About this file

RFI's

View the file

Other files

File Type Posted
09B0029-Amend0007-Dwgs.pdf PDF
09B0029-Amend0007-Specs.pdf PDF
09B0029-Amend0006-Dwgs.pdf PDF
09B0029-Amend0006-Specs.pdf PDF
09B0029-Amend0005-Specs.pdf PDF
09B0029-Amend0005-Dwgs.pdf PDF
09B0029-Specs-Amend0004.pdf PDF
09B0029-Amend0003-Specs.pdf PDF
09B0029-Amend0002-Specs.pdf PDF
21AUG2009 Amendment2.pdf PDF
Amendment0001.pdf PDF
100-PrompII-Dwgs-12AUG2009.pdf PDF
100-PrompII-Specs-Vol-II.pdf PDF
100-PrompII-Specs-Vol-I.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FORMAT FOR SUBMITTING REQUESTS FOR INFORMATION
RFP W912BU-09-R-0019
CONSOLIDATED NORTH BUILDING, C4ISR PHASE II, APG, MD
Sample Questions
Spec Sect/
RFI#DisciplineDrawingDescription
1Mechanical15 22 00Para. 2.5.1 specifies 4-inch pipe, however Dwg P2.01 shows
piping is 8-inch in size.<--Note: Entire comment on one row please.
2ArchitecturalA5.1.2Unable to locate the specifications for the Grab Bars shown in the Toilet rooms.

File details come from the government source that posted it. Updated .