This document contains a specification for SECTION 34 75 13.13 CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS for the ADAL South Entry Gate project at Minot AFB, North Dakota. The key details are:
The specification covers requirements for a crash-rated active vehicle barrier system, including retractable barriers, controls, detection, traffic signals/beacons, and other related components. It includes detailed requirements for the system features, operations, controls, power, and safety. Major components specified include the active vehicle barriers, programmable logic controller, traffic signals, warning beacons, vehicle presence/wrong-way detectors, and control panels. Submittal requirements are provided for shop drawings, product data, design data, test reports, certificates, and operation/maintenance data. The specification also covers installation, testing, training, and warranty requirements. Overall, this is a comprehensive technical specification for the crash-rated active vehicle barrier system to be provided as part of the ADAL South Entry Gate project at Minot AFB.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADAL South Gate ECF - Minot AFB, ND MIE3
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 78 39.00 24
AS-BUILT DRAWINGS
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Red-Line Drawings
1.1.2 As-Built Drawings
1.1.3 Black-Line Drawings
1.1.4 Full-Size Drawings
1.1.5 Modification Circle
1.1.6 Electronic CAD Files
1.2 REFERENCES
1.3 SUBMITTALS
1.4 GENERAL REQUIREMENTS
1.4.1 As-built Drawings
1.4.2 Red-Line Drawings
1.4.2.1 Electronic Red-Lines
1.5 PAYMENT
1.6 CONTRACTOR PERFORMANCE RATING
1.7 TRANSMITTAL OF AS-BUILT DRAWINGS
1.7.1 Optional As-built Drawings Sample
1.7.2 100 Percent Preliminary As-Built Drawings
1.7.3 Final As-Built Drawings
1.8 AS-BUILT DRAWINGS FORMAT REQUIREMENTS
1.8.1 General Formatting
1.8.2 Title Block
1.8.3 Modification Changes
1.8.4 Legends
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 GENERAL
3.2 SITE WORK
3.2.1 Utilities
3.2.2 Structures
3.2.3 Grades
3.3 STRUCTURAL
3.3.1 Steel/Concrete
3.4 MECHANICAL
3.4.1 Ductwork
3.4.2 Plumbing
3.5 ELECTRICAL
3.5.1 PANELS
3.5.2 Controls
3.6 CONTRACTOR SHOP DRAWINGS
ATTACHMENTS:
SECTION 01 78 39.00 24 Page 1Am #0003
Modifications and Title Block Examples
-- End of Section Table of Contents --
SECTION 01 78 39.00 24 Page 2Am #0003
SECTION 01 78 39.00 24
AS-BUILT DRAWINGS
02/22
PART 1 GENERAL
Attachments: Modifications and Title Block Examples
1.1 DEFINITIONS
The definitions listed below form a part of this specification.
1.1.1 Red-Line Drawings
Contract drawings marked-up during construction to show actual work performed to include necessary sketches, modification drawings, shop drawings and notes.
1.1.2 As-Built Drawings
Professionally-finished paper drawings and Electronic CAD Files developed from the contract drawings that include all of the information from the redline drawings and suitable for half-size reproduction. Building Information Modeling (BIM) files are considered a part of As-Built Drawings.
1.1.3 Black-Line Drawings
Paper drawings reproduced from electronic CAD files or high quality reproducible drawings.
1.1.4 Full-Size Drawings
22 inches x 34 inches nominal size drawings with all details visually readable so that half-size plot will fit on 11 inches x 17 inches cut sheets.
1.1.5 Modification Circle
A circle with a horizontal line through the center to identify modification changes on the drawings. The top half will contain the letter "R" with the bottom half containing the Modification number, unless directed otherwise. The lettering standard will be 1/8-inch Arial.ttf.
1.1.6 Electronic CAD Files
Electronic CAD files in [*Am-0003] Autodesk (.dwg) version 2022 or newer or Revit (.rvt) version 2021 or newer[**Am-0003] in accordance with appropriate CAD standard. The CAD standard will include level on/off status, special characters, line weights, font, and size requirements.
SECTION 01 78 39.00 24 Page 3Am #0003
[*Am-0003] Autodesk (.dwg) version 2022 or newer or Revit (.rvt) version 2021 or newer[**Am-0003]
1.2 REFERENCES
U.S. ARMY CORPS OF ENGINEERS (USACE)
ERDC/ITL TR-19-7 (2019) A/E/C CAD Standard - Release 6.1
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
100 Percent Preliminary As-Built Drawings; G-DO
SD-11 Closeout Submittals
Final As-Built Drawings; G-DO
1.4 GENERAL REQUIREMENTS
1.4.1 As-built Drawings
Upon award of this contract, the Government will provide the Contractor PDFs of the Contract drawings. Once the Contractor makes hardcopy distribution of these drawings in accordance with Section 01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS, the Government will provide the Contractor with Govenment-furnished electronic CAD Files.
Maintain electronic CAD files and Red-Line Drawings showing As-Built conditions. Use the ERDC/ITL TR-19-7 USACE A/E/C CAD Standard for the As-Built drawings. Obtain the A/E/C Standards in effect at time of Contract Award. The A/E/C Standards are available at:
https://cadbimcenter.erdc.dren.mil/
(New users will be required to register. See "New User Registration" at the website indicated above.)
Obtain the required CAD software and BIM software for Contractor use. Do not convert electronic drawing files from one software language to another.
Show the transmittal requirements for the As-built Drawings as activities on the Contractor-prepared project schedule.
Show all changes from the contract drawings on the as-builts. Accurately and neatly record all changes on the As-built drawings using the same symbols, terminology, and general quality as the original set of contract drawings. Show all changes on all drawings that are affected by the change. Changes include: actual work performed, deviations resulting from Government responses to Requests for Information or Serial letters, surveys, shop drawings, descriptive changes, sketch changes, and modifications to the contract. Show all systems designed or enhanced by the Contractor such as HVAC control system, fire alarm system fire sprinkler system, and irrigation sprinkler system, on the As-built drawings. Where contract drawings or specifications allow for options, only show the option selected and actually constructed on the As-Built
SECTION 01 78 39.00 24 Page 4Am #0003
Drawings.
1.4.2 Red-Line Drawings
Update Red-Line Drawings throughout the construction phase of the contract showing all changes that will be shown on the final as-builts. Place all as-built conditions on the Red-Line Drawings within two (2) days after completing the work activity or it shall be entered on the deficiency tracking system (see Section 01 45 00.00 10, QUALITY CONTROL). The Government will consider the Contractor to not be making satisfactory progress and will withhold funds from progress payments if the Contractor does not completely and accurately update the as-built drawings.
Provide red-line drawings in an electronic format.
1.4.2.1 Electronic Red-Lines
Make electronic red-line drawings available to the COR at all times through a Local Area Network (LAN) or Internet connection. The connection shall have a download transfer rate not less than 10 Megabit/second (~1.250 Megabytes/second) and an upload transfer rate of not less than 1 Megabit/second (~124 kilobytes/second) in order to facilitate the timely access of drawing files. Make backups of all the electronic drawings at the close of business on the final day of work each week on a durable digital media such as removable hard-drive, tape drive, or optical disk.
Preserve each weekly file system backup over the course of the project and do not overwrite; label the file folders or individual media with the date of backup. Store the weekly backup media in a fireproof and waterproof safe in a locked room of the Contractor's trailer. Electronically provide the COR with updated PDF drawings on a monthly basis. Show all changes to the electronic drawings with clouding and in accordance with
ERDC/ITL TR-19-7.
1.5 PAYMENT
In accordance with FAR 52.232-5 "Payment Under Fixed - Price Construction Contracts", the Contracting Officer may withhold up to 10 percent of payment until the Contractor delivers to the COR and the COR accepts the Final As-Built Drawings. The amount withheld will be $10,000 or 1 percent of the present contract value, whichever is greater.
1.6 CONTRACTOR PERFORMANCE RATING
The Government will evaluate the Contractor's performance in CPARS (Contractor Performance Assessment Reporting System) at intervals of no more than 365 days during the period of performance and complete the final evaluation within 120 days of completion of the project. The timeliness and quality of As-Built drawings submittals, Final As-built Drawings, Red-line drawings will be an important factor in determining the assigned rating for the Schedule evaluation area. If the Contractor fails to submit complete and accurate Final As-Built Drawings within sixty (60) calendar days of turning the completed project over to the Using Service, this failure will be noted in the comments under the Schedule evaluation area and may result in a lower rating for this area. Repeated failure to submit correct and accurate As-Built drawings submittals, Final As-built Drawings, Red-line drawings may also result in lower ratings for the Quality and Management evaluation areas.
SECTION 01 78 39.00 24 Page 5Am #0003
1.7 TRANSMITTAL OF AS-BUILT DRAWINGS
1.7.1 Optional As-built Drawings Sample
Optionally submit a sample of preliminary as-built drawings to the Omaha District Office that will be reviewed for formatting purposes. Include five distinct sheets from the project drawings in this submittal. Send this optional submittal on approved digitial media to the Omaha District Office (ATTN: Patricia Lambert, CENWO-CDS-C) and include the following:
a. Electronic CAD/BIM/CIM Files
b. Individual PDF Drawings
c. One (1) Combined Set of full-size PDF Drawings with bookmarks for each sheet
1.7.2 100 Percent Preliminary As-Built Drawings
The 100 Percent Preliminary As-Built Drawings include all changes to the drawings as specified. The 100 Percent Preliminary As-Built Drawings will be reviewed for technical content and formatting requirements. Within thirty (30) days after the final inspection, submit 100 Percent Preliminary As-Built Drawings indicating all as-built changes with "clouding" on all of the project drawings. Submit all drawings contained in the complete project set of drawings plus any additional drawings with the 100 Percent Preliminary As-Built Drawings. The COR may grant the Contractor additional time if the Contractor is making reasonable progress on the as-builts, in the sole judgment of the COR. Do not submit the Final As-Built Drawings until the 100 Percent Preliminary As-Built Drawings are approved. Include the following on the approved digital media for the 100 Percent Preliminary As-Built Drawings (ATTN: Patricia Lambert, CENWO-CDS-C):
a. Electronic CAD Files.
b. Individual PDF's of Drawings.
c. Combined Set of PDF Drawings with bookmarks for each sheet.
d. Current electronic red-lines for reviewing purposes.
1.7.3 Final As-Built Drawings
Produce Final As-Built Drawings without "clouding". Include all changes shown on the 100 Percent Preliminary As-Built Drawings plus any additional required changes on the Final As-Built Drawings. Submit all drawings contained in the complete project set of drawings plus any additional drawings with the Final As-Built Drawings. Submit the Final Drawings no later than ten days after the 100 Percent Preliminary As-Built Drawing submittal is approved. The COR may grant additional time if the Contractor is making reasonable progress on the as-builts. Send the following to the COR:
Three approved digital media containing the following:
a. Electronic CAD Files.
b. Individual PDF's of Drawings.
c. Combined Set of PDF Drawings with bookmarks for each sheet.
d. Current electronic red-lines for reviewing purposes.
Send one copy of the digital media only to the Omaha District Office (ATTN: Patricia Lambert, CENWO-CDS-C).
SECTION 01 78 39.00 24 Page 6Am #0003
1.8 AS-BUILT DRAWINGS FORMAT REQUIREMENTS
1.8.1 General Formatting
Prepare As-built Drawings in accordance with ERDC/ITL TR-19-7 requirements and/or match the detail shown on the contract drawings. Include all of the requirements below on the drawings:
a. Update the drawing index when drawings are added.
b. When opened, ensure the view is zoomed to fit the border.
c. Reference a border supplied by the CAD/BIM Technology Center ( https://cadbimcenter.erdc.dren.mil/) placed in the layout/sheet model at a scale of 1 at the location (0,0) in all files.
d. Delete all unnecessary information outside the border.
e. Purge/compress all files.
f. Include all reference files and ensure they are 'Bound' (AutoCAD) or 'Attached' (Microstation) to the CAD files in which the files are referenced.
g. Use the Arial.ttf font for all text.
h. Provide an ASCII text file with the following information: the name and phone number of the person we need to contact if we have problems, and the version of the CAD software used to create and/or work on the drawings.
i. (CAD only) Supply pen tables for plotting.
j. (CAD only) Provide each sheet/design with its own file and file name with only one layout/sheet per design file.
k. (CAD only) Accomplish half toning by using the color 8 and setting the pen table to plot color 8 to half tone.
l. Include the File number in the border on every sheet. The file number is: (the Contract number, to be provided at award).
m. Change the cover sheet from "Contract Award Set" to "As-Built Record Set" with month & year completed.
n. Show drawing changes by "clouding" the affected area in layer "G-ANNO-REVS" (CAD only) in the drawing file of all preliminary as-builts and redlines. For BIM, accomplish clouding commensurate with the available tools.
o. Place all submitted Electronic CAD Files and PDF drawings under a folder labeled "As-Built" on the submitted Digital Media.
p. Include the name of the project, location, project code, solicitation number, contract number, and words detailing which submittal it is on both the Digital Media case and Digital Media.
Title the Final As-builts Drawings "As-Built Record Set".
q. Do not use zipped or compressed folders on any of the As-built submittals.
r. On the cover sheet add or revise text to read "This folio includes all reissued and descriptive amendments, RFIs, and modifications."
s. Place the Electronic CAD native design files and PDF drawings in separate folders on the Digital Media.
1.8.2 Title Block
Fill in and correct all information in the title block. Include all the requirements below in the title block.
a. Add "RECORD DRAWING" text below the title block on the right side of the drawing on all sheets.
b. Add the date in the revision box for modifications from Block 3 of Form SF-30.
SECTION 01 78 39.00 24 Page 7Am #0003
c. State "REVISED TO SHOW AS-BUILT CONDITIONS" and date the top line of the revision box. Use a "-" for the "Mark".
d. Enter the month and year as-builts were completed in the date box.
e. Show the contract number and the solicitation number (if available) on all sheets.
f. Properly identify additional word abbreviations, not found on the abbreviation sheet but necessary to describe the work, and incorporate with the other standard word abbreviations.
g. Properly note modifications in the title block in accordance with paragraph "Modification Changes" below.
1.8.3 Modification Changes
Include all modification changes on the as-built drawings. At a minimum, include all revised and reissued sheets, descriptive changes, sketches, etc. Change other sheets as appropriate with any modification change that also affects other sheets other than the one referenced with the modification. Typically, modification changes can be done by following the descriptive change included with the modification, but may require additional effort depending on the change and level of detail of the modification change. Post modifications in accordance with the following:
a. Follow directions in the modification for posting all changes.
b. Post all modifications to the contract in chronological order.
c. Show the last modification number completed on the sheet with the modification circle in the top right corner of the "Project Title" and "Project Location" box.
d. Place a modification number in the revision box over column entitled "Mark" for all modifications to plans, sections, or details.
Use the statement "GENERAL REVISIONS" when applicable.
e. Make the Modification Circle size 1/2-inch diameter unless the area where the circle is located is crowded. Use a smaller size circle for crowded areas.
f. Place a Modification Circle at the location of each deletion.
g. For all new details or sections that are added to a drawing, place a Modification Circle by the detail or section title.
h. For changes to a drawing, place a Modification Circle by the title of the affected plan, section or detail titles (each location).
i. For changes to schedules on drawings, place a Modification Circle either by the schedule heading or by the change in the schedule.
1.8.4 Legends
Do not use symbols which conflict with those on the original contract legend sheet. Properly identify and add to the legend sheet or supplemental legend additional symbols necessary to depict any additional work items. Those projects that do not have legend sheets may use supplemental legends on each sheet where symbol is shown.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 GENERAL
Make revisions to and maintain the red-line and as-built drawings to the same level of detail as shown on the original contract drawings. Provide any additional drawings as required to display all details.
SECTION 01 78 39.00 24 Page 8Am #0003
3.2 SITE WORK
3.2.1 Utilities
Show all utilities whether active or abandoned on the as-built drawings and include all those shown on the original contract drawings or found on-site. Show the type of utility, location, general direction, size, material make-up and depth. Show the location and description of any utility line or other installations of any kind known to exist within the construction area. Include dimensions to permanent features as part of the location. Locate during installation all new underground utility lines (including electrical power and communications, gas, water, sanitary sewer, storm drains, roof drains and culverts). Survey pipe invert of gas, water, sanitary sewer, storm drains, roof drains and culverts and top of duct bank of electrical power and communications lines and associated fixtures (valves, manholes, test points, meters, cathodic protection points, tanks, ground points, and all point features along the new utility lines). Survey storm drains and sanitary sewer lines where pipes enter manholes and inlets and at 100-foot maximum intervals along the line.
Survey the inverts of all cleanouts and tees. Survey inverts at each end of culverts. Survey electrical power, communications, gas and water lines at all manholes, tees, valves, corners, changes in direction and at intervals along the line to accurately depict the location of the line in both horizontal and vertical directions (50-foot maximum interval). Make the horizontal and vertical accuracy such that 100% of the points are + 0.25' of their absolute position. Show new underground utility lines as 3-dimensional elements in a [*Am-003] Autodesk .dwg version 2022 or newer [**Am-0003] file.
3.2.2 Structures
Show structures above and below ground. Show the size, material make-up, location, height, and/or depth. Show rim elevation and invert elevations as applicable at manholes. Show electrical equipment, guy wires, and voltage rating on power poles.
3.2.3 Grades
Correct grade or alignment of roads, structures, or utilities if any changes were made from the contract drawings. Correct elevations if changes were made in site grading. If any grades were finalized outside of the respective grades tolerances, show that new grade on the as-builts.
3.3 STRUCTURAL
3.3.1 Steel/Concrete
Incorporate shop drawings that deviate from the contract drawings in the As-Built Drawings.
3.4 MECHANICAL
3.4.1 Ductwork
Show ductwork to reflect actual installation and duct size. Show ductwork routing changes.
SECTION 01 78 39.00 24 Page 9Am #0003
[*Am-003] Autodesk .dwg version 2022 or newer [**Am-0003]
3.4.2 Plumbing
Show piping and fixtures to reflect the type of material, size and the route or location.
3.5 ELECTRICAL
3.5.1 PANELS
Revise all contract drawing panel schedules to show as-built conditions.
Ensure home-run circuit designation on electrical drawingsaccurately correspond to the as-built panel schedules.
3.5.2 Controls
Revise all control diagrams in contract drawings to reflect as-built conditions and setpoints.
3.6 CONTRACTOR SHOP DRAWINGS
Incorporate contractor shop drawings, which supersede data on the contract plans and/or additional drawings, prepared by the Contractor, into the As-Built Drawings. Include the designer's name on the As-Built Drawings for any design plans prepared by the Contractor.
-- End of Section --
SECTION 01 78 39.00 24 Page 10Am #0003
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 53 23
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
05/12, CHG 2: 08/18
PART 1 GENERAL
1.1 REFERENCES
1.2 DESCRIPTION OF ROOF MEMBRANE SYSTEM
1.3 SUBMITTALS
1.3.1 Shop Drawings
1.4 QUALITY ASSURANCE
1.4.1 Qualification of Manufacturer
1.4.2 Qualification of Applicator
1.4.3 Not Used
1.4.4 Fire Resistance
1.4.5 Wind Uplift Resistance
1.4.6 Preroofing Conference
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.2 Storage
1.5.3 Handling
1.6 ENVIRONMENTAL REQUIREMENTS
1.7 SEQUENCING
1.8 WARRANTY
1.8.1 Roof Membrane Manufacturer Warranty
1.8.2 Roofing System Installer Warranty
1.8.3 Continuance of Warranty
1.9 CONFORMANCE AND COMPATIBILITY
1.10 ELIMINATION, PREVENTION OF FALL HAZARDS
1.10.1 Fall Protection
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 EPDM Sheet
2.1.2 Energy Performance
2.1.3 Seam Tape
2.1.4 Lap Splice Adhesive
2.1.5 Bonding Adhesive
2.1.6 Lap Cleaner, Lap Sealant, and Edge Treatment
2.1.7 Water Cutoff Mastic/Water Block
2.1.8 Membrane Flashings and Flashing Accessories
2.1.8.1 Flashing Tape
2.1.9 Membrane Fasteners and Plates
2.1.9.1 Stress Plates for Fasteners
2.1.9.2 Auxiliary Fasteners
2.1.9.3 Powder-Driven Fasteners
2.1.9.4 Metal Disks
2.1.10 Roof Insulation Below EPDM Sheet
2.1.11 Wood Products
SECTION 07 53 23 Page 1Am #0003
2.1.12 Membrane Liner
2.2 FLASHING CEMENT
PART 3 EXECUTION
3.1 EXAMINATION
3.2 APPLICATION
3.2.1 Special Precautions
3.2.2 EPDM Sheet Roofing
3.2.3 Application Method
3.2.4 Tape Seams / Lap Splices
3.2.5 Adhesive Seams / Lap Splices
3.2.6 Perimeter Attachment
3.2.7 Securement at Base Tie-In Conditions
3.3 FLASHINGS
3.3.1 General
3.3.2 Membrane Flashing
3.3.3 Flashing at Roof Drain
3.3.4 PRE-FABRICATED CURBS
3.3.5 Set-On Accessories
3.3.6 Lightning Protection
3.4 CORRECTION OF DEFICIENCIES
3.5 CLEAN UP
3.6 PROTECTION OF APPLIED ROOFING
3.6.1 Water Cutoffs
3.6.2 Temporary Flashing for Permanent Roofing
3.6.3 Temporary Walkways, Runways, and Platforms
3.7 FIELD QUALITY CONTROL
3.7.1 Construction Monitoring
3.7.2 Manufacturer's Inspection
3.7.3 Roof Drain Test
3.8 INSTRUCTIONS TO GOVERNMENT PERSONNEL
3.9 INFORMATION CARD
SECTION 07 53 23 Page 2Am #0003
SECTION 07 53 23
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
05/12, CHG 2: 08/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures
ASTM INTERNATIONAL (ASTM)
ASTM D4637/D4637M (2015) EPDM Sheet Used in Single-Ply Roof Membrane
ASTM D4811/D4811M (2016) Standard Specification for Nonvulcanized (Uncured) Rubber Sheet Used as Roof Flashing
ASTM D6369 (1999; R 2006) Design of Standard Flashing Details for EPDM Roof Membranes
ASTM E108 (2020a) Standard Test Methods for Fire Tests of Roof Coverings
FM GLOBAL (FM)
FM 4470 (2022) Single-Ply, Polymer-Modified Bitumen Sheet, Built-up Roof (BUR), and Liquid Applied Roof Assemblies for Use in Class 1 and Noncombustible Roof Deck Construction
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)
NRCA RoofMan (2020) The NRCA Roofing Manual
SINGLE PLY ROOFING INDUSTRY (SPRI)
ANSI/SPRI RD-1 (2014) Performance Standard for Retrofit Drains
UNDERWRITERS LABORATORIES (UL)
UL 790 (2022) UL Standard for Safety Test Methods
SECTION 07 53 23 Page 3Am #0003 for Fire Tests of Roof Coverings
UL RMSD (2012) Roofing Materials and Systems Directory
1.2 DESCRIPTION OF ROOF MEMBRANE SYSTEM
Fully adhered EPDM roof membrane system applied over insulation substrate.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Roof Plan Drawing
Wind Load Calculations
Boundaries of Enhanced Perimeter
Corner Attachments of Roof System Components
Location of Perimeter Half-Sheets
Spacing of Perimeter, Corner, and Infield Fasteners
Slopes and Drain Locations
SD-03 Product Data
Cement
EPDM Sheet; G
Seam Tape
Bonding Adhesive
Lap Splice Adhesive
Water Cutoff Mastic/Water Block
Lap Cleaner, Lap Sealant, and Edge Treatment
Flashings
Flashing Accessories
Flashing Tape
Fasteners and Plates
SECTION 07 53 23 Page 4Am #0003
Roof Insulation
Sample Warranty Certificate; G
Submit all data required together with requirements of this section. Include a written acceptance by the roof membrane manufacturer of the insulation and other products and accessories to be provided. List products in the applicable wind uplift and fire rating classification listings, unless approved otherwise by the Contracting Officer.
SD-05 Design Data
Wind Uplift Calculations; G
SD-07 Certificates
Qualification of Manufacturer
Certify that the manufacturer of the roof membrane meets requirements specified under paragraph entitled "Qualification of Manufacturer."
Qualification of Applicator
Certify that the applicator meets requirements specified under paragraph entitled "Qualification of Applicator."
Wind Uplift Resistance classification, as applicable; G
Fire Resistance classification; G
Submit the roof system assembly wind uplift and fire rating classification listings.
SD-08 Manufacturer's Instructions
Application; G
Application Method; G, including pattern and frequency of mechanical attachments required in the field of roof, corners, and perimeters to provide for the specified wind resistance
Membrane Flashing; G
Seam Tape
Tape Seams / Lap Splices
Adhesive Seams / Lap Splices
Perimeter Attachment
Primer
Fasteners
Cold Weather Installation; G
SECTION 07 53 23 Page 5Am #0003
Include detailed application instructions and standard manufacturer drawings altered as required by these specifications.
Explicitly identify in writing, differences between manufacturer's printed instructions and the specified requirements.
SD-11 Closeout Submittals
Warranty
Information Card
Instructions To Government Personnel
Include copies of Safety Data Sheets (SDS) for maintenance/repair materials.
1.3.1 Shop Drawings
Roof plan drawing depicting wind load calculations and boundaries of enhanced perimeter and corner attachments of roof system components, as applicable. Include the project roof plan of each roof level and conditions indicated. Provide all slopes and drain locations.
1.4 QUALITY ASSURANCE
1.4.1 Qualification of Manufacturer
EPDM sheet roofing membrane manufacturer must have at least 5 years experience in manufacturing EPDM roofing products.
1.4.2 Qualification of Applicator
Roofing system applicator must be approved, authorized, or licensed in writing by the roof membrane manufacturer and must have a minimum of three years experience as an approved, authorized, or licensed applicator with that manufacturer and be approved at a level capable of providing the specified warranty. The applicator must supply the names, locations and client contact information of 5 projects of similar size and scope that the applicator has constructed using the manufacturer's roofing products submitted for this project within the previous three years.
[*Am.#0003] 1.4.3 Not Used
[**Am.#0003]
1.4.4 Fire Resistance
Complete roof covering assembly must:
a. Be Class A rated in accordance with ASTM E108, FM 4470, or UL 790; and
b. Be listed as part of Fire-Classified roof deck construction in the UL RMSD or Class I roof deck construction in the FM APP GUIDE.
FM or UL approved components of the roof covering assembly must bear the appropriate FM or UL label.
SECTION 07 53 23 Page 6Am #0003
[*Am.#0003] 1.4.3 Not Used
[**Am.#0003]
1.4.5 Wind Uplift Resistance
Provide a complete roof system assembly that is rated and installed to resist wind loads calculated in accordance with ASCE 7-16 and validated by uplift resistance testing in accordance with Factory Mutual (FM) test procedures. Do not install non-rated systems except as approved by the Contracting Officer. Submit licensed engineer's wind uplift calculations and substantiating data to validate any non-rated roof system. Base wind uplift measurements based on a design wind speed of 111 mph in accordance with ASCE 7-16 and other applicable building code requirements
1.4.6 Preroofing Conference
After approval of submittals and before performing roofing and insulation system installation work, hold a preroofing conference to review the following:
a. Drawings, specifications and submittals related to the roof work;
b. Roof system components installation;
c. Procedure for the roof manufacturer's technical representative's onsite inspection and acceptance of the roofing substrate, the name of the manufacturer's technical representatives, the frequency of the onsite visits, distribution of copies of the inspection reports from the manufacturer's technical representative;
d. Contractor's plan for coordination of the work of the various trades involved in providing the roofing system and other components secured to the roofing; and
e. Quality control plan for the roof system installation;
f. Safety requirements.
Coordinate preroofing conference scheduling with the Contracting Officer.
The conference must be attended by the Contractor, the Contracting Officer's designated personnel, personnel directly responsible for the installation of roofing and insulation, flashing and sheet metal work, , other trades interfacing with the roof work, and representative of the roofing materials manufacturer. Before beginning roofing work, provide a copy of meeting notes and action items to all attending parties. Note action items requiring resolution prior to start of roof work.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver materials in their original, unopened containers or wrappings with labels intact and legible. Where materials are covered by a referenced specification number, the labels must bear the specification number, type, class, and shelf life expiration date where applicable. Deliver materials in sufficient quantity to allow continuity of work.
1.5.2 Storage
Store and protect materials from damage and weather in accordance with manufacturer's printed instructions, except as specified otherwise. Keep materials clean and dry. Store and maintain adhesives, sealants, primers
SECTION 07 53 23 Page 7Am #0003 and other liquid materials above 60 degrees F. Utilize insulated hot boxes or other enclosed warming devices in cold weather. Mark and remove damaged materials from the site. Use pallets to support and canvas tarpaulins to completely cover material materials stored outdoors. Do not use polyethylene as a covering. Locate materials temporarily stored on the roof in approved areas, and distribute the load to stay within the live load limits of the roof construction. Remove unused materials from the roof at the end of each days work.
1.5.3 Handling
Prevent damage to edges and ends of roll materials. Do not install damaged materials in the work. Select and operate material handling equipment so as not to damage materials or applied roofing. Do not use materials contaminated by exposure or moisture. Remove contaminated materials from the site. When hazardous materials are involved, adhere to the special precautions of the manufacturer. Adhesives may contain petroleum distillates and may be extremely flammable; prevent personnel from breathing vapors, and do not use near sparks or open flame.
1.6 ENVIRONMENTAL REQUIREMENTS
Do not install EPDM sheet roofing during high winds or inclement weather, or when there is ice, frost, moisture, or visible dampness on the substrate surface, or when condensation develops on surfaces during application. Unless recommended otherwise by the EPDM sheet manufacturer and approved by the Contracting Officer, do not install EPDM sheet when air temperature is below 40 degrees F or within 5 degrees F of the dewpoint. Follow manufacturer's printed instructions for installation during cold weather conditions.
1.7 SEQUENCING
Coordinate the work with other trades to ensure that components which are to be secured to or stripped into the roofing system are available and that permanent flashing and counterflashing are installed as the work progresses. Ensure temporary protection measures are in place to preclude moisture intrusion or damage to installed materials. Apply roofing immediately following application of insulation as a continuous operation. Coordinate roofing operations with insulation work so that all roof insulation applied each day is covered with roof membrane installation the same day.
1.8 WARRANTY
Provide roof system material and workmanship warranties meeting specified requirements. Provide revision or amendment to standard membrane manufacturer warranty as required to comply with the specified requirements. Provide a manufacturer's warranty that has no dollar limit, covers full system water-tightness and has a minimum duration of 20 years.
1.8.1 Roof Membrane Manufacturer Warranty
Furnish the roof membrane manufacturer's 20 year no dollar limit roof system materials and installation workmanship warranty, including flashing, insulation, and accessories necessary for a watertight roof system construction. Write the warranty directly to the Government and commence at time of Government's acceptance of the roof work. The warranty must state that:
SECTION 07 53 23 Page 8Am #0003
a. If within the warranty period the roof system, as installed for its intended use in the normal climatic and environmental conditions of the facility, becomes non-watertight, shows evidence of moisture intrusion within the assembly, splits, tears, cracks, delaminates, separates at the seams, shrinks to the point of bridging or tenting membrane at transitions, or shows evidence of excessive weathering due to defective materials or installation workmanship, the repair or replacement of the defective and damaged materials of the roof system assembly and correction of defective workmanship is the responsibility of the roof membrane manufacturer. The roof membrane manufacturer is responsible for all costs associated with the repair or replacement work.
b. When the manufacturer or his approved applicator fail to perform the repairs within 72 hours of notification, emergency temporary repairs performed by others does not void the warranty.
1.8.2 Roofing System Installer Warranty
The roof system installer must warrant for a period of two years that the roof system, as installed, is free from defects in installation workmanship, to include the roof membrane, flashing, insulation, accessories, attachments, and sheet metal installation integral to a complete watertight roof system assembly. Write the warranty directly to the Government. The roof system installer is responsible for correction of defective workmanship and replacement of damaged or affected materials. The roof system installer is responsible for all costs associated with the repair or replacement work.
1.8.3 Continuance of Warranty
Approve repair or replacement work that becomes necessary within the warranty period and accomplish in a manner so as to restore the integrity of the roof system assembly and validity of the roof membrane manufacturer warranty for the remainder of the manufacturer warranty period.
1.9 CONFORMANCE AND COMPATIBILITY
Provide the entire roofing and flashing system in accordance with specified and indicated requirements, including fire and wind resistance requirements. Work not specifically addressed and any deviation from specified requirements must be in general accordance with recommendations of the NRCA RoofMan, membrane manufacturer published recommendations and details, ASTM D6369, and compatible with surrounding components and construction. Submit any deviation from specified or indicated requirements to the Contracting Officer for approval prior to installation.
1.10 ELIMINATION, PREVENTION OF FALL HAZARDS
1.10.1 Fall Protection
Provide Person Fall Arrest System (PFAS) andchorage and horizontal liflelines in accordance with EM 385-1-1, Section Commercially manufactured horizontal lifelines (HLL) must be designed,installed, and certified by a qualified person. Provide fall protection as part of a complete fall arrest system which maintains safety factor of 2 (29 CFR 1926.500).
SECTION 07 53 23 Page 9Am #0003
PART 2 PRODUCTS
2.1 MATERIALS
Coordinate with other specification sections related to the roof work.
Furnish a combination of specified materials that comprise a roof system acceptable to the roof membrane manufacturer and meeting specified requirements. Protect materials provided from defects and make suitable for the service and climatic conditions of the installation.
2.1.1 EPDM Sheet
Ethylene Propylene Diene Terpolymer (EPDM), ASTM D4637/D4637M, Type III, fabric or fleece backed, 0.090 inch nominal thickness for fully adhered application. Provide membrane with minimum thickness not less than minus 10 percent of the specified thickness value. EPDM membrane thickness specified is exclusive of backing material on the EPDM membrane.
Principal polymer used in manufacture of the membrane sheet must be greater than 95 percent EPDM. Width and length of sheet must be maximum width attainable as recommended by the manufacturer to minimize field formed seams in the field of the roof.
2.1.2 Energy Performance
Install a roof system that meets an overall performance as specified on the drawings or by insulation specified in other sections.
2.1.3 Seam Tape
Double-sided synthetic rubber tape, minimum 0.03 inch thick, minimum 3 inch wide. Utilize seam tape as recommended by the manufacturer's printed data for forming watertight bond of EPDM sheet materials to each other for the application specified and conditions encountered. 6 inch wide tape is required for seam seals along lines of mechanical attachment of membrane.
2.1.4 Lap Splice Adhesive
Low volatile organic compound (VOC) synthetic rubber adhesive as supplied by roof membrane manufacturer and recommended by the manufacturer's printed data for forming watertight bond of EPDM sheet membrane materials to each other . Do not use splice adhesive to form membrane seams in field of roof or at standard base flashing conditions.
2.1.5 Bonding Adhesive
Low volatile organic compound (VOC) adhesive as supplied by roof membrane manufacturer and recommended by the manufacturer's printed data for bonding EPDM membrane materials to insulation, wood, metal, concrete or other substrate materials. Do not use bonding adhesive to bond membrane materials to each other.
2.1.6 Lap Cleaner, Lap Sealant, and Edge Treatment
As supplied by the roof membrane manufacturer and recommended by the manufacturer's printed data.
2.1.7 Water Cutoff Mastic/Water Block
As supplied by the roof membrane manufacturer and recommended by the
SECTION 07 53 23 Page 10Am #0003 manufacturer's printed data.
2.1.8 Membrane Flashings and Flashing Accessories
Provide membrane flashing, including self-adhering membrane flashing, perimeter flashing, flashing around roof penetrations, and prefabricated pipe seals, that is minimum 0.045 inch cured EPDM, as recommended by the roof membrane manufacturer or minimum 0.055 inch thick uncured EPDM sheet in compliance with ASTM D4811/D4811M, Type I. Use cured EPDM membrane to the maximum extent recommended by the roof membrane manufacturer. Limit uncured flashing material to reinforcing inside and outside corners and angle changes in plane of membrane, and to flash scuppers, pourable sealer pockets, and other formed penetrations or unusually shaped conditions as recommended by the roof membrane manufacturer where the use of cured material is impractical.
2.1.8.1 Flashing Tape
EPDM-backed synthetic rubber tape, minimum 6 inch wide as supplied by the roof membrane manufacturer and recommended by the manufacturer's printed data.
2.1.9 Membrane Fasteners and Plates
Coated, corrosion-resistant fasteners as recommended by the roof membrane manufacturer and meeting the requirements of FM 4470 and FM APP GUIDE for Class I roof deck construction and the wind uplift resistance specified.
As supplied and warranted for the substrate type(s) by EPDM sheet manufacturer and recommended by EPDM sheet manufacturer's printed data.
2.1.9.1 Stress Plates for Fasteners
Flat corrosion-resistant round stress plates as recommended by the roof membrane manufacturer's printed instructions and meeting the requirements of FM 4470; not less than 2 inch in diameter. Provide pre-formed discs to prevent dishing or cupping.
2.1.9.2 Auxiliary Fasteners
Corrosion resistant screws, nails, or anchors suitable for intended attachment purpose and as recommended by the roof membrane manufacturer.
2.1.9.3 Powder-Driven Fasteners
Powder-driven fasteners may be used only when approved in writing.
2.1.9.4 Metal Disks
Provide flat metal disks of minimum 1 inch in diameter, made of nonferrous material compatible with the nails or fasteners.
2.1.10 Roof Insulation Below EPDM Sheet
Ensure insulation system and facer material is compatible with membrane application specified and as approved by the roof membrane manufacturer.
[*Am.#0002][**Am.#0002]2.1.11 Wood Products
Do not allow fire retardant treated materials be in contact with EPDM
SECTION 07 53 23 Page 11Am #0003 membrane or EPDM accessory products, unless approved by the membrane manufacturer and the Contracting Officer.
2.1.12 Membrane Liner
Self-adhering EPDM membrane liner conforming to ASTM D4637/D4637M, or other waterproof membrane liner material as approved by the roof membrane manufacturer and the Contracting Officer.
2.2 FLASHING CEMENT
Provide a self-vulcanizing butyl compound flashing cement for splicing laps and for flashings workable at 20 degrees F. Obtain a recommendation for such flashing cement from the roofing membrane manufacturer.
PART 3 EXECUTION
3.1 EXAMINATION
Ensure that the following conditions exist prior to application of the roofing materials:
a. Do not install items that show visual evidence of biological growth.
b. Drins,a curbs, perimeter walls, roof penetrating components, and equipment supports are in place.
c. Surfaces are rigid, clean, dry, smooth, and free from cracks, holes, and sharp changes in elevation.
d. The plane of the substrate does not vary more than 1/4 inch within an area 10 by 10 feet when checked with a 10 foot straight edge placed anywhere on the substrate.
e. Substrate is sloped to provide positive drainage.
f. Walls and vertical surfaces are constructed to receive counterflashing, and will permit mechanical fastening of the base flashing materials.
g. Treated wood nailers are in place on non-nailable surfaces, to permit nailing of base flashing at minimum height of 8 inch above finished roofing surface.
h. Pressure-preservative treated wood nailers are fastened in place at eaves, gable ends, openings, and intersections with vertical surfaces for securing of membrane, edging strips, attachment flanges of sheet metal, and roof fixtures. Embedded nailers are flush with deck surfaces.
i. Avoid contact of EPDM materials with fire retardant treated wood, except as approved by the roof membrane manufacturer and Contracting Officer.
j. Cants are securely fastened in place in the angles formed by walls and other vertical surfaces. The angle of the cant is 45 degrees and the height of the vertical leg is not less than 3-1/2 inch.
SECTION 07 53 23 Page 12Am #0003
3.2 APPLICATION
Apply entire EPDM sheet utilizing fully adhered application method. Apply roofing materials as specified herein unless approved otherwise by the Contracting Officer.
3.2.1 Special Precautions
a. Do not dilute coatings or sealants unless specifically recommended by the materials manufacturer's printed application instructions. Do not thin liquid materials with cleaners used for cleaning EPDM sheet.
b. Keep liquids in airtight containers, and keep containers closed except when removing materials.
c. Use liquid components, including adhesives, within their shelf life period. Store adhesives at 60 to 80 degrees F prior to use. Avoid excessive adhesive application and adhesive spills, as they can be destructive to some elastomeric sheets and insulations; follow adhesive manufacturer's printed application instructions. Mix and use liquid components in accordance with label directions and manufacturer's printed instructions.
d. Provide clean, dry cloths or pads for applying membrane cleaners and cleaning of membrane
e. Do not use heat guns or open flame to expedite drying of adhesives or primers.
f. Require workmen and others who walk on the membrane to wear clean, soft-soled shoes to avoid damage to roofing materials.
g. Do not use equipment with sharp edges which could puncture the EPDM sheet.
h. Shut down air intakes and any related mechanical systems and seal open vents and air intakes when applying solvent-based materials in the area of the opening or intake. Coordinate shutdowns with the Contracting Officer.
3.2.2 EPDM Sheet Roofing
Provide a watertight roof membrane sheet free of contaminants and defects that might affect serviceability. Provide a uniform, straight, and flat edge. Unroll EPDM sheet roofing in position without stretching membrane.
Inspect for holes. Remove sections of EPDM sheet roofing that are damaged. Allow sheets to relax minimum 30 minutes before seaming. Lap sheets as specified, to shed water, and as recommended by the roof membrane manufacturer's published installation instructions for the application required but not less than 3 inch in any case.
3.2.3 Application Method
3.2.4 Tape Seams / Lap Splices
Field form seams, or lap splices, with seam tape in accordance with membrane manufacturer's printed instructions and as specified. Clean and prime mating surfaces in the seam area. After primer has dried or set in accordance with membrane manufacturer's instructions, apply seam tape to
SECTION 07 53 23 Page 13Am #0003 bottom membrane and roll with a 3 inch to 4 inch wide smooth silicone or steel hand roller, or other manufacturer approved rolling device, to ensure full contact and adhesion of tape to bottom membrane. Tape end laps must be minimum 1 inch. Roll top membrane into position to check for proper overlap and alignment. Remove release paper from top of seam tape and form seam splice. Ensure top membrane contact with seam tape as release paper is removed. Roll the closed seam with a smooth silicone or steel hand roller, rolling first across the width of the seam then along the entire length, being careful not to damage the membrane. Apply minimum 9 inch long strip of membrane-backed flashing tape over T-intersections of roof membrane. Roll tape to ensure full adhesion and seal over T-joint.
3.2.5 Adhesive Seams / Lap Splices
Use only field-applied adhesive formed seams in flashing areas where approved by the membrane manufacturer and the Contracting Officer. Do not use adhesive formed seams for field of roof membrane seaming, except as approved by the membrane manufacturer and the Contracting Officer.
Thoroughly and completely clean mating surfaces of materials throughout the lap area. Remove all dirt, dust, and contaminants and allow to dry.
Apply primer as recommended by the membrane manufacturer. Apply splice adhesive with a 3 inch to 4 inch wide, 1/2 inch thick, solvent-resistant brush in a smooth, even coat with long brush strokes. Bleed out brush marks. Do not apply adhesive in a circular motion. Simultaneously apply adhesive to both mating surfaces in an approximate 0.025 to 0.030 inch wet film thickness, or other thickness as recommended by the roof membrane manufacturer's printed instructions.
Allow the splice adhesive to set-up in accordance with membrane manufacturer's printed instructions. Perform manufacturer recommended field check to test for adhesive readiness prior to closing seam. Apply a 1/8 inch to 1/4 inch bead of in-seam sealant approximately 1/2 inch from the inside edge of the lower membrane sheet prior to closing the seam.
Ensure the in-seam sealant does not extend onto the splice adhesive.
Maintain the full adhered seam width required. Roll the top membrane onto the mating surface. Roll the seam area with a 2 inch to 3 inch wide, smooth silicone or steel hand roller. A minimum of 2 hours after joining sheets and when the lap edge is dry, clean the lap edge with membrane manufacturer's recommended cleaner and apply a 1/4 inch to 3/8 inch bead of lap sealant centered on the seam edge. With a feathering tool, immediately feather the lap sealant to completely cover the splice edge, leaving a mound of sealant over the seam edge. Apply lap sealant to all adhesive formed seams.
3.2.6 Perimeter Attachment
Adhesive bond or mechanically secure roof membrane sheet at roof perimeter in a manner to comply with wind resistance requirements and in accordance with membrane manufacturer's printed application instructions. When adhesively bonding a mechanically fastened system in perimeter areas, the perimeter boundary of the adhesive bond must be the same as the boundary required for additional perimeter mechanical fastening to meet wind resistance requirements.
3.2.7 Securement at Base Tie-In Conditions
Mechanically fasten the roof membrane at penetrations, at base of curbs and walls, and at all locations where the membrane turns and angle greater
SECTION 07 53 23 Page 14Am #0003 than 4 degrees (1:12). Space fasteners a maximum of 12 inch on center, except where more frequent attachment is required to meet specified wind resistance or where recommended by the roof membrane manufacturer. Flash over fasteners with a fully adhered layer of material as recommended by the roof membrane manufacturer's printed data.
3.3 FLASHINGS
3.3.1 General
Provide flashings in the angles formed at walls and other…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .