The document is a Submittal Register (Am-0003) for the Intake Crane Replacement project at Gavins Point Dam in South Dakota. The 15-page register comprehensively details the extensive documentation and submittals required from the contractor throughout the project lifecycle, covering preconstruction submittals, shop drawings, product data, test reports, certificates, design data, and closeout submittals across multiple technical specification sections. Key submittal categories include construction right-of-way, care of water, project scheduling, safety and training documentation, quality control plans, environmental protection plans, crane operation and maintenance manuals, welding documentation, material certifications, electrical system documentation, and various technical design and test reports related to crane replacement, electrical systems, lifting devices, and other critical project components.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W9128F25RA0400005 SF 30.pdf | ||
| GP104_G-201XXX Sheet 1 (1).pdf | ||
| GP104_E-201XXX Sheet 1 (1).pdf | ||
| Solicitation Amendment W9128F25RA0400004 SF 30.pdf | ||
| Site Visit Documentation_SAM.pdf | ||
| 41 22 13.72 26 Am-0003.pdf | ||
| 01 35 26 Am-0003.pdf | ||
| Solicitation Amendment W9128F25RA0400003 SF 30.pdf | ||
| 41 22 13.71 26 Am-0003.pdf | ||
| Solicitation Amendment W9128F25RA0400002 SF 30.pdf | ||
| 41 22 13.74 26 Am-0001.pdf | ||
| Solicitation Amendment W9128F25RA0400001 SF 30.pdf | ||
| 41 22 13.73 26 Am-0001.pdf | ||
| W9128F25RA040 GP Intake Crane Replacement - Reference Drawings.pdf | ||
| W9128F25RA040 GP Intake Crane Replacement - Contract Drawings.pdf | ||
| W9128F25RA040 GP Intake Crane Replacement - Specs.pdf | ||
| Solicitation - W9128F25RA040.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 15 PAGES
Intake Crane Replacement - Gavins Point Dam, South Dakota
01 12 00 SD-01 Preconstruction Submittals
1.2Construction Right-of-Way
SD-02 Shop Drawings
1.4 G AOCare of Water
SD-11 Closeout Submittals
1.12Warranty of Construction
01 30 00.24 SD-01 Preconstruction Submittals
AT Level I Training Sign In
Sheets iWATCH and/or CorpsWatch
Training Sign In Sheets
OPSEC Training Sign In Sheets
E-Verify
1.21.1.4 G ROContractor Computer
Cybersecurity Compliance
Statements
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G AOProject Scheduler Qualifications
3.4.1 G AOPreliminary Project Schedule
3.4.2 G AOInitial Project Schedule
3.6.2 G AOPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 G AOSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.8 G AOAccident Prevention Plan (APP)
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Am-0003
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 15 PAGES
01 35 26 1.12.2 G AOAccident Reports
1.12.3LHE Inspection Reports
1.5 G AOMonthly Exposure Reports
SD-07 Certificates
1.9 G AOActivity Hazard Analysis (AHA)
1.12.4Certificate of Compliance
1.12.4 G AOStandard Lift Plan
1.8.3.1 G AOCritical Lift Plan
01 45 00 SD-01 Preconstruction Submittals
1.5.2 G AOContractor Quality Control (CQC)
Plan
SD-06 Test Reports
1.12.3Verification Statement
01 57 20.00 10 SD-01 Preconstruction Submittals
1.8 G AOEnvironmental Protection Plan
01 78 23.00 24 SD-01 Preconstruction Submittals
1.3 G HDCO&M Manual Execution Plan
SD-10 Operation and Maintenance
Data
1.4 G HDCDraft Crane Operation and
Maintenance Manual
1.4 G HDCFinal Crane Operation and
Maintenance Manual
01 78 39.00 24 SD-03 Product Data
1.7.2 G DO100 Percent Preliminary As-Built
Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 15 PAGES
01 78 39.00 24 SD-11 Closeout Submittals
1.7.3 G DOFinal As-Built Drawings
02 41 16.00 26 SD-01 Preconstruction Submittals
1.9 G HDCRemoval Plan
1.5 GOn-Site Work Notification
3.1.4Copies of Notifications
02 83 00 SD-01 Preconstruction Submittals
G AOCompetent Person
1.5.2.7 G AOLead Waste Management Plan
1.5.2.2 G AOLead Compliance Plan
SD-03 Product Data
1.6.1 G AORespirators
2.1 G AOMaterials and Equipment
2.1.1 G AOExpendable Supplies
G AOLocal Exhaust Equipment
SD-06 Test Reports
G AOSampling Results
1.5.1.2 G AOTesting Laboratory
SD-11 Closeout Submittals
3.5.2.1 G AOHazardous Waste Manifest
3.5.2.1 G AOTurn-In Documents or Weight
Tickets
03 60 00.01 26 SD-01 Preconstruction Submittals
3.4.1 G HDCConcrete Removal and Disposal
Plan
3.4.3 G HDCSaw Cutting Procedure
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 15 PAGES
03 60 00.01 26 3.4.4 G HDCCore Drilling Procedure
3.4.8 G HDCConcrete Imaging Report
3.4.12 G HDCRepair Procedure of Concrete
Surfaces
G HDCFirestopping Materials
GInstallation Procedure for
Pre-cast Ceramic Tile
05 05 23.17 26 SD-01 Preconstruction Submittals
1.4.1 G EC Fabricator's Welding Quality
Control Plan
1.4.1.2 G EC Witness Points
1.4.2 G EC Welding Procedure Specifications
(WPS)
1.4.2 G EC Procedure Qualification Records
(PQR)
1.4.3 G EC Welder Performance Qualification
Records (WPQR)
SD-03 Product Data
3.5.1 G EC Nonconformance Reports
1.4.2.2 G EC Pre-Qualified Welding
Procedures
2.2 G EC Welding Electrodes and Rods
2.2 G EC Shielding Gas
SD-06 Test Reports
3.5.1 G EC Test and Inspection Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 15 PAGES
05 05 23.17 26 1.4.1.1 G EC NDT Equipment Calibration
Records
SD-07 Certificates
1.4.4 G EC Inspector Qualifications
05 50 04.00 26 SD-03 Product Data
2.2.2 G HDCProduct Data
SD-06 Test Reports
2.2.1 G HDCMaterials List
2.2.1 G HDCMaterial Test Reports
09 97 02.10 26 SD-01 Preconstruction Submittals
1.2 G ECSafety, Health, and
Environmental Requirements
SD-03 Product Data
Part 2 G HDCManufacturer's Product Data
Sheet
SD-04 Samples
Part 2 G HDCProduct Samples
Part 2 G HDCColor Samples
SD-06 Test Reports
3.4 G HDCInspection Reports
Part 2 G HDCCERL Test Reports
SD-07 Certificates
1.4.4 G HDCCoating Thickness Gage
Qualification
1.4.3 G HDCQualified Paint Applicator
1.4.1 G HDCQuality Control Personnel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 15 PAGES
09 97 02.10 26 1.4.2 G HDCQualified Painting Contractor
13 48 00.00 26 SD-02 Shop Drawings
1.5 G HDCDetail Drawings
SD-03 Product Data
3.4 G HDCConcrete Anchors
3.1 G HDCSeismic Sway Bracing
SD-05 Design Data
1.5 G HDCStructural Design Calculations for
Seismic Restraints
SD-06 Test Reports
3.6.2.1 G HDCConcrete Anchor Test Reports
3.6.1 G HDCContractor Qualification Testing
41 22 13.70 26 SD-05 Design Data
1.5.1Design Package Submittal List and Schedule
1.5.8Design Package Submittal List and Schedule
HDC
1.6.3 G HDCInterim Design Submittal
1.6.3 G HDCInterim Design Submittal
1.6.4 G HDCPreliminary Electrical Design
Submission
1.7 G HDCDRAFT FINAL APPROVED
VERSIONS OF CONTRACTOR
PREPARED DRAWINGS AND
CALCULATIONS
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 15 PAGES
41 22 13.70 26 SD-07 Certificates
1.4.3 G HDCRegistered Professional Electrical
Engineer
1.4.1 G HDCRegistered Professional
Mechanical Engineer
1.4.2 G HDCRegistered Professional
Structural Engineer
SD-11 Closeout Submittals
1.8 G HDCFINAL APPROVED VERSIONS
OF CONTRACTOR PREPARED
DRAWINGS AND
CALCULATIONS
41 22 13.71 26 SD-01 Preconstruction Submittals
3.7.5 G HDCTest Weight Plan
3.2.1 G HDCShop Inspection And Testing
Procedure
3.2.4 G HDCShop Inspection And Testing
Procedure
G HDCFinal Inspection and Acceptance
Test Procedure
SD-03 Product Data
G HDCSpare Parts And Special Tools
G HDCSoftware, Licenses, And Cables
SD-06 Test Reports
3.3 G HDCFitment and Alignment Survey
3.5 G HDCCrane Weight
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 15 PAGES
41 22 13.71 26 G HDCShop Inspection Report
G HDCPre-Final Inspection and
Preliminary No-Load Performance
Test Report
G HDCFinal Inspection and Acceptance
Test Report
3.16 G HDCOil Test Results (After Load
Testing)
SD-07 Certificates
G ECNon-Contaminated Equipment
Certifications
1.5.1 G HDCCrane Inspectors and Craftsmen
and Operators
SD-08 Manufacturer’s Instructions
G OPSGeneral Operation and
Maintenance Training Agenda
G OPSSolid State Maintenance Training
Agenda
SD-10 Operation and Maintenance
Data
1.6 G OPSOperating Manual For the Cab
SD-11 Closeout Submittals
3.17.2 G OPSTraining Manuals
3.15 G HDCAs-Commissioned VFD
Parameters
41 22 13.72 26 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 15 PAGES
41 22 13.72 26 2.23.4 G HDCGrease Lubrication Shop
Drawings
SD-03 Product Data
2.20.2 G HDCDrum Dimensions
2.12.4 G HDCGear Dimension, Quality, and
Hardness Verification Reports
2.1.2 G HDCContractor's Nameplate
G HDCSpare Parts
SD-05 Design Data
G HDCDesign Package Submittals
1.6 G HDCCrane Design Data
G HDCBolt Tension Chart
2.20.2 G HDCDrum Groove Measuring
Procedure
2.11 G HDCGantry Parking Tie-Downs
G HDCClearance/Coverage Diagram
2.23.3 G HDCSpeed Reducer Oil Filter Micron
Rating
SD-06 Test Reports
3.7.2 G HDCHoist Brake Torque Test Report
2.7.3 G HDCGantry Wheel Hardness Test
Report
2.8.2 G HDCTrolley Wheel Hardness Test
Report
2.9.2 G HDCTrolley Wheel Hardness Test
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 15 PAGES
41 22 13.72 26 2.23.1 G HDCOil Test Results (new oil delivery)
3.8 G HDCOil Test Results (12 month
service)
2.22 G HDCWire Rope Magnetic Flux
Leakage Tests (Pre-Load Test)
2.22 G HDCWire Rope Magnetic Flux
Leakage Tests (Post-Load Test)
SD-07 Certificates
G HDCRegistered Professional
Structural Engineer
2.22 G HDCWire Rope Certificates
1.9 G HDCManufacturer's Representative
G HDCRegistered Professional
Mechanical Engineer
SD-08 Manufacturer’s Instructions
3.7.1 G HDCHoist Brake Alignment And
Run-In Procedure
SD-09 Manufacturer’s Field
Reports
G HDCCrane Weight
3.6 G HDCBalance Quality Report
1.8 G HDCField Measurements
2.12.4 G HDCGear Dimension, Quality, and
Hardness Verification Procedure
3.5 G HDCShaft Alignment Report
3.6 G HDCDynamic Balancing Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 15 PAGES
41 22 13.72 26 3.3.2 G HDCAs-Delivered Inspection Report
SD-11 Closeout Submittals
1.7.2 G HDCFinal Calculations
1.7.1 G HDCFinal Approved Versions Of
Contractor Prepared Drawings
41 22 13.73 26 SD-03 Product Data
2.5.1 G HDCMaintenance Hoist Product Data
SD-05 Design Data
1.4 G HDCDesign Data For Crane
Appurtenances
2.5.1 G HDCMaintenance Hoist Design Data
SD-07 Certificates
2.5.1 G HDCMaintenance Hoist Load-Test
Certification
41 22 13.74 26 SD-01 Preconstruction Submittals
3.3.4 G HDCControl System Factory Test Plan
SD-02 Shop Drawings
1.5.1 G HDCElectrical Drawing Index
1.5.2 G HDCBill of Electrical Materials
1.5.3 G HDCMain One-Line Drawing
1.5.4 G HDCSchematic Drawings
1.5.5 G HDCElectrical Interconnecting
Diagrams
1.5.6 G HDCElectrical Installation Drawings
1.5.7 G HDCCable and Conduit Schedule
1.5.8 G HDCCable Carrier Systems Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 15 PAGES
41 22 13.74 26 SD-03 Product Data
2.1.3 G HDCCable Carrier System
2.2.3 G HDCMain Line Disconnect
2.2.2 G HDCManual Disconnect Switch
2.3 G HDCControl Systems and Equipment
2.1.2 G HDCConductor and Collector System
2.3.4 G HDCVariable Frequency Drives
(VFDs)
2.3.4.5Elapsed Time Meter
2.3.5 G HDCLimit Switches
2.4.3 G HDCOperator Chair
2.4.4 G HDCOperator Console
2.4.5 G HDCPushbuttons and Selector
Switches
2.4.5Indicating Lights
2.4.5 G HDCMaster Switches
2.4.6 G HDCRemote (Radio) Control System
2.5.1 G HDCLoad Cells and Indication
2.5.3Warning Signals
2.6.1 G HDCMotors
2.7.1 G HDCHolding Brakes
2.10Power, Heating, Lighting and
Convenience Outlet Systems
2.11Conduit and Wireways
2.12 G HDCInsulated Wire and Cable
2.13Terminal Blocks
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 15 PAGES
41 22 13.74 26 2.14 G HDCCabinets and Enclosures
2.15 G HDCPosition Indication
2.10.2 G HDCPanelboards
2.10.3 G HDCMolded Case Circuit Breakers
2.3.4.3 G HDCLine And Load Reactors
2.2.4 G HDCUtility Disconnect
2.5.5 G HDCElectric Heat Pump Units
G HDCIntercom
2.5.2 G HDCWind Speed Monitor
2.5.2 G HDCWind Speed Monitor
2.8 G HDCGantry Storm Brakes
2.5.6 G HDCInfrared Heaters
SD-05 Design Data
1.5.11 G HDCElectrical Calculations
3.2Arc Flash Analysis Information
2.5.4Heating Capacity and Airflow
Calculation
2.3.4.4 G HDCDynamic Braking
SD-06 Test Reports
3.3.2Motor Test Reports
3.3.3Brake Test Reports
3.3.4Control System Factory Test
Results
3.3.5Field Wiring Test Reports
2.4.5.2Operator Cab Wiring Testing
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 15 PAGES
41 22 13.74 26 2.7.4Brake Torque Rating
3.3.3Brake Torque Rating
3.3.3 G HDCFactory Adjusted Torque Rating
Of Holding Brakes
SD-10 Operation and Maintenance
Data
1.5.9 G HDCFinal Approved Versions Of
Contractor Prepared Drawings
41 22 13.75 26 SD-01 Preconstruction Submittals
3.2 G HDCField Measurements and Lifting
Device Pre-Test
2.1.3 G HDCWorking Load Limit Markings
3.4.1 G HDCLifting Device Shop Test
Procedure
3.5 G HDCLifting Device Onsite Test
Procedure
SD-02 Shop Drawings
2.1.1 G HDCNameplate for Lifting Device
2.1.2 G HDCSafety Label for Lifting Device
1.5.2.2 G HDCDetailed Shop Drawings
1.5.1 G HDCBill Of Materials and Schedule of
Equipment
1.5.2.1 G HDCDimensioned Design and
Assembly Drawings
SD-03 Product Data
1.5.3 G HDCProduct Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 15 PAGES
41 22 13.75 26 2.5 G HDCLifting Device Sheave Material
Certification
2.7.2 G HDCHook Material Certification
2.4 G HDCPin Material Certification
2.8Jib Log Grapple
SD-05 Design Data
1.5.4 G HDCPreliminary Design Calculations
1.5.5 G HDCDesign Calculations
SD-06 Test Reports
3.2 G HDCExisting Lifting Device Weight
Report
3.4.3 G HDCNew Lifting Device Weight Report
1.5.6 G HDCLifting Beam Hooks NDE Report
3.4.1 G HDCLifting Device Shop Test Report
3.5 G HDCLifting Device Onsite Test Report
1.5.7 G HDCLog Grapple Tines NDE Report
SD-07 Certificates
1.5 G HDCRegistered Professional
Mechanical Engineer
SD-11 Closeout Submittals
1.6.1 G HDCFinal Approved Versions of
Contractor-Prepared Drawings
1.6.2 G HDCFinal Calculations
3.7 G HDCLIFTING DEVICE O&M MANUAL
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS