This document provides details on a federal solicitation opportunity. The solicitation number is W9128F24R0019 and seeks bids to design and construct the B-21 Fuels System Maintenance Dock at Ellsworth Air Force Base in South Dakota. The Department of the Army Corps of Engineers Engineering District Omaha is the contracting agency. Bids are due by an unspecified date for the construction of the maintenance dock facility to support fuel systems operations for the B-21 bomber aircraft. Relevant experience and pricing will likely be evaluation factors.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B-21: Fuel System Maintenance Dock (Single Bay) - Ellsworth AFB ELB1

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 30 00.24

OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS

07/20

PART 1 GENERAL

1.1 REFERENCES

1.2 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

1.3 CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING

CONSTRUCTION WAGE RATE REQUIREMENTS STATUTE CERTIFIED LABOR

PAYROLLS

1.4 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

1.5 COMPLETION OF WORK

1.6 CONTRACTOR PERFORMANCE EVALUATIONS

1.7 EXCEPTION TO COMPLETION TIME AND LIQUIDATED DAMAGES

1.8 ANTITERRORISM (AT)/OPERATIONS SECURITY (OPSEC) PROVISIONS

1.9 ORDER OF WORK

1.10 CONTRACT DRAWINGS AND SPECIFICATIONS

1.10.1 SETS FURNISHED

1.10.2 REPRODUCTION AND DISTRIBUTION

1.10.3 NOTIFICATION OF DISCREPANCIES

1.10.4 OMISSIONS

1.11 SUBMITTALS

1.12 CONCURRENT CONSTRUCTION

1.13 PAYMENT

1.13.1 PROMPT PAYMENT ACT

1.13.2 PAYMENT FOR MATERIALS DELIVERED OFFSITE

1.14 AVAILABILITY OF UTILITY SERVICES

1.14.1 Backflow Preventers

1.14.1.1 Backflow Tester Certificate

1.14.1.2 Backflow Prevention Training Certificate

1.14.1.3 Backflow Preventers Certificate

1.14.1.4 Reduced Pressure Backflow Preventers

1.15 UTILITY SERVICE INTERRUPTIONS

1.16 DIGGING PERMITS AND ROAD CLOSINGS

1.17 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

1.18 INSURANCE REQUIRED

1.19 SECURITY REQUIREMENTS

1.19.1 Contractor's Employee Identification

1.19.2 Entry Requirements

1.20 CONTRACTOR QUALITY CONTROL (CQC)

1.21 NONDOMESTIC CONSTRUCTION MATERIALS

1.22 DAILY WORK SCHEDULES AND WEEKLY COORDINATION MEETINGS

1.23 AS-BUILT DRAWINGS

1.24 SIGN

1.25 EQUIPMENT ROOM DRAWINGS

1.26 CONTRACTOR FURNISHED EQUIPMENT DATA

1.27 ACCOMMODATIONS FOR GOVERNMENT INSPECTORS

1.28 TEMPORARY GOVERNMENT FIELD OFFICE (Bid Option)

SECTION 01 30 00.24 Page 1Am #0005

1.29 ASBESTOS

1.30 PARTNERING

1.31 PROFIT

1.32 LABOR CONDITIONS APPLICABLE TO TEMPORARY FACILITIES

1.33 DRAWING SCALES

1.34 WAGE RATE APPLICATION

1.34.1 Building Schedule

1.34.2 Heavy and Highway Schedule

1.35 FEDERAL HOLIDAYS

1.36 BASE HOURS

1.37 UPKEEP OF ROADWAYS WITHIN A MILITARY INSTALLATION

1.38 COST AND TIME IMPACT (CTI) LOG

1.39 AIRFIELD PAVEMENT WORKSHOP

1.40 REAL PROPERTY RECORD

1.40.1 Interim DD FORM 1354

1.40.2 Completed DD FORM 1354

PART 2 NOT USED

PART 3 EXECUTION

3.1 APPENDIX A- CONTRACT DOCUMENT DISTRIBUTION LIST

ATTACHMENTS:

Appendix A - Contract Document Distribution List

AF103OI - 28 CES AF Form 103 Base Civil Engineer Work Clearance Operating Instruction

AF103 - Base Civil Engineer Work Clearance Request

Project Sign Details

-- End of Section Table of Contents --

SECTION 01 30 00.24 Page 2Am #0005

SECTION 01 30 00.24

OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS

07/20

PART 1 GENERAL

Attachments:

Appendix A - Contract Document Distribution List AF103OI - 28 CES AF Form 103 Base Civil Engineer Work Clearance Operating Instruction AF103 - Base Civil Engineer Work Clearance Request Project Sign Details

1.1 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

[*Am-4]

AMERICAN WATER WORKS ASSOCIATION (AWWA)

AWWA C511 (2017; R 2021) Reduced-Pressure Principle Backflow Prevention Assembly [**Am-4]

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 1-300-08 (2023) Criteria for Transfer and Acceptance of DoD Real Property

1.2 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

In accordance with FAR 31.105(d)(2)(i)(b), for the predetermined schedule of construction equipment use rates, use Engineer Pamphlet (EP) 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule. Copies of each regional schedule may be obtained through the following internet site:

https://www.publications.usace.army.mil/USACE-Publications/Engineer-Pamphlets/ on pages 10 and 11 of 13.

1.3 CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING

CONSTRUCTION WAGE RATE REQUIREMENTS STATUTE CERTIFIED LABOR PAYROLLS

a. Use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Wage Rate Requirements statute.

b. Obtain and provide for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the Contractor to comply with the Wage Rate Requirements statute. Use the electronic payroll service to prepare, process, and maintain the relevant payrolls and basic records during all work under

SECTION 01 30 00.24 Page 3Am #0005 this construction contract. The electronic payroll service must be capable of preserving these payrolls and related basic records for the required three years after contract completion. Obtain and provide electronic system access to the Government, as required to comply with the Wage Rate Requirements over the duration of the construction contract.

c. The Contractor's provision and use of an electronic payroll processing system must meet the following basic functional criteria:

(1) commercially available;

(2) compliant with appropriate Wage Rate Requirements statute payroll provisions in the FAR;

(3) able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract;

(4) capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records for export into an Excel spreadsheet to be imported into the contractor's mode of Resident Management System 3.0;

(5) demonstrated security of data and data entry rights;

(6) ability to produce Contractor-certified electronic versions of weekly payroll data;

(7) ability to identify erroneous entries and track the data/time of all versions of the certified Wage Rate Requirements statute payrolls submitted to the government over the life of the contract;

(8) capable of generating a durable record copy in a Compact Disc (CD) or Digital Versatile Disc (DVD) and Portable Document Format (PDF) file record of data from the system database at the end of the contract closeout. This durable record copy of data from the electronic payroll processing system must be provided to the Government during contract closeout.

d. All Contractor-incurred costs related to the Contractor's provision and use of an electronic payroll processing service must be included in the Contractor's price for the overall work under the contract. The costs for compliance with the Wage Rate Requirements statute by using electronic payroll processing services must not be a separately bid or reimbursed item under this contract.

1.4 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

- U.S. Department of Labor Veterans’ Employment and Training Service

(VETS):

SECTION 01 30 00.24 Page 4Am #0005 https://www.dol.gov/vets/

- Federal Veteran Employment Information: https://www.fedshirevets.gov/

- Veterans Opportunity to Work (VOW) Program:

https://www.benefits.va.gov/vow/

- U.S. Army Warrior Transition Command Employment Index:

https://wct.army.mil/modules/employers/index.html

- Hiring Our Heroes: https://www.uschamberfoundation.org/hiring-our-heroes

1.5 COMPLETION OF WORK

See FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984).

1.6 CONTRACTOR PERFORMANCE EVALUATIONS

Federal Acquisition Regulation (FAR) Subpart 36.201(Evaluation of Contractor Performance) requires evaluation of the construction contractor's performance throughout the contract period of performance.

For construction contracts valued at or above $700,000.00, including all modifications, the USACE will evaluate Contractor's performance using the web-based Contractors Performance Assessment Reporting System (CPARS).

After the USACE drafts an evaluation (interim or final), the Contractor will have the opportunity to access, review, comment and either concur or non-concur with the evaluation in the CPARS system for a period of 60 days. Access to the CPARS system requires either specific software called PKI certification (recommended method) or a username and password. The PKI certification is a Department of Defense recommendation and to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and may be purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and contacting vendors can be found on the web site: https://www.cpars.gov.

1.7 EXCEPTION TO COMPLETION TIME AND LIQUIDATED DAMAGES

In case the Contracting Officer determines that seeding and/or the specified maintenance thereof is not feasible during the construction period, such work will be exempt from the completion time and liquidated damages. Accomplish this work during the first seeding period and the specified maintenance period following the completion date.

1.8 ANTITERRORISM (AT)/OPERATIONS SECURITY (OPSEC) PROVISIONS

1. AT Level I Training

All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:

https://jko.jten.mil/courses/AT-level1/launch.html; or it can be provided by the Requiring Activity Anti-Terrorism Officer (RA ATO) in presentation form which will be documented via memorandum.

SECTION 01 30 00.24 Page 5Am #0005

2. Access and General Protection/Security Policy and Procedures

All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

2b. for Contractors Who Do Not Require CAC, But Require Access To A Dod Facility Or Installation

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available).

3. Not Used

4. Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something)

The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

5. Contractor Employees Who Require Access to Government Information Systems.

Not Applicable

6. OPSEC Standing Operating Procedure/Plan

Not Applicable

7. OPSEC Training

All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR

SECTION 01 30 00.24 Page 6Am #0005 is not assigned), within 5 calendar days after completion of training.

OPSEC awareness training is available at the following websites:

https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.

8. Information Assurance (IA)/Information Technology (IT) Training

Not Applicable

9. Information Assurance (IA)/Information Technology (IT) Certification

Not Applicable

10. Not Used

11. Not Used

12. Handling or Access to Classified Information.

Not Applicable

13. Will be Escorted in Areas Where They May be Exposed to Classified and/or Sensitive Materials and/or Sensitive or Restricted Areas

If applicable, all contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

14. Contractor Company to Obtain a Facility Clearance and Individual Clearances at the Appropriate Level

The Prime Contractor Company must have (or will have) a Facility Clearance (FCL) at the appropriate level (IAW the NISPOM DOD 5220.22-M and AR 380-49) prior to the start of the contract awarded period of performance.

Contractor personnel performing work under this contract must have the required security clearance, per AR 380-67, at the appropriate level at the start of the period of performance. Security Clearances and FCL requirements are required to be maintained for the life of the contract IAW the DD254 attached to the contract. If no FCL, the supporting Government Contracting Activity will sponsor the prime contract company in obtaining the FCL.

15. Pre-Screen Candidates using E-Verify Program

The Contractor must pre-screen Candidates using the E-verify Program ( http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

16. Required Armed Security Guards

Not Applicable

SECTION 01 30 00.24 Page 7Am #0005

17. Threat Awareness Reporting Program (TARP) Training

All new contractor employees will complete annual Threat Awareness and Reporting Program (TARP) Training provided by a Counterintelligence Agent, IAW AR 381-12. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee(s) or a memorandum for the record, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. Authorized webbased TARP training for CAC card holders is available at the following website: https://www.lms.army.mil. Log in using CAC and search for "TARP". The same training is available without a CAC at https://securityawareness.usalearning.gov/ by launching the course "Counterintelligence Awareness and Reporting Course for DOD".

1.9 ORDER OF WORK

See Section 01 14 00 WORK RESTRICTIONS.

1.10 CONTRACT DRAWINGS AND SPECIFICATIONS

1.10.1 SETS FURNISHED

Make copies of conformed specifications with amendments incorporated.

Utilize the bid drawings and specifications as amended in the performance of the work until the conformed specifications and contract drawings (i.e., bid drawings that have been posted with all amendment changes) are mailed or sent electronically to the Contractor. See Appendix A for Document Distribution list. See paragraph below for contract drawing reproduction and distribution requirements. The work must conform to the contract drawings, set out in the drawing index, all of which form a part of these specifications. The work must also conform to any of the standard details bound or referenced herein.

1.10.2 REPRODUCTION AND DISTRIBUTION

Reproduce multiple legible hard copy sets (half-size English unless directed otherwise) of contract drawings from Government provided read-only Adobe Acrobat.pdf file drawings. Within 14 calendar days after receipt of conformed specifications and drawings containing read-only Adobe Acrobat.pdf drawing files, provide legible hard copy drawing and conformed specification sets to the addressees contained in the Contract Document Distribution List for Project in Appendix A to this specification. The Government will process no progress payments prior to receipt of the legible contract drawings and conformed specification sets. After receipt and distribution of the legible hard copy drawing and conformed specification sets, the Government will provide the Contractor with editable CAD file drawings (format defined in Section 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS). Prepare final record or as-built drawings as defined in Section 01 78 39.00 24 AS-BUILT

DRAWINGS.

1.10.3 NOTIFICATION OF DISCREPANCIES

Check all drawing files furnished by the Government immediately upon their receipt and promptly notify the Contracting Officer of any discrepancies.

Follow dimensions marked on drawings in lieu of scale measurements.

Enlarged plans and details govern where the same work is shown at smaller scales. All scales shown are based on a standard drawing size of 22" x 34". If any other size drawings are furnished or plotted adjust the

SECTION 01 30 00.24 Page 8Am #0005 scales accordingly. Advise sub-contractors of the above. Compare all drawings and verify the figures before laying out the work. Contractor will be responsible for any errors which might have been avoided thereby.

1.10.4 OMISSIONS

Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, does not relieve the Contractor from performing such omitted or misdescribed details of the work but work must be performed as if fully and correctly set forth and described in the drawings and specifications.

1.11 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit items below in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

[*Am-4] SD-01 Preconstruction Submittals

Contractor Trailer Area(s) Lay-Down Plan; G, RO

SD-02 Shop Drawings

Equipment Room Drawings; G-RO.

SD-03 Product Data

Backflow Preventers; G, RO

SD-06 Test Reports

Backflow Preventer Tests

SD-07 Certificates

Backflow Tester Certification

Backflow Preventers Certificate of Full Approval

SD-11 Closeout Submittals

Interim DD FORM 1354; G, RO

Checklist For DD FORM 1354; G, RO [**Am-4]

1.12 CONCURRENT CONSTRUCTION

Construction work closely related to and/or located at the site of the work under a concurrent contract will be in progress simultaneously with work under this contract (as described in the design drawings). Cooperate with others as necessary in the interest of timely completion of all work.

In the event of interference, notify the Contracting Officer immediately for resolution.

All contractors involved in performing B-21 facilities beddown work will

SECTION 01 30 00.24 Page 9Am #0005 be required to participate in weekly coordination meetings throughout their project's respective periods of performance.

1.13 PAYMENT

1.13.1 PROMPT PAYMENT ACT

Pay requests authorized in GENERAL CONDITIONS (CONTRACT CLAUSES) clause:

"Payments Under Fixed-Price Construction Contracts", will be paid pursuant to the clause, "Prompt Payment for Construction Contracts". Submit pay requests on ENG Form 93 and 93a, "Payment Estimate-Contract Performance" and "Continuation". All information and substantiation required by the identified contract clauses must be submitted with the ENG Form 93, and the required certification included on the last page of the ENG Form 93a, signed by an authorized contractor official and dated when signed. The designated billing office is the Office of the Area Engineer.

1.13.2 PAYMENT FOR MATERIALS DELIVERED OFFSITE

a. Pursuant to Federal Acquisition Regulation (FAR) 52.232-5, Payments Under Fixed Price Construction Contracts, materials delivered to the contractor at locations other than the site of the work may be taken into consideration in making payments, if included in payment estimates and if all the conditions of the General Provisions are fulfilled. Payment for items delivered to locations other than the work site are limited to:

(1) Materials required by the technical provisions; or

(2) Materials that have been fabricated to the point where they are identifiable to an item of work required under this contract; or

(3) Items specifically listed below in paragraph b.

b. Payment for materials delivered off-site must be made only after receipt of paid invoices listing the value of material and labor incorporated in the items along with a canceled check showing the prime contractor's title to the items delivered off site. Payment for materials delivered off-site must be limited to the following items:

-Structural Steel as defined by Section 05 12 00 of this RFP.

-Metal Wall panels as defined by Sections 07 42 63 of this RFP.

-Metal roofing as defined by Section 07 61 14.00 20 of this RFP.

1.14 AVAILABILITY OF UTILITY SERVICES

[*Am-4] The Government will make all [**Am-4] reasonably required amounts of domestic water and electricity [*Am-4] used for construction of this project and to make final tests of the completely installed items [**Am-4] available to the Contractor [*Am-4] <text deleted> [**Am-4] from existing system outlets and supplies [*Am-4] without charge. Carefully conserve utilities furnished without charge. The Government will not allow the charging of electric vehicles owned or operated by the Contractor or subcontractors at Government charging stations. [**Am-4] The Contractor is reponsible to, at their own expense, make all temporary connections and install distribution lines. Furnish to the Contracting Officer a complete system layout drawing showing type of materials to be used and method of installation for all temporary [*Am-4] connections.

Maintain all [**Am-4] temporary lines in a workmanlike manner satisfactory to the Contracting Officer and remove in like manner prior to

SECTION 01 30 00.24 Page 10Am #0005 final acceptance of the construction. [*Am-4] Equip all connections with appropriate utility meters complying with associated utility meter requirements defined in this Contract. Furnish and install approved metered reduced pressure backflow prevention assemblies on all connections to domestic water lines in a manner that does not contaminate or impact operation of base-wide water supply as specfified below. Provide access to and readings for utility usage to the Government for accountability and recordkeeping. Meters on temporary connections will remain the property of the Contractor after disconnect.

1.14.1 Backflow Preventers

1.14.1.1 Backflow Tester Certificate

Prior to testing, submit to the Contracting Officer certification issued by the State or local regulatory agency attesting that the backflow tester has successfully completed a certification course sponsored by the regulatory agency. Tester must not be affiliated with a company participating in other phases of this Contract.

1.14.1.2 Backflow Prevention Training Certificate

Submit a certificate recognized by the State or local authority that states the Contractor has completed at least 10 hours of training in backflow preventer installations. The certificate must be current.

1.14.1.3 Backflow Preventers Certificate

Certificate of Full Approval from FCCCHR List, University of Southern California, attesting that the design, size and make of each backflow preventer has satisfactorily passed the complete sequence of performance testing and evaluation for the respective level of approval. Certificate of Provisional Approval is not acceptable.

Reduced pressure principle type conforming to the applicable requirements

AWWA C511.

1.14.1.4 Reduced Pressure Backflow Preventers

Perform backflow preventer tests using test equipment, procedures, and certification forms conforming to those outlined in the latest edition of the Manual of Cross-Connection Control published by the FCCCHR Manual.

Test and tag each reduced pressure backflow preventer upon initial installation (prior to continued water use) and quarterly thereafter. Tag must contain the following information: make, model, serial number, dates of tests, results, maintenance performed, and signature of tester.

Record test results on certification forms conforming to requirements cited earlier in this paragraph. [**Am-4]

1.15 UTILITY SERVICE INTERRUPTIONS

Submit written notification not less than 15 calendar days in advance of each interruption of each utility and communication service to or within existing buildings and facilities being used by others. No single outage will exceed 4 hours unless approved in writing. The time and duration of all outages will be coordinated and approved with the Using Agency by the Contracting Officer. See Section 01 14 00 WORK RESTRICTIONS for additional requirements.

SECTION 01 30 00.24 Page 11Am #0005

1.16 DIGGING PERMITS AND ROAD CLOSINGS

Allow 14 calendar days from date of written application to receive permission to dig and to close roads. Only close roads one lane at a time and allow vehicular traffic to pass through the construction area. Flag work on or near roadways in accordance with the safety requirements in Safety and Health Requirements Manual EM 385-1-1, which forms a part of these specifications. Do not cause blockage of work located along the alert force route and maintain unobstructed access for alert force traffic at all times. See Section 01 14 00 WORK RESTRICTIONS for additional requirements.

1.17 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

a. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the GENERAL CONDITIONS (CONTRACT CLAUSES) clause entitled "Default:

(Fixed-Price Construction)." In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the contractor.

b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK

Jan 9 Feb 9 Mar 8 Apr 5 May 6 Jun 5 Jul 4 Aug 3 Sep 3 Oct 3 Nov 4 Dec 10

c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the contractor will record on the RMS daily CQC report, any occurrence of adverse weather and resultant impact to normally scheduled work, within 24 hours of the event. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the contractor's scheduled work day. Describe in the RMS daily CQC

SECTION 01 30 00.24 Page 12Am #0005 reports the critical path item that is being affected and provide the critical path activity number(s) from the current schedule. The COR must acknowledge and accept the agreed upon occurrence of each adverse weather delay in RMS for the delays to be considered as adverse weather delays.

At the end of each month, identify the number of actual adverse weather delay days that includes days impacted by actual adverse weather (even if adverse weather occurred in previous month), calculated chronologically from the first to the last day of each month, and recorded as full days.

If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b. above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the GENERAL CONDITIONS (CONTRACT CLAUSES) clause entitled "Default (Fixed Price Construction)". (ER 415-1-15)

1.18 INSURANCE REQUIRED

In accordance with GENERAL CONDITIONS (CONTRACT CLAUSES) clause:

"Insurance Work on a Government Installation," procure the following minimum insurance:

Type Amount

Workmen's Compensation and Employer's Liability Insurance $100,000

General Liability Insurance $500,000 per occurrence

Automobile Liability Insurance Bodily injury $200,000 per person and $500,000 per occurrence Property damage $ 20,000 per occurrence

(Coverages per FAR 28.307-2)

1.19 SECURITY REQUIREMENTS

1.19.1 Contractor's Employee Identification

The Contractor is responsible for furnishing to each employee and for requiring each employee engaged on the work to display such identification as may be approved and directed by the Contracting Officer. Deliver all prescribed identification immediately be delivered to the Contracting Officer, for cancellation upon release of any employees. When the contract involves work in restricted security areas, only employees who are U.S. citizens will be permitted to enter. Proof of U.S. citizenship is required prior to entry. When required by the Contracting Officer, obtain and submit fingerprints of all persons employed or to be employed on the project. (Based on FAR 52.204-2)

1.19.2 Entry Requirements

See Section 01 14 00 WORK RESTRICTIONS.

1.20 CONTRACTOR QUALITY CONTROL (CQC)

See Section 01 45 00 QUALITY CONTROL.

SECTION 01 30 00.24 Page 13Am #0005

1.21 NONDOMESTIC CONSTRUCTION MATERIALS

The list of excepted nondomestic construction materials or their components referenced in the Buy American Construction Material Contract Clauses includes the list set forth in paragraph 25.104 of the Federal Acquisition Regulation.

1.22 DAILY WORK SCHEDULES AND WEEKLY COORDINATION MEETINGS

In order to closely coordinate work under this contract, prepare a written agenda/meeting minutes and attend a weekly coordination meeting with the Contracting Officer and Using Service at which time the Contractor must submit for coordination and approval, their proposed daily work schedule for the next two week period. Provide a copy of modifications (MODs), Serial Letters, Requests for Information (RFIs)and any other information that is needed in the minutes of the meeting.

Include required temporary utility services, time and duration of interruptions, and protection of adjoining areas with the Contractor's proposed 2-week work schedule. At this meeting, the Contractor must also submit their schedule of proposed dates and times of all preparatory inspections to be performed during the next 2 weeks. The items of work listed on the proposed 2-week schedule are to be keyed to the NAS by activity number and description for each activity anticipated to be performed during the next 2-week period. Coordination action by the Contracting Officer relative to these schedules will be accomplished during these weekly meetings. Daily reports must be completed and given to the Contracting Officer or Representative within 24 hours of work. All official correspondence such as serial letters and RFIs, with attachments are to be provided in one hardcopy original with original signatures and one electronic (Adobe pdf format) copy by email. The Government will consider the correspondence to be received when the official hardcopy or electronic copy is received by the designated office. See Section 01 14 00 WORK RESTRICTIONS for additional requirements.

1.23 AS-BUILT DRAWINGS

See 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/CAD) REQUIREMENTS.

1.24 SIGN

On commencement of work on this project, furnish and erect the temporary sign in the location selected by the Contracting Officer near the project site. Maintain the sign in good condition through the project construction period. Upon completion of the project remove the sign from the premises. The project sign must conform to standard drawing bound herein. A decal of the "Engineer Castle" and the U. S. Air Force emblem will be furnished the Contractor upon request.

1.25 EQUIPMENT ROOM DRAWINGS

Prior to construction, prepare and submit room plans for all mechanical, electrical, and communication rooms or similar areas. The plans must be consolidated for all trades, be to scale, and show all pertinent structural features. In addition, other items such as doors, windows, and cabinets required for installation and which will affect the available space, must be shown. All mechanical and electrical equipment and accessories must be shown to scale in plan and elevation and/or section in their installed positions. All duct work and piping must be shown.

SECTION 01 30 00.24 Page 14Am #0005

1.26 CONTRACTOR FURNISHED EQUIPMENT DATA

See Section 01 78 36.00 24 WARRANTY OF CONSTRUCTION for Contractor Furnished Equipment Data to be submitted as part of the Warranty Equipment Booklet.

1.27 ACCOMMODATIONS FOR GOVERNMENT INSPECTORS

The Contractor shall submit a Contractor Trailer Area(s) Lay-Down Plan for COR approval within 30 calendar days of receiving Notice to Proceed. The plan shall include the proposed location and dimensions of any area to be fenced and used by the Contractor, the number of trailers to be used, arrangement of field offices, parking areas, avenues of ingress/egress to the fenced area, dumpster locations and material storage locations.

Identify any areas which may have to be graveled to prevent the tracking of mud.

1.28 TEMPORARY GOVERNMENT FIELD OFFICE (Bid Option)

The contractor shall provide a new stand-alone weather tight government only field office on the site indicated in the design drawings. [*Am-3] For bidding purposes, assume trailer must be in place within 45 days of NTP through the period of performance for this contract. [**Am-3] Coordinate and install all required utility connections for the facility to include water, sanitary sewer, [*Am-5] (text removed) [**Am-5] electrical, and communications (NIPR). Connections must be coordinated, submitted, and approved by respective Government and privatized utility system owners.

a. The location and configuration of the Government field office shall be included in the Contractor Trailer Area(s) Lay-Down plan.

b. Parking areas are existing hard-surface paving. Maintain government only parking for a minimum of 15 government-owned vehicles on existing adjacent roadways and apron. Provide hard surface sidewalks (aggregate/gravel paths not acceptable on flightline) from all building entrances and exits to the nearest adjacent hard surface paving.

c. Provide office suitable in size (minimum 4,000 SF, via a combination or complex of trailers) to accommodate thirty shared occupancy (2 chairs each; total 60 seats) cubicles/workstations (minimum 6 ft x 8 ft), not less than six fully-enclosed private offices, conference room (described below), restrooms and kitchen/break area.

d. Furnish and maintain drinking water facilities, adequate lighting, infrastructure for high speed internet (requirements listed below), air-conditioning, heating equipment, and an enclosed restroom.

e. Provide all furniture to include cubicles, chairs, small conference table, drafting table & plan rack, trash cans, etc. Cubicles shall be a minimum of 6 ft x 6 ft and contain adequate storage for drawings, plans, documents, etc. Used furniture in good condition is acceptable.

f. Provide kitchen/break area to include sink, refrigerator (minimum 16 cu-ft), coffee pot and microwave.

g. Provide color printer capable of copying, printing 11 in x 17 in, and scanning. Printer must be from Air Force approved devices list.Provide IT support for equipment setup, troubleshooting, and maintenance.

SECTION 01 30 00.24 Page 15Am #0005

[*Am-5] (text removed) [**Am-5]

h. Provide a conference room capable of seating a minimum of 20 persons with a minimum of 12 seated at the table. Conference room will be for Government use only. Provide conference table, chairs, projector, whiteboard, and conference speakerphone capable of connecting to a cell phone.

i. Conference room may be a separate building or attached to Government field office. If the room is a separate building, locate it directly adjacent to Government field office.

j. Equip entrance doors with a substantial lock and exterior stoop light.

k. Provide once a week janitorial service/cleaning for the trailers with twice weekly cleaning of restrooms. Janitorial service shall include trash removal, light dusting, floor sweeping and mopping, restroom cleaning and carpet vacuuming. Provide supplies to include hand soap, toilet paper, paper towels, cleaning supplies and trash can liners throughout.

Janitorial staff must be able to be badged for Restricted Area (RA) access without escort privileges. See 01 14 00 WORK RESTRICTIONS for requirements. Janitorial staff will be escorted by Air Force personnel while in the RA and in the field office facilities.

l. Provide pest control as necessary.

m. [*Am-4] Provide exterior fiber optic NIPR cabling (12 pair single mode fiber optic cable) complying with EAFB fiber optic cabling standards, below grade, from manhole indicated in drawings to trailer facility. EAFB comm squadron will provide and install switch(es). Contractor to provide cabinets, (not less than one half rack per 48 port patch panel, and not less than one half rack per temporary building provided as part of this bid option), patch panels (not less than (2) 48 port patch panels total, and not less than (1) 48 port patch panel per building), cable management, and interior CAT 6 cabling. Exterior cabling referenced above is sized to provide NLT 76 drops (60 PN + 6 offices + 10 spare) [**Am-4].

n. Provide boot brush at each entrance.

o. Provide weed control and mowing around the trailer complex.

p. Perform repairs as needed for routine maintenance, weather damage (high winds, hail, water damage, etc.) during construction.

q. Provide sign mounted on exterior of building indicating its occupant.

Sign shall be a minimum of 18 in x 24 in. Coordinate sign contents and location with the COR.

r. At completion of the project, the office & conference room, including furniture will remain the property of the Contractor and be removed from the site. Restore area to previous condition.

s. The Contractor may, at their option, furnish and maintain a trailer-type mobile office acceptable to the Contracting Officer and providing as a minimum the facilities specified above. Trailers shall be in new condition and present a clean and neat exterior appearance.

t. All contractor and contractor-provided Government trailers shall be provided with signage that indicates company name and Primary POC phone

SECTION 01 30 00.24 Page 16Am #0005 number readily visible on the exterior of the trailer facility.

[*Am-5]

u. Electrical connection(s) will be via tie-in to nearby transformer T804L1 (adjacent to Dock 74. Provide a NEMA 3 drypack transformer (480V 3-phase to 120/208V 3-phase) sized to support the temporary facilities.

All connection work will be accomplished by the contractor, and no holes will be drilled in the side of existing transformer T804L1. Coordinate with EAFB CES (via USACE COR) to turn transformer off when needed.

v. Water connection(s) will be via 12 in. plastic pipe running adjacent and through site. See design drawings for approximate location. Coordinate install and utility tapping with EAFB CES (via USACE COR). Contractor to provide tap, sanitation, backflow prevention, metering, pressure reducers, etc for a complete temporary install per "AVAILABILITY OF UTILITY SERVICES" paragraph above.

w. Sanitary connection(s) can either be via connection to sanitary manhole across Pease Drive or holding tanks. For manhole connection, cut and replace Pease Drive with concrete meeting airfield concrete specifications in the RFP to match existing paving section. Paving section is similar to typical airfield paving section shown in the design drawings. Alternatively, contractor may provide holding tanks sized for approximately 30 days of regular use by 60 PN. Pumping of tanks to be provided by the contractor as required, not less than monthly, for the duration of the project. [**Am-5]

1.29 ASBESTOS

a. The Contractor is warned that inhalation of asbestos and lead has been associated with health hazards.

b. Asbestos-containing materials may be present in area(s) where contract work is to be performed. Perform all contract work activities where the potential exists for worker exposure to airborne asbestos fibers in accordance with the requirements set forth in Section 02 82 00 ASBESTOS

REMEDIATION.

1.30 PARTNERING

a. Host a formal partnering session within 45 calendar days of contract award or as coordinated and approved by the Government. To most effectively accomplish this Contract, the Contractor and Government must form a cohesive partnership with the common goal of drawing on the strength of each organization in an effort to achieve a successful project without safety mishaps, conforming to the Contract, within budget and on schedule. The partnering team must consist of personnel from both the Government and Contractor including project level and corporate level leadership positions. Key Personnel from the supported command, end user (an associated representatives), USACE, AFCEC, Contractor, key subcontractors and the Designer of Record are required to participate in the Partnering process. This partnership between the Contractor and the Government will be voluntary and its implementation will not be part of the contract requirements nor will it result in a change to contract price or terms.

b. Host the Formal Partnering session with key personnel from the project team including both Contractor and Government personnel near Ellsworth Air Force Base (in the Rapid City area). All costs associated with the Partnering session including the third-party independent

SECTION 01 30 00.24 Page 17Am #0005

[*Am-5]

u. Electrical connection(s) will be via tie-in to nearby transformer T804L1 (adjacent to Dock 74. Provide a NEMA 3 drypack transformer (480V 3-phase to 120/208V 3-phase) sized to support the temporary facilities.

AAll connection work will be accomplished by the contractor, and no holes will be drilled in the side of existing transformer T804L1. Coordinate with EAFB CES (via USACE COR) to turn transformer off when needed.

v. Water connection(s) will be via 12 in. plastic pipe running adjacent and through site. See design drawings for approximate location. Coordinate install and utility tapping with EAFB CES (via USACE COR). Contractor to provide tap, sanitation, backflow prevention, metering, pressure reducers, etc for a complete temporary install per "AVAILABILITY OF UTILITY SERVICES" paragraph above.

w. Sanitary connection(s) can either be via connection to sanitary manhole across Pease Drive or holding tanks. For manhole connection, cut and replace Pease Drive with concrete meeting airfield concrete specifications in the RFP to match existing paving section. Paving section is similar to typical airfield paving section shown in the design drawings. Alternatively, contractor may provide holding tanks sized for approximately 30 days of regular use by 60 PN. Pumping of tanks to be provided by the contractor as required, not less than monthly, for the duration of the project. [**Am-5]

Facilitator Consultant, meeting room and other incidental items are the responsibility of the Contractor.

c. Before the Facilitated (Formal) Partnering session, coordinate with the Facilitator all requirements for incidental items (such as audio-visual equipment, easels, flipchart paper, colored markers, note pads, pens/pencils, colored flash cards) and have these items available at the Partnering session. Provide copies of any documents required for distribution to all attendees. Participants will bear their own costs for meals, lodging and transportation associated with Partnering.

d. The Initial Partnering Session must be a duration of at least one day and be held at a location off base as agreed to by the Contracting Officer. Partnering session may take place concurrently with the Pre-Construction Post-Award Kickoff Meeting.

e. Facilitator must be experienced in conducting corporate Partnering sessions and must be a third-party independent facilitating consultant -not an employee of the Contractor. The Facilitator is responsible for leading all aspects of the Partnering session necessary to achieve the Partnering goal.

f. An outcome of the Partnering session must be an escalation matrix agreed upon by both the Government and Contractor, which identifies key Government and Contractor decision makers by name and anticipated decision durations.

g. Host follow-on Partnering Sessions at approximately six-month intervals (minimum of 4 additional sessions) or more frequently if needed and lasting generally a half day or less. Attendees need only be those required to resolve current issues. The same Facilitator used in the Initial Partnering session must lead the follow-on sessions unless an alternative is permitted by the Contractor Officer. All costs associated with follow-on Partnering sessions are the responsibility of the Contractor.

1.31 PROFIT

a. Use the weighted guidelines method of determining profit on any equitable adjustment change order or modification issued under this contract. The profit factors must be as follows:

Factor Rate Weight Value Degree of Risk 20 See Item Relative difficulty of work 15 b. below Size of Job 15 Period of performance 15 Contractor's investment 5 Assistance by Government 5 Subcontracting 25

b. Based on the circumstances of each procurement action, each of the above factors must be weighted from .03 to .12 as indicated below. Obtain the value by multiplying the rate by the weight. The value column when totaled indicates the fair and reasonable profit percentage under the circumstances of the particular procurement.

(1) Degree of Risk. Where the work involves no risk or the

SECTION 01 30 00.24 Page 18Am #0005 degree of risk is very small, the weighting should be .03; as the degree of risk increases, the weighting should be increased up to a maximum of .12.

Lump sum items will have, generally, a higher weighted value than the unit price items for which quantities are provided. Other things to consider:

the portion of the work to be done by subcontractors, nature of work, where work is to be performed, reasonableness of negotiated costs, amount of labor included in costs, and whether the negotiation is before or after performance of work.

(2) Relative Difficulty of Work. If the work is most difficult and complex, the weighting should be .12 and should be proportionately reduced to .03 on the simplest of jobs. This factor is tied in to some extent with the degree of risk. Some things to consider: the nature of the work, by whom it is to be done, where, and what is the time schedule.

(3) Size of Job. All work not in excess of $100,000 shall be weighted at .12. Work estimated between $100,000 and $5,000,000 shall be proportionately weighted from .12 to .05.

(4) Periods of Performance. Jobs in excess of 24 months are to be weighted at .12. Jobs of lesser duration are to be proportionately weighted to a minimum of .03 for jobs not to exceed 30 days. No weight where additional time not required.

(5) Contractor's Investment. To be weighted from .03 to .12 on the basis of below average, average, and above average. Things to consider: amount of subcontracting, mobilization payment item, Government furnished property, equipment and facilities, and expediting assistance.

(6) Assistance by Government. To be weighted from .12 to .03 on the basis of average to above average. Things to consider: use of Government-owned property, equipment and facilities, and expediting assistance.

(7) Subcontracting.