REGISTER Am-0003.pdf

PDF 681 KB Posted

Attached to
Gavins Point Intake Crane Replacement Federal contract opportunity
Solicitation number
W9128F25RA040
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

The document is a Submittal Register (Am-0003) for the Intake Crane Replacement project at Gavins Point Dam in South Dakota. The 15-page register comprehensively details the extensive documentation and submittals required from the contractor throughout the project lifecycle, covering preconstruction submittals, shop drawings, product data, test reports, certificates, design data, and closeout submittals across multiple technical specification sections. Key submittal categories include construction right-of-way, care of water, project scheduling, safety and training documentation, quality control plans, environmental protection plans, crane operation and maintenance manuals, welding documentation, material certifications, electrical system documentation, and various technical design and test reports related to crane replacement, electrical systems, lifting devices, and other critical project components.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 15 PAGES

Intake Crane Replacement - Gavins Point Dam, South Dakota

01 12 00 SD-01 Preconstruction Submittals

1.2Construction Right-of-Way

SD-02 Shop Drawings

1.4 G AOCare of Water

SD-11 Closeout Submittals

1.12Warranty of Construction

01 30 00.24 SD-01 Preconstruction Submittals

AT Level I Training Sign In

Sheets iWATCH and/or CorpsWatch

Training Sign In Sheets

OPSEC Training Sign In Sheets

E-Verify

1.21.1.4 G ROContractor Computer

Cybersecurity Compliance

Statements

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G AOProject Scheduler Qualifications

3.4.1 G AOPreliminary Project Schedule

3.4.2 G AOInitial Project Schedule

3.6.2 G AOPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 G AOSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.8 G AOAccident Prevention Plan (APP)

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Am-0003

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 15 PAGES

01 35 26 1.12.2 G AOAccident Reports

1.12.3LHE Inspection Reports

1.5 G AOMonthly Exposure Reports

SD-07 Certificates

1.9 G AOActivity Hazard Analysis (AHA)

1.12.4Certificate of Compliance

1.12.4 G AOStandard Lift Plan

1.8.3.1 G AOCritical Lift Plan

01 45 00 SD-01 Preconstruction Submittals

1.5.2 G AOContractor Quality Control (CQC)

Plan

SD-06 Test Reports

1.12.3Verification Statement

01 57 20.00 10 SD-01 Preconstruction Submittals

1.8 G AOEnvironmental Protection Plan

01 78 23.00 24 SD-01 Preconstruction Submittals

1.3 G HDCO&M Manual Execution Plan

SD-10 Operation and Maintenance

Data

1.4 G HDCDraft Crane Operation and

Maintenance Manual

1.4 G HDCFinal Crane Operation and

Maintenance Manual

01 78 39.00 24 SD-03 Product Data

1.7.2 G DO100 Percent Preliminary As-Built

Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 15 PAGES

01 78 39.00 24 SD-11 Closeout Submittals

1.7.3 G DOFinal As-Built Drawings

02 41 16.00 26 SD-01 Preconstruction Submittals

1.9 G HDCRemoval Plan

1.5 GOn-Site Work Notification

3.1.4Copies of Notifications

02 83 00 SD-01 Preconstruction Submittals

G AOCompetent Person

1.5.2.7 G AOLead Waste Management Plan

1.5.2.2 G AOLead Compliance Plan

SD-03 Product Data

1.6.1 G AORespirators

2.1 G AOMaterials and Equipment

2.1.1 G AOExpendable Supplies

G AOLocal Exhaust Equipment

SD-06 Test Reports

G AOSampling Results

1.5.1.2 G AOTesting Laboratory

SD-11 Closeout Submittals

3.5.2.1 G AOHazardous Waste Manifest

3.5.2.1 G AOTurn-In Documents or Weight

Tickets

03 60 00.01 26 SD-01 Preconstruction Submittals

3.4.1 G HDCConcrete Removal and Disposal

Plan

3.4.3 G HDCSaw Cutting Procedure

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 15 PAGES

03 60 00.01 26 3.4.4 G HDCCore Drilling Procedure

3.4.8 G HDCConcrete Imaging Report

3.4.12 G HDCRepair Procedure of Concrete

Surfaces

G HDCFirestopping Materials

GInstallation Procedure for

Pre-cast Ceramic Tile

05 05 23.17 26 SD-01 Preconstruction Submittals

1.4.1 G EC Fabricator's Welding Quality

Control Plan

1.4.1.2 G EC Witness Points

1.4.2 G EC Welding Procedure Specifications

(WPS)

1.4.2 G EC Procedure Qualification Records

(PQR)

1.4.3 G EC Welder Performance Qualification

Records (WPQR)

SD-03 Product Data

3.5.1 G EC Nonconformance Reports

1.4.2.2 G EC Pre-Qualified Welding

Procedures

2.2 G EC Welding Electrodes and Rods

2.2 G EC Shielding Gas

SD-06 Test Reports

3.5.1 G EC Test and Inspection Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 15 PAGES

05 05 23.17 26 1.4.1.1 G EC NDT Equipment Calibration

Records

SD-07 Certificates

1.4.4 G EC Inspector Qualifications

05 50 04.00 26 SD-03 Product Data

2.2.2 G HDCProduct Data

SD-06 Test Reports

2.2.1 G HDCMaterials List

2.2.1 G HDCMaterial Test Reports

09 97 02.10 26 SD-01 Preconstruction Submittals

1.2 G ECSafety, Health, and

Environmental Requirements

SD-03 Product Data

Part 2 G HDCManufacturer's Product Data

Sheet

SD-04 Samples

Part 2 G HDCProduct Samples

Part 2 G HDCColor Samples

SD-06 Test Reports

3.4 G HDCInspection Reports

Part 2 G HDCCERL Test Reports

SD-07 Certificates

1.4.4 G HDCCoating Thickness Gage

Qualification

1.4.3 G HDCQualified Paint Applicator

1.4.1 G HDCQuality Control Personnel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 15 PAGES

09 97 02.10 26 1.4.2 G HDCQualified Painting Contractor

13 48 00.00 26 SD-02 Shop Drawings

1.5 G HDCDetail Drawings

SD-03 Product Data

3.4 G HDCConcrete Anchors

3.1 G HDCSeismic Sway Bracing

SD-05 Design Data

1.5 G HDCStructural Design Calculations for

Seismic Restraints

SD-06 Test Reports

3.6.2.1 G HDCConcrete Anchor Test Reports

3.6.1 G HDCContractor Qualification Testing

41 22 13.70 26 SD-05 Design Data

1.5.1Design Package Submittal List and Schedule

1.5.8Design Package Submittal List and Schedule

HDC

1.6.3 G HDCInterim Design Submittal

1.6.3 G HDCInterim Design Submittal

1.6.4 G HDCPreliminary Electrical Design

Submission

1.7 G HDCDRAFT FINAL APPROVED

VERSIONS OF CONTRACTOR

PREPARED DRAWINGS AND

CALCULATIONS

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 15 PAGES

41 22 13.70 26 SD-07 Certificates

1.4.3 G HDCRegistered Professional Electrical

Engineer

1.4.1 G HDCRegistered Professional

Mechanical Engineer

1.4.2 G HDCRegistered Professional

Structural Engineer

SD-11 Closeout Submittals

1.8 G HDCFINAL APPROVED VERSIONS

OF CONTRACTOR PREPARED

DRAWINGS AND

CALCULATIONS

41 22 13.71 26 SD-01 Preconstruction Submittals

3.7.5 G HDCTest Weight Plan

3.2.1 G HDCShop Inspection And Testing

Procedure

3.2.4 G HDCShop Inspection And Testing

Procedure

G HDCFinal Inspection and Acceptance

Test Procedure

SD-03 Product Data

G HDCSpare Parts And Special Tools

G HDCSoftware, Licenses, And Cables

SD-06 Test Reports

3.3 G HDCFitment and Alignment Survey

3.5 G HDCCrane Weight

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 15 PAGES

41 22 13.71 26 G HDCShop Inspection Report

G HDCPre-Final Inspection and

Preliminary No-Load Performance

Test Report

G HDCFinal Inspection and Acceptance

Test Report

3.16 G HDCOil Test Results (After Load

Testing)

SD-07 Certificates

G ECNon-Contaminated Equipment

Certifications

1.5.1 G HDCCrane Inspectors and Craftsmen

and Operators

SD-08 Manufacturer’s Instructions

G OPSGeneral Operation and

Maintenance Training Agenda

G OPSSolid State Maintenance Training

Agenda

SD-10 Operation and Maintenance

Data

1.6 G OPSOperating Manual For the Cab

SD-11 Closeout Submittals

3.17.2 G OPSTraining Manuals

3.15 G HDCAs-Commissioned VFD

Parameters

41 22 13.72 26 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 15 PAGES

41 22 13.72 26 2.23.4 G HDCGrease Lubrication Shop

Drawings

SD-03 Product Data

2.20.2 G HDCDrum Dimensions

2.12.4 G HDCGear Dimension, Quality, and

Hardness Verification Reports

2.1.2 G HDCContractor's Nameplate

G HDCSpare Parts

SD-05 Design Data

G HDCDesign Package Submittals

1.6 G HDCCrane Design Data

G HDCBolt Tension Chart

2.20.2 G HDCDrum Groove Measuring

Procedure

2.11 G HDCGantry Parking Tie-Downs

G HDCClearance/Coverage Diagram

2.23.3 G HDCSpeed Reducer Oil Filter Micron

Rating

SD-06 Test Reports

3.7.2 G HDCHoist Brake Torque Test Report

2.7.3 G HDCGantry Wheel Hardness Test

Report

2.8.2 G HDCTrolley Wheel Hardness Test

Report

2.9.2 G HDCTrolley Wheel Hardness Test

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 15 PAGES

41 22 13.72 26 2.23.1 G HDCOil Test Results (new oil delivery)

3.8 G HDCOil Test Results (12 month

service)

2.22 G HDCWire Rope Magnetic Flux

Leakage Tests (Pre-Load Test)

2.22 G HDCWire Rope Magnetic Flux

Leakage Tests (Post-Load Test)

SD-07 Certificates

G HDCRegistered Professional

Structural Engineer

2.22 G HDCWire Rope Certificates

1.9 G HDCManufacturer's Representative

G HDCRegistered Professional

Mechanical Engineer

SD-08 Manufacturer’s Instructions

3.7.1 G HDCHoist Brake Alignment And

Run-In Procedure

SD-09 Manufacturer’s Field

Reports

G HDCCrane Weight

3.6 G HDCBalance Quality Report

1.8 G HDCField Measurements

2.12.4 G HDCGear Dimension, Quality, and

Hardness Verification Procedure

3.5 G HDCShaft Alignment Report

3.6 G HDCDynamic Balancing Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 15 PAGES

41 22 13.72 26 3.3.2 G HDCAs-Delivered Inspection Report

SD-11 Closeout Submittals

1.7.2 G HDCFinal Calculations

1.7.1 G HDCFinal Approved Versions Of

Contractor Prepared Drawings

41 22 13.73 26 SD-03 Product Data

2.5.1 G HDCMaintenance Hoist Product Data

SD-05 Design Data

1.4 G HDCDesign Data For Crane

Appurtenances

2.5.1 G HDCMaintenance Hoist Design Data

SD-07 Certificates

2.5.1 G HDCMaintenance Hoist Load-Test

Certification

41 22 13.74 26 SD-01 Preconstruction Submittals

3.3.4 G HDCControl System Factory Test Plan

SD-02 Shop Drawings

1.5.1 G HDCElectrical Drawing Index

1.5.2 G HDCBill of Electrical Materials

1.5.3 G HDCMain One-Line Drawing

1.5.4 G HDCSchematic Drawings

1.5.5 G HDCElectrical Interconnecting

Diagrams

1.5.6 G HDCElectrical Installation Drawings

1.5.7 G HDCCable and Conduit Schedule

1.5.8 G HDCCable Carrier Systems Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 15 PAGES

41 22 13.74 26 SD-03 Product Data

2.1.3 G HDCCable Carrier System

2.2.3 G HDCMain Line Disconnect

2.2.2 G HDCManual Disconnect Switch

2.3 G HDCControl Systems and Equipment

2.1.2 G HDCConductor and Collector System

2.3.4 G HDCVariable Frequency Drives

(VFDs)

2.3.4.5Elapsed Time Meter

2.3.5 G HDCLimit Switches

2.4.3 G HDCOperator Chair

2.4.4 G HDCOperator Console

2.4.5 G HDCPushbuttons and Selector

Switches

2.4.5Indicating Lights

2.4.5 G HDCMaster Switches

2.4.6 G HDCRemote (Radio) Control System

2.5.1 G HDCLoad Cells and Indication

2.5.3Warning Signals

2.6.1 G HDCMotors

2.7.1 G HDCHolding Brakes

2.10Power, Heating, Lighting and

Convenience Outlet Systems

2.11Conduit and Wireways

2.12 G HDCInsulated Wire and Cable

2.13Terminal Blocks

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 15 PAGES

41 22 13.74 26 2.14 G HDCCabinets and Enclosures

2.15 G HDCPosition Indication

2.10.2 G HDCPanelboards

2.10.3 G HDCMolded Case Circuit Breakers

2.3.4.3 G HDCLine And Load Reactors

2.2.4 G HDCUtility Disconnect

2.5.5 G HDCElectric Heat Pump Units

G HDCIntercom

2.5.2 G HDCWind Speed Monitor

2.5.2 G HDCWind Speed Monitor

2.8 G HDCGantry Storm Brakes

2.5.6 G HDCInfrared Heaters

SD-05 Design Data

1.5.11 G HDCElectrical Calculations

3.2Arc Flash Analysis Information

2.5.4Heating Capacity and Airflow

Calculation

2.3.4.4 G HDCDynamic Braking

SD-06 Test Reports

3.3.2Motor Test Reports

3.3.3Brake Test Reports

3.3.4Control System Factory Test

Results

3.3.5Field Wiring Test Reports

2.4.5.2Operator Cab Wiring Testing

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 15 PAGES

41 22 13.74 26 2.7.4Brake Torque Rating

3.3.3Brake Torque Rating

3.3.3 G HDCFactory Adjusted Torque Rating

Of Holding Brakes

SD-10 Operation and Maintenance

Data

1.5.9 G HDCFinal Approved Versions Of

Contractor Prepared Drawings

41 22 13.75 26 SD-01 Preconstruction Submittals

3.2 G HDCField Measurements and Lifting

Device Pre-Test

2.1.3 G HDCWorking Load Limit Markings

3.4.1 G HDCLifting Device Shop Test

Procedure

3.5 G HDCLifting Device Onsite Test

Procedure

SD-02 Shop Drawings

2.1.1 G HDCNameplate for Lifting Device

2.1.2 G HDCSafety Label for Lifting Device

1.5.2.2 G HDCDetailed Shop Drawings

1.5.1 G HDCBill Of Materials and Schedule of

Equipment

1.5.2.1 G HDCDimensioned Design and

Assembly Drawings

SD-03 Product Data

1.5.3 G HDCProduct Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 15 PAGES

41 22 13.75 26 2.5 G HDCLifting Device Sheave Material

Certification

2.7.2 G HDCHook Material Certification

2.4 G HDCPin Material Certification

2.8Jib Log Grapple

SD-05 Design Data

1.5.4 G HDCPreliminary Design Calculations

1.5.5 G HDCDesign Calculations

SD-06 Test Reports

3.2 G HDCExisting Lifting Device Weight

Report

3.4.3 G HDCNew Lifting Device Weight Report

1.5.6 G HDCLifting Beam Hooks NDE Report

3.4.1 G HDCLifting Device Shop Test Report

3.5 G HDCLifting Device Onsite Test Report

1.5.7 G HDCLog Grapple Tines NDE Report

SD-07 Certificates

1.5 G HDCRegistered Professional

Mechanical Engineer

SD-11 Closeout Submittals

1.6.1 G HDCFinal Approved Versions of

Contractor-Prepared Drawings

1.6.2 G HDCFinal Calculations

3.7 G HDCLIFTING DEVICE O&M MANUAL

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

File details come from the government source that posted it. Updated .