoring 1 JOB LS $____________
144. Beachfill 358,000 CY $______ $____________
145. Pedestrian Crossover 6,693 SF $______ $____________
146. Sand Fence 2,048 LF $______ $____________
147. Split Rail Fence 1,264 LF $______ $____________
148. Dune Grass Planting - 18” O.C. 17,528 SY $______ $____________
149. Dune Grass Planting - 24” O.C. 6,294 SY $______ $____________
TOTAL ESTIMATED OPTION 9 TOTAL $_________________
BOROUGH OF MANTOLOKING - FROM STATION 162+36 TO STATION 182+69:
150. OPTION 10 - Beachfill 50,000 CY $______ $____________
OPTION 11
BOROUGH OF MANTOLOKING - FROM STATION 182+69 TO STATION 207+68:
151. Demolition 1 JOB LS $____________
152. Structures Monitoring 1 JOB LS $____________
153. Beachfill 597,000 CY $______ $____________
154. Pedestrian Crossover 3,198 SF $______ $____________
155. Vehicle Crossover 4,758 SF $______ $____________
156. Sand Fence 2,573 LF $______ $____________
157. Split Rail Fence 1,354 LF $______ $____________
158. Dune Grass Planting - 18” O.C. 22,336 SY $______ $____________
159. Dune Grass Planting - 24” O.C. 9,727 SY $______ $____________
TOTAL ESTIMATED OPTION 11 TOTAL $_________________
BOROUGH OF MANTOLOKING - FROM STATION 182+69 TO STATION 207+68:
160. OPTION 12 - Beachfill 72,000 CY $______ $____________
BOROUGH OF MANTOLOKING - FROM STATION 207+68 TO STATION 277+58
161. OPTION 13 - Beachfill 226,000 CY $______ $____________
00 10 00-9
162. OPTION 14 - Beachfill 100,000 CY $______ $____________
BRICK TOWNSHIP – FROM STATION 277+58 TO STATION 371+64
163. OPTION 15 - Beachfill 177,000 CY $______ $____________
164. OPTION 16 - Beachfill 98,000 CY $______ $____________
TOMS RIVER TOWNSHIP (NORTH) - FROM STATION 371+64 TO STATION 449+81
165. OPTION 17 - Beachfill 128,000 CY $______ $____________
166. OPTION 18 - Beachfill 71,000 CY $______ $____________
167. OPTION 19 – Dune Crossover Stabilization Mat for ADA Crossovers 3,370 SF $______ $____________
OPTION 20
TOMS RIVER TOWNSHIP (NORTH) - FROM STATION 371+64 TO STATION 449+81
168. Private Dune Crossover with Stabilization Mats 32,431 SF $______ $____________
169. Split Rail Fence 6,845 LF $______ $____________
TOTAL ESTIMATED OPTION 20 TOTAL $_________________
BOROUGH OF LAVALLETTE - FROM STATION 449+81 TO STATION 526+37
170. OPTION 21 - Beachfill 159,000 CY $______ $____________
171. OPTION 22 - Beachfill 88,000 CY $______ $____________
OPTION 23
BOROUGH OF LAVALLETTE - FROM STATION 449+81 TO STATION 526+37
172. ADA Accessible Crossover 3,814 SF $______ $____________
173. Berm Stabilization Mat 600 SF $______ $____________
174. Post and Rail Fence 763 LF $______ $____________
TOTAL ESTIMATED OPTION 23 TOTAL $_________________
TOMS RIVER TOWNSHIP (SOUTH) - FROM STATION 526+37 TO STATION 567+09
175. OPTION 24 - Beachfill 139,000 CY $______ $____________
176. OPTION 25 - Beachfill 77,000 CY $______ $____________
177. OPTION 26 - Dune Crossover Stabilization Mat for ADA Crossovers 6,990 SF $______ $____________
OPTION 27
TOMS RIVER TOWNSHIP (SOUTH) - FROM STATION 526+37 TO STATION 567+09
178. Private Dune Crossover with Stabilization Mats 17,514 SF $______ $____________
179. Split Rail Fence 3,665 LF $______ $____________
TOTAL ESTIMATED OPTION 27 TOTAL $_________________
00 10 00-10
BOROUGH OF SEASIDE HEIGHTS - FROM STATION 567+09 TO STATION 608+70
180. OPTION 28 - Beachfill 75,000 CY $______ $____________
181. OPTION 29 - Beachfill 42,000 CY $______ $____________
BOROUGH OF SEASIDE PARK - FROM STATION 608+70 TO STATION 698+01
182. OPTION 30 - Beachfill 105,000 CY $______ $____________
183. OPTION 31 - Beachfill 58,000 CY $______ $____________
OPTION 32
BERKELEY TOWNSHIP - FROM STATION 698+01 TO STATION 735+40
184. Demolition 1 JOB LS $____________
185. Structures Monitoring 1 JOB LS $____________
186. Beachfill 161,000 CY $______ $____________
187. Pedestrian Crossovers 6,689 SF $______ $____________
188. ADA Accessible Crossovers 3,236 SF $______ $____________
189. Vehicle Crossover 8,013 SF $______ $____________
190. Sand Fence 3,727 LF $______ $____________
191. Split Rail Fence 2,538 LF $______ $____________
192. Post and Rail Fence 647 LF $______ $____________
193. Berm Stabilization Mat 367 SF $______ $____________
194. Dune Grass Planting - 18” O.C. 9,379 SY $______ $____________
195. Dune Grass Planting - 24” O.C. 9,831 SY $______ $____________
196. Name the State of New Jersey and Berkeley Township as “Additional Insured” under General Liability Insurance 1 JOB LS $____________
TOTAL ESTIMATED OPTION 32 TOTAL $_________________
BERKELEY TOWNSHIP - FROM STATION 698+01 TO STATION 735+40
197. OPTION 33 - Beachfill 18,000 CY $______ $____________
198. OPTION 34 - Beachfill 10,000 CY $______ $____________
TOTAL ESTIMATED BASE BID AND OPTIONS 1 THROUGH 34 AMOUNT $_________________
NOTES:
1. Bidders must bid on all items.
2. Bidders shall list the cost of additional premium, if any, to name the State of New Jersey and the municipalities of Point Pleasant Beach, Bay Head, Mantoloking, Brick Township, Toms River Township, Lavallette, Seaside Heights, Seaside Park, and Berkeley Township as “Additional Insured” under General Liability Insurance as noted in Section 00 73 00, Special Clause entitled “INSURANCE REQUIREMENTS”.
Section 00 21 00
Bidding Schedule/Instructions to Bidders
52.204-6 Data Universal Numbering System Number JUL 2013 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.214-3 Amendments To Invitations For Bids DEC 1989 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids MAR 1997 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.216-1 Type Of Contract APR 1984 52.217-5 Evaluation Of Options JUL 1990 52.219-2 Equal Low Bids OCT 1995 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction
FEB 1999
52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements
MAY 2014
52.232-38 Submission of Electronic Funds Transfer Information with Offer
JUL 2013
52.233-2 Service Of Protest SEP 2006 252.219-7000 Advancing Small Business Growth MAY 2015 252.236-7008 Contract Prices-Bidding Schedules DEC 1991 52.214-5000 Apparent Clerical Mistakes MAR 2000
THIS PAGE INTENTIONALLY LEFT BLANK FOR DUPLEX PRINTING
00 21 00 - 1
Section 00 21 00
Bidding Schedule/Instructions to Bidders
52.204-6 DATA UNIVERSAL NUMBERING SYSTEM NUMBER (JULY 2013)
(a) Definition. Data Universal Numbering System (DUNS) number, as used in this provision, means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities, which is used as the identification number for Federal Contractors.
(b)The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS number or “DUNS+4” that identifies the offeror's name and address exactly as stated in the offer. The DUNS number is a nine-digit number assigned by Dun and Bradstreet, Inc. The DUNS+4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the offeror to establish additional System for Award Management records for identifying alternative Electronic Funds Transfer (EFT) accounts (see Subpart 32.11) for the same concern.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number--
(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(End of provision)
00 21 00 - 2
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016)
(a) Definition. As used in this provision--
Commercial and Government Entity (CAGE) code means—
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity; or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
(b) The Offeror shall enter its CAGE code in its offer with its name and address or otherwise include it prominently in its proposal.
The CAGE code entered must be for that name and address. Enter ``CAGE'' before the number. The CAGE code is required prior to award.
(c) CAGE codes may be obtained via--
(1) Registration in the System for Award Management (SAM) at www.sam.gov. If the Offeror is located in the United States or its outlying areas and does not already have a CAGE code assigned, the DLA Commercial and Government Entity (CAGE) Branch will assign a CAGE code as a part of the SAM registration process. SAM registrants located outside the United States and its outlying areas shall obtain a NCAGE code prior to registration in SAM (see paragraph (c)(3) of this provision).
(2) The DLA Commercial and Government Entity (CAGE) Branch. If registration in SAM is not required for the subject procurement, and the offeror does not otherwise register in SAM, an offeror located in the United States or its outlying areas may request that a CAGE code be assigned by submitting a request at https://cage.dla.mil.
(3) The appropriate country codification bureau. Entities located outside the United States and its outlying areas may obtain an NCAGE code by contacting the Codification Bureau in the foreign entity's country if that country is a member of NATO or a sponsored nation. NCAGE codes may be obtained from the NSPA at https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx if the foreign entity's country is not a member of NATO or a sponsored nation. Points of contact for codification bureaus, as well as additional information on obtaining NCAGE codes, are available at http://www.nato.int/structur/AC/135/main/links/contacts.htm.
(d) Additional guidance for establishing and maintaining CAGE codes is available at https://cage.dla.mil.
(e) When a CAGE Code is required for the immediate owner and/or the highest-level owner by 52.204-17 or 52.212-3(p), the Offeror shall obtain the respective CAGE Code from that entity to supply the CAGE Code to the Government.
(f) Do not delay submission of the offer pending receipt of a CAGE code.
(End of Provision)
52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989)
(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.
(b) Bidders shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, (2) by identifying the amendment number and date in the space provided for this purpose on the form for submitting a bid, (3) by letter or telegram, or (4) by facsimile, if facsimile bids are authorized in the solicitation. The Government must receive the acknowledgment by the time and at the place specified for receipt of bids.
http://www.sam.gov/ https://cage.dla.mil/ https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx http://www.nato.int/structur/AC/135/main/links/contacts.htm https://cage.dla.mil/
00 21 00 - 3
52.214-4 FALSE STATEMENTS IN BIDS (APR 1984)
Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments. The penalty for making false statements in bids is prescribed in 18 U.S.C. 1001.
52.214-5 SUBMISSION OF BIDS (MAR 1997)
(a) Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation, and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.
(b) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a)(1) and (2) of this provision when delivered to the office specified in the solicitation.
(c) Telegraphic bids will not be considered unless authorized by the solicitation; however, bids may be modified or withdrawn by written or telegraphic notice.
(d) Facsimile bids, modifications, or withdrawals, will not be considered unless authorized by the solicitation.
(e) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.
52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)
Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.
52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV 1999)
(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.
(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and--
(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or
(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.
00 21 00 - 4
(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.
52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984)
(a) Bids must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a bid must initial each erasure or change appearing on any bid form.
(b) The bid form may require bidders to submit bid prices for one or more items on various bases, including--
(1) Lump sum bidding;
(2) Alternate prices;
(3) Units of construction; or
(4) Any combination of subparagraphs (1) through (3) above.
(c) If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted.
(d) Alternate bids will not be considered unless this solicitation authorizes their submission.
52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)
(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.
(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.
(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.
(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items.
A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly
00 21 00 - 5 overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm fixed price contract resulting from this solicitation.
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
52.219-2 EQUAL LOW BIDS. (OCT 1995)
(a) This provision applies to small business concerns only.
(b) The bidder's status as a labor surplus area (LSA) concern may affect entitlement to award in case of tie bids. If the bidder wishes to be considered for this priority, the bidder must identify, in the following space, the LSA in which the costs to be incurred on account of manufacturing or production (by the bidder or the first-tier subcontractors) amount to more than 50 percent of the contract price.
(c) Failure to identify the labor surplus area as specified in paragraph (b) of this provision will preclude the bidder from receiving priority consideration. If the bidder is awarded a contract as a result of receiving priority consideration under this provision and would not have otherwise received award, the bidder shall perform the contract or cause the contract to be performed in accordance with the obligations of an LSA concern.
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
00 21 00 - 6
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
17.0% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S.
Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Ocean County, NJ (non-SMSA County).
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER TRADE
AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of
00 21 00 - 7 this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers.
The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.232-38 SUBMISSION OF ELECTRONIC FUNDS TRANSFER INFORMATION WITH OFFER (JULY 2013)
The offeror shall provide, with its offer, the following information that is required to make payment by electronic funds transfer (EFT) under any contract that results from this solicitation. This submission satisfies the requirement to provide EFT information under paragraphs (b)(1) and (j) of the clause at 52.232-34, Payment by Electronic Funds Transfer--Other than System for Award Management.
(1) The solicitation number (or other procurement identification number).
(2) The offeror's name and remittance address, as stated in the offer.
(3) The signature (manual or electronic, as appropriate), title, and telephone number of the offeror's official authorized to provide this information.
(4) The name, address, and 9-digit Routing Transit Number of the offeror's financial agent.
(5) The offeror's account number and the type of account (checking, savings, or lockbox).
(6) If applicable, the Fedwire Transfer System telegraphic abbreviation of the offeror's financial agent.
00 21 00 - 8
(7) If applicable, the offeror shall also provide the name, address, telegraphic abbreviation, and 9-digit Routing Transit Number of the correspondent financial institution receiving the wire transfer payment if the offeror's financial agent is not directly on-line to the Fedwire and, therefore, not the receiver of the wire transfer payment.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Mr. Gregory C. Keaton, Contracting Officer Philadelphia District Corps of Engineers Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
252.219-7000 ADVANCING SMALL BUSINESS GROWTH (MAY 2015)
(a) This provision implements 10 U.S.C. 2419.
(b) The Offeror acknowledges by submission of its offer that by acceptance of the contract resulting from this solicitation, the Offeror may exceed the applicable small business size standard of the North American Industry Classification System (NAICS) code assigned to the contract and would no longer qualify as a small business concern for that NAICS code. (Small business size standards matched to industry NAICS codes are published by the Small Business Administration and are available at http://www.sba.gov/content/table-small-business-size-standards.) The Offeror is therefore encouraged to develop the capabilities and characteristics typically desired in contractors that are competitive as other-than-small contractors in this industry.
(c) For procurement technical assistance, the Offeror may contact the nearest Procurement Technical Assistance Center (PTAC).
PTAC locations are available at www.dla.mil/SmallBusiness/Pages/ptac.aspx.
252.236-7008 CONTRACT PRICES - BIDDING SCHEDULES. (DEC 1991)
(a) The Government's payment for the items listed in the Bidding Schedule shall constitute full compensation to the Contractor for --
(1) Furnishing all plant, labor, equipment, appliances, and materials; and
(2) Performing all operations required to complete the work in conformity with the drawings and specifications.
(b) The Contractor shall include in the prices for the items listed in the Bidding Schedule all costs for work in the specifications, whether or not specifically listed in the Bidding Schedule.
http://www.sba.gov/content/table-small-business-size-standards http://www.sba.gov/content/table-small-business-size-standards http://www.dla.mil/SmallBusiness/Pages/ptac.aspx
00 21 00 - 9
52.214-5000 APPARENT CLERICAL MISTAKES (MAR 1995)--EFARS
(a) For the purpose of initial evaluations of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the government will proceed on the assumption that the bidder intends his bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
(End of statement)
Section 00 45 00 Representations & Certifications
52.203-2 Certificate Of Independent Price Determination APR 1985 52.203-11 Certification…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .