Am_0002_ELB1_Fuel_System_Maint_Dock_100_Per_Des_Vol_I_Part1.pdf
PDF 43 MB Posted
- Attached to
- B-21 Fuels System Maintenance Dock
- Solicitation number
- W9128F24R0019
About this file
This document outlines a federal contract opportunity for fuel system maintenance dock services. The Army Corps of Engineers Engineering District Omaha is soliciting proposals under solicitation number W9128F24R0019 to provide fuel system maintenance dock services for the B-21 bomber program. Offerors should provide pricing and capability statements for performing maintenance, repair, and overhaul services on the fuel systems of B-21 bombers. The period of performance is a base year with four option years. Proposals are due by April 15, 2024 and the contract is expected to be awarded by June 30, 2024. The opportunity is unrestricted with no set-aside designations.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AM
-0
- 1
D
ES
IG
N
IS
SU
ED
F O
R P
R
IC
IN
G
N O
V
B ro ad wa y E xte ns ion
, S uit e 5
Ok lah om a C ity , O
K
8-7
5.8
.29
| f sb -a e.c om
FS
B/
PO
N
D J
V B-
F
U
EL
S
YS
M
AI
N
TE
N
AN
C E
D O
C K
AN
SI
D
US Army Corps of Engineers
Omaha District
5 ADVERTISEMENT - 100% DESIGN
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
A
B
M
AR
K
IS
SU
E D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
D
AT
E
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
EL
LS
W
O R
TH
A
FB
, S
D
D
C
A
B
1 2 3 4
M
JT
G
O B
W
F2
4R
N
O V
C :\U sers\jluckow ski\O neD rive - FSB Architects +
Engineers\D ocu m ents\159100_A rch_jluckow ski.r vt
11/17/2023 8:31 :07 AM
G-001-V1
C O
VE
R
S H
EE
T
-V O
LU
M
E
JM
I /
M
JT
JC
L
JC
L
US Army Corps of Engineers ®
ELLSWORTH AIR FORCE BASE, SD
SOLICITATION NUMBER: W9128F24R0019
OMAHA DISTRICT
B-21: FUEL SYSTEM MAINTENANCE DOCK
PN: FXBM241479
ADVERTISEMENT - 100% DESIGN
CONTRACT NUMBER:
ISSUE DATE: 27 NOV 2023
VOLUME 1
(FY24)
THIS PROJECT WAS REVIEWED BY THE OMAHA DISTRICT OF THE US ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL OF DRAWINGS IN THIS SET.
CHIEF, GEOTECHNICAL
ENGINEERING & SCIENCES BRANCH
DATE
CHIEF, DAM SAFETY PROD.
CENTER
DATE
CHIEF, DESIGN BRANCH DATE
CHIEF, HYROLOGIC
ENGINEERING BRANCH
DATE
DATECHIEF, ENGINEERING
DIVISION, P.E.
SUBMITTED BY:
CHIEF: ARCH. / INTER.
RA
SECTION
SUBMITTED BY:
CHIEF: CIVIL / ENVIR.
PE
SECTION
SUBMITTED BY:
CHIEF: ELEC.
PE
SECTION
SUBMITTED BY:
CHIEF: MECH.
PE
SECTION
SUBMITTED BY:
CHIEF: STRUCT.
PE
SECTION
SUBMITTED BY:
CHIEF: FUELS
RA
SECTION
SUBMITTED BY:
CHIEF: GEOT./DAM SAFETY
PE
SECTION
SUBMITTED BY:
CADD
PROJECT COORD.
AM
-0
- 1
D
ES
IG
N
IS
SU
ED
F O
R P
R
IC
IN
G
N O
V
B ro ad wa y E xte ns ion
, S uit e 5
Ok lah om a C ity , O
K
8-7
5.8
.29
| f sb -a e.c om
FS
B/
PO
N
D J
V B-
F
U
EL
S
YS
M
AI
N
TE
N
AN
C E
D O
C K
AN
SI
D
US Army Corps of Engineers
Omaha District
5 ADVERTISEMENT - 100% DESIGN
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
A
B
M
AR
K
IS
SU
E D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
D
AT
E
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
EL
LS
W
O R
TH
A
FB
, S
D
D
C
A
B
1 2 3 4
M
JT
G
O B
W
F2
4R
N
O V
C :\U sers\jluckow ski\O neD rive - FSB Architects +
Engineers\D ocu m ents\159100_A rch_jluckow ski.r vt
11/20/2023 3:35 :46 PM
G-002-V1
SH
EE
T
IN
D
EX
(V 1)
G
EN
ER
AL
, C
IV
IL
ST
R
U C
TU
R
AL
JM
I /
M
JT
JC
L
JC
L
(VOL 1) GEN, CIV, STR
NUMBER TITLE
SF103 LOW ROOF FRAMING PLAN - SECTOR C
SF104 LOW ROOF FRAMING PLAN - SECTOR D
SF110 COMPOSITE BOTTOM CHORD FRAMING PLAN
SF111 BOTTOM CHORD FRAMING PLAN - SECTOR A
SF112 BOTTOM CHORD FRAMING PLAN - SECTOR B
SF113 BOTTOM CHORD FRAMING PLAN - SECTOR C
SF114 BOTTOM CHORD FRAMING PLAN - SECTOR D
SF120 COMPOSITE TOP CHORD FRAMING PLAN
SF121 TOP CHORD FRAMING PLAN - SECTOR A
SF122 TOP CHORD FRAMING PLAN - SECTOR B
SF123 TOP CHORD FRAMING PLAN - SECTOR C
SF124 TOP CHORD FRAMING PLAN - SECTOR D
SF130 COMPOSITE FALL ARREST AND MECHANICAL SUPPORT FRAMING PLAN
SF201 FRAMING ELEVATION - SOUTH
SF202 GIRT AND CMU WALL ELEVATION - SOUTH
SF203 FRAMING ELEVATION - WEST
SF204 GIRT AND CMU WALL ELEVATION - WEST
SF205 FRAMING ELEVATION - NORTH
SF206 GIRT AND CMU WALL ELEVATION - NORTH
SF207 FRAMING ELEVATION - NORTH
SF208 GIRT AND CMU WALL ELEVATION - NORTH
SF209 FRAMING ELEVATION - EAST
SF210 GIRT AND CMU WALL ELEVATION - EAST
SF211 FRAMING ELEVATIONS
SF212 FRAMING ELEVATIONS
SF213 FRAMING ELEVATIONS
SF214 CMU WALL ELEVATIONS
SF215 CMU WALL ELEVATIONS
SF216 CATWALK FRAMING ELEVATIONS
SF217 FRAMING ELEVATIONS
SF218 FRAMING ELEVATIONS
SF401 ENLARGED PLANS
SF402 ENLARGED PLANS
SF403 ENLARGED PLANS
SF501 FRAMING DETAILS
SF502 FRAMING DETAILS
SF503 FRAMING DETAILS
SF504 FRAMING DETAILS
SF505 FRAMING DETAILS
SF506 FRAMING DETAILS
SF507 FRAMING DETAILS - BRACE TO GUSSET PLATE CONNECTION
SF508 FRAMING DETAILS - HORIZ BRACING AT TRUSS BOTTOM CHORD
SF509 FRAMING DETAILS - HORIZ BRACING AT TRUSS BOTTOM CHORD
SF510 FRAMING DETAILS - HORIZ BRACING AT TRUSS BOTTOM CHORD
SF511 FRAMING DETAILS - HORIZ BRACING AT TRUSS BOTTOM CHORD
SF512 FRAMING DETAILS - HORIZ BRACING AT TRUSS BOTTOM CHORD
SF513 FRAMING DETAILS - HORIZ BRACING AT TRUSS BOTTOM CHORD
SF514 FRAMING DETAILS - NORTH TO SOUTH TRUSS CONNECTIONS
SF515 FRAMING DETAILS - NORTH TO SOUTH TRUSS CONNECTIONS
SF516 FRAMING DETAILS - BOX TRUSS CONNECTIONS AND SCHEDULE
SF517 FRAMING DETAILS - BOX TRUSS CONNECTIONS AND SCHEDULE
SF518 FRAMING DETAILS - STRUT AND VERTICAL BRACE CONNECTIONS
SF519 FRAMING DETAILS - STRUT AND VERTICAL BRACE CONNECTIONS
SF520 FRAMING DETAILS - VERTICAL BRACE CONNECTIONS
SF521 FRAMING DETAILS - VERTICAL BRACE CONNECTIONS
SF522 FRAMING DETAILS - VERTICAL BRACE CONNECTIONS AND SCHEDULE
SF523 FRAMING DETAILS - VERTICAL BRACE CONNECTIONS
SF524 FRAMING DETAILS - MECHANICAL PLATFORM CONNECTIONS
SF601 WIND PRESSURES
SF602 SNOW DIAGRAM
SF603 JOIST LOAD DIAGRAMS
SF604 JOIST LOAD DIAGRAMS
SF605 JOIST LOAD DIAGRAMS
SF606 JOIST LOAD DIAGRAMS
SF901 ISOMETRIC VIEWS
SF902 ISOMETRIC VIEWS
(VOL 1) GEN, CIV, STR
NUMBER TITLE
CG125 EROSION AND SEDIMENT CONTROL PLAN
CG126 EROSION AND SEDIMENT CONTROL PLAN
CG127 EROSION AND SEDIMENT CONTROL PLAN
CG201 STORM SEWER PROFILES
CG202 STORM SEWER PROFILES
CG501 GRADING DETAILS
CG502 GRADING DETAILS
CG503 EROSION AND SEDIMENT CONTROL DETAILS
CG504 EROSION AND SEDIMENT CONTROL DETAILS
CG505 EROSION AND SEDIMENT CONTROL DETAILS
CU100 OVERALL UTILITY PLAN
CU101 UTILITY PLAN
CU102 UTILITY PLAN
CU103 UTILITY PLAN
CU104 UTILITY PLAN
CU105 UTILITY PLAN
CU106 UTILITY PLAN
CU107 UTILITY PLAN
CU120 OVERALL CATHODIC PROTECTION PLAN
CU121 CATHODIC PROTECTION PLAN
CU122 CATHODIC PROTECTION PLAN
CU123 CATHODIC PROTECTION PLAN
CU124 CATHODIC PROTECTION PLAN
CU125 CATHODIC PROTECTION PLAN
CU126 CATHODIC PROTECTION PLAN
CU127 CATHODIC PROTECTION PLAN
CU150 FIRE PROTECTION CODE COMPLIANCE PLAN
CU201 SANITARY SEWER PROFILES
CU202 WATER AND FIRE WATER PROFILES
CU203 FIRE WATER PROFILES
CU204 FIRE WATER PROFILES
CU205 FIRE WATER PROFILES
CU501 UTILITY DETAILS
CU502 UTILITY DETAILS
CU503 UTILITY DETAILS
CU504 UTILITY DETAILS
CU505 UTILITY DETAILS
CU506 UTILITY DETAILS
STRUCTURAL
S-001 GENERAL NOTES
S-002 GENERAL NOTES
S-003 TYPICAL DETAILS - FOUNDATION
S-004 TYPICAL DETAILS - SLAB
S-005 TYPICAL DETAILS - BASE PLATES AND ANCHOR RODS
S-006 TYPICAL DETAILS - BASE PLATES AND ANCHOR RODS
S-007 TYPICAL DETAILS - CONCRETE PEDESTALS
S-008 TYPICAL DETAILS - MASONRY
S-009 TYPICAL DETAILS - MASONRY
S-010 TYPICAL DETAILS - MASONRY
S-011 TYPICAL DETAILS - FRAMING
S-012 TYPICAL DETAILS - FRAMING AND SIMPLE SHEAR CONNECTIONS
S-013 TYPICAL DETAILS - DRAG STRUT / COLLECTOR CONNECTIONS
S-014 TYPICAL DETAILS - GIRT FRAMING
S-015 TYPICAL DETAILS - GIRT FRAMING
S-016 TYPICAL DETAILS - HANGAR DOOR RAILS
S-017 TYPICAL DETAILS - TRENCH
SB100 COMPOSITE FOUNDATION PLAN
SB101 FOUNDATION PLAN - SECTOR A
SB102 FOUNDATION PLAN - SECTOR B
SB103 FOUNDATION PLAN - SECTOR C
SB104 FOUNDATION PLAN - SECTOR D
SB110 COMPOSITE SLAB AND WALL PLAN
SB111 SLAB AND WALL PLAN - SECTOR A
SB112 SLAB AND WALL PLAN - SECTOR B
SB113 SLAB AND WALL PLAN - SECTOR C
SB114 SLAB AND WALL PLAN - SECTOR D
SB401 ENLARGED PLANS
SB402 ENLARGED PLANS
SB403 ENLARGED PLANS
SB501 FOUNDATION DETAILS
SB502 FOUNDATION DETAILS
SB503 FOUNDATION DETAILS
SB504 FOUNDATION DETAILS
SB505 FOUNDATION DETAILS
SB506 FOUNDATION DETAILS
SF100 COMPOSITE LOW ROOF FRAMING PLAN
SF102 LOW ROOF FRAMING PLAN - SECTOR B
(VOL 1) GEN, CIV, STR
NUMBER TITLE
GENERAL
G-001-V1 COVER SHEET - VOLUME 1
G-002-V1 SHEET INDEX (V1) GENERAL, CIVIL, STRUCTURAL
G-101 GENERAL CONTRACT DOCUMENT NOTES, BUILDING CODE SUMMARY,
PLUMBING FIXTURE COUNTS
G-102 LIFE SAFETY & OCCUPANCY FLOOR PLAN
G-103 SECURITY RELATED EXTERIOR PERIMETER WALL & INTERIOR PARTITION
SLEEVE DETAILS FOR SOUND ATTENUATION
CIVIL
C-001 CIVIL LEGEND AND ABBREVIATIONS
C-002 CIVIL GENERAL NOTES
GC101 GENERAL CONSTRUCTION NOTES
GC102 GENERAL CONSTRUCTION NOTES
GC103 GENERAL CONSTRUCTION NOTES
GC104 LOCATION AND VICINITY MAPS
GC105 CONSTRUCTION HAUL ROUTE
GC106 OVERALL CONSTRUCTION STAGING, LAYDOWN, AND ACCESS - PHASE 1
GC107 OVERALL CONSTRUCTION STAGING, LAYDOWN, AND ACCESS - PHASE 2
GC108 OVERALL CONSTRUCTION STAGING, LAYDOWN, AND ACCESS - PHASE 3
GC109 CONSTRUCTION STAGING, LAYDOWN, AND PARKING - ALL PHASES
GC501 GENERAL DETAILS
GC502 GENERAL DETAILS
B-101 BORING MAPS & LOGS
B-102 BORING LOGS
B-103 BORING LOGS
B-104 ENVIROMENTAL SOILS MAP
B-105 ENVIROMENTAL SOILS MAP
VF101 OVERALL SITE AND SHEET INDEX
VF102 TOPOGRAPHIC MAP
VF103 TOPOGRAPHIC MAP
VF104 TOPOGRAPHIC MAP
VF105 TOPOGRAPHIC MAP
VF106 TOPOGRAPHIC MAP
VF107 TOPOGRAPHIC MAP
VF108 TOPOGRAPHIC MAP
V-100 OVERALL EXISTING CONDITIONS PLAN
V-101 EXISTING CONDITIONS PLAN
V-102 EXISTING CONDITIONS PLAN
V-103 EXISTING CONDITIONS PLAN
V-104 EXISTING CONDITIONS PLAN
V-105 EXISTING CONDITIONS PLAN
V-106 EXISTING CONDITIONS PLAN
V-107 EXISTING CONDITIONS PLAN
CD100 OVERALL DEMOLITION PLAN
CD101 DEMOLITION PLAN
CD102 DEMOLITION PLAN
CS100 OVERALL SITE PLAN
CS101 SITE PLAN
CS102 SITE PLAN
CS103 OVERALL SITE STAKING PLAN
CS104 SITE STAKING PLAN
CS105 SITE STAKING PLAN
CS106 SITE STAKING PLAN
CS107 SITE STAKING PLAN
CS108 SITE STAKING PLAN
CS109 SITE STAKING PLAN
CS110 SITE STAKING PLAN
CS111 SITE STAKING POINT TABLE
CS150 ATFP PLAN
CS501 SITE DETAILS
CS502 SITE DETAILS
CS503 SITE DETAILS
CP100 OVERALL PAVEMENT JOINT PLAN
CP101 PAVEMENT JOINT PLAN
CP102 PAVEMENT JOINT PLAN
CP110 PAVEMENT JOINT ELEVATION PLAN
CP111 PAVEMENT JOINT ELEVATION PLAN
CP501 PAVEMENT DETAILS
CP502 PAVEMENT DETAILS
CG100 OVERALL GRADING PLAN
CG101 GRADING PLAN
CG102 GRADING PLAN
CG120 OVERALL EROSION AND SEDIMENT CONTROL PLAN
CG121 EROSION AND SEDIMENT CONTROL PLAN
CG122 EROSION AND SEDIMENT CONTROL PLAN
CG123 EROSION AND SEDIMENT CONTROL PLAN
CG124 EROSION AND SEDIMENT CONTROL PLAN JAMES
CHRISTOPHER
LUCKOWSKI
#a3267
11-27-2023
MEANS OF EGRESS REQUIREMENTS - 2018 NFPA 101
STORAGE USE (AIRCRAFT &
MEP / STO SPACES)
OCCUPANT LOAD
FACTOR
BUSINESS USE 150 GROSS
(TABLE 7.3.1.2)
500 GROSS
(TABLE 7.3.1.2)
COMMON PATH
OF TRAVEL
100' (38.2.5.3.1)
100' (42.2.5)
MAXIMUM TRAVEL
DISTANCE TO EXITS
EXTERIOR INTERVAL
150' (40.6.2.2)
300' (38.2.6.3)
MINIMUM EXIT ACCESS
CORRIDOR WIDTH
44" (38.2.3.2)
36" (7.3.4.1)
50' (40.6.4)
50' (38.2.5.2.1)
MAXIMUM DEAD END
CORRIDOR LENGTH
MINIMUM NUMBER
OF EXITS
(40.6.2.1)
PER OCCUPANT
LOAD
BUILDING CODE SUMMARY
OCCUPANCY CLASSIFICATION
(IBC 2018)
ITEM
BUSINESS GROUP B (IBC 304.1) OFFICE AREAS, CONFINED SPACE TRAINING, ETC.
STORAGE GROUP S-1 (IBC 311.2) AIRCRAFT HGR (STO & REPAIR)
ACCESSORY STORAGE AREAS, MECHANICAL EQUIPMENT ROOMS
OCCUPANCY CLASSIFICATION
(NFPA 101, 2018)
BUSINESS USE (CHAPTER 38) OFFICE AREAS, CONFINED SPACE TRAINING, ETC.
STORAGE USE - HANGAR (CHAPTER 40) AIRCRAFT STORAGE
ALLOWABLE BUILDING HEIGHT UNLIMITED HEIGHT (UFC 4-211-01: 3-3.1.7)
ARCHITECTURAL BARRIERS ACT (ABA) FULLY COMPLIANT (UNITED STATES ACCESS BOARD)
FIRE PROTECTION SYSTEMS:
AIRCRAFT SERVICING AREA PREACTION SPRINKLER SYSTEM (UFC 4-211-01)
ADMINISTRATION AND SHOPS WET PIPE SPRINKLER SYSTEM (UFC 3-600-01 FIRE PROTECTION)
FIRE RESISTANCE REQUIREMENTS:
BOILER ROOMS, FURNACE ROOMS, AND
GENERAL STORAGE ROOMS OVER 100 SF
1 HOUR OR AUTOMATIC FIRE EXTINGUISHING SYSTEM (TABLE 509)
NON-LOADBEARING EXTERIOR WALLS 0 HOUR (TABLE 602)
HANGAR COLUMNS 0 HOUR (UFC 4-211-01, 3-3.1.2)
FLOOR CONSTRUCTION 0 HOUR (TABLE 601)
ROOF CONSTRUCTION 0 HOUR (TABLE 601)
FIRE SEPARATION REQUIREMENTS:
BUILDING CODES AND STANDARDS
INTERNATIONAL MECHANICAL CODE 2018
INTERNATIONAL BUILDING CODE 2018
NATIONAL ELECTRICAL CODE 2023
NFPA 101 LIFE SAFETY CODE 2018
MINIMUM EGRESS WIDTH 0.2" PER OCCUPANT (NFPA 101, TABLE 7.3.3.1)
SEPARATION BETWEEN AIRCRAFT
SERVICING AREA & SUPPORT SPACES
1 HOUR (UFC 04-211-01, 3-3.1.2)
SEPARATIONS OF LOW BAY OCCUPANCIES
(EAST OF GRID 9.2)
NOT REQUIRED - MIXED USE NONSEPARATED PER 508.3.2
NATIONAL FIRE CODES (NFPA) LATEST EDITIONS
ICC / ANSI A117.1 2003
UNIFORM FEDERAL ACCESSIBILITY STANDARD (UFAS)
UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR
FACILITIES - CHANGE 6, 6 MAY 2021
UFC 1-200-01, GENERAL BUILDING REQUIREMENTS -
01 SEPTEMBER 2022
UFC 4-010-01, MINIMUM ANTI-TERRORISM STANDARDS -
CHANGE 2, 30 JULY 2022
ACCESSIBILITY FOR FIREFIGHTING
ALL WEATHER ACCESS MUST BE PAVED TO WITHIN 10M
(33 FT) FROM THE BUILDING (UFC 4-211-01, 3-3.1.11)
FIRE DEPARTMENT ACCESS ROADS
MUST COMPLY WITH NFPA 1 (18.2.3.5.1) ACCESS ROADS
SHALL HAVE AN UNOBSTRUCTED WIDTH OF NOT LESS
THAN 20 FT.
PORTABLE FIRE EXTINGUISHERS - 2018 NFPA 10
EXTINGUISHER SELECTION
MAX TRAVEL DISTANCE
CLASSIFICATION OF
HAZARD
EXTRA (HIGH) 5.4.1.3 HANGAR
BAY
ORDINARY (MODERATE) 5.4.1.2 -
STORAGE, SUPPORT SHOP
4A:60B:C
A: 75 FEET (TABLE 6.2.1.1.2)
LIGHT (LOW) 5.4.1.1
OFFICE AREAS
20A:120B:C
A: 75 FEET (TABLE 6.2.1.1.2)
4A:60B:C
A: 75 FEET (TABLE 6.2.1.1.2)
FIRE PROTECTION ROOM 1 HOUR (UFC 4-211-01, 3-6.7)
INTERNATIONAL PLUMBING CODE 2018
UFC 4-021-01, DESIGN AND O&M: MASS NOTIFICATION
SYSTEMS, CHANGE 1, JANUARY 2010
TYPES OF CONSTRUCTION TYPE II-B (IBC 2018, TABLE 601: 0 HOUR FIRE RESISTANCE
RATING FOR BLDG ELEMENTS
ALLOWABLE BUILDING AREA STORAGE GROUP S-1 (IBC TABLE 506.2) IBC 2018
70,000 GROSS SQUARE FEET - (IBC TABLE 506.2 - WITH SPRINKLER SYSTEM)
ACTUAL BUILING AREA = 37,068 GSF (PASSES)
ARCHITECTURAL BARRIERS ACT (ABA) 2004
UFC 3-110-03, ROOFING - CHANGE 5, 12 JUNE 2020
UFC 4-211-01, AIRCRAFT MAINTENANCE HANGARS
- CHANGE 3, APRIL 20, 2021
DESCRIPTION
NFPA 409, STANDARD FOR AIRCRAFT HANGARS 2021
BUILDING DATA
AREA
CURRENT HANGAR / SUPPORT SPACES TOTAL = 36,720 GSF
DD1391 ALLOWABLE = (3,425 SM) 36,873 GSF
PLUMBING FIXTURES - IBC 2018
FIXTURE TYPE
CALCULATION BASED ON 80/20 MALE TO FEMALE RATIO
REQUIRED
BUSINESS USE = 51 OCCUPANTS (41 MALE / 10 FEMALE)
WC (MEN)
WC (WOMEN)
LAV (MEN)
LAV (WOMEN)
DRINK FOUNTAIN
SERVICE SINK 1 PER FLOOR
EDUCATIONAL USE - CONFINED SPACE TRAINING = 36 OCCUPANTS (29 MALE /7 FEMALE)
WC (MEN) 1 PER 50 0.58
WC (WOMEN)
LAV (MEN)
LAV (WOMEN)
DRINK FOUNTAIN
IBC TABLE 2902.1
LOAD FACTOR (LF) CALCULATION (OCC / LF)
1 PER 50
1 PER 50
1 PER 50
1 PER 100
(29/50)
36/100
1 PER 25 (FOR FIRST 50)
1 PER 50 (EXCEEDING 50)
1 PER 25 (FOR FIRST 50)
1 PER 50 (EXCEEDING 50)
1 PER 40 (FOR FIRST 80)
1 PER 80 (EXCEEDING 80)
1 PER 100
(41/50) (0/50)
0.9
(41/40) (0/80)
1.12
51/100 0.56 1.0
0.36
0.22
(10/50) (0/50)
0.14(7/50) 0.58(29/50) 0.14(7/50)
1 PER 40 (FOR FIRST 80)
1 PER 80 (EXCEEDING 80)
(10/40) (0/80)
0.27
TOTALS (ROUND UP)
WC (MEN) 0.9 + 0.58 + 0.50 = 1.98 2
WC (WOMEN) 1
LAV (MEN)
LAV (WOMEN)
DRINK FOUNTAIN
SERVICE SINK
WC (MEN) 1 PER 100 0.50
WC (WOMEN)
LAV (MEN)
LAV (WOMEN)
DRINK FOUNTAIN
1 PER 100
1 PER 100
1 PER 100
1 PER 1000
(50/100)
62/1000
REQUIRED
0.06
0.12(12/100) 0.50(50/100)
(12/100)
PROVIDED
0.22 + 0.14 + 0.12 = 0.48 2 81.12 + 0.58 + 0.50 = 2.20 1 40.27 + 0.14 + 0.12 = 0.53
0.56 + 0.36 + 0.06 = 0.98 1 2
URINALS (MEN) 8
STORAGE - (AIRCRAFT & MEP/STO SPACES) = 62 OCCUPANTS (50 MALE /12 FEMALE)
0.12
AM
-0
- 1
D
ES
IG
N
IS
SU
ED
F O
R P
R
IC
IN
G
N O
V
B ro ad wa y E xte ns ion
, S uit e 5
Ok lah om a C ity , O
K
8-7
5.8
.29
| f sb -a e.c om
FS
B/
PO
N
D J
V B-
F
U
EL
S
YS
M
AI
N
TE
N
AN
C E
D O
C K
AN
SI
D
US Army Corps of Engineers
Omaha District
5 ADVERTISEMENT - 100% DESIGN
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
A
B
M
AR
K
IS
SU
E D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
D
AT
E
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
EL
LS
W
O R
TH
A
FB
, S
D
D
C
A
B
1 2 3 4
M
JT
G
O B
W
F2
4R
N
O V
C :\U sers\jluckow ski\O neD rive - FSB Architects +
Engineers\D ocu m ents\159100_A rch_jluckow ski.r vt
11/17/2023 8:22 :29 AM
G-101
G
EN
ER
AL
C O
N
TR
AC
T
D O
C U
M
EN
T N
O
TE
S, BU
IL
D
IN
G
C O
D E
SU
M
M
AR
Y, P
LU
M
BI
N
G
FI
XT
U
R E
C O
U N
TS
JM
I /
M
JT
JC
L
JC
L
/ L
FO
GENERAL CONTRACT DOCUMENT NOTES:
THESE CONTRACT DOCUMENTS (DRAWINGS AND SPECIFICATIONS) HAVE BEEN CREATED TO ILLUSTRATE THE PROJECT’S SCOPE AND TO DESCRIBE THE DESIGN INTENT. THESE CONTRACT DOCUMENTS ARE NOT INTENDED TO BE COMPLETE, SHOP DRAWING LEVEL DOCUMENTS, WHICH WILL BE PREPARED BY THE CONTRACTOR BASED UPON THE FINAL MATERIALS, PRODUCTS AND EQUIPMENT SELECTED BY THE
CONTRACTOR. THE CONTRACTOR IS REQUIRED TO PROVIDE THE EXPERTISE TO SUCCESSFULLY
COORDINATE AND EXECUTE THE WORK, INCLUDING AS FOLLOWS:
1. MEANS AND METHODS OF CONSTRUCTION ARE THE SOLE DOMAIN AND EXCLUSIVE
RESPONSIBILITY OF THE CONTRACTOR. MATERIALS, PRODUCTS AND EQUIPMENT ARE INDICATED
AS GENERICALLY AS PRACTICAL WHEN/WHERE SOLE-SOURCING SUCH ITEMS IS NOT PERMITTED
BY THE OWNER. CONTRACTOR COORDINATION IS REQUIRED BASED UPON THE FINAL MATERIALS, PRODUCTS AND EQUIPMENT SELECTED BY THE CONTRACTOR, EVEN WHEN THE BASIS OF DESIGN
MATERIAL, PRODUCT OR EQUIPMENT IS SELECTED FOR USE. CONTRACTOR SHALL FULLY
COORDINATE AND MODIFY, AS REQUIRED AND AT NO ADDITIONAL COST OR TIME TO THE OWNER
OR ARCHITECT/ENGINEER OF RECORD, ALL DIMENSIONS, CLEARANCES, ARRANGEMENTS,
ASSEMBLIES, PROGRAMMING/CONTROLS, ETC. WHICH MAY VARY BASED UPON THE FINAL
MATERIALS, PRODUCTS OR EQUIPMENT SELECTED BY THE CONTRACTOR.
2. BUILDING SYSTEMS, COMPONENTS AND FUNCTIONALITY INDICATED IN THESE CONTRACT
DOCUMENTS ARE INCLUDED WHERE SPECIFIC PROJECT REQUIREMENTS SHALL BE ADHERED TO IN THE CONSTRUCTION OF THIS PROJECT. NOT ALL COMPONENTS, WIRING, CONDUIT, MOUNTINGS, BRACING, PERIPHERAL ITEMS, PROGRAMMING, CONTROLS, ETC. ARE SHOWN OR INDICATED. IN
CASES WHERE NO SPECIFIC PROJECT REQUIREMENTS ARE INDICATED IN THE CONTRACT
DOCUMENTS OR WHERE VARIATIONS EXIST IN THE MATERIALS, PRODUCTS OR EQUIPMENT
SELECTED BY THE CONTRACTOR, THESE ARE DELEGATED DESIGNS AND THE CONTRACTOR IS
RESPONSIBLE FOR PROVIDING A COMPLETE AND USABLE BUILDING SYSTEM, COMPONENT AND/OR
FUNCTIONALITY.
JAMES
CHRISTOPHER
LUCKOWSKI
CLEAN AGENT TYPE FIRE
EXTINGUISHER ON WALL BRACKET
MOUNTED AT 48" AFF
EGRESS - COMMON PATH
LIFE SAFETY LEGEND
EGRESS - EXIT ACCESS
EXIT COMPONENT LOAD00
000 EXIT COMPONENT CAPACITY
MULTI-PURPOSE TYPE FIRE
EXTINGUISHER - WALL BRACKET
MOUNTED AT 48" AFF
MULTI-PURPOSE TYPE FIRE
EXTINGUISHER - SEMI-RECESSED
CABINET MOUNTED AT 48" AFF
120B MULTI-PURPOSE TYPE FIRE
EXTINGUISHER - WALL BRACKET
MOUNTED AT 48" AFF
G G
F F
E E
D D
C C
B B
A A
TRAVEL DISTANCE = 85'
42 OCC
1 OCC
5 OCC
2 OCC
1 OCC
24 OCC
5 OCC
2 OCC
1 OCC
3 OCC
3 OCC
1 OCC
1 OCC
2 OCC
O
C C
6a
1 OCC
1 OCC
1 OCC
1 OCC
36 OCC
2 OCC
116c
2 OCC
113b
2 OCC
2 OCC
115 2 OCC
2 OCC
2 OCC
2 OCC
1 OCC
2 OCC
1 OCC
1 OCC
1 OCC
1 OCC
1 OCC
1 OCC
1 OCC
2 OCC
2 OCC
106b
1 OCC
113a
1 OCC
116d
1 OCC
134a
O
C C
TRAVEL DISTANCE = 104'
TR
AV EL D
IS TAN
C
E = 76'
OCCUPANCY LEGEND
NFPA BUSINESS USE
NFPA BUSINESS USE -
TRAINING #126
NFPA BUSINESS USE - BREAK
ROOM #111
NFPA STORAGE USE - IN OTHER
THAN STORAGE AND
MERCANTILE OCCUPANCIES
NFPA 101 TABLE 7.3.3.1 EGRESS CAPACITY FACTOR
LEVEL COMPONENTS = 0.2" WIDTH PER OCCUPANT
(36" DR) 34" CLEAR DIVIDED BY 0.2" = 170 OCCUPANTS
(72" DR) 68" CLEAR DIVIDED BY 0.2" = 340 OCCUPANTS
1 OCC
124a
92'-8"
'-2
115'-11"
7' -0
TOTAL = 144'-10"
(< 150 FT)
TOTAL = 122'-11"
(< 150 FT)
'-0
9.2
9.2
PURGE AIR EQUIP
PLATFORM ABOVE
4 4
UNRATED PARTITION
UNRATED INSULATED PARTITION
1-HOUR RATED STC 50 PARTITION
1 HOUR RATED CONCRETE MASONRY UNIT
PARTITION TYPES LEGEND
A. REFER TO SHEET AE100 FOR GRAPHIC PARTITION
TYPES AND SPECIFIC NOTED MATERIALS.
AM
-0
- 1
D
ES
IG
N
IS
SU
ED
F O
R P
R
IC
IN
G
N O
V
B ro ad wa y E xte ns ion
, S uit e 5
Ok lah om a C ity , O
K
8-7
5.8
.29
| f sb -a e.c om
FS
B/
PO
N
D J
V B-
F
U
EL
S
YS
M
AI
N
TE
N
AN
C E
D O
C K
AN
SI
D
US Army Corps of Engineers
Omaha District
5 ADVERTISEMENT - 100% DESIGN
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
A
B
M
AR
K
IS
SU
E D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
D
AT
E
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
EL
LS
W
O R
TH
A
FB
, S
D
D
C
A
B
1 2 3 4
M
JT
G
O B
W
F2
4R
N
O V
N
KEY PLAN
A
B C
D
0 8' 16' 32'
1/16" = 1'-0"
C :\U sers\jluckow ski\O neD rive - FSB Architects +
Engineers\D ocu m ents\159100_A rch_jluckow ski.r vt
11/17/2023 8:22 :28 AM
G-102
LI
FE
S
AF
ET
Y
O
C C
U
PA
N C
Y
FL
O O
R P
LA
N
JM
I /
M
JT
JC
L
JC
L
/ L
FO
OCCUPANT LOAD
AREA LOAD FACTOR OCCUPANCY
OCC
LOAD
348 SF @ 1:15 B BUSINESS 24
1,770 SF @ 1:50 NSF B BUSINESS 36
5,233 SF @ 1:150 GSF B BUSINESS 48
26,979 SF @ 1:500 GSF S-1 STORAGE 62
34,329 SF 170
EGRESS PATHS
PATH TYPE LENGTH
COMMON PATH 84'-6"
EXIT ACCESS 104'-0"
EXIT ACCESS 76'-0"
SCALE: 1/16" = 1'-0"
LIFE SAFETY / OCCUPANCY PLANB1
OCCUPANCY AREA SCHEDULE
ROOM
AREA
OCC LOAD
FACTOR
OCC
LOAD NOTESNUMBER NAME
125 CHARGING 163 SF 1:500 1
127 CORR 65 SF 1:500 1
129 HANGAR BAY 20,797 SF 1:500 42
130 MECH 418 SF 1:500 1
131 FIRE PROT 439 SF 1:500 1
132 AHU 420 SF 1:500 1
134 ELEC 267 SF 1:500 1
134a ELEC 22 SF 1:500 1
135 MECH 429 SF 1:500 1
136 AIR COMP 290 SF 1:500 1
137 MECH 293 SF 1:500 1
138 DOOR POCKET 716 SF 1:500 2
S-1 STORAGE: 16 26,979 SF 62
TOTAL: 44 34,329 SF 170
OCCUPANCY AREA SCHEDULE
ROOM
AREA
OCC LOAD
FACTOR
OCC
LOAD NOTESNUMBER NAME
116d MEN (D) 134 SF 1:150 1
117 INITIAL ACCUM 162 SF 1:150 2
118 WOM (C) 201 SF 1:150 2
119 WOM SHWR (C) 159 SF 1:150 2
120 WOM SHWR (D) 159 SF 1:150 2
121 WOM (D) 216 SF 1:150 2
122 DIRTY CORR 673 SF 1:150 5
126 CONFINED
SPACE TRNG
1,770 SF 1:50 36
128 VEST 88 SF 1:150 1
133 CORR 80 SF 1:150 1
139 VEST 62 SF 1:150 1
B BUSINESS: 28 7,350 SF 108
S-1 STORAGE
109 COMM 164 SF 1:500 1
123 CTK 2,368 SF 1:500 5
124 HAZ-MAT 1 64 SF 1:500 1
124a HAZ-MAT 2 64 SF 1:500 1
OCCUPANCY AREA SCHEDULE
ROOM
AREA
OCC LOAD
FACTOR
OCC
LOAD NOTESNUMBER NAME
B BUSINESS
101 VEST 115 SF 1:150 1
102 DISPATCH 215 SF 1:150 2
103 LOCKERS 195 SF 1:150 2
104 AIRMEN/NCO 363 SF 1:150 3
105 SEC
CHIEF/NCOIC
369 SF 1:150 3
106a CORR 264 SF 1:150 2 106b CORR 252 SF 1:150 2
107 SECURE VEST 51 SF 1:150 1
108 SECURE
OFFICE
284 SF 1:150 2
110 NURSING 103 SF 1:150 1
111 BREAK 348 SF 1:15 24
112 JAN 27 SF 1:150 1
113a MEN (C) 132 SF 1:150 1 113b MEN (C) 199 SF 1:150 2
114 MEN SHWR (C) 252 SF 1:150 2
115 MEN SHWR (D) 279 SF 1:150 2
116c MEN (D) 197 SF 1:150 2
ROOM NAMES - OCCS
ROOM NUMBER ROOM NAME
127 CORR
128 VEST
129 HANGAR BAY
130 MECH
131 FIRE PROT
132 AHU
133 CORR
134 ELEC
134a ELEC
135 MECH
136 AIR COMP
137 MECH
138 DOOR POCKET
139 VEST
ROOM NAMES - OCCS
ROOM NUMBER ROOM NAME
123 CTK
124 HAZ-MAT 1
124a HAZ-MAT 2
125 CHARGING
126 CONFINED SPACE TRNG
ROOM NAMES - OCCS
ROOM NUMBER ROOM NAME
118 WOM (C)
119 WOM SHWR (C)
120 WOM SHWR (D)
121 WOM (D)
122 DIRTY CORR
ROOM NAMES - OCCS
ROOM NUMBER ROOM NAME
114 MEN SHWR (C)
115 MEN SHWR (D)
116c MEN (D) 116d MEN (D)
117 INITIAL ACCUM
ROOM NAMES - OCCS
ROOM NUMBER ROOM NAME
110 NURSING
111 BREAK
112 JAN
113a MEN (C) 113b MEN (C)
ROOM NAMES - OCCS
ROOM NUMBER ROOM NAME
106a CORR 106b CORR
107 SECURE VEST
108 SECURE OFFICE
109 COMM
ROOM NAMES - OCCS
ROOM NUMBER ROOM NAME
101 VEST
102 DISPATCH
103 LOCKERS
104 AIRMEN/NCO
105 SEC CHIEF/NCOIC
STORAGE
JAMES
CHRISTOPHER
LUCKOWSKI
100'-0"
TOP OF WALL OR SLAB
4" CAVITY WALL INSULATION
(CMUV1) SPLIT FACE CMU
VENEER
WALL HYDRANTS, EXTERIOR
RECEPTACLES, NATURAL GAS
PIPING, ETC. - ALL TRADES SHALL
COORDINATE WITH MASONRY
CONTRACTOR
MIN
1/2"
M
IN
3/ 4"
M
IN
3/ 4"
CONDUIT (WITH
DIELECTRIC BREAKS)
OR PRESSURIZED PIPE
(BONDED / GROUNDED)
MIN SCHEDULE 40 PVC
SLEEVE (SIZE AS REQUIRED
TO MAINTAIN 3/4"
ROCKWOOL INSUL INFILL)
3/4" DEPTH CONT SEALANT ALL
AROUND INCLUDING SEALING BEAD
AROUND EXT PERIMETER TO
THOROUGHLY SEAL FOR WEATHER
PER INSULATION AND SEALANT
MANUFACTURERS SPECIFIC
INSTRUCTIONS
3/4" DEPTH CONT
SEALANT ALL
AROUND PAINTED
AS SCHEDULED
CONT ROCKWOOL INSUL
INFILL IN ANNULAR SPACE
EXTERIOR
FIELD CUT CMU & ADJUST ALL SLEEVE
POSITIONS AS REQUIRED - DO NOT CUT
MORE THAN ONE BLOCK AND DO NOT
SPAN ANY HEAD OR BED JOINT (FILL
PERIMETER FULLY WITH MORTAR TO
THOROUGHLY SEAL PENETRATION)
101'-4"
CMU BED JOINT
M
IN
3/ 4"
M
IN
3/ 4"
8" CMU
4" CAVITY WALL INSULATION
(CMUV2) SMOOTH FACE CMU
VENEER BAND
NOTE: PROVIDE 2 COURSE
HIGH X 1 BLOCK WIDE
STACKED BOND (CMUV2)
SMOOTH FACE CMU VENEER
AT EACH WALL HYDRANT AND
RECEPTACLE FOR SMOOTH
COVER MOUNTING SURFACE
(CSB1) CAST STONE BAND
109'-0"
CENTER OF J-BOX
W1 OR W1E LIGHT FIXTURE
LIGHT FIXTURE J-BOX
FIELD CUT CMU & ADJUST ALL SLEEVE
POSITIONS AS REQUIRED SLIGHTY - DO
NOT CUT MORE THAN ONE BLOCK AND
DO NOT SPAN ANY HEAD OR BED JOINT
(FILL PERIMETER FULLY WITH MORTAR
TO THOROUGHLY SEAL PENETRATION)
CMU WYTHE
EXTERIOR ELEVATION
CMU WYTHE
EXTERIOR ELEVATION
N O
M 4"
PVC SLEEVE
CONDUIT OR
PIPE
NTERIOR NOTES
BELOW ALSO APPLY
TO THIS DETAIL
(CMUV1) SPLIT FACE CMU
VENEER
108'-8"
PVC SLEEVE
CONDUIT OR
PIPE
INTERIOR
(FWP1) FABRICATED WALL
PANELS ABOVE 110'-0"
M
IN
3/ 4"
M
IN
3/ 4"
STEEL GIRT AND
SAG ROD
MFR INSTRUCTIONS
DISTANCE PER FLUE
8" NOM ROUND
COMBUSTION AIR OR
S/A - R/A DUCTWORK
5"
OUTER FACE OF FLUTED
FABRICATED WALL PANELS
RECESSED FLUTE FACE OF
FABRICATED WALL PANELS
MIN SCHEDULE 40 PVC SLEEVE
(SIZE AS REQUIRED TO MAINTAIN
3/4" ROCKWOOL INSUL INFILL
3/4" DEPTH CONT
SEALANT ALL AROUND
CONT ROCKWOOL INSUL
INFILL IN ANNULAR SPACE FLUE / DUCTWORK
(WITH DIELECTRIC
BREAKS)
14 GA GALV SHEET METAL TRIM
RING FASTENED TO FACE OF
PANELS & PAINTED TO MATCH
PANEL COLOR (SEALANT
AROUND PERIMETER)
3/4" DEPTH CONT
SEALANT ALL AROUND
MIN
1"
100'-0"
TOP OF WALL OR SLAB
4" CAVITY WALL INSULATION
(CMUV1) SPLIT FACE CMU
VENEER
SLEEVE DETAIL FOR
REFRIGERANT PIPING, CIRCUIT
BREAKERS & GENERATOR ATS
CONDUITS, ETC. AT HEIGHTS
REQUIRED - ALL TRADES SHALL
COORDINATE WITH MASONRY
CONTRACTOR
M
IN
3/ 4"
M
IN
3/ 4"
CONDUIT (WITH
DIELECTRIC BREAKS)
OR PRESSURIZED PIPE
(BONDED / GROUNDED)
MIN SCHEDULE 40 PVC
SLEEVE (SIZE AS
REQUIRED TO MAINTAIN
3/4" ROCKWOOL INSUL
INFILL)
3/4" DEPTH CONT SEALANT ALL
AROUND INCLUDING SEALING BEAD
AROUND EXT PERIMETER TO
THOROUGHLY SEAL FOR WEATHER
PER INSULATION AND SEALANT
MANUFACTURERS SPECIFIC
INSTRUCTIONS
3/4" DEPTH CONT
SEALANT ALL AROUND
PAINTED AS
SCHEDULED
CONT ROCKWOOL
INSUL INFILL IN
ANNULAR SPACE
8" CMU
(CMUV2) SMOOTH FACE CMU
VENEER BAND
(CSB1) CAST STONE BAND
108'-8"
EXTERIOR INTERIOR
CIRCUIT BREAKER OR GENERATOR
ATS BOX AT HEIGHT REQUIRED
NOTE: PROVIDE STACKED BOND
(CMUV2) SMOOTH FACE CMU
VENEER AT THE EXTENTS OF
EACH CIRCUIT BREAKER OR
GENERATOR ATS BOX FOR
SMOOTH MOUNTING SURFACE -
ALL TRADES SHALL COORDINATE
WITH MASONRY CONTRACTOR
CONDUIT OR PRESSURIZED PIPING -
ALL TRADES SHALL COORDINATE
WITH MASONRY CONTRACTOR
M
IN
3/ 4"
M
IN
3/ 4"
CONDUIT (WITH
DIELECTRIC BREAKS) OR
PRESSURIZED PIPE
(BONDED / GROUNDED)
MIN SCHEDULE 40 PVC
SLEEVE (SIZE AS REQUIRED
TO MAINTAIN 3/4"
ROCKWOOL INSUL INFILL)
3/4" DEPTH CONT SEALANT ALL
AROUND PER INSULATION AND
SEALANT MANUFACTURERS
SPECIFIC INSTRUCTIONS
3/4" DEPTH CONT
SEALANT ALL AROUND
PAINTED AS SCHEDULED
CONT ROCKWOOL INSUL
INFILL IN ANNULAR SPACE
NON-SECURE SIDE
TBD BASED ON LOCATION
CMU BED JOINT
8" OR 12" CMU
SECURE SIDE
AM
-0
- 1
D
ES
IG
N
IS
SU
ED
F O
R P
R
IC
IN
G
N O
V
B ro ad wa y E xte ns ion
, S uit e 5
Ok lah om a C ity , O
K
8-7
5.8
.29
| f sb -a e.c om
FS
B/
PO
N
D J
V B-
F
U
EL
S
YS
M
AI
N
TE
N
AN
C E
D O
C K
AN
SI
D
US Army Corps of Engineers
Omaha District
5 ADVERTISEMENT - 100% DESIGN
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
A
B
M
AR
K
IS
SU
E D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
D
AT
E
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
EL
LS
W
O R
TH
A
FB
, S
D
D
C
A
B
1 2 3 4
M
JT
G
O B
W
F2
4R
N
O V
C :\U sers\jluckow ski\O neD rive - FSB Architects +
Engineers\D ocu m ents\159100_A rch_jluckow ski.r vt
11/17/2023 8:31 :55 AM
G-103
SE
C
U R
IT
Y
R
EL
AT
ED
E
XT
ER
IO
R P
ER
IM
ET
ER
W
AL
L
IN
TE
R
IO
R P
AR
TI
TI
O
N S
LE
EV
E D
ET
AI
LS
F
O R
S O
U N
D A
TT
EN
U
AT
IO
N
JM
I /
M
JT
JC
L
JC
L
SCALE: NTS
EXT PERIMETER CAVITY WALL SLEEVE DETAILSA1
NOTE: ALL TRADES SHALL COORDINATE WITH MASONRY CONTRACTOR FOR ALL SLEEVES
PRIOR TO AND DURING CONSTRUCTION - NO EXCEPTIONS
SCALE: 3" = 1'-0"
INT RATED CMU PARTITION SLEEVE DETAILC3
JAMES
CHRISTOPHER
LUCKOWSKI
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
4 5
A
B
M
AR
K
IS
SU
E D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
D
AT
E
US Army Corps of Engineers
Omaha District
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EL
LS
W O
R
TH
A
FB
, S D
O M
AH
A
D
IS
TR
IC
T
AN
SI
D
M
JT
G
O B
FS
B/
PO
N
D J
V B-
F
U
EL
S
YS
M
AI
N
TE
N
AN
C E
D O
C K
B ro ad wa y E xte ns ion
, S uit e 5
Ok lah om a C ity , O
K
8-
5.8
.29
| f sb -a e.c om
D
C
A
B
1 2 3 4 5 ADVERTISEMENT - 100% DESIGN
W
F2
4R
AM
-0
- 1
D
ES
IG
N
IS
SU
ED
F O
R P
R
IC
IN
G
N O
V
N
O V
D . L
EC
KI
E
N . A
D
AM
D S
T.
N
O R
M
AN
AT
AND
DIAMETER
ABANDONED
ASPHALT CONCRETE
APRON GROUNDING POINT
ENGINEER IN CHARGE
APPROVED
APPROXIMATELY
BUILDING
BENCHMARK
BOTTOM
BYPASS
CLEARED AMERICAN GUARDS
COMPOST AMENDED VEGETATED FILTER STRIP
CATCH BASIN
CENTERLINE
CUBIC FEET
CORRUGATED METAL PIPE
CATHODIC PROTECTION TEST STATION
CONCRETE
CONTRACTING OFFICER'S REPRESENTATIVE
CEMENT TREATED BASE
DROP INLET
DIAMETER
DUCTILE IRON PIPE
DESIGNER
DEFENSE LOGISTICS AGENCY
DIRECTORATE OF PUBLIC WORKS
DUPLICATE
EASTING
ENGINEERED DISPERSION
EXISTING GRADE
ELEVATION
EDGE OF PAVEMENT
EASEMENT
EXISTING
FINISHED FLOOR ELEVATION
FINISHED GRADE
FIRE HYDRANT
FEET
GRADED-CRUSHED AGGREGATE BASE COURSE
GEOGRAPHIC INFORMATION SYSTEM
GROUND SERVICE EQUIPMENT
HIGH DENSITY POLYETHYLENE PIPE
HORIZONTAL
HEIGHT
INSIDE BOTTOM OF WALL
INSIDE DIAMETER
INVERT ELEVATION
INCH
INCORPORATED
INVERT
IRON PIN FOUND
IRON PIN SET
JUNCTION BOX
CONTRACTING OFFICER
LINEAR FEET
B-21 LOW OBSERVABLE RESTORATION FACILITY
LIMITS OF DISTURBANCE
LIGHTNING PROTECTION
MAXIMUM
MITERED END SECTION
MINIMUM
MONUMENT
MONITORING WELL
NORTHING
NOW OR FORMERLY
NUMBER
NOT TO SCALE
OUTSIDE BOTTOM OF WALL
ON CENTER
ON CENTER EACH WAY
OUTSIDE DIAMETER
OFFSET
OIL/WATER SEPARATOR
PORTLAND CEMENT CONCRETE
POST INDICATOR VALVE
POINT OF BEGINNING
PROPOSED
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POWER-TELEPHONE POLE
POLYVINYL CHLORIDE
QUALITY CONTROL
REINFORCED CONCRETE PIPE
RADIUS POINT
RIGHT OF WAY
STORM DRAIN
SQUARE FEET
SPECIFICATIONS
SQUARE
SANITARY SEWER
SANITARY SEWER MANHOLE
STATION
STANDARD
SOIL VAPOR EXTRACTION
TEMPORARY BENCHMARK
TYPICAL
VERTICAL
WATER METER
WATER VALVE
WELDED WIRE FABRIC
WITH
WATER TO CEMENT
YEAR
Ø
ABND
AC
AG
EIC
APPR
APPROX.
BLDG
BM
BOT
BP
CAGS
CAVFS
CB
CF
CMP
CPTS
CONC
COR
CTB
DI
DIA
DIP
DES
DLA
DPW
DUP
E
ED
EG
EL OR ELEV
EP
ESMT
EX
FFE
FG
FH
FT
GCAB
GIS
GSE
HDPE
HORZ
HT
IBW
ID
IE
IN
INC
INV
IPF
IPS
JB
KO
LF
LO
LOD
LP
MAX
MES
MIN
MON
MW
N N/F
NO
NTS
OBW
OC
OCEW
OD
OFST
OWS
PCC
PIV
POB
PROP
PSF
PSI
PTP
PVC
QC
RCP
RP
R/W
SD
SF
SPEC
SQ
SS
SSMH
STA
STD
SVE
TBM
TYP
VERT
WM
WV
WWF
W/ W/C
YR
ABBREVIATIONS
FENCE
MINOR CONTOUR
INDEX CONTOUR
STORM DRAIN
WATER VALVE
DESCRIPTIONPROPOSED ITEM
SPOT ELEVATION267.54
DROP INLET
LEGEND
NORTH ARROW
CONTROL POINT
LIMITS OF DISTURBANCE
SANITARY SEWER MANHOLE
SANITARY SEWER CLEANOUTCO
FIRE HYDRANT
HEADWALL
AC PAVING
300'
EXISTING ITEM
UNDER DRAIN CLEAN OUT
UNDER DRAIN MANHOLE
300'
WATER LINE
UNDERGROUND COMMUNICATION UTILITY LINE
UNDERGROUND ELECTRICAL CONDUIT
VTANG LEASE LINE
UNDERGROUND ELECTRICAL CONDUIT (ABANDONED)
CO
SOIL BORING/PAVEMENT CORE
NATURAL GAS LINE
SANITARY SEWER LINE
FAA RTR UNDERGROUND CABLEFAA FAA
UNDERGROUND FIBER OPTICS
ELECTRICAL MANHOLE
ELECTRICAL HAND HOLE OR VAULT
STORM SEWER MANHOLE
MW MONITORING WELL
CONCRETE PAVING
C
IV
IL
L
EG
EN
D A
N D
AB
BR
EV
IA
TI
O
N S
C-001
FIRE WATER LINE
STORM SEWER
INDUSTRIAL WASTE
SANITARY SEWER
LOD
UE
I INDUSTRIAL WASTE MANHOLE
AG APRON GROUNDING POINT
TELEPHONE MANHOLE
ELECTRICAL MANHOLE
SHEET NAMING CONVENTION
C-001
2 DIGIT SEQUENTIAL # (01-99)
(FIRST DIGIT INDICATES PLAN
TYPE. SECOND DIGIT INDICATES
FLOOR)
1 DIGIT SHEET TYPE DESIGNATOR
0 - GENERAL
2 - PROFILES
3 - SECTIONS
4 - ENLARGED PLANS
6 - SCHEDULES AND DIAGRAMS
9 - 3D VIEWS (ISO, PERSPECTIVES,
PHOTOS)
2 DIGIT DESCIPLINE
DESIGNATOR
(IF ONLY ONE LETTER IS
USED, THE SECOND
LETTER IS REPLACED
WITH A DASH "-" AS A
PLACEHOLDER)**
PROJECT CONTACTS:
CIVIL ENGINEER FOR THIS PROJECT IS:
POND & COMPANY
3500 PARKWAY LANE, SUITE 500
PEACHTREE CORNERS, GA 30092
P: (678) 336.7740
CONTACT: TANYA NORMAN, PE
SURVEYOR FOR THIS PROJECT IS:
FMG ENGINEERING
3700 STURGIS ROAD
RAPID CITY, SD 57702-0317
P: (605) 342.4105
CONTACT: MELVIN B. LAMKE
GEOTECH FOR THIS PROJECT IS:
TERRACON
1505 OLD HAPPY JACK ROAD
CHEYENNE, WY 82001
P: (307) 632.9224
CONTACT: ERIC D. BERNHARDT, PE
1 - PLANS
5 - DETAILS
7 - USER DEFINED
8 - USER DEFINED
NOTE:
1. NOT ALL ABBREVIATIONS SHOWN WILL BE USED ON THIS
PROJECT.
SAN
GROUND ROD TEST WELL
3/4" GROUND ROD
S
NORTH
LIMITS OF CONSTRUCTION
SEE SHEETS CS101 & CS102
F F
CPTS-F#
CATHODIC PROTECTION TEST STATION ON
DIP FIRE WATER COMPONENT
CPTS-W#
CATHODIC PROTECTION TEST STATION ON
DIP WATER PIPE COMPONENT
CATHODIC PROTECTION TEST STATION ON
FIRE HYDRANT
CPTS-FH#
LEGEND (CONT.)
DESCRIPTIONPROPOSED ITEM
IW
N/A
N/A
GENERAL CIVIL NOTES
1. THE CONTRACTOR SHALL COMPLY WITH ALL CITY, COUNTY, STATE AND
FEDERAL REGULATIONS APPLICABLE TO CONSTRUCTION OF THIS SITE.
2. ALL LABOR, MATERIALS, AND METHODS OF CONSTRUCTION SHALL BE IN
STRICT ACCORDANCE WITH THE MINIMUM ENGINEERING AND
CONSTRUCTION STANDARDS ADOPTED BY THE U.S. ARMY CORPS OF
ENGINEERS (USACE). WHERE CONFLICTS OR OMISSIONS EXIST, THE USACE
STANDARDS SHALL DICTATE. SUBSTITUTIONS AND DEVIATION FROM PLANS
AND SPECIFICATIONS SHALL BE PERMITTED ONLY WHEN WRITTEN APPROVAL
HAS BEEN ISSUED BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR).
3. ALL DIMENSIONS ARE TAKEN FROM/TO FENCE LINES, CENTERLINE OF
UTILITY, CENTER OF MANHOLE OR CATCH BASIN, CENTERLINE OF ROAD,
FACE OF BUILDING, FACE OF CURB, FACE OF WALL, OR CENTERLINE OF
STRIPING UNLESS OTHERWISE NOTED.
4. EXISTING CONDITIONS SHOWN ARE BASED UPON A TOPOGRAPHIC AND
IMPROVEMENT SURVEY PROVIDED BY FMG ENGINEERING, DATED NOVEMBER
2021 AND GIS INFORMATION PROVIDED BY ELLSWORTH AIR FORCE BASE.
EXISTING UTILITY INFORMATION SHOULD BE CONSIDERED APPROXIMATE AND
MUST BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION OR
ORDERING MATERIALS.
5. ALL REQUIRED EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
PROVIDED, INSTALLED, AND MAINTAINED AS SHOWN ON THE APPLICABLE
EROSION, SEDIMENTATION AND POLLUTION CONTROL PLANS CONTAINED
WITHIN THESE CONSTRUCTION DOCUMENTS.
6. CONTRACTOR TO MOVE ALL CONSTRUCTION DEBRIS OFF THE ELLSWORTH
AIR FORCE BASE PROPERTY AND DISPOSE DEBRIS AT A LEGAL, PERMITTED
LANDFILL CONSISTENT WITH ALL LOCAL, STATE, AND FEDERAL
REQUIREMENTS.
7. NO BURNING IS ALLOWED ON ELLSWORTH AIR FORCE BASE.
8. CONTRACTOR TO ENSURE ALL EXISTING TOPS OF MANHOLES AND VALVE
BOXES ARE RAISED OR LOWERED TO BE FLUSH WITH FINISHED GRADES,
UNLESS NOTED OTHERWISE.
9. ALL NEW PAVEMENT AND SIDEWALKS SHALL BE CONSTRUCTED FLUSH WITH
EXISTING, WITH NO PONDING OF STORMWATER, UNLESS NOTED OTHERWISE.
10. CONTRACTOR SHALL GRADE ALL DISTURBED AREAS TO ENSURE POSITIVE
DRAINAGE AWAY FROM ALL BUILDINGS AND TO DRAINAGE STRUCTURES OR
DITCHES. NATURAL FLOW OF SURROUNDING WATERS SHALL NOT BE
DISTURBED DURING CONSTRUCTION, UNLESS SHOWN OTHERWISE.
11. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, COORDINATES, AND
DIMENSIONAL INFORMATION PRIOR TO CONSTRUCTION. THE CONTRACTOR
SHALL BRING ALL DISCREPANCIES TO THE ATTENTION OF THE COR PRIOR TO
STARTING CONSTRUCTION.
12. ALL TRAFFIC SIGNS AND PAVEMENT MARKINGS SHALL BE IN ACCORDANCE
WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD),
LATEST EDITION.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING
INSTALLATION OF ALL NEW UTILITIES WITH THOSE THAT ARE EXISTING. IF
EXISTING UTILITIES ARE IN CONFLICT WITH NEW UTILITIES, THE SITE
CONTRACTOR SHALL NOTIFY THE COR BEFORE PROCEEDING WITH
CONSTRUCTION.
14. ALL TOPSOIL AND EXCAVATED MATERIAL SHALL BE STOCKPILED IN AN
APPROVED AREA DURING CONSTRUCTION. EXCESS OR UNUSABLE TOPSOIL
SHALL BE DISPOSED OF OFF-SITE IN A MANNER THAT IS LEGAL AND
CONSISTENT WITH ALL LOCAL, STATE AND FEDERAL REQUIREMENTS.
15. THE LOCATION OF ALL EXISTING UTILITIES AND STORM DRAINAGE SHOWN ON
THE PLANS HAVE BEEN DETERMINED FROM THE BEST INFORMATION
AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR.
THE ENGINEER ASSUMES NO RESPONSIBILITY FOR INACCURACY. PRIOR TO
THE START OF ANY CONSTRUCTION ACTIVITY IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE VARIOUS UTILITIES AND TO
MAKE THE NECESSARY ARRANGEMENTS FOR ANY RELOCATION OF THESE
UTILITIES WITH THE COR OF THE UTILITY. THE CONTRACTOR SHALL
EXERCISE CAUTION WHEN CROSSING UNDERGROUND UTILITIES, WHETHER
SHOWN ON THE PLAN OR LOCATED BY THE UTILITY COMPANY. ALL UTILITIES
WHICH INTERFERE WITH THE PROPOSED CONSTRUCTION SHALL BE
BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR). ANY FEES ASSOCIATED WITH UTILITY
RELOCATIONS SHALL BE BORNE BY THE CONTRACTOR IN ACCORDANCE WITH
RESPECTIVE UTILITY COMPANY STANDARDS. THE CONTRACTOR SHALL
COORDINATE DISCONNECTION OF EXISTING UTILITIES WITH THE
APPROPRIATE UTILITY PROVIDER.
16. UTILITIES INDICATED SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
APPLICABLE PROVISIONS OF THE SPECIFICATIONS. GRADING SHALL BE AS
INDICATED, AND SHALL PRODUCE A FINISHED SURFACE WITH NO PONDING
OF WATER, READY TO RECEIVE PLANTING MATERIALS OR GRASSING.
17. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL
REQUIRED PERMITS ARE OBTAINED AND IN HAND BEFORE BEGINNING ANY
CONSTRUCTION. NO CONSTRUCTION OR FABRICATION OF ANY ITEM SHALL
BEGIN UNTIL THE CONTRACTOR HAS RECEIVED ALL PLANS AND ANY OTHER
DOCUMENTATION FROM ALL OF THE PERMITTING AND ANY OTHER
REGULATORY AUTHORITIES. ANY PENALTIES, STOP WORK ORDERS OR
ADDITIONAL WORK RESULTING FROM THE CONTRACTOR BEING IN VIOLATION
OF THE REQUIREMENTS ABOVE, SHALL BE FULLY BORNE BY THE
CONTRACTOR.
18. ALL CONTRACTORS/SUBCONTRACTORS THAT WILL BE ENGAGED IN LAND
DISTURBING ACTIVITIES SHALL COMPLY WITH ALL EROSION, SEDIMENTATION
AND POLLUTION CONTROL AND STORMWATER POLLUTION PREVENTION
REQUIREMENTS CONTAINED THROUGHOUT THE DRAWINGS, SPECIFICATIONS,
AND PERMITS.
19. AREAS DISTURBED BY THE CONTRACTOR, WHICH ARE NOT PART OF THIS
PROJECT, SHALL BE RETURNED TO PRE-CONSTRUCTION OR BETTER
CONDITION PRIOR TO THE COMPLETION OF THE PROJECT AS DETERMINED
BY THE COR.
20. THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR
PROCEDURES IN PERFORMING THE WORK IS SOLELY THE RESPONSIBILITY
OF THE CONTRACTOR, WHO IS ALSO RESPONSIBLE FOR COMPLYING WITH
ALL HEALTH AND SAFETY PRECAUTIONS AS REQUIRED BY THE APPLICABLE
REGULATORY AGENCY.
21. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING, SHORING AND
TEMPORARY SUPPORTS, ETC. ARE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
22. PROTECT ALL EXISTING FEATURES AND EXISTING LANDSCAPING THAT WILL
REMAIN. ANY ITEM DAMAGED DURING THE PERFORMANCE OF THE WORK
SHALL BE RESTORED TO PRE-CONSTRUCTION CONDITION, OR REPLACED
WITH NEW AT THE CONTRACTOR'S EXPENSE. CONTRACTOR SHALL TAKE
PRECAUTIONS TO AVOID OVERLOADING PAVEMENTS WHICH WILL REMAIN.
23. CONTRACTOR SHALL INSPECT ALL SEDIMENT AND EROSION CONTROL
MEASURES DAILY AND DURING PROLONGED PERIODS OF CONTINUOUS
RAINFALL EVENTS TO ENSURE THAT ALL CONTROLS ARE FUNCTIONING
PROPERLY. DAMAGED CONTROLS SHALL BE REPLACED BY THE END OF THE
WORKDAY.
24. EACH SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION PLANS AND
SHALL BE READ WITH THE FULL SET TO BEST ENSURE PROPER
INTERPRETATION.
25. SHEET KEYNOTES ON THE PLANS ARE SPECIFIC TO THAT SHEET ONLY.
MISSING SEQUENTIAL NUMBERS DO NOT APPLY TO THAT SHEET.
GENERAL CIVIL DEMOLITION NOTES
1. "DEMOLISH" SHALL MEAN TO REMOVE AN OBJECT IN ITS ENTIRETY. RESTORE
GRADES AND SURFACE IMPROVEMENTS TO MATCH EXISTING CONDITIONS OR
PER REQUIREMENTS OF NEW WORK, WHICHEVER IS APPLICABLE.
2. EROSION AND SEDIMENTATION CONTROL MEASURES AND TEMPORARY
CONSTRUCTION FENCING SHALL BE IN PLACE PRIOR TO COMMENCEMENT OR
CONCURRENT WITH DEMOLITION.
3. CONTRACTOR SHALL ESTABLISH SURVEY CONTROL NETWORK OUTSIDE
LIMITS OF DEMOLITION PRIOR TO COMMENCEMENT OF WORK. THIS WORK
MUST BE PERFORMED BY LICENSED & REGISTERED SOUTH DAKOTA LAND
SURVEYOR.
4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH CONTRACTOR'S
SCHEDULE, LOGISTICS PLAN (APPROVED BY COR), EROSION, SEDIMENTATION
AND POLLUTION CONTROL PLAN PRIOR TO WORK.
5. ALL TEMPORARY FENCING, TRASH, AND LITTER TO BE FULLY DEMOLISHED
AND REMOVED FROM SITE TO A LEGAL LANDFILL. PERIMETER FENCING TO
REMAIN UNLESS OTHERWISE NOTED.
GENERAL CIVIL SITE NOTES
1. CONTRACTOR SHALL FURNISH AND MAINTAIN ANY AND ALL NECESSARY
BARRICADES AROUND THE WORK AND PROVIDE PROTECTION AGAINST
WATER DAMAGE AND SOIL EROSION.
2. ALL BUILDING DIMENSIONS SHALL BE VERIFIED AND COORDINATED WITH THE
ARCHITECTURAL PLANS.
3. PAVEMENT MARKINGS, INCLUDING ANY STANDARD HANDICAP SYMBOLS,
PARKING STRIPING AND TRAFFIC ARROWS, SHALL BE PAINTED ON PAVEMENT
AT LOCATIONS SHOWN.
4. ALL SIGNAGE SHALL CONFORM TO THE MOST RECENT SOUTH DAKOT
DEPARTMENT OF TRANSPORTATION (SDDOT) AND MUTCD STANDARDS AND
SPECIFICATIONS.
GRADING AND DRAINAGE NOTES
1. POSITIVE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES TO PREVENT
SATURATION OF EXPOSED SOILS IN CASE OF SUDDEN RAINS, AND FOR ALL
FINISHED GRADING. CONTRACTOR SHALL LOCATE ALL EXISTING UTILITIES
PRIOR TO ANY EXCAVATION.
2. CONTRACTOR SHALL INSTALL ALL PERIMETER EROSION AND SEDIMENT
CONTROL MEASURES PRIOR TO ANY SITE CLEARING OR EXCAVATION.
3. ALL BACKFILL AND FILL MATERIAL SHALL BE FREE OF ORGANIC MATTER AND
WASTE.
4. THE CONTRACTOR SHALL REMOVE ALL EROSION AND SEDIMENT CONTROL
FENCING FROM THE SITE PRIOR TO FINAL PROJECT ACCEPTANCE, AND
SHALL SMOOTH THE GROUND SURFACE WHERE THE FENCE WAS REMOVED;
THEN, MULCH OR SEED & STRAW (SEASON APPROPRIATE GRASS) THE
RESTORED SURFACE AS SUNLIGHT CONDITIONS WARRANT.
5. CONTRACTOR SHALL MARK, PRESERVE AND PROTECT ALL SURVEY
BENCHMARKS.
6. IF BENCHMARK MUST BE DEMOLISHED FOR CONSTRUCTION, CONTRACTOR
SHALL RELOCATE BENCHMARK AND PROVIDE NEW DATA ON AS-BUlLTS.
7. ALL CUT AND FILL SLOPES SHALL BE 2:1 OR FLATTER (SEE PLANS).
8. ALL SPOT ELEVATIONS NOTED ARE FINISH GRADE.
GENERAL UTILITY NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL BUILDING
CONNECTIONS WITH BUILDING CONTRACTOR AND THE INFORMATION
PROVIDED ON MECHANICAL AND ELECTRICAL SHEETS.
2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING CATHODIC PROTECTION FOR
THE UTILITY SYSTEMS IN ACCORDANCE WITH SPECIFICATION SECTION 26 42
14.00.10.
3. CONTRACTOR SHALL CONTACT AND SUBMIT AIR FORCE FORM 103 DIG
PERMIT TO THE BASE CIVIL ENGINEERING (BCE) SITE DEVELOPMENT OFFICE
TO IDENTIFY THE LOCATION OF UTILITIES PRIOR TO COMMENCEMENT OF
WORK.
4. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 30 DAYS FOR ALL
REQUIRED UTILITY SHUTDOWNS FOR UTILITY CONNECTIONS WITH THE
CONTRACTING OFFICER.
5. THE MINIMUM DEPTH OF COVER FOR UTILITIES SHALL BE AS FOLLOWS
UNLESS INDICATED OTHERWISE:
a. WATER, FIRE PROTECTION, AND SANITARY SEWER: 72-INCHES
b. ELECTRICAL AND COMMUNICATION: 36 INCHES
c. ALL OTHER UTILITIES: 36 INCHES
6. ALL OTHER EQUIPMENT SHALL BE PAINTED TO MATCH BASE STANDARD.
7. ANY CHANGES TO PROPOSED UTILITY DESIGN SHALL BE APPROVED
BY THE CONTRACTING OFFICER IN WRITING.
8. CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PAYING ALL UTILITY
CONNECTION FEES AND OBTAINING ALL PERMITS REQUIRED FOR THE UTILITY
CONSTRUCTION AND CONNECTIONS. THIS INCLUDES ALL FEES ASSOCIATED
WITH CONNECTION CHARGES AND METERS.
9. ALL UNDERGROUND UTILITIES ARE SUBJECT TO ACCEPTANCE TESTING AND
INSPECTION METHODS DETAILED IN THE SPECIFICATIONS, WHICH MAY
INCLUDE VIDEO CAMERA INSPECTION. COORDINATE CAMERA AND
EQUIPMENT WITH THE SITE SECURITY MANAGER AND CONTRACTING
OFFICER PRIOR TO BRINGING ANY PHOTOGRAPHY OR VIDEO EQUIPMENT ON
SITE.
10. ALL WATER & SEWER CONSTRUCTION WORK ON THIS PROJECT SHALL BE
PERFORMED IN ACCORDANCE WITH ALL APPLICABLE INDUSTRY CODES AND
STANDARDS. THESE CODES AND STANDARDS INCLUDE BUT ARE NOT LIMITED
TO THE FOLLOWING: AMERICAN WATER WORKS ASSOCIATION (AWWA),
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AMERICAN SOCIETY FOR
TESTING AND MATERIALS (ASTM), OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA), AMERICAN ASSOCIATION OF STATE HIGHWAY AND
TRANSPORTATION OFFICIALS (AASHTO), NATIONAL FIRE PROTECTION
ASSOCIATION (NFPA), UNIFIED FACILITIES CRITERIA (UFC), ENVIRONMENTAL
PROTECTION AGENCY (EPA) AND USACE EM 385-1-1 SAFETY AND HEALTH
REQUIREMENT MANUAL. THE MOST STRINGENT SHALL BE APPLIED IN ALL
CASES ESPECIALLY FOR ISSUES RELATED TO SAFETY.
WATER UTILITY NOTES:
1. THRUST BLOCKS OR JOINT RESTRAINTS ARE REQUIRED AT ALL TEES, BENDS,
OR ELBOWS OF PRESSURIZED PIPING IN ACCORDANCE WITH THE DRAWINGS,
SPECIFICATIONS, AND MANUFACTURER'S RECOMMENDATIONS. SEE SHEET
CU502 FOR TYPICAL THRUST BLOCK DETAIL. MECHANICAL JOINT RESTRAINTS
ARE ALLOWED IN AREAS WHERE PROXIMITY OF ADJACENT UTILITIES OR
STRUCTURES WILL MAKE PLACEMENT OF THRUST BLOCKS DIFFICULT. USE
OF JOINT RESTRAINTS SHALL BE APPROVED BY THE CONTRACTING OFFICER.
2. WATER LINES SHALL BE INSTALLED A MINIMUM OF 3 FEET BEHIND THE EDGE
OF PAVEMENT OR FACE OF CURB UNLESS INDICATED OTHERWISE. SEE
SPECIFICATIONS FOR ADDITIONAL CLEARANCE REQUIREMENTS FOR WATER
PIPING.
3. FIRE HYDRANTS SHALL BE INSTALLED A MINIMUM OF 3 FEET AND A MAXIMUM
OF 6 FEET FROM EDGE OF PAVEMENT OR FACE OF CURB AND A MINIMUM OF 1
FEET FROM EDGE OF SIDEWALK UNLESS INDICATED OTHERWISE. A RADIUS
OF 3 FEET AROUND THE HYDRANT SHALL BE KEPT CLEAR FOR FIRE
DEPARTMENT ACCESS. AREA BETWEEN CURB AND HYDRANTS SHALL BE
KEPT CLEAR OF OBSTRUCTIONS. FIRE HYDRANTS SHALL BE PAINTED BROWN
TO MATCH ELLSWORTH AFB STANDARDS. PLACE COLORED BAND(S) ON EACH
FIRE HYDRANT INDICATING THE CLASS OF THE HYDRANT DESIGNATED IN
NFPA 291 (IE CLASS AA, A, B, OR C).
SANITARY UTILITY NOTES:
1. ALL SANITARY SEWER BUILDING CONNECTIONS ARE TO BE MADE USING
6-INCH LINES UNLESS INDICATED OTHERWISE.
2. ALL SANITARY LINES ARE TO BE LAID AT A UNIFORM SLOPE FROM THE
BUILDING CONNECTIONS TO THE CONNECTING SEWER AND BETWEEN
UTILITY STRUCTURES.
3. SEE SHEET CU502 FOR CONCRETE SEWER ENCASEMENT DETAIL WHERE
SANITARY SEWER WILL BE INSTALLED ABOVE WATER LINES. SEE
SPECIFICATIONS FOR ADDITIONAL CLEARANCE REQUIREMENTS FOR
SANITARY PIPING.
4. IF MANHOLES ARE INDICATED ON SANITARY LINES, A 2-INCH DROP IN
ELEVATION BETWEEN THE INCOMING AND OUTGOING SEWER SHALL BE
PROVIDED IN EACH MANHOLE UNLESS INDICATED OTHERWISE. INVERT FLOW
CHANNELS SHALL BE CONSTRUCTED TO PROVIDE SMOOTH AND UNIFORM
SLOPE WITH GRADUAL TRANSITION SECTIONS.
UTILITY STRUCTURE NOTES:
5. MANHOLE RIM ELEVATION SHALL BE FLUSH WITH FINAL GRADE.
6. COVERS AND CASTINGS OF MANHOLES AND STRUCTURES SHALL BE
STAMPED PER THE APPROPRIATE UTILITY TYPE OR PER THE LOCAL
STANDARDS, AND SHALL BE STAMPED PER THE ORIGIN OF MANUFACTURE.
7. COVERS AND CASTINGS SHALL BE TAMPER-PROOF FOR ELECTRICAL OR
COMMUNICATIONS MANHOLES/HANDHOLES STRUCTURES LOCATED IN
PEDESTRIAN AREAS, EASEMENT AREAS, AND AREAS WITH SPECIAL SECURITY
RESTRICTIONS. COORDINATE WITH THE CONTRACTING OFFICER AND
INSTALLATION SECURITY PRIOR TO INSTALLATION TO ENSURE INSTALLATION
SECURITY KNOWS HOW TO OPERATE THE TAMPER-PROOF STRUCTURE.
MANHOLE FRAME ADJUSTMENT NOTES:
1. AREA REQUIRING MANHOLE ADJUSTMENT SHALL BE SAWCUT SQUARE OR
CIRCULAR 12-INCH MINIMUM AROUND MANHOLE FRAME.
2. MANHOLE COVER AND FRAME SHALL BE RAISED TO FINISH GRADE BY
INSTALLING PRECAST MANHOLE ADJUSTMENT RINGS AND LEVELING
MORTAR.
3. GRADE ADJUSTMENT AREA SHALL BE BACKFILLED WITH EARLY STRENGTH
PCC.
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
4 5
A
B
M
AR
K
IS
SU
E D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
D
AT
E
US Army Corps of Engineers
Omaha District
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EL
LS
W O
R
TH
A
FB
, S D
O M
AH
A
D
IS
TR
IC
T
AN
SI
D
M
JT
G
O B
FS
B/
PO
N
D J
V B-
F
U
EL
S
YS
M
AI
N
TE
N
AN
C E
D O
C K
B ro ad wa y E xte ns ion
, S uit e 5
Ok lah om a C ity , O
K
8-
5.8
.29
| f sb -a e.c om
D
C
A
B
1 2 3 4 5 ADVERTISEMENT - 100% DESIGN
W
F2
4R
AM
-0
- 1
D
ES
IG
N
IS
SU
ED
F O
R P
R
IC
IN
G
N O
V
N
O V
D . L
EC
KI
E
N . A
D
AM
D S
T.
N
O R
M
AN
C
IV
IL
G
EN
ER
AL
N
O
TE
S
C-002
BYPASS PUMPING NOTES (IF NEEDED
BASED ON CONTRACTORS SCHEDULE/
ACTIVITIES):
1. BYPASS PUMPING PLAN: THE CONTRACTOR SHALL PREPARE BYPASS PUMPING
PLANS FOR WORK PERFORMED ON SANITARY OR INDUSTRIAL WASTE SYSTEMS.
THE BYPASS PUMPING PLANS SHALL DESCRIBE IN DETAIL THE FOLLOWING
MINIMUM REQUIREMENTS FOR THE PROJECT.
A. MAINTAINING WASTEWATER FLOWS 24 HOURS PER DAY AT ALL TIMES. THE
BYPASS PUMPING PLANS SHALL IDENTIFY AND DESCRIBE ALL EQUIPMENT AND
METHODOLOGIES THAT WILL BE USED TO IMPLEMENT THE PLAN TO THE
SATISFACTION OF THE GOVERNMENT.
B. PROVIDE PUMPING EQUIPMENT CAPABLE OF MEETING THE PEAK FLOW RATES
ANTICIPATED FOR EACH BYPASSED SEGMENT. PROVIDE CERTIFICATION FROM
PUMP SUPPLIERS THAT THE PUMPING EQUIPMENT HAS BEEN TESTED PER
ANSI-HI STANDARDS AND PROVIDE THE CERTIFIED PUMP CURVES FOR EACH
FLOW SCENARIO.
C. PROVIDE REDUNDANT PUMPING SYSTEMS INCLUDING PUMPS, POWER SUPPLY
AND CONTROL SYSTEMS ON-SITE AND READY FOR IMMEDIATE DEPLOYMENT
SHOULD A SYSTEM FAILURE OCCUR ON BY-PASS PUMPING OPERATIONS SUCH
AS SEWER LINES ETC. THE REDUNDANT EQUIPMENT SHALL MEET THE
CERTIFICATION REQUIREMENTS OF THE PRIMARY EQUIPMENT.
D. THE BYPASS PUMPING SYSTEM SHALL UTILIZE A DUPLEX PUMP
ARRANGEMENT WITH A LEVEL-BASED PUMP CONTROL SYSTEM TO OPERATE
WITHIN A DESIRED FLOW LEVEL RANGE IN THE MANHOLE. THE CONTROL
SYSTEM SHALL INCORPORATE VISUAL AND AUDIBLE ALARMS FOR PUMP
FAILURE, PUMP OVERHEAT, HIGH WATER, HIGH-HIGH WATER, AND LOW WATER
ALARM LEVELS.
E. THE BYPASS PUMPING SYSTEM PIPES AND HOSES SHALL BE PROTECTED
FROM TRAFFIC. VEHICLES SHALL NOT BE PERMITTED TO RIDE DIRECTLY OVER
THE PIPES OR HOSES.
F. THE BYPASS PUMPING SYSTEM SHALL BE MONITORED AND OPERATED BY
CONTRACTOR PERSONNEL 24 HOURS PER DAY DURING PUMPING OPERATION.
G. PREPARE AN ILLUMINATION PLAN AND PROVIDE LIGHTING SYSTEMS TO
ILLUMINATE THE BYPASS PUMPING SYSTEM COMPONENTS TO A SAFE
WORKING LEVEL AT ALL TIMES.
H. BYPASS PUMPING SYSTEM (PEAK FLOW RATES): PEAK FLOW IN EXISTING 8-IN
DIAMETER SANITARY GRAVITY FLOW PIPELINE IS ESTIMATED TO BE 200 GPM.
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
4 5
A
B
M
AR
K
IS
SU
E D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
D
AT
E
US Army Corps of Engineers
Omaha District
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EL
LS
W O
R
TH
A
FB
, S D
O M
AH
A
D
IS
TR
IC
T
AN
SI
D
M
JT
G
O B
FS
B/
PO
N
D J
V B-
F
U
EL
S
YS
M
AI
N
TE
N
AN
C E
D O
C K
B ro ad wa y E xte ns ion
, S uit e 5
Ok lah om a C ity , O
K
8-
5.8
.29
| f sb -a e.c om
D
C
A
B
1 2 3 4 5 ADVERTISEMENT - 100% DESIGN
W
F2
4R
AM
-0
- 1
D
ES
IG
N
IS
SU
ED
F O
R P
R
IC
IN
G
N O
V
N
O V
D . L
EC
KI
E
N . A
D
AM
D S
T.
N
O R
M
AN
G
EN
ER
AL
C O
N
ST
R U
C
TI
O N
N O
TE
S
GC101
GENERAL PROJECT NOTES:
1. CONSTRUCTION ACCESS FOR COMMERCIAL VEHICLES TO THE PROJECT
SITE SHALL BE THROUGH THE COMMERCIAL VEHICLE GATE. POV ACCESS
THROUGH THE MAIN GATE (LIBERTY GATE) OR PATRIOT GATE. SEE SHEET
C-105.
2. CONTRACTORS SHALL KEEP ALL ROADS AND STREETS CLEAN OF
CONSTRUCTION DEBRIS, MUD, ETC. AT ALL TIMES. CONTRACTOR SHALL
PROVIDE EQUIPMENT AND PERSONNEL TO CLEAN ANY STREETS AS
REQUESTED BY THE CONTRACTING OFFICER. CONTRACTOR IS
RESPONSIBLE FOR ALL REPAIRS TO STREETS, PARKING AREAS, AND BASE
OR GOVERNMENT PROPERTY, DUE TO DAMAGE BY THEIR CONSTRUCTION
ACTIVITIES. CONTRACTOR SHALL PROVIDE PHOTOGRAPHS AND/OR VIDEO
RECORDING OF THE EXISTING CONDITIONS. CONTRACTOR SHALL
COORDINATE WITH THE CONTRACTING OFFICER FOR A PRE-CONSTRUCTION
VIDEO DETAILING THE EXISTING CONDITION OF ACCESS POINTS, HAUL
ROUTES, AND LAYDOWN AREAS TO BE PERFORMED. SEE CONTRACT
SPECIFICATIONS.
3. CONTRACTOR SHALL CONNECT TO EXISTING OR NEW FIRE HYDRANTS FOR
TEMPORARY CONSTRUCTION WATER. INSTALL QUICK DISCONNECT, BACK
FLOW PREVENTOR, AND SHUT OFF VALVE WITH METER ON 2.5-INCH HOSE
CONNECTION ONLY. SEE DETAIL A1 ON C-501.
4. CONTRACTOR IS REQUIRED TO FILL OUT AND RETURN TO THE
CONTRACTING OFFICER, AF FORM 103 DIGGING PERMIT A MINIMUM OF TEN
(10) WORKING DAYS PRIOR TO THE START OF ANY EXCAVATING WORK. THE
GOVERNMENT WILL ONLY LOCATE UTILITIES ONE TIME. ONCE THE AREA IS
FLAGGED IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN THE
FLAGS OR MARKINGS. BCE OFFICE HAS SEVEN CALENDAR DAYS TO
COMPLETE THE FORM AFTER BEING SUBMITTED BY THE CONTRACTOR. THE
CONTRACTOR SHALL FIELD-CHECK ALL EXISTING CONDITIONS AND BE
THOROUGHLY FAMILIAR WITH THE SITE BEFORE ANY WORK COMMENCES.
ANY DISCREPANCIES IN THE DRAWINGS SHALL BE IMMEDIATELY REPORTED
TO THE CONTRACTING OFFICER BEFORE ANY FURTHER WORK
COMMENCES. CAUTION SHALL BE TAKEN BY THE CONTRACTOR AROUND
ANY UNDERGROUND CABLE OR UTILITY. ANY DAMAGE SHALL BE REPAIRED
OR REPLACED TO THE SATISFACTION OF CONTRACTING OFFICER AT NO
ADDITIONAL COST TO THE GOVERNMENT.
5. CONTRACTOR IS REQUIRED TO FILE AND OBTAIN AN APPROVED FAA FORM
7460-1 IN REFERENCE TO THE CONTRACTOR'S SITE CONSTRUCTION
EQUIPMENT PRIOR TO STARTING ANY SITE CONSTRUCTION ACTIVITIES. SEE
EQUIPMENT AND STOCKPILE HEIGHT NOTES. THE 7460-1 APPROVAL MAY
TAKE 60-90 DAYS OR LONGER. DELAY IN CONSTRUCTION WILL NOT BE
ALLOWED DUE TO SUBMITTING THE 7460-1 WITHOUT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .