About this file

This document is a Record of Attendance and Site Visit documentation for the Gavins Point Intake Crane Replacement federal contract opportunity (Solicitation W9128F25RA040). The site visit occurred on 17 June 2025 at Gavins Point Dam, with 24 participants from various organizations including USACE, Barnhart, OCCI Inc., Uni Systems Engineering, and other crane and engineering firms. The site visit included a detailed walkthrough of the facility, examining the current 80-ton intake gantry crane, MCC feeder breaker, bridge, laydown areas, and upper levels, with participants both in-person and on phone.

Key technical discussions during the site visit focused on specific crane replacement requirements, including clearance concerns for the gantry and structural elements, potential hazards like upstream wheel fall risks, electrical load requirements, and the need to address issues with the current crane system such as wheel slippage and inability to effectively handle trash racks. Common walkthrough questions raised included inquiries about MCC feeder breaker upgrades, ZM mitigation project piping, lifting beam drawings, external lock requirements, camera replacements, bridge weight limits, and feed rail specifications. The project aims to replace the existing crane with a new 80-ton intake gantry crane that meets current operational and safety standards, with a projected 920-calendar day completion timeline.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RECORD OF ATTENDANCE

Pre-Bid Site Visit

Solicitation W9128F25RA040 Gavins Point Intake Crane Replacement

Gavins Point Dam 17 June 2025

NAME (PLEASE PRINT) ORGANIZATION PHONE

1 Mike Nuss USACE – Gavins Point

Email Address:

2 Emily Anderson USACE- Gavins Point

Email Address:

3 Andy Kilgore USACE- Gavins Point

Email Address:

4 Mark Grubel Barnhart 402-241-7315

Email Address: mgrubel@barnhartcrane.com

5 Kyle Deeken OCCI Inc. 573-645-9977

Email Address: kdeeken@occimofab.com

6 Nicolas Johnson Uni Systems Engineering 612-251-4109

Email Address: njohnson@uni-engineer.com

7 Dan Miller BCI 618-792-9767

Email Address: dmiller@bciconusa.com

8 Stephan Bedard Reelcoh 514-232-8550

Email Address: sbedard@reelcoh.com

9 Eric Johnson USACE-Gavins Point

Email Address:

10 Alois Warner Kelley Engineered Equip. 402-730-4043

Email Address: alois.warner@keellc.com

11 Dylan Friedrichsen Kelley Engineered Equip. 712-269-7433

Email Address: dylan.friedrichsen@keellc.com

12 Matt Turner WEMCO Inc. 509-999-9913

Email Address: matt@wemcoinc.com

13 Jeff Negrete Sievert Crane and Hoist 708-676-1095

Email Address: jeff.negrete@sievertelectric.com

14 Shelley Durette McMillen Inc. 208-484-0430

Email Address: durette@mcmillen.com

15 Enrique Chavez Jr. BCI Construction 314-437-5794

Email Address: echavez@bciconusa.com

16 John Palya Westmont Eng. 702-327-6183

Email Address: jp@westmontengineering.com

17 Bill Vyhlidal Barnhart 712-522-0029

Email Address: bvyhlidal@barnhartcrane.com

18 JD Wilson TCB Veteran 901-509-5141

Email Address: jdwilson@tcbveteran.com

19 John Ackley Alltech Engineering 651-249-9804

Email Address: jackley@alltechengineering.com

20 Michael Wagner Superior Crane Corp 262-370-7724

Email Address michaelw@superiorcranecorp.com

21 David Knight Knight Construction 509-995-7922

Email Address: dave@knightconst.com

22 Brenden Renninger LOENBRO 406-590-1372

Email Address: brenninger@loebro.com

23 Richard Meyer LOENBRO 402-802-4618

Email Address: rmeyer@loenbro.com

24 Orland Maldonado USACE- Gavins Point

Email Address:

Email Address:

Email Address:

Email Address:

Email Address:

Email Address:

Email Address:

Email Address

Gavins Point Intake Crane Replacement Site Survey

6/17/25 10:00 Gavins Point Conference Room

Participants:

On phone- Jonathon Hansel (PMC), Katie Shook (CDM), Spencer Heinz (HDC), Samuel Bettrello (HDC), and Tygh Mcgilvery (HDC)

In person- Bill Vyhlidal (Barnhart), Mark Grubel (Barnhart), Kyle Deeken (OCCI Inc.), JD Wilson (TCB Veteran), John Ackley (Alltech Engineering), Mike Wagner (Alltech Engineering), David Knight (Knight Construction), Enrique Chavez Jr. (BCI Construction), Dan Miller (BCI Construction), John Palya (Westmont Engineering), Nicolas Johnson (Uni Systems Engineering), Stephan Bedard (Reelcoh), Alois Warner (Kelly Engineered Equipment), Dylan Friedrichsen (Kelly Engineered Equipment), Matt Turner (WEMCO Inc.), JeƯ Negrete (Sievert Crane and Hoist), Shelly Durette (McMillen), Orland Maldonado (GP), Mike Nuss (GP), Emily Anderson (GP), Andy Kilgore (GP), and Eric Johnson (GP)

Meeting Minutes:

Introduction of participants on the phone and GP employees GP- Do not make any assumptions during the walkthrough or on the package and submit any bid questions via Projnet. Amendments will be made if needed.

HDC

o Be aware of clearance concerns to include the Gantry and structural o Ensure contractors can inspect upper levels of the crane, site, and laydown areas o The Jib Hoist configuration will not be duplicated o For the auxiliary trolley, A4 or A2 are example arrangements but other options can be used o Current system cannot pick up the trash racks due to wheel slippage and slamming against limits o Additional clearance will be needed for ZM mitigation system piping o Clearance and coverage need to be met or exceeded, 2” to 3” clearance for jib hoist o Potential hazards- Upstream wheels create a potential fall hazard and while the Gantry travels there is a noted popping sound o Electrical concerns- Unique heating load requirements GP- Measure and take pictures as needed. Ensure to submit any additional questions via oƯicial means HDC- Items to look at: articulate beams and look at locking mechanisms, trash rack guides, new gantry drive arrangement and clearance Introduction of contractors

6/17/25 10:30 Gavins Point Walkthrough

Participants:

Brenden Renainger (Loenbro) and Richard Meyer (Loenbro), in addition to the previously listed in person participants.

Walkthrough:

2nd floor- looked at the MCC with the current feeder breaker Bridge o Main and aux- lowered for view, raised and latched to a lifting beam to display latching and unlatching of the main o Gantry- moved north to show current clearances o Laydown Areas- shown hookups and allotted space o Staging Areas- shown hookups and allotted space o Lifting beams- latched and unlatched to the main o Control Cabin o Upper levels

Common Walkthrough Questions:

Will the MCC feeder breaker need to be upgraded to included wiring and conduit to support this project?

What size of piping is needed for the ZM mitigation project?

Can lifting beam drawings be included in the package?

Are external locks required on the Main?

Do cameras need to be replaced on the crane?

What is the road weight limit for the bridge?

Is the feed rail staying or need to be replaced?

Is it a 3 or 4 conductor feed rail?