A.02. Performance Work Statement - MapsFinal-CC.pdf

PDF 1 MB Posted

Attached to
TRI-LAKES PROJECT WEED CONTROL
Solicitation number
W9128F26QA022
Issued by

About this file

This document is a spray overview map and work specification for the Cherry Creek Project vegetation control contract. The total workload encompasses approximately 252.7 acres divided into two primary work areas: the Dam Embankment (0002AA) covering 176.7 acres and the Spillway (0002AB) covering 76 acres. The Dam Embankment work requires total vegetation control of stockpiles, all rock/rip-rap, and service roads, along with noxious weed treatment in all grass areas. Specific application requirements include spraying a 30-foot buffer from the toe of rip-rap, a 15-foot buffer from the edge of service roads, and all areas within the base of spoil berm slopes and top of slope shoulders.

The Spillway work area requires treatment of noxious weeds and all woody vegetation with stump re-growth and woody species treatment, excluding willows which may be left standing. Two critical special notes apply to the Dam Embankment: a 3-week notice is required prior to closing Dam Road, and the recreation trail on the upstream side of the dam must not be sprayed. The work area includes defined boundaries marked by I-225, road gates and fences, chain-link fencing, wire fencing at the toe of the dam embankment, and proximity to Chatfield State Park Campground, Parker Road, Hampden Avenue, and Chambers Road.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHERRY CREEK PROJECT

SPRAY OVERVIEW MAP

Total Workload = Approximately 252.7 ac.

0002AA

Dam Embankment

176.7 ac.

0002AB

Spillway

76 ac.

0002AA - Cherry Creek

DAM EMBANKMENT

Approximately 176.7 AC.

Total vegetation control: Stockpiles, all rock/ rip-rap, service roads

Noxious weeds: all grass areas

SPECIAL NOTES: 1. 3 Week Notice Required prior to closing Dam Road.

2. Do not spray recreation trail on upstream side of dam Stockpiles

I-225 Parker Rd.

Road gate & fence

Spray 30 ft. buffer from toe of rip-rap

Spray 15 ft. buffer from edge of service road

Chain-link fence

Wire fence at toe of dam embankment

Inside base of spoil berm slopes

Top of slope shoulder

Chatfield State Park Campground

Parker Road

I-225

Chambers Rd.

Hampden Ave.

0002AB - Cherry Creek

SPILLWAY

Approximately 76 acres

Treatment: Noxious weeds, all woody vegetation - Treat all trees (except willows may be left) stump re-growth and woody species.

Fenceline

File details come from the government source that posted it. Updated .