W9128F24B0008_District Warehouse Roof Replacement Solicititation.pdf

PDF 557 KB Posted

Attached to
District Warehouse Roof Replacement
Solicitation number
W9128F24B0008
Issued by

About this file

This document is a solicitation for a construction contract to replace and repair the roofing on the existing District Warehouse building for the U.S. Army Corps of Engineers, Omaha District. The project involves replacing the approximately 40,000 square feet of roofing to restore the building to full operational capabilities. The estimated construction cost range is between $1,000,000 and $5,000,000. The solicitation is set aside for small businesses and bids are due by October 1, 2024. The contract will be awarded as a firm-fixed-price contract. Key details include the requirement for bid bonds, performance and payment bonds, and compliance with the Buy American Act for construction materials. A site visit is scheduled for September 10, 2024. Evaluation will be based on price, with no discussions planned.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The Offeror hereby agrees to do all w ork described in the documents entitled:

District Warehouse Roof Repairs - Missouri River Project Office Omaha, Nebraska

RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442). THIS SOLICITATION IS RESTRICTED TO SMALL

BUSINESSES.

All bids must be submitted electronically. See Section 00 21 00 INSTRUCTIONS TO OFFERORS, "General Bidding Information" for instructions on submitting bids.

BID OPENING WILL BE VIRTUAL

X

MIKA N MAHYENGA

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

29-Aug-2024

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________90 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________01 Oct 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F

PAGE OF PAGES

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9128F24B0008 1 OF 58

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W9128F24B0008

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

BIDDING SCHEDULE

ITEM

NO.

DESCRIPTION EST

QTY

UNIT UNIT

PRICE

EST AMOUNT

BASIC ITEMS

0001 Entire work complete to construct District Warehouse Repairs Phase 1 Roofing, excluding items listed separately below.

1 Job XXX $_____________________

TOTAL BASIC AMOUNT $_____________________________

OPTION ITEMS

[Option]

Entire work complete for security services during construction

1 Job XXX $_____________________

TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________

NOTES:

1. See 00 21 00, INSTRUCTIONS TO OFFERORS for evaluation of options. If the Government exercises an option, it will exercised upon award. No additional time will be given should any of the options be awarded.

2. Bid prices must be entered for all items of the schedule. Total amounts submitted without bid prices being entered on individual items will be rejected.

Section 00 21 00 - Instructions

1.1 GENERAL BIDDING INFORMATION

Bidders shall e-mail bids to the below individuals no later than the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recent SF 30, as applicable:

Lee M. McCormick, Contracting Officer: lee.m.mccormick@usace.army.mil Mika N. Mahyenga, Contract Specialist: mika.n.mahyenga@usace.army.mil

Each email shall contain the following information:

a. Solicitation No: W9128F24B0008

b. Bid Due Date and Time: See Section SF1442 (00 10 00 page 1)

c. Bid Validity Date: 60 Days

Bids received after the date and time stated within Block 13 of the SF 1442 or Block 14 of the most recent SF 30, as applicable, will be considered late and will not be considered for award. To avoid rejection of a bid, the bidder must ensure the e-mail submission is virus-free. The government will follow FAR 14.406 if an e-mail bid is unreadable. Part 15 is not applicable to this acquisition.

Bidders should enter a description for every file submitted. For files over 20 megabytes (MB) the bidders shall break the file into smaller files sent via separate emails with each email marked to identify which number the email is relative to the total number of emails submitted (i.e. "email one of four"). Once all of the emails submitted have been received the Government will confirm receipt via responsive email. If a bidder submits multiple bids the Government will only consider the last bid submitted prior to the bid due date and time.

Do not assume submission will be instantaneous. File size and number of files submitted shall be considered.

Bidder/Teammate/Subcontractors should allow adequate time for submission completion because the entire bid (i.e. bidders' submission and all teammate/subcontractor(s) independent submissions) must be received by the bid due date and time specified in Block 13 of SF 1442, or SF 30 as applicable.

Electronic submission of bids satisfies the requirement set forth in Block 13A of the SF 1442 ('…in original and copies…"). Additionally, electronic submission of the bid guarantee, when a bid guarantee is required, is due with the bid submission. Mailing a bid guarantee is not allowed.

1.1.1 INFORMATION TO BE PROVIDED WITH BID

Bidders must include the below information with the bid:

a. Standard Form (SF) 1442 with Blocks 14 through 20c completed and a person’s signature authorized to sign. Bidders must include their CAGE Code in Block 14, under “CODE.”

b. Bid Schedule (SECTION 00 10 00).

c. Bid Bond (SF-24)

1.1.2 BID OPENING

The government will NOT conduct a physical bid opening for this solicitation. The government will hold the bid opening by conference call at 3:00 pm CST when the bids are due. The government scheduled the bid opening an hour after the due time to allow enough time to download all e-mail documents. The

USACE Omaha District will not accept any hard copy documentation submitted in response to this invitation for bids.

Bidders wishing to participate in the telephonic bid opening shall email a list of participants to both Contracting Officer (lee.m.mccormick@usace.army.mil) and Contract Specialist (mika.n.mahyenga@usace.army.mil) no later than the close of business 24 hours prior to the bid due date and time. Please reference "W9128F24B0008, District Warehouse Roof Repairs" in the email subject line. An email will be sent to the bidder which will include confirmation of the list of participants, the conference call-in telephone number, and the security passcode for participants to utilize for the telephonic bid opening.

1.1.3 INFORMATION FOR MODIFYING BIDS

If a bidder needs to modify its bid, the bidder shall send the revised offer by e-mail before the date submitted within Block 13 of the SF 1442 or Block 14 of the most recently issued SF 30 applicable.

1.1.4 ARITHMETIC DISCREPANCIES

Any clerical mistake, including arithmetic discrepancies in a bid, will be handled according to FAR 14.407-

2. Any clerical error, apparent on its face in the offer, may be corrected by the contracting officer before award, but only after first obtaining bidder verification of the bid intended. The following are examples of mistakes that may be fixed:

(1) Obviously misplaced decimal points;

(2) Discrepancies between unit price and extended price (unit price will govern);

(3) Apparent errors in extension of unit prices;

(4) Apparent errors in addition of lump sum and extended prices.

1.1.5 BASIS FOR AWARD

Per FAR 52.214-19 Contract Award-Sealed Bidding-Construction in Section 00 21 00 (Instructions), the government will evaluate bids in response to this solicitation without discussions. It will award a contract to the responsible bidder whose offer, conforming to the solicitation, will be most advantageous to the government, considering only price and the price-related factors specified elsewhere in the solicitation.

1.1.6 DESCRIPTION OF WORK

This project is to provide roofing assembly replacement and repairs to the existing Missouri River Project Office (MRPO) Warehouse building features that are in a failing or near failing state. The roof replacement and repairs to the building will restore specific components to as new conditions and enable continued use of the building capable of providing regular daily activities for which the facility was intended when initially constructed. The repaired facility will accommodate approximately 21 permanently assigned personnel. The roof gross square footage (rounded) is approximately 40,000 SF. The facility includes administrative/office space, vehicle storage, warehouse storage space, and building support spaces. The general concept behind the roof replacement and repair is to match the existing roof features as they currently exist, and repair associated items such as eave flashings and insulation envelope that are failing and causing environmental and safety concerns.

The facility roof replacement and repairs will permit the facility to have an additional 25-year useful design life before re-use/re-purpose, and a 50-year building replacement life.

1.1.7 ESTIMATED CONSTRUCTION COST

The estimated magnitude of construction is between $1,000,000 and $5,000,000.

1.1.8 BID GUARANTEE

See 52.228-1, Bid Guarantee in Section 00 72 00 (General Conditions). The bid guarantee must be on SF 24 and include a Power of Attorney appointing an attorney-in-fact with authority to bind the surety. At the time of bid opening, the bond is enforceable against the surety should the bidder fail to meet its obligation.

A power of attorney must include a certification as to the authority of the surety’s agents supported by a resolution of the surety authorizing their use and committing it bound by them. Electronic signatures and electronic, mechanically-applied, or printed dates may be used and considered original signatures and dates, without regard to the order in which affixed. A corporate seal on the SF-24 is not required. Mailing a bid guarantee is not allowed.

1.1.9 PERFORMANCE AND PAYMENT BONDS OR ALTERNATE PAYMENT PROTECTION

See 52.228-15 Performance and Payment Bonds-Construction (JUN 2020) (DEVIATION 2020-O0016) in Section 00 72 00 (General Conditions). The performance bond must be on SF-25, and the payment bond must be on SF-25A. Electronic signatures and electronic, mechanically-applied, or printed dates may be used and considered original signatures and dates, without regard to the order in which affixed. A corporate seal on the SF-25 or SF-25A is not required.

1.1.10 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and amendments are available by internet access only. The government will post all solicitation documents to https://www.sam.gov/. The bidder is responsible for checking the website for amendments.

To view a list of interested vendors and receive notifications or e-mail of changes regarding the solicitation, bidders must register as vendors on the website listed above. If a bidder is already registered, enter the user name and password to log in and search for the solicitation number. If you wish for general contractors, subcontractors, suppliers, plan rooms, or print shops to have the ability to contact you, click on the “Add Me to Interested Vendors” for this solicitation.

1.1.11 REJECTION OF BIDS

The government will handle the rejection of bids per FAR 14.404. The government may reject an offer if the prices for line items or subline items are materially unbalanced (see 15.404-1(g)). Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly over or underestimated as indicated by the application of cost or price analysis techniques. See also 52.214- 19 Contract Award-Sealed Bidding-Construction in Section 00 72 00 (General Conditions) for additional information.

1.1.12 NOTICE REGARDING BUY AMERICAN STATUE

The Buy American statute (41 U.S.C. 83 chapter 83, Buy American) generally requires that only domestic construction material be used in the performance of this contract. Exception from the Buy American statute shall be permitted only in the case of non-availability of domestic construction materials or allowed under Trade Agreements, if included in the solicitation. A bid offering nondomestic construction material will not be accepted unless specifically approved by the Government or allowed under Trade Agreements, if included in the solicitation. When a bidder proposes to furnish nondomestic construction material, his bid must set forth an itemization of the quantity, unit price, and intended use of each item of such nondomestic construction material. When offering nondomestic construction material pursuant to this paragraph, bids may also offer, at stated prices, any available comparable domestic construction material, so as to avoid the possibility that failure of a nondomestic construction material to be acceptable under this paragraph will cause rejection of the entire bid, unless allowed under Trade Agreements, if included in the solicitation.

All bidders are cautioned that, prior Government conduct notwithstanding, the Contractor's selection of a domestic construction material (as defined in FAR 52.225-9 Buy American Construction Materials) which would require the subsequent selection of a foreign construction material for compatibility is not a justification for waiver of the Buy American statute. It is the Contractor's responsibility to verify, prior to submitting the materials for approval that each system can be built to meet the contract specifications and Buy American statute requirements of the solicitation.

1.1.13 FEDERAL, STATE AND LOCAL TAXES

The bidder is responsible for investigating applicable federal, state, and local taxes and any specific exemptions that may exist and includes applicable Value-Added Taxes (VAT), sales, use, and excise taxes.

See 52.229-3 Federal, State, and Local in Section 00 72 00 (General Conditions).

1.1.13.1 NEBRASKA EXEMPTION FOR BUILDING MATERIALS ON FEDERAL REAL ESTATE

The State of Nebraska permits exempt status on some purchases used for a construction project provided that Nebraska Department of Revenue Form 17G status is granted to the contractor. This exemption covers purchases and uses of building materials that will be annexed to real estate that is owned by the federal government. The Offeror should exclude Nebraska sales and use tax from the proposal which are subject to this exemption as provided under Form 17G (attached to this section for reference). The Contracting Officer will provide a completed Form 17G to the successful Offeror after award. Upon receipt of the signed form, the Offeror must comply with the instructions on Form 17G for use in securing exemption from state taxes on the purchase of covered building materials. The Offeror will retain the original form and provide a copy to the Contracting Officer.

1.1.14 BIDDER’S QUESTIONS AND COMMENTS

Bidders must submit questions and comments relative to the bidding documents via Bidder Inquiry as indicated below.

Bidders may submit questions and comments relative to any proprietary concerns or bidding documents, or if the Bidder Inquiry system is out of service, to the individuals below:

Contract Specialist – Mika N. Mahyenga mika.n.mahyenga@usace.army.mil

Contracting Officer – Lee M. McCormick lee.m.mccormick@usace.army.mil

1.1.14.1 BIDDER INQUIRY

Bidders shall submit all questions via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet/, ten calendar days before bid opening, to allow the government time to respond before receipt of bids or issue an amendment.

Technical inquiries and questions relating to technical requirements, bidding procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at: https://www.projnet.org/projnet/ No Later Than four

(4) calendar days before bid opening, in order that they may be given consideration or actions taken prior to receipt of offers. Phone calls for non-technical or procedural type questions should be made between 8:30 a.m. and 3:30 p.m. (Central Standard Time) Monday through Friday. The Bidder Inquiry system is to be used to ask and receive answers to all non-proprietary questions.

To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.

Bidders must use the Bidder Inquiry Key and instructions below to submit and review inquiry items. A bidder who enters a comment/question will receive an acknowledgment of their comment /question by e-mail, followed by an answer to the comment/question after the government has processed it.

The government will make available all timely questions and approved answers in ProjNet.

The Solicitation Number is: W9128F24B0008

The Bidder Inquiry Key is: W8JUA4-84KDXC

a. Registration for ProjNet Bidder Inquiry Access

1. From the ProjNet home page listed above, click on Quick Add on the upper right side of the screen.

2. Select USACE for the Agency.

3. Enter the Bidder Inquiry Key above.

4. Enter the primary e-mail address to use for communication for.

5. Check the “I agree to the Privacy & Security Notice” box and click Continue. A page will open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, E-mail, Secret Question, Secret Answer, and Time Zone. Bidders will use the answer to the Secret Question from this point on to access the ProjNet system.

7. Click Add User. Once completed, ProjNet registration is complete, and the bidder is logged into the system.

b. Entering Bidder Inquiries in ProjNet Bidder Inquiry System

1. For future access to ProjNet, bidders will not receive a password by e-mail. Bidders will utilize the Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Select USACE for the Agency.

4. Enter the Bidder Inquiry Key above.

5. Enter the primary e-mail address used to register.

6. Check the “I agree to the Privacy & Security Notice” box and click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once complete, the bidder is logged into the system.

8. Follow online screen instructions to enter specific bidder inquiries for the project.

c. The Bidder Inquiry System will be unavailable for new inquires starting four (4) calendar days before bid opening in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

d. Bidders are requested to review the plans and specifications in their entirety and review the Bidder Inquiry System for answers to questions prior to submitting a new inquiry.

e. The call center operate weekdays from 8 am to 5 pm Central Standard Time Zone (Chicago). The telephone number for the call center is 800-428-HELP.

f. Bids will be publicly opened electronically. Information concerning the status of the evaluation and/or award will NOT be available after receipt of bids. The bid abstract will be posted to https://www.sam.gov.

1.1.15 AVAILABILITY OF BID RESULTS

Bid results will be available after bid opening on https://www.sam.gov/.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.204-26 Covered Telecommunications Equipment or Services--

Representation.

OCT 2020

52.207-1 Notice Of Standard Competition MAY 2006 52.211-2 Availability of Defense Specifications, Standards, and Data

Item Descriptions in the Acquisition Streamlining and Standardization Information System (ASSIST) Website

SEP 2023

52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.225-11 Buy American--Construction Materials Under Trade

Agreements

NOV 2023

52.228-1 Bid Guarantee SEP 1996 252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.211-7002 Availability For Examination Of Specifications, Standards, Plans, Drawings, Data Item Descriptions, And Other Pertinent Documents

DEC 1991

252.236-7001 Contract Drawings, and Specifications AUG 2000

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

A site visit is scheduled for 10 September 2024 at 10 am CT. Contractors interested in seeing the site need to make a reservation with David Nuss telephone 402-350-1957 or by e-mail at David.E.Nuss@usace.army.mil.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

The full text of FAR provisions can be found at:

https://www.acquisition.gov/browse/index/far

The full text of DFARS provisions can be found at:

https://www.acq.osd.mil/DPAP/dars/dfarspgi/current/index.html

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

None.

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

Section 00 45 00 - Representations and Certifications

52.204-8 Annual Representations and Certifications MAY 2024 52.204-24 Representation Regarding Certain Telecommunications and

Video Surveillance Services or Equipment

NOV 2021

52.209-7 Information Regarding Responsibility Matters OCT 2018 52.209-11 Representation by Corporations Regarding Delinquent Tax

Liability or a Felony Conviction under any Federal Law

FEB 2016

52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law

FEB 2016

52.209-13 Violation of Arms Control Treaties or Agreements -- Certification

NOV 2021

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.

JUN 2020

252.203-7005 Representation Relating to Compensation of Former DoD Officials

SEP 2022

252.204-7007 Alternate A, Annual Representations and Certifications NOV 2023 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation

DEC 2019

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation

MAY 2021

Section 00 72 00 - General Conditions

52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

JUN 2020

52.203-13 Contractor Code of Business Ethics and Conduct NOV 2021 52.203-16 Preventing Personal Conflicts of Interest JUN 2020 52.203-19 Prohibition on Requiring Certain Internal Confidentiality

Agreements or Statements

JAN 2017

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUN 2020

52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-21 Basic Safeguarding of Covered Contractor Information Systems

NOV 2021

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities

DEC 2023

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

NOV 2021

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

NOV 2021

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.209-13 Violation of Arms Control Treaties or Agreements -- Certification

NOV 2021

52.210-1 Market Research NOV 2021 52.211-13 Time Extensions SEP 2000 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-26 Audit and Records--Sealed Bidding JUN 2020 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data -

Modifications - Sealed Bidding

JUN 2020

52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.219-28 Post-Award Small Business Program Rerepresentation FEB 2024 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime

Compensation

MAY 2018

52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work

MAY 2014

52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment JUN 2020 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons NOV 2021 52.222-54 Employment Eligibility Verification MAY 2022 52.222-55 Minimum Wages for Contractor Workers Under Executive

Order 14026

JAN 2022

52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.223-2 Reporting of Biobased Products Under Service and

Construction Contracts.

MAY 2024

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2024 52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.227-1 Authorization and Consent JUN 2020 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

JUN 2020

52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Individual Surety--Pledge of Assets FEB 2021 52.228-12 Prospective Subcontractor Requests for Bonds DEC 2022 52.228-15 Performance and Payment Bonds--Construction JUN 2020 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

MAR 2023

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.242-13 Bankruptcy JUL 1995 52.244-6 Subcontracts for Commercial Products and Commercial

Services

FEB 2024

52.245-1 Government Property SEP 2021 52.253-1 Computer Generated Forms JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

MAY 2024

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

JAN 2023

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

JAN 2023

252.204-7020 NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.236-7008 Contract Prices-Bidding Schedules DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Products or Commercial

Services

NOV 2023

252.247-7023 Transportation of Supplies by Sea JAN 2023

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 days* The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,167.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.214-28 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA - MODIFICATIONS - SEALED

BIDDING. (JUN 2020)

(a) The requirements of paragraphs (b) and (c) of this clause shall—

(1) Become operative only for any modification to this contract involving aggregate increases and/or decreases in costs, plus applicable profits, expected to exceed the threshold for submission of certified cost or pricing data in Federal Acquisition Regulation (FAR) 15.403-4(a)(1) on the date of execution of the modification; and

(2) Be limited to such modifications.

(b) Before awarding any subcontract expected to exceed the threshold for submission of certified cost or pricing data in FAR 15.403-4(a)(1), on the date of agreement on price or the date of award, whichever is later, or before pricing any subcontract modifications involving aggregate increases and/or decreases in costs, plus applicable profits, expected to exceed the threshold for submission of certified cost or pricing data in FAR 15.403-4(a)(1), the Contractor shall require the subcontractor to submit certified cost or pricing data (actually or by specific identification in writing), as part of the subcontractor’s proposal in accordance with FAR 15.408, Table 15-2 (to include any information reasonably required to explain the subcontractor’s estimating process such as the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data, and the nature and amount of any contingencies included in the price), unless an exception under FAR 15.403-1(b) applies. If the threshold for submission of certified cost or pricing data specified in FAR 15.403-4(a)(1) is adjusted for inflation as set forth in FAR 1.109(a), then pursuant to FAR 1.109(d) the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment.

(c) The Contractor shall require the subcontractor to certify in substantially the form prescribed in FAR subsection 15.406-2 that, to the best of its knowledge and belief, the data submitted under paragraph (b) of this clause were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract or subcontract modification.

(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in each subcontract that, when entered into, exceeds the threshold for submission of certified cost or pricing data in FAR 15.403-4(a)(1).

52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that--

(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.

(c) Applicability. This clause applies only to--

(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;

(4) Orders expected to exceed the simplified acquisition threshold and that are--

(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);

(5) Orders, regardless of dollar value, that are--

(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or

(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and

(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for--

(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;

(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.

(f) The Contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause--

[Contracting Officer check as appropriate.]

___ By the end of the base term of the contract and then by the end of each subsequent option period; or

___ By the end of the performance period for each order issued under the contract.

(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.

(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph

(e) of this clause will be performed by the aggregate of the joint venture participants.

(1) In a joint venture comprised of a small business protege and its mentor approved by the Small Business Administration, the small business protege shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protege in the joint venture must be more than administrative functions.

(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

7.6% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Douglas County in Omaha, Nebraska.

52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-

DESIGNATED ITEMS (MAY 2008)

(a) Definitions. As used in this clause--

Postconsumer material means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”

Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original…