Amd-0002_W9128F24B0008_Drawings (Reissued).pdf

PDF 459 KB Posted

Attached to
District Warehouse Roof Replacement
Solicitation number
W9128F24B0008
Issued by

About this file

This document is a set of drawings related to a federal contract opportunity for a roof replacement project at the Missouri River Project Office (MRPO) in Omaha, Nebraska.

The key details are:

  • The solicitation number is W9128F24B0008, and the project is titled "District Warehouse Roof Replacement".
  • The project involves providing roofing assembly replacement and repairs to the existing MRPO Warehouse building.
  • The drawings include composite floor plans, roof plans, elevations, and details for the demolition and installation of the new roof assembly.
  • The drawings indicate the project will be phased, with the contractor required to coordinate with the government on access, schedule, and protection of the existing building and contents.
  • The drawings specify requirements for the new roof assembly, including standing seam metal roof, insulation, vapor retarder membrane, and flashing details.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

A B C D E F

101102

108109

119A

1'

4"

20' - 0" 20' - 0" 12' - 6" 15' - 0" 12' - 6" 20' - 0" 20' - 0"

AREA A

AREA B

AREA B

AREA C

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

AD110

C O

M

PO

SI

TE

F

LO

O R

P

LA

N D

EM

O

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

1" = 20'-0"A1 COMPOSITE FIRST FLOOR DEMO

KEYPLAN

AREA "A"

AREA "B"

AREA "C"

PLAN NORTH

GENERAL NOTES

1. SEE DRAWINGS A-111, A-112, AND A-113 FOR LARGER SCALE FLOOR PLANS.

2. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.

3. THE EXISTING BUILDING WILL REMAIN OCCUPIED AND OPERATIONAL AT ALL TIMES DURING THE ROOF DEMOLITION AND REPLACEMENT WORK AND FOR ALL OTHER WORK ASSOCIATED WITH THIS CONTRACT.

1" = 1'-0"B15 LEGEND

PHASE 1

PHASE 2

PHASE 3

PHASE 4

PHASE 5

PHASE 6

GENERAL DEMOLITION AND CONSTRUCTION ACTIVITY NOTES

1. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER FOR EACH ROOM OR AREA WHERE

WORK WILL OCCUR AND TO MAINTAIN A SAFE CONDITION FOR THE BUILDING OCCUPANTS.

2. ALL EXISTING BUILDING ELEMENTS AND ALL BUILDING CONTENTS SHALL BE PROTECTED TO PREVENT DAMAGE THROUGHOUT THE DURATION OF THE CONTRACT WORK, SEE SPECIFICATION 01 12 00 AND 02 41 00.

3. EXISTING BUILDING ELEMENTS AND BUILDING CONTENTS DAMAGED AS A RESULT OF THE CONTRACT WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE REPLACED OR REPAIRED, SEE ALSO

SPECIFICATION 01 12 00.

4. ALL INTERIOR AND EXTERIOR FIRE EXITS AND FIRE EXIT ACCESS THAT ARE AFFECTED BY THE DEMOLITION, NEW ROOF ASSEMBLY INSTALLATION, AND ALL WORK ASSOCIATED WITH THE CONTRACT SHALL BE MAINTAINED, KEPT OBSTRUCTION FREE, AND PROTECTED DURING THE WORK, SEE ALSO SPECIFICATION 01 12 00.

5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AN INDEPENDENT THIRD PARTY SECURITY FIRM, SEE

SPECIFICATION 01 52 10 (BID OPTION).

6. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER FOR ACCESS TO ALL INTERIOR

SPACES.

CONSTRUCTION PHASING AND SEQUENCING

1. THE CONTRACTOR SHALL FOLLOW THE PHASING NUMBERING/ORDER FOR THE DEMOLITION AND NEW ROOF ASSEMBLY INSTALLATION AND CONSTRUCTION FOR INTERIOR AND EXTERIOR CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL NOT LEAVE ANY PORTIONS OF THE EXISTING BUILDING OR CONTENTS EXPOSED TO THE ELEMENTS OR EXTERIOR ENVIRONMENT DURING THE TIME WHEN CONSTRUCTION ACTIVITIES ARE NOT OCCURRING

UNLESS APPROVED BY THE CONTRACTING OFFICER.

2. THE CONTRACTOR SHALL NOT START ON A SUBSEQUENT PHASE OF THE ROOF CONSTRUCTION UNTIL COMPLETING A PRIOR PHASE UNLESS APPROVED BY THE CONTRACTING OFFICER. THE EXISTING ROOF DEMOLITION, INTERIOR FABRIC LINER MEMBRANE INSTALLATION, AND NEW ROOF ASSEMBLY INSTALLATION SHALL START WITH PHASE 1 AND SPECIFICALLY ROOM 122. THIS PHASE SHALL BE COMPLETED AND TURNED OVER TO THE GOVERNMENT FOR USE AND ACCESS. ACCESS TO ROOM 122 SHALL BE PROTECTED THROUGHOUT THE DURATION OF THE CONTRACT FOR GOVERNMENT ACCESS AND STORAGE OF MATERIAL. PHASE 2 WILL THEN BE COMPLETED BEFORE MOVING TO THE NEXT PHASE AND SUBSEQUENT PHASES SHALL FOLLOW IN THE ORDER INDICATED. PHASE 3 WILL FOLLOW AFTER THE COMPLETION OF PHASE 2 WITH PRIORITY BEING PLACED ON COMPLETING THE WORK

OVER ROOM 121 AND THEN 115.

3. THE EXISTING ROOF ASSEMBLY DEMOLITION AND NEW ROOF ASSEMBLY INSTALLATION SHALL FOLLOW THE PHASING INDICATED ON THIS DRAWING. COMPLETE ALL WORK IN THE ORDER INDICATED FOR THE DESIGNATED PHASE BEFORE MOVING TO THE NEXT DESIGNATED PHASE OF WORK UNLESS APPROVED BY THE CONTRACTING

OFFICER.

4. SEE THE MEZZANINE PLANS ON AD124, AD125, AND AD126 FOR AREAS OF THE ROOF REMOVAL AND REPLACEMENT THAT CORRESPOND TO THE AREAS IDENTIFIED ON DRAWINGS AD110 AND TO BE INCLUDED IN THE WORK PHASING

OVER THE MEZZANINE AREA.

5. DAILY WORK SCHEDULES AND WEEKLY COORDINATION MEETINGS. IN ORDER TO CLOSELY COORDINATE WORK UNDER THIS CONTRACT, THE CONTRACTOR SHALL PREPARE A WRITTEN AGENDA, PREPARE MEETING MINUTES, AND ATTEND COORDINATION MEETINGS THREE (3) TIME PER WEEK (EVERY MONDAY, WEDNESDAY, AND FRIDAY UNTIL CONTRACT COMPLETION) WITH THE CONTRACTING OFFICER AT WHICH TIME THE CONTRACTOR SHALL SUBMIT FOR COORDINATION AND APPROVAL, A PROPOSED DAILY WORK SCHEDULE FOR THE SUBSEQUENT TWO- WEEK PERIOD OR UPDATES TO THE SCHEDULED WORK PLAN. THE CONTRACTING OFFICER RESERVES THE RIGHT TO SCHEDULE MORE FREQUENT COORDINATION MEETINGS BASED ON THE AREA OF THE BUILDING BEING AFFECTED AND THE CONTRACTOR'S PROGRESS IN THE PHASES AND AREAS OF WORK DEFINED IN THE PHASING REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE A COPY OF MODIFICATIONS (MODS), SERIAL LETTERS, REQUESTS FOR INFORMATION (RFIS) AND ANY OTHER INFORMATION THAT IS REQUIRED IN THE MEETINGS AND RECORDED IN THE MINUTES OF THE MEETINGS. REQUIRED TEMPORARY UTILITY SERVICES, TIME AND DURATION OF INTERRUPTIONS, AND PROTECTION OF OCCUPANTS - BUILDING ACCESS - EGRESS, BUILDING CONTENTS, AND ADJOINING AREAS SHALL BE INCLUDED WITH THE CONTRACTOR'S PROPOSED 2-WEEK WORK SCHEDULE. AT THESE MEETINGS, THE CONTRACTOR SHALL ALSO SUBMIT A SCHEDULE OF PROPOSED DATES AND TIMES OF ALL PREPARATORY INSPECTIONS TO BE PERFORMED DURING THE NEXT 2 WEEKS. COORDINATION ACTION BY THE CONTRACTING OFFICER RELATIVE TO THESE SCHEDULES WILL BE ACCOMPLISHED AND ADJUSTED BASED ON THE PROGRESS OF THE WORK DURING THESE THREE WEEKLY MEETINGS. DAILY REPORTS SHALL BE COMPLETED AND

GIVEN TO THE CONTRACTING OFFICER OR REPRESENTATIVE WITHIN 24 HOURS OF THE WORK.

6. THE CONTRACTOR SHALL NOT REMOVE MORE OF THE EXISTING ROOF ASSEMBLY AND INSTALLATION OF THE NEW ASSOCIATED SEGMENT OF ROOF ASSEMBLY THAN CAN BE REINSTALLED OR MADE WEATHERTIGHT IN A SINGLE DAY.

IF THE AREA IDENTIFIED IN THE PHASING PLAN CANNOT BE MADE WEATHERTIGHT IN A SINGLE DAY, THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER TO ADJUST THE AREA OF SEQUENCING

ACCORDINGLY.

7. THE CONTRACTOR SHALL COORDINATE WITH THE GOVERNMENT AND THE CONTRACTING OFFICER FOR MOVING OF GOVERNMENT OWNED ITEMS AND EQUIPMENT ON THE WAREHOUSE FLOOR(S) AND IN THE MEZZANINES IN ORDER TO ALLOW CONTRACTOR ACCESS TO THE UNDERSIDE OF THE STRUCTURE FOR LIFTS, LADDERS, AND EQUIPMENT NECESSARY TO INSTALL SEGMENTS OF THE CONTINUOUS VAPOR RETARDER MEMBRANE/FABRIC LINER INSULATION SUPPORT SYSTEM. COORDINATION FOR MOVEMENT OF GOVERNMENT OWNED ITEMS OR EQUIPMENT IF REQUIRED SHALL OCCUR IN THE 3 WEEKLY MEETINGS BETWEEN THE CONTRACTOR AND THE CONTRACTING OFFICER. THE CONTRACTING OFFICER WILL COORDINATE WITH THE BUILDING TENANTS FOR SPECIFICS OF WHERE

THE CONTRACTOR WILL BE WORKING AND OF SCHEDULES.

8. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT A MINIMUM OF 10 WORKING DAYS NOTICE TO ENABLE ACCESS TO AND FOR THE GOVERNMENT TO MOVE ANY GOVERNMENT OWNED CONTENTS THAT ARE TO REMAIN IN THE BUILDING BUT THAT AREA REQUIRED TO BE MOVED FOR CONTRACTOR ACCESS TO INTERIOR BUILDING LOCATIONS. THIS INCLUDES THE VEHICLE BAYS AND THE WAREHOUSE SPACES. THIS NOTICE WILL ALSO ENABLE THE CONTRACTOR TO PLAN LOCATIONS OF AND ACCESS FOR EQUIPMENT OR MEANS AND METHODS FOR INTERIOR INSTALLATION OF THE CONTINUOUS VAPOR RETARDER MEMBRANE/FABRIC LINER INSULATION SUPPORT SYSTEM, FOR CONTRACTOR ACCESS IN THE AFFECTED PHASES OF THE WORK, AND FOR PROTECTION OF LOCATIONS REQUIRING GOVERNMENT PERSONNEL ACCESS AND MAINTAINING SAFE MEANS OF EGRESS. THE CONTRACTOR SHALL COORDINATE WITH THE CONSTRUCTION REPRESENTATIVE FOR GOVERNMENT MOVEMENT OF GOVERNMENT

OWNED CONTENTS IF REQUIRED.

9. EXISTING HEAVY DUTY SHELVING WILL NOT BE MOVED, WILL REMAIN IN PLACE, AND THE CONTRACTOR SHALL WORK AROUND EXISTING ITEMS IN THE BUILDING TO INSTALL THE CONTINUOUS VAPOR RETARDER

MEMBRANE/FABRIC LINER INSULATION SUPPORT SYSTEM AND THE ROOFING ASSEMBLY.

10. THE CONTINUOUS VAPOR RETARDER MEMBRANE/FABRIC LINER INSULATION SUPPORT SYSTEM SHALL BE INSTALLED FROM THE INTERIOR AND CONTINUOUSLY SUPPORTED BY STRAPPING COMPATIBLE WITH THE CONTINUOUS VAPOR RETARDER MEMBRANE/FABRIC LINER INSULATION SUPPORT SYSTEM AND SECURED TO THE UNDERSIDE OF THE EXISTING ROOF PURLINS AND STRUCTURE AS STANDARD WITH THE MANUFACTURER.

11. FOR GOVERNMENT OWNED ITEMS THAT WILL NOT BE MOVED AND WILL REMAIN IN PLACE, INCLUDING BUT NOT LIMITED TO SHELVING UNITS, RACKS, CABINETS, WORK SURFACES, ETC., THE CONTRACTOR SHALL PROVIDE TARPS OR OTHER MEANS TO COMPLETELY COVER AND FULLY PROTECT ALL INTERIOR CONTENTS FROM DUST, DEBRIS, AND TEMPORARY EXPOSURE TO THE EXTERIOR WHILE THE ROOF IS REMOVED AND UNTIL THE NEW ROOF

ASSEMBLY IS INSTALLED.

12. THE CONTRACTOR SHALL NOT REMOVE OR INSTALL ANY ROOF ASSEMBLY OR COMPONENTS IF THEIR IS A RISK OF ADVERSE WEATHER AND COORDINATION WITH THE CONTRACTING OFFICER SHALL OCCUR IN SUCH INSTANCE.

THE CONTRACTING OFFICER RESERVES THE RIGHT TO STOP CONSTRUCTION ACTIVITIES AND DIRECT THE CONTRACTOR TO PROVIDE WEATHERTIGHTNESS OF THE WORK IN PROGRESS IN THE EVENT OF FORECASTED

INCLEMENT WEATHER.

13. REMOVE RUBBISH AND DEBRIS FROM GOVERNMENT PROPERTY FROM DEMOLITION AND NEW CONSTRUCTION

ACTIVITIES DAILY. CONTRACTOR TO FURNISH WASTE CONTAINERS.

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

A B C D E F

119' - 7"

20' - 0" 20' - 0" 12' - 6" 15' - 0" 12' - 6" 20' - 0" 20' - 0"

120' - 0"

AREA A

AREA B

CHAIN LINK FENCESHELVES

SHELVES

SHELVES

WOODEN BOXES

HESCO BASKETS

ARCHIVE STORAGE

SHELVES

SHELVES

SHELVES

SHELVES

SHELVES

SHELVES

SHELVES

SHELVES

SHELVES

SHELVES

SHELVES

SHELVES

SHELVES

SHELVES

SHELVES

BOXES

MISC ITEMS

MISC.

STORAGE

UNITS

USER DESKS

SHELVES

SHELVES

STORAGE CABINETSDESKS

SHELVES

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

AD111

FL

O

O R

P

LA

N D

EM

O

A R

EA

A

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

ROOF ASSEMBLY DEMOLITION NOTES

NUMBER DESCRIPTION

1 REMOVE EXISTING STANDING SEAM METAL ROOF ASSEMBLY, TRIM, FLASHINGS, VENT AND

FLUE FLASHINGS, EXHAUST FANS AND CURBS, GUTTERS, DOWNSPOUTS, INSULATION, VAPOR

RETARDERS, ASSESSORIES, ETC. - TYP.

2 WHEN REMOVING EXISTING GUTTER, GUTTER FLASHINGS,AND ASSOCIATED EAVE TRIM,

REPAIR ALL GAPS AND HOLES AT AND BEHIND METAL WALL PANEL AND FLASHINGS AT TOP OF

ALL WALLS (ESPECIALLY ABOVE CONCRETE MASONRY UNITS AT EAVE) WITH NEW CONT.

METAL FLASHING TO PREVENT BIRDS AND INSECTS FROM ENTERNG THE BUILDING AT VOIDS. -

TYP.

1/8" = 1'-0"C1 FLOOR PLAN DEMO - AREA A

KEYPLAN

AREA "A"

AREA "B"

AREA "C"

PLAN NORTH

GENERAL DEMOLITION NOTES

1. THE DEMOLISHED ITEMS IN THE SCOPE ARE TO BE SCRAPPED.

2. FURNITURE, EQUIPMENT, AND AREAS THAT ARE INDICATED TO HAVE STORAGE SHELVES,

STORAGE UNITS, PALLETS, AND OTHER ITEMS ARE FOR INFORMATION RELATIVE TO THE

PHASING PLANS OF THE ROOF DEMOLITION AND NEW ROOF ASSEMBLY INSTALLATION.

8'0 4' 16'

PHOTO K1

AD114

PHOTO E1

AD114

PHOTO E5

AD114

PHOTO K6

AD114

PHOTO K11

AD114

PHOTO K16

AD114

PHOTO A1

AD114

PHOTO A6

AD114

PHOTO A11

AD114

PHOTO A16

AD114

PHOTO E10

AD114

PHOTO E15

AD114

PHOTO J1

AD115

PHOTO J5

AD115

PHOTO J8

AD115

PHOTO J12

AD114

PHOTO J16

AD115

PHOTO D1

AD115

PHOTO D5

AD 115

PHOTO A1

AD115

PHOTO A5

AD115

PHOTO D8

AD115

PHOTO A10

AD115

PHOTO A14

AD115

PHOTO D12

AD115

PHOTO D16

AD115

PHOTO K1

AD116

PHOTO K6

AD116

PHOTO G16

AD116

PHOTO L16

AD119

PHOTO G1

AD119

PHOTO G6

AD119

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

Stream Gauging Storage

Vehicle Service Garage

Warehouse Office

EDH Workstation

Utility 119A

4'

4"

2'

8" 2'

8"

2'

4" 2'

8"

AREA A

AREA B

AREA B

AREA C

USER STORAGE

AND WORK

BENCH

USER

LOCKERS

SHELVES

USER DESKS

SHELVES

CHAIN LINK FENCE

STORAGE CABINETSDESKS

SHELVES

SHELVES

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

AD112

FL

O

O R

P

LA

N D

EM

O

A R

EA

B

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

ROOF ASSEMBLY DEMOLITION NOTES

NUMBER DESCRIPTION

1 REMOVE EXISTING STANDING SEAM METAL ROOF ASSEMBLY, TRIM, FLASHINGS, VENT AND

FLUE FLASHINGS, EXHAUST FANS AND CURBS, GUTTERS, DOWNSPOUTS, INSULATION, VAPOR

RETARDERS, ASSESSORIES, ETC. - TYP.

2 WHEN REMOVING EXISTING GUTTER, GUTTER FLASHINGS,AND ASSOCIATED EAVE TRIM,

REPAIR ALL GAPS AND HOLES AT AND BEHIND METAL WALL PANEL AND FLASHINGS AT TOP OF

ALL WALLS (ESPECIALLY ABOVE CONCRETE MASONRY UNITS AT EAVE) WITH NEW CONT.

METAL FLASHING TO PREVENT BIRDS AND INSECTS FROM ENTERNG THE BUILDING AT VOIDS. -

TYP.

1/8" = 1'-0"D1 FLOOR PLAN DEMO - AREA B

KEYPLAN

AREA "A"

AREA "B"

AREA "C"

PLAN NORTH

GENERAL DEMOLITION NOTES

1. THE DEMOLISHED ITEMS IN THE SCOPE ARE TO BE SCRAPPED.

2. FURNITURE, EQUIPMENT, AND AREAS THAT ARE INDICATED TO HAVE STORAGE SHELVES,

STORAGE UNITS, PALLETS, AND OTHER ITEMS ARE FOR INFORMATION RELATIVE TO THE

PHASING PLANS OF THE ROOF DEMOLITION AND NEW ROOF ASSEMBLY INSTALLATION.

8'0 4' 16'

PHOTO K11

AD116

PHOTO K16

AD116

PHOTO G1

AD116 PHOTO G6

AD116

PHOTO G11

AD116

PHOTO C1

AD116

PHOTO C6

AD116

PHOTO C11

AD116

PHOTO C16

AD116

PHOTO K1

AD117

PHOTO K6

AD117

PHOTO K11

AD117

PHOTO A1

AD117

PHOTO A5

AD117

PHOTO A10

AD117

PHOTO A14

AD117

PHOTO K15

AD117

PHOTO L6

AD118

PHOTO L10

AD118

PHOTO L1

AD119

PHOTO G12

AD119

PHOTO C6

AD119

PHOTO C11

AD119

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

Vestibule

Corridor

Corridor

Survey and Mapping

DRILLING

PRODUCTION

CENTER

Water Quality Lab

Corridor

Women

Men

Survery and Mapping Storage

Janitor

Stream Gauging Shop

Stream Gauging Workstation

Mechanical

Warehouse

AREA B

AREA C

DESK

SHELVES

STORAGE RACK

STORAGE RACK

SHELVES

HESCO BASKET STACKS

SHELVES

HESCO BASKET STACKS

GEOTECH SAND

SHELVES

NOT FIXED METAL

OFFICE STORAGE UNITS

SHELVES

VERTICAL STORAGE UNITS

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

AD113

FL

O

O R

P

LA

N D

EM

O

A R

EA

C

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

ROOF ASSEMBLY DEMOLITION NOTES

NUMBER DESCRIPTION

1 REMOVE EXISTING STANDING SEAM METAL ROOF ASSEMBLY, TRIM, FLASHINGS, VENT AND

FLUE FLASHINGS, EXHAUST FANS AND CURBS, GUTTERS, DOWNSPOUTS, INSULATION, VAPOR

RETARDERS, ASSESSORIES, ETC. - TYP.

2 WHEN REMOVING EXISTING GUTTER, GUTTER FLASHINGS,AND ASSOCIATED EAVE TRIM,

REPAIR ALL GAPS AND HOLES AT AND BEHIND METAL WALL PANEL AND FLASHINGS AT TOP OF

ALL WALLS (ESPECIALLY ABOVE CONCRETE MASONRY UNITS AT EAVE) WITH NEW CONT.

METAL FLASHING TO PREVENT BIRDS AND INSECTS FROM ENTERNG THE BUILDING AT VOIDS. -

TYP.

1/8" = 1'-0"B1 FLOOR PLAN DEMO - AREA C KEYPLAN

AREA "A"

AREA "B"

AREA "C"

PLAN NORTH

GENERAL DEMOLITION NOTES

1. THE DEMOLISHED ITEMS IN THE SCOPE ARE TO BE SCRAPPED.

2. FURNITURE, EQUIPMENT, AND AREAS THAT ARE INDICATED TO HAVE STORAGE SHELVES,

STORAGE UNITS, PALLETS, AND OTHER ITEMS ARE FOR INFORMATION RELATIVE TO THE

PHASING PLANS OF THE ROOF DEMOLITION AND NEW ROOF ASSEMBLY INSTALLATION.

8'0 4' 16'

PHOTO G1

AD117

PHOTO G6

AD117

PHOTO A1

AD118

PHOTO L1

AD118

PHOTO L6

AD119

PHOTO L12

AD119

PHOTO G16

AD119

PHOTO C1

AD119

PHOTO C1

AD119

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

A B C D E F

1" / 1'-0"1" / 1'-0"

J2

AD131

J7

AD131

J16

AD131

DEMOLISHED REGION

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

AD130

R O

O F

PL

AN

D

EM

O

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

1" = 20'-0"B1 ROOF PLAN DEMO

DEMO LEGEND

KEYPLAN

AREA "A"

AREA "B"

AREA "C"

PLAN NORTH

GENERAL DEMOLITION NOTES

1. THE DEMOLISHED ITEMS IN THE SCOPE ARE TO BE SCRAPPED.

2. SEE SHEET AD131 FOR TYPCAL REMOVAL DETAILS.

3. SEE SHEET A-130 FOR ADDITIONAL INFORMATION.

4. THE CONTRACTOR SHALL PROVIDE A TEMPORARY FALL PROTECTION/

FALL ARREST SYSTEM IN ACCORDANCE WITH OSHA REQUIREMENTS.

8'0 4' 16'

ROOF ASSEMBLY DEMOLITION NOTES

NUMBER DESCRIPTION

1 REMOVE EXISTING STANDING SEAM METAL ROOF ASSEMBLY, TRIM, FLASHINGS, VENT AND

FLUE FLASHINGS, EXHAUST FANS AND CURBS, GUTTERS, DOWNSPOUTS, INSULATION, VAPOR

RETARDERS, ASSESSORIES, ETC. - TYP.

2 WHEN REMOVING EXISTING GUTTER, GUTTER FLASHINGS,AND ASSOCIATED EAVE TRIM,

REPAIR ALL GAPS AND HOLES AT AND BEHIND METAL WALL PANEL AND FLASHINGS AT TOP OF

ALL WALLS (ESPECIALLY ABOVE CONCRETE MASONRY UNITS AT EAVE) WITH NEW CONT.

METAL FLASHING TO PREVENT BIRDS AND INSECTS FROM ENTERNG THE BUILDING AT VOIDS. -

TYP.

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

EXISTING METAL GUTTER TO BE REMOVED

AND SCRAPPED. WHEN REMOVING EXISTING

GUTTER, GUTTER FLASHINGS,AND

ASSOCIATED EAVE FLASHINGS AND TRIM,

INSPECT AND ASSESS THE CONDITION AT THE

TOP OF THE METAL WALL PANELS AT THE

EAVE. REPAIR ALL GAPS AND HOLES AT AND

BEHIND METAL WALL PANEL AND THE EAVE

FLASHINGS AT TOP OF ALL WALLS

(ESPECIALLY ABOVE CONCRETE MASONRY

UNITS AT EAVE). REPAIR HOLES AND GAPS

WITH NEW CONT. METAL FLASHINGS TO

PREVENT BIRDS AND INSECTS FROM

ENTERNG THE BUILDING - TYP.

EXISTING EAVE FLASHING TO BE

REMOVED AND SCRAPPED OR NEW 24

GAGE CONTINUOUS PREFINISHED SHEET

METAL TO MATCH EXISTING AND TO

COMPLETELY SEAL OFF ALL GAPS AND

OPENINGS - SEE NEW DETAIL

EXISTING STEEL GIRT TO REMAIN

EXISTING INSULATED METAL WALL

PANEL TO REMAIN. BIRD AND INSECT

PROOF ALL GAPS. SEE ABOVE NOTE.

EXISTING WIDE FLANGE STEEL BEAM

TO REMAIN

EXISTING ANGLES TO REMAIN

1' - 2"

WALL

EXISTING PANEL LINTEL, BOLTED TO

STEEL CHANNEL TO REMAIN

EXISTING STANDING SEAM

METAL ROOF TO BE

REMOVED AND SCRAPPED

EXISTING 8" STEEL ROOF PURLINS TO REMAIN

EXISTING INSULATION AND

VAPOR RETARDER MEMBRANE

TO BE REMOVED AND SCRAPPED

EXISTING METAL RAKE TRIM

TO BE REMOVED AND

SCRAPPED. PROVIDE NEW 24

GAGE CONTINUOUS

PREFINISHED SHEET METAL

FASCIA/FLASHINGS TO MATCH

EXISTING SHAPE AND COLOR

AND TO COMPLETELY SEAL

OFF ALL GAPS AND

OPENINGS - SEE NEW DETAILS

EXISTING GIRT

TO REMAIN

EXISTING

INSULATED

METAL WALL

PANEL TO

REMAIN

EXISTING STEEL

ROOF

PURLINS TO

REMAIN

EXISTING

INSULATION AND

VAPOR RETARDER

MEMBRANE TO BE

REMOVED AND

SCRAPPED

EXISTING STANDING

SEAM METAL ROOF

TO BE REMOVED

AND SCRAPPED

EXISTING RIGID

STEEL

STRUCUTRE TO

REMAIN

EXISTING RIDGE CAP

TO BE REMOVED AND

SCRAPPED

EXISTING STANDING

SEAM METAL ROOF

TO BE REMOVED

AND SCRAPPED

EXISTING INSULATION AND

VAPOR RETARDER

MEMBRANE TO BE REMOVED

AND SCRAPPED

EXISTING PURLINS TO REMAIN

EXISTING RIGID

STRUCTURAL FRAME

TO REMAIN

EXISTING METAL GUTTER TO BE REMOVED

AND SCRAPPED. WHEN REMOVING

EXISTING GUTTER, GUTTER

FLASHINGS,AND ASSOCIATED EAVE

FLASHINGS AND TRIM, INSPECT AND

ASSESS THE CONDITION AT THE TOP OF

THE METAL WALL PANELS AT THE EAVE.

REPAIR ALL GAPS AND HOLES AT AND

BEHIND METAL WALL PANEL AND THE EAVE

FLASHINGS AT TOP OF ALL WALLS

(ESPECIALLY ABOVE CONCRETE MASONRY

UNITS AT EAVE). REPAIR HOLES AND GAPS

WITH NEW CONT. METAL FLASHINGS TO

PREVENT BIRDS AND INSECTS FROM

ENTERNG THE BUILDING - TYP.

EXISTING EAVE FLASHING TO BE

REMOVED AND SCRAPPED AND NEW 24

GAGE CONTINUOUS PREFINISHED

SHEET METAL TO MATCH EXISTING AND

TO COMPLETELY SEAL OFF ALL GAPS

AND OPENINGS - SEE NEW DETAIL.

EXISTING GIRT TO REMAIN

EXISTING INSULATED METAL WALL

PANEL TO REMAIN. BIRD AND INSECT

PROOF ALL GAPS. SEE ABOVE NOTE.

EXISTING ANGLES TO

REMAIN.

1' - 2"

WALL

EXISTING STANDING SEAM

METAL ROOF ASSEMBLY TO

BE REMOVED AND SCRAPPED

EXISTING 6" PURLINS TO REMAIN

EXISTING INSULATION AND

VAPOR RETARDER MEMBRANE

TO BE REMOVED AND SCRAPPED

EXISTING PLUMBING VENT

OR FLUE PIPE TO REMAIN

REMOVE AND SCRAP EXISTING

STORM COLLAR HOOD

REMOVE AND

SCRAP EXISTING

CLAMPING RING

REMOVE AND SCRAP EXISTING

FIBERGLASS INSULATION AND

VAPOR RETARDER

REMOVE AND SCRAP

EXISTING PLUMBING

VENT OR PIPE AND

METAL FL BOOT

REMOVE AND SCRAP

EXISTING METAL TRAY

TURN DOWN OVER RIBS

AT LOW END AND

INTEGRAL FLANGED

SLEEVE

REMOVE AND SCRAP

EXISTING VAPOR

RETARDER MEMBRANE

REMOVE AND SCRAP

EXISTING STANDING

SEAM MTL ROOF

ASSEMBLY

EXISTING STEEL ROOF

PURLINS AND STEEL

STRUCTURE TO REMAIN

BASE DIA. VARIES W/PIPE DIA.

REMOVE AND

SCRAP EXISTING

FLASHING

W /P

IP

E

D

IA

VA

R

IE

S

1/ 2"

M

IN

RADIATION SHEILD

AT HOT FLUE PIPE

LOCATIONS

REMOVE AND SCRAP EXISTING

EXHAUST FAN - SEE MECH.

REMOVE AND SCRAP

EXISTING SEALANT OR TAPE

REMOVE AND SCRAP EXISTING

METAL COUNTER FLASHING

REMOVE AND SCRAP

EXISTING FASTENERS

REMOVE AND SCRAP

EXISTING CURB ASSEMBLY

REMOVE AND SCRAP EXISTING

CRICKET IF IN PLACE

REMOVE AND SCRAP

EXISTING Z-SHAPED PANEL

CLOSURE W/ CONT SEALANT

AT JOINT

REMOVE AND SCRAP

EXISTING STANDING SEAM

METAL ROOF ASSEMBLY

EXISTING ROOF

OPENING FRAMING

TO REMAIN

REMOVE AND SCRAP

EXISTING INSULATION

AND VAPOR RETARDER

MEMBRANE

EXISTING ROOF PURLINS

AND RIGID STEEL

STRUCTURE TO REMAIN

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

AD131

R O

O F

D

ET

AI

LS

D

EM

O

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

1" = 1'-0"J2 DEMO EAVE DETAIL @ OH DOOR

1" = 1'-0"J16 DEMO RAKE DETAIL

1" = 1'-0"J7 DEMO RIDGE DETAIL

1" = 1'-0"J1 DEMO EAVE DETAIL

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

1 1/2" = 1'-0"A7 ROOF REMOVAL DETAIL AT EXISTING PLUMBING VENT/FLUE

1 1/2" = 1'-0"1 ROOF EXHAUST FAN AND CURB REMOVAL DETAIL

GENERAL NOTES:

1. THE CONTRACTOR SHALL PROVIDE A TEMPORARY FALL PROTECTION/

FALL ARREST SYSTEM IN ACCORDANCE WITH OSHA REQUIREMENTS.

A B C D E F

20' - 0" 20' - 0" 12' - 6" 15' - 0" 12' - 6" 20' - 0"

AREA A

AREA B

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

A-111

FI

R

ST

F

LO

O

R P

LA

N

A R

EA

A

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

1/8" = 1'-0"B2 FIRST FLOOR PLAN AREA A

KEYPLAN

AREA "A"

AREA "B"

AREA "C"

8'0 4' 16'

GENERAL NOTES

1. ALL EXISTING ITEMS UNDERNEATH THE AREA OF THE ROOF BEING REMOVED TO BE PROTECTED

FROM ANY DEBRIS. SEE DRAWING AD110 AND SPECIFICATION SECTION 02 41 00.

2. ALL DEBRIS TO BE CLEANED UP FROM THE BUILDING AND SITE EACH DAY AFTER CONSTRUCTION

ACTIVITIES ARE COMPLETE. SEE DRAWING AD110 AND SPECIFICATION SECTION 02 41 00.

PLAN NORTH

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

Stream Gauging Storage

114 Vehicle Service Garage

Warehouse Office

EDH Workstation

Utility 119A

4'

8" 4'

0"

4'

8" 3'

0"

7'

4" 8"

2'

8" 2'

8"

8'

4" 2'

8"

6'

4" 6'

4"

3'

8"

4'

4"

/4

68' - 8 5/8" 19' - 10 3/8" 31' - 0"

6'

6" 3'

0"

1'

6"

AREA A

AREA B

AREA B

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

A-112

FI

R

ST

F

LO

O

R P

LA

N

A R

EA

B

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

1/8" = 1'-0"E2 FIRST FLOOR PLAN AREA B

KEYPLAN

AREA "A"

AREA "B"

AREA "C"

8'0 4' 16'

GENERAL NOTES

1. ALL EXISTING ITEMS UNDERNEATH THE AREA OF THE ROOF BEING REMOVED TO BE PROTECTED

FROM ANY DEBRIS. SEE DRAWING AD110 AND SPECIFICATION SECTION 02 41 00.

2. ALL DEBRIS TO BE CLEANED UP FROM THE BUILDING AND SITE EACH DAY AFTER CONSTRUCTION

ACTIVITIES ARE COMPLETE. SEE DRAWING AD110 AND SPECIFICATION SECTION 02 41 00.

PLAN NORTH

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

Vestibule

Corridor 102Corridor

Survey and Mapping

DRILLING

PRODUCTION

CENTER

Water Quality Lab

Corridor

Women

Men

Survery and Mapping Storage

Janitor

Stream Gauging Shop

Stream Gauging Workstation

Mechanical

Warehouse

8"

8"

3/ 8"

1'

5/

8"

4'

0"

4"

6'

4" 4"

68' - 7 1/2" 19' - 11 1/2" 7' - 2" 1' - 0" 20' - 10"

19' - 2 3/8" 8" 7' - 2" 1' - 0" 21' - 6 7/8"

12' - 0 1/8" 3' - 4" 3' - 4"

1' - 0"

7' - 4 1/4" 1' - 0" 21' - 6 7/8"

10' - 0"8' - 8 3/8"

19' - 2 3/8"

Telecom 113A

AREA B

AREA C US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

A-113

FI

R

ST

F

LO

O

R P

LA

N

A R

EA

C

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

1/8" = 1'-0"E2 FIRST FLOOR PLAN AREA C

KEYPLAN

AREA "A"

AREA "B"

AREA "C"

8'0 4' 16'

GENERAL NOTES

1. ALL EXISTING ITEMS UNDERNEATH THE ROOF IN THE AREA BEING REMOVED AND REINSTALLED TO BE

PROTECTED FROM ANY DEBRIS. SEE DRAWING AD110 AND SPECIFICATION SECTION 02 41 00.

2. ALL DEBRIS TO BE CLEANED UP FROM THE BUILDING AND SITE EACH DAY AFTER CONSTRUCTION

ACTIVITIES ARE COMPLETE. SEE DRAWING AD110 AND SPECIFICATION SECTION 02 41 00.

PLAN NORTH

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

A B C D E F

OPEN TO BELOW

OPEN TO BELOW

20' - 0" 20' - 0" 12' - 6" 15' - 0" 12' - 6" 20' - 0" 20' - 0"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

A-121

M

EZ

ZA

N

IN

E

PL

AN

A R

EA

A

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

1" = 20'-0"B1 MEZZANINE PLAN - AREA A

KEYPLAN

AREA "A"

AREA "B"

AREA "C"

8'0 4' 16'

PLAN NORTH

GENERAL NOTES

1. ALL EXISTING ITEMS UNDERNEATH THE ROOF IN THE AREA BEING REMOVED AND REINSTALLED TO BE PROTECTED FROM ANY DEBRIS. SEE DRAWING AD110 AND SPECIFICATION SECTION 02 41 00.

2. ALL DEBRIS TO BE CLEANED UP FROM THE BUILDING AND SITE EACH DAY AFTER CONSTRUCTION

ACTIVITIES ARE COMPLETE. SEE DRAWING AD110 AND SPECIFICATION SECTION 02 41 00.

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

DN

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW

WOODEN

PALLETS WITH

DESK

SURFACES

SHELVES

DESK AND

CHAIR

ZORINSKY

BUILDING

FURNITURE

SYSTEM

STORAGE

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

A-122

M

EZ

ZA

N

IN

E

PL

AN

A R

EA

B

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

1" = 20'-0"B1 MEZZANINE PLAN - AREA B KEYPLAN

AREA "A"

AREA "B"

AREA "C"

8'0 4' 16'

PLAN NORTH

GENERAL NOTES

1. ALL EXISTING ITEMS UNDERNEATH THE ROOF IN THE AREA BEING REMOVED AND REINSTALLED TO BE PROTECTED FROM ANY DEBRIS. SEE DRAWING AD110 AND SPECIFICATION SECTION 02 41 00.

2. ALL DEBRIS TO BE CLEANED UP FROM THE BUILDING AND SITE EACH DAY AFTER CONSTRUCTION

ACTIVITIES ARE COMPLETE. SEE DRAWING AD110 AND SPECIFICATION SECTION 02 41 00.

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

DN

52' - 0"

OPEN TO BELOW

PALLET WITH

EMPTY SOIL

SAMPLE

STORAGE

VERTICAL

STORAGE

CABINET

VERTICAL STORAGE UNITS

MAP STORAGE

UNITS

WOODEN

CABINETS

SHELVES

METAL STORAGE

CABINETS

MISC. BOXES

DISASSEMBLED

VERTICAL

STORAGE

UNITS

MISC. EMERGENCY

MANAGEMENT

STORAGE

METAL MESH DIVIDER

MISC. EMERGENCY

MANAGEMENT

STORAGE

ZORINSKY BUILDING

FURNITURE SYSTEM

STORAGE

WOODEN PALLETS

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

A-123

M

EZ

ZA

N

IN

E

PL

AN

A R

EA

C

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

1" = 20'-0"B1 MEZZANINE PLAN - AREA C

KEYPLAN

AREA "A"

AREA "B"

AREA "C"

8'0 4' 16'

PLAN NORTH

GENERAL NOTES

1. ALL EXISTING ITEMS UNDERNEATH THE ROOF IN THE AREA BEING REMOVED AND REINSTALLED TO BE PROTECTED FROM ANY DEBRIS. SEE DRAWING AD110 AND SPECIFICATION SECTION 02 41 00.

2. ALL DEBRIS TO BE CLEANED UP FROM THE BUILDING AND SITE EACH DAY AFTER CONSTRUCTION

ACTIVITIES ARE COMPLETE. SEE DRAWING AD110 AND SPECIFICATION SECTION 02 41 00. 2

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

A B C D E F

1" / 1'-0"1" / 1'-0"

NEW RAKE EDGE FLASHING TO MATCH EXISTING

- CONTINUOUS AND TYP.

NEW STANDING SEAM ROOF ASSEMBLY - TYP.

NEW DOWNSPOUTS AND 12'-0" LONG DOWNSPOUTS EXTENSIONS WITH

CONCRETE SPLASHBLOCKS - NEW DOWNSPOUTS TO BE 4" BY 5"

MINIMUM AND INSTALLED AT SAME LOCATION AS EXISTING

DOWNSPOUTS. TYP ALL DOWNSPOUTS

J13 A-510

J1 A-510

J10 A-510

NEW DOWNSPOUTS AND 12'-0" LONG DOWNSPOUTS EXTENSIONS

WITH CONCRETE SPLASHBLOCKS - NEW DOWNSPOUTS TO BE 4"

BY 5" MINIMUM AND INSTALLED AT SAME LOCATION AS EXISTING

DOWNSPOUTS. TYP ALL DOWNSPOUTS.

NEW DOWNSPOUTS AND

DOWNSPOUTS EXTENSIONS -

TYP

NEW GUTTERS TO BE SAME SIZE AS

EXISTING AND INSTALLED AT SAME

LOCATION AS EXISTING GUTTERS.

- TYP ALL LOCATIONS

NEW PLUMBING VENT FLASHINGS, RADIANT HEATER FLUE

FLASHING, AND MISC. FLASHING - TYP.

NEW FLASHINGS AT ALL ROOF PENETRATIONS - TYP

NEW DOWNSPOUTS AND 12'-0" LONG DOWNSPOUTS EXTENSIONS

WITH CONCRETE SPLASHBLOCKS - NEW DOWNSPOUTS TO BE 4" BY 5"

MINIMUM AND INSTALLED AT SAME LOCATION AS EXISTING

DOWNSPOUTS. TYP ALL DOWNSPOUTS

NEW LIGHTING PROTECTION SYSTEM - SEE ELEC.

NEW DOWNSPOUTS AND 12'-0" LONG DOWNSPOUTS EXTENSIONS

WITH CONCRETE SPLASHBLOCKS - NEW DOWNSPOUTS TO BE SAME

SIZE AS EXISTING AND INSTALLED AT SAME LOCATION AS EXISTING

DOWNSPOUTS. TYP ALL DOWNSPOUTS

NEW ROOF CAP AT RIDGE - TYP.

NEW GUTTERS TO BE SAME SIZE AS

EXISTING AND INSTALLED AT SAME

LOCATION AS EXISTING GUTTERS.

- TYP ALL LOCATIONS

NEW FLASHINGS AT ALL ROOF PENETRATIONS - TYP

NEW EXHAUST FANS, ROOF CURBS,

FLASHINGS AND CRICKETS - TYP.

NEW PLUMBING VENT FLASHINGS, RADIANT HEATER FLUE

FLASHING, AND MISC. FLASHING - TYP.

NEW FLASHINGS AT ALL ROOF PENETRATIONS - TYP

NEW PLUMBING VENT FLASHINGS, RADIANT HEATER FLUE

FLASHING, AND MISC. FLASHING - TYP.

NEW FLASHINGS AT ALL ROOF PENETRATIONS - TYP

NEW PLUMBING VENT FLASHINGS, RADIANT HEATER FLUE

FLASHING, AND MISC. FLASHING - TYP.

NEW FLASHINGS AT ALL ROOF PENETRATIONS - TYP

NEW EXHAUST FANS, ROOF CURBS,

FLASHINGS AND CRICKETS - TYP.

NEW FENCE TYPE SNOW GUARDS BETWEEN

COLUMN LINES 5 AND 11 ON EAST SIDE AND

BETWEEN 7 AND 8 ON WEST SIDE

NEW FALL PROTECTION TIE OFF POINTS/ASSEMBLIES

BENEATH RIDGE AND ABOVE NEW EXHAUST FANS

- TYP OF FOUR (4)

NEW FALL PROTECTION TIE OFF POINTS/ASSEMBLIES

BENEATH RIDGE AND ABOVE NEW EXHAUST FANS

- TYP OF FOUR (4)

EXISTING ANTENNA

STRUCTURE TO REMAIN

EXISTING MAST, ELECTRICAL

WEATHERHEAD, MAST, AND ANTENNA

TO REMAIN. REMOVE AND REINSTALL

AS NECESSARY TO INSTALL NEW SSMR

ASSEMBLY AND FLASHINGS

EXISTING ANTENNAE AND

STRUCTURE TO REMAIN

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

A-130

R O

O F

PL

AN

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

1" = 20'-0"B1 ROOF PLAN

KEYPLAN

AREA "A"

AREA "B"

AREA "C"

KEYNOTES

MARK DESCRIPTION

1 NEW ROOF ASSEMBLY - TYP.

PLAN NORTH

GENERAL NOTES

1. ALL EXTERIOR COLORS FOR THE STANDING SEAM METAL ROOF ASSEMBLY INCLUDING GUTTERS, DOWSNPOUTS, FLASHINGS, TRIM, AND ACCESSORIES SHALL MATCH EXISTING COLORS. COLOR TO

BE SUBMITTED FOR APPROVAL.

2. MATCH THE PROFILE, SHAPE, AND SIZES OF ALL FLASHINGS, TRIM, AND GUTTERS. DOWNSPOUTS

SHALL NOT BE LESS THAN 4" BY 5".

3. SEE SHEET A-510 FOR TYPICAL ROOF DETAILS AND NOTES.

4. THE EXISTING BUILDING STRUCTURE WILL BE USED TO PROVIDE THE REQUIRED ROOF SLOPE

AND IS APPROXIMATELY 1:12. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS.

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

01_LEVEL_FF

0' - 0"

MEZZANINE

11' - 4"

T.O. ROOF

22' - 0"

T.O. CMU

13' - 10"

A B C D E F

B2 A-301

EXISTING LIGHTS

AND BUILDING

SIGNS TO REMAIN12

01_LEVEL_FF

0' - 0"

MEZZANINE

11' - 4"

T.O. ROOF

22' - 0"

T.O. CMU

13' - 10"

ABCDEF

B2 A-301

EXISTING LIGHTS

AND BUILDING

SIGNS TO REMAIN

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

A-201

N O

R

TH

A N

D S

O U

TH

E

LE

VA

TI

O

N S

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

1/8" = 1'-0"B1 SOUTH ELEVATION

1/8" = 1'-0"J2 NORTH ELEVATION

8'0 4' 16'

KEYNOTES

MARK DESCRIPTION

1 NEW ROOF ASSEMBLY - TYP.

2 NEW DOWNSPOUTS AND DOWNSPOUT EXTENSION

3 NEW RAKE EDGE TRIM / FASCIA

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

GENERAL NOTES

1. THE EXISTING BUILDING STRUCTURE WILL BE USED TO PROVIDE THE REQUIRED ROOF SLOPE

AND IS APPROXIMATELY 1:12. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS.

01_LEVEL_FF

0' - 0"

MEZZANINE

11' - 4"

T.O. ROOF

22' - 0"

T.O. CMU

13' - 10"

234567891011121314 1

1 3 3 2

PLUMBING

VENT

PLUMBING

VENT

HEATER

FLUE HEATER

FLUE

HEATER

FLUE

BUILDING

LIGHTS

BUILDING

LIGHTS

BUILDING

LIGHTS

EXHAUST

FAN, CURB

AND

CRICKET

BUILDING

NUMBER

SIGN

01_LEVEL_FF

0' - 0"

MEZZANINE

11' - 4"

T.O. ROOF

22' - 0"

T.O. CMU

13' - 10"

2 3 4 5 6 7 8 9 10 11 12 13 141

1 1

3 3

EXHAUST

FAN, CURB

AND

CRICKET

EXHAUST

FAN, CURB

AND

CRICKET

HEATER

FLUE

HEATER

FLUE

HEATER

FLUE

HEATER

FLUE

BUILDING

LIGHTSBUILDING

NUMBER

SIGN

BUILDING

LIGHTS

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

A-202

C O

M

PO

SI

TE

E

AS

T

AN

D W

ES

T

EL

EV

AT

IO

N S

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

1/16" = 1'-0"J1 COMPOSITE EAST ELEVATION

1/16" = 1'-0"D1 COMPOSITE WEST ELEVATION

32'8'0 16'

KEYNOTES

MARK DESCRIPTION

1 NEW ROOF ASSEMBLY - TYP.

2 NEW GUTTER TO MATCH EXISTING DOWNSPOUTS AND DOWNSPOUT EXTENSIONS

EXISTING TOPS OF METAL WALL PANELS @ ROOF EAVE TO ADD NEW FLASHINGS AND

INCLUDE SHEET METAL TO SEAL ALL OPENINGS AND VOIDS TO MITIGATE INTRUSION

OF BIRDS AND INSECTS - TYP. ALL LOCATIONS

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

RIDGE CAP - COLOR TO MATCH

EXISTING

STANDING SEAM METAL

ROOF ASSEMBLY - COLOR

TO MATCH EXISTING - TYP.

CONT. FIBERGLASS BLANKET

INSULATION (TOP LAYER = R-13,

BOTTOM LAYER = R-25) - TYP.

EXISTING STEEL PURLIN

TO REMAIN - TYP.

CONTINUOUS VAPOR

RETARDER MEMBRANE/

LINER FABRIC AND SUPPORT

STRAP ASSEMBLY

EXISTING RIGID STEEL

STRUCUTRAL FRAME TO

REMAIN - TYP.

CONTINUOUS LINER

SUPPORT STRAPS AS

STANDARD W/ THE MFR

LIGHTNING PROTECTION

AIR TERMINAL W/ ADHESIVE

OR SEAM CLAMPING BASE

(DO NOT PENETRATE

ROOF) - SEE ELEC

CONT. SUB-FLASHING

W/CONT. SEALANT AT LAPS

AS STD. W/ MFR.

PANEL Z CLOSURE W/ CONT.

SEALANT AS STD W/ MFR.

NEOPRENE GASKET UNDER

EACH FASTENER HEAD

BASE COLOR TO MATCH

ROOF COLOR

THERMAL SPACER BLOCK @

CLIPS - TYP.

NEW METAL FASCIA - MATCH

PROFILE OF EXISTING

REMOVED FASCIA

EXISTING GIRT TO

REMAIN - TYP.

EXISTING INSULATED

METAL PANEL TO

REMAIN

EXISTING STEEL RIGID

FRAME- TO REMAIN

NEW STANDING SEAM METAL

ROOF ASSEMBLY - COLOR TO

MATCH EXISTING

NEW CONT. FIBERGLASS

BLANKET INSULATION (TOP

LAYER = R-13, BOTTOM LAYER =

R-25) - TYP.

NEW CONTINUOUS VAPOR

RETARDER MEMBRANE/LINER

FABRIC - CONTINUOUSLY SEAL AT ALL

PENETRATIONS AND AT PERIMETER

EXISTING METAL FLASHING. AFTER

REMOVAL OF EXISTING RAKE AND TRIM,

VERIFY CONDITION OF EXISTING FLASHING.

WHEN REMOVING EXISTING RAKE TRIM,

GUTTER, GUTTER FLASHINGS,AND

ASSOCIATED EAVE AND RAKE FLASHINGS

AND TRIM, INSPECT AND ASSESS THE

CONDITION AT THE TOP OF THE METAL WALL

PANELS. REPAIR ALL GAPS AND HOLES AT

AND BEHIND METAL WALL PANEL AND THE

RAKE FLASHINGS AT TOP OF ALL WALLS.

REPAIR HOLES AND GAPS WITH NEW CONT.

METAL FLASHINGS TO PREVENT BIRDS AND

INSECTS FROM ENTERING THE BUILDING -

TYP.

EXISTING ROOF PURLINS

TO REMAIN - TYP.

T.O. CMU

13' - 10"

NEW METAL GUTTERS - SIZE AND COLOR TO MATCH EXISTING

EXISTING STEEL GIRT

EXISTING INSULATED

METAL PANELS

EXISTING PANEL LINTEL,

BOLTED TO STEEL CHANNEL

AFTER EXISTING METAL GUTTER ,GUTTER FLASHINGS,

AND ASSOCIATED EAVE FLASHINGS AND TRIM ARE REMOVED,

INSPECT AND ASSESS THE CONDITION AT THE TOP OF THE METAL

WALL PANELS. REPAIR ALL GAPS AND HOLES AT, BEHIND,

AND ON TOP OF METAL WALL PANELS AND THE

EAVE FLASHINGS AT TOP OF ALL WALLS (ESPECIALLY ABOVE

CONCRETE MASONRY UNITS AT EAVE). REPAIR HOLES AND

GAPS WITH NEW CONT. METAL FLASHINGS TO PREVENT BIRDS

AND INSECTS FROM ENTERNG THE BUILDING - TYP.

EXISTING STEEL ROOF PURLIN

NEW CONT. FIBERGLASS BLANKET

INSULATION (TOP LAYER = R-13,

BOTTOM LAYER = R-25) - TYP.

NEW CONTINUOUS VAPOR

RETARDER MEMBRANE/LINER FABRIC -

CONTINUOUSLY SEAL ALL

PENETRATIONS AND AT PERIMETER -

TYP.

NEW STANDING SEAM METAL ROOF

ASSEMBLY - COLOR TO MATCH EXISTING

EXISTING STEEL LINTEL

AND ANGLES

NEW THERMAL SPACER BLOCKS @ CLIPS - TYP.

NEW STEEL DOWNSPOUT TO MATCH EXISTING

AND NOT LESS THAN 4" X 5"

PLUMBING VENT OR INFARED

HEATER FLUE PIPE

STAINLESS STEEL FIELD FABRICATED

STORM COLLAR HOOD

STAINLESS STEEL

CLAMPING RING

CONT. FIBERGLASS BLANKET

INSULATION (TOP LAYER = R-13,

BOTTOM LAYER = R-25) - TYP.

FLEXIBLE EPDM PIPE

FLASHING BOOT OR METAL

FL BOOT ONLY AT HOT

SURFACES

METAL TRAY TURN

DOWN OVER RIBS AT

LOW END AND INTEGRAL

FLANGED SLEEVE

CONT. VAPOR RETARDER

MEMBRANE/ LINER FABRIC

STANDING SEAM MTL ROOF

ASSEMBLY - COLOR TO MATCH

EXISTING - TYP.

EXISTING RIGID FRAME

STEEL STRUCTURE

BASE DIA. VARIES W/PIPE DIA.

CONTINUOUS LINER

SUPPORT STRAPS AS

STD. W/ THE MFR.

FLASHING EXTENDS 2'-0"

IN ALL DIRECTIONS -

TYP.

W /P

IP

E

D

IA

VA

R

IE

S

1/ 2"

M

IN

RADIATION SHIELD

AT HOT FLUE PIPE

LOCATIONS - TYP

EXISTING STEEL ROOF

PURLIN TO REMAIN - TYP.

THERMAL SPACER BLOCK @

CLIPS - TYP.

NEW MECH. EQUIPMENT -

SEE MECH.

FOAM SEALANT TAPE

PREFINISHED 22 GAUGE METAL

COUNTER FLASHING

APPROVED

FASTENERS SECURE

AT 6" O.C.

INSULATED ROOF CURB -

SEE SPECIFICATIONS

CRICKET - TYP AT ALL ROOF CURBS

Z-SHAPED PANEL

CLOSURE W/ CONT

SEALANT AT JOINT

NEW STANDING SEAM

METAL ROOF ASSEMBLY -

COLOR TO MATCH

EXISTING

ROOF OPENING FRAMING

IS EXISTING - ALL CURBS AND EQUIPMENT

SIZES BASED ON EXISTING OPENINGS

3" MIN. CLOSED-CELL SPF INSUL AROUND

DECK PENETRATION

" M

IN

NEW STANDING SEAM

METAL ROOF ASSEMBLY -

COLOR TO MATCH

EXISTING

NEW THERMAL SPACER BLOCKS @ CLIPS - TYP.

NEW CONT. FIBERGLASS BLANKET

INSULATION (TOP LAYER = R-13,

BOTTOM LAYER = R-25) - TYP.

NEW CONTINUOUS VAPOR

RETARDER MEMBRANE/LINER FABRIC - CONTINUOUSLY SEAL ALL

PENETRATIONS AND AT PERIMETER - TYP.

EXISTING STEEL ROOF PURLIN - TYP.

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

FI

LE

N

AM

E.

AD

VE

R

TI

SE

M

EN

T

FI

LE

N U

M

BE

R

A-510

R O

O F

D

ET

AI

LS

M

IS

SO

U

R I R

IV

ER

P R

O

JE

C T

O

FF

IC

E, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

M . B

IE

G

ER

T

M . B

IE

G

ER

T

B.

G

O R

U P

B.

G

O R

U P

/1

5/

W

F2

4B

PH

AS

E

I - R

O O

F R

EP

LA

C

EM

EN

T

O D

_R

F_

AR

C H

.rv t

1" = 1'-0"J1 RIDGE DETAIL - TYP.

1" = 1'-0"J10 RAKE DETAIL - TYP.

1" = 1'-0"J13 EAVE DETAIL - TYP.

1 1/2" = 1'-0"E1 ROOF DETAIL @ PLUMBING VENT/FLUE PENETRATION - TYP.

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-3 0-

1 1/2" = 1'-0"E11 ROOF CURB DETAIL - TYP.

GENERAL NOTES:

1. UNFASTEN ALL OBSTRUCTIONS FOR PLACEMENT OF THE

CONTINUOUS VAPOR RETARDER MEMBRANE / LINER FABRIC AND SUPPORT

STRAP ASSEMBLY. IMMEDIATELY REFASTEN OBSTRUCTIONS THAT WERE

UNFASTENED FOR INSTALLAION OF THE CONTINUOUS VAPOR RETARDER

MEMBRANE / LINER FABRIC AND SUPPORT STRAP ASSEMBLY UPON

INSTALLATION AND COMPLETION OF THAT WORK.

2. THE CONTRACTOR SHALL PROVIDE A TEMPORARY FALL PROTECTION/

FALL ARREST SYSTEM IN ACCORDANCE WITH OSHA REQUIREMENTS.

3. THE EXISTING BUILDING STRUCTURE WILL BE USED TO PROVIDE THE

REQUIRED ROOF SLOPE AND IS APPROXIMATELY 1:12. CONTRACTOR TO

FIELD VERIFY ALL EXISTING CONDITIONS.

AD110 - COMPOSITE FLOOR PLAN DEMO
AD111 - FLOOR PLAN DEMO AREA A
AD112 - FLOOR PLAN DEMO AREA B
AD113 - FLOOR PLAN DEMO AREA C
AD130 - ROOF PLAN DEMO
AD131 - ROOF DETAILS DEMO
A-111 - FIRST FLOOR PLAN AREA A
A-112 - FIRST FLOOR PLAN AREA B
A-113 - FIRST FLOOR PLAN AREA C
A-121 - MEZZANINE PLAN AREA A
A-122 - MEZZANINE PLAN AREA B
A-123 - MEZZANINE PLAN AREA C
A-130 - ROOF PLAN
A-201 - NORTH AND SOUTH ELEVATIONS
A-202 - COMPOSITE EAST AND WEST ELEVATIONS
A-510 - ROOF DETAILS

File details come from the government source that posted it. Updated .