W9128F23R0026-0006- 13 Oct 2023.pdf

PDF 566 KB Posted

Attached to
Construct Ground Based Strategic Deterrence (GBSD) Missile Handling Complex (MHC) Federal contract opportunity
Solicitation number
W9128F23R0026
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This amendment to the solicitation modifies requirements for the Construct Ground Based Strategic Deterrence (GBSD) Missile Handling Complex (MHC) opportunity issued by the Department of the Army Corps of Engineers Engineering District Omaha. Key changes include extending the proposal submission deadline from October 20, 2023 to October 26, 2023 at 2:00 PM Central Time. The amendment also revises specifications and drawings, removes closed circuit television from the scope of one contract line item, and adds the Highway Davis-Bacon Wage Determination. Offerors must acknowledge receipt of this amendment in their proposals.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

CONSTRUCT_GBSD MISSILE HANDLING COMPLEX F.E. WARREN AIR FORCE BASE, WYOMING

The purpose of this amendment is as follow s:

1. Extend the proposal submission due date from 20 October 2023 to 2:00 PM Central on 26 October 2023.

2. Removed CCTV from CLIN 0010 description.

3. Added the Highw ay Davis-Bacon Wage Determination.

4. Removed DFARS 252.216-7009.

5. Draw ing and specification changes as per the attached document.

Government Point of Contact: Brandon Landis, Contract Specialist, brandon.p.landis@usace.army.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Oct-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F23R0026

X 9B. DATED (SEE ITEM 11)

18-Aug-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Oct-2023

CODE

ARMY CORPS OF ENGINEERS

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9128F23R0026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 6 SUMMARY OF CHANGES

13 October 2023 Solicitation No. W9128F23R0026

Date of Issue: 18 AUG 2023 Date of Receiving Proposals: 26 OCT 2023

SUBJECT: Amendment No. 0006 to Request for Proposal Solicitation Package for Construction of GBSD MISSILE HANDLING COMPLEX, F.E. WARREN AIR FORCE BASE, WYOMING

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.) See SF 30

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.

For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.

Pages or Sections Deleted Pages or Sections Substituted or Added 05 50 13 05 50 13 08 71 00 08 71 00 23 35 16.17 10 23 35 16.17 10 28 10 05 28 10 05 33 82 00 33 82 00

c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.

Volume 1 Site:

1) Sheet CU602, TELECOMM PLAN AND PROFILE 1

2) Sheet CU603, TELECOMM PLAN AND PROFILE 2

3) Sheet CU604, TELECOMM PLAN AND PROFILE 3

4) Sheet ES111, SITE PLAN, STREET IMPROVEMENTS

5) Sheet ES501, SITE ELECTRICAL

6) Sheet TS503, TELECOMMUNICATION DETAILS

7) Sheet TS538, TELECOMMUNICATION DETAIL

Volume 2 MHF:

8) Sheet S-004, STRUCTURAL GENERAL NOTES

9) Sheet S-111, OVERALL FIRST FLOOR FRAMING PLAN

10) Sheet S-113, FIRST FLOOR FRAMING PLAN -AREA -B

11) Sheet S-301, BUILDING SECTIONS

12) Sheet S-401, ENLARGED PLANS

13) Sheet S-502, FOUNDATION -SECTIONS & DETAILS

14) Sheet S-503, FOUNDATION -SECTIONS & DETAILS

15) Sheet AE201, NORTH AND SOUTH ELEVATIONS

16) Sheet AE202, EAST AND WEST ELEVATIONS

17) Sheet AE301, BUILDING SECTIONS

Volume 3 TSAF:

18) Sheet S-004, STRUCTURAL GENERAL NOTES

19) Sheet S-111, OVERALL FIRST FLOOR FRAMING PLAN

20) Sheet S-112, FIRST FLOOR FRAMING PLAN -AREA -A

21) Sheet S-113, FIRST FLOOR FRAMING PLAN -AREA -B

22) Sheet S-301, BUILDING SECTIONS

23) Sheet S-401, ENLARGED PLAN

24) Sheet S-502, FOUNDATION -SECTIONS & DETAILS

25) Sheet AE201, NORTH AND SOUTH ELEVATIONS

26) Sheet AE202, EAST AND WEST ELEVATIONS

27) Sheet IN132, SIGNAGE PLAN -FIRST FLOOR -AREA-A

28) Sheet IN133, SIGNAGE PLAN -FIRST FLOOR -AREA-B

d. Drawings (New). The following new drawings dated as indicated in the border are hereby added to the request for proposal drawings and are issued with this amendment.

Volume 1 Site:

1) Sheet ES112, SITE PLAN, STREET IMPROVEMENTS

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in the Request for Proposal.

4. Offers will be received until 2:00 p.m. Central on 26 OCT 2023.

Attachments (under separate cover):

Specifications listed in 1.b. above Drawings listed in 1.c. and 1.d. above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

13 OCT 2023

nep/2160

SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

The required response date/time has changed from 20-Oct-2023 02:00 PM to 26-Oct-2023 02:00 PM.

CLIN 0010

The CLIN extended description has changed from:

Entire work complete for Procurement and Installation of Electronic Security Equipment, including all access control systems, detection systems, CCTV systems and all necessary head end equipment for proper function. O&M funded

To:

Entire work complete for Procurement and Installation of Electronic Security Equipment, including all access control systems, detection systems, and all necessary head end equipment for proper function. O&M funded

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been deleted:

252.216-7009 Allowability of Legal Costs Incurred in Connection With a

Whistleblower Proceeding

DEC 2022

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

DBA - WY20230040 - HIGHWAY

"General Decision Number: WY20230040 08/25/2023

State: Wyoming

Construction Type: Highway

County: Laramie County in Wyoming.

HIGHWAY CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |� Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |� The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|� Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |� The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours performing on that | | | contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 08/25/2023

SUWY2023-003 06/09/2022

Rates Fringes

CARPENTER........................$ 32.20 13.00

CONCRETE FINISHER................$ 23.80 9.61

ELECTRICIAN

Electrician.................$ 32.73 15.80 Equipment Operator (Electrical Work Only)......$ 49.55 16.51 Groundperson................$ 35.18 15.24

IRONWORKER.......................$ 55.47 0.00

LABORER

GROUP 1.....................$ 19.28 5.60

GROUP 2.....................$ 21.56 5.60

GROUP 3.....................$ 26.50 5.60

LABORER CLASSIFCATIONS

GROUP 1: Erector & Installer (fences, guardrail & barrier);

Flag persons (traffic control); Form Strippers; General Laborers; Heater Tender; Material Checker; Pick-up Truck Driver; Pilot Car Driver; Pre-watering, Presetting & Pre-irrigation (all work); Riprap Man; Tar & Asphalt Pot Tender.

GROUP 2: Asphalt Raker and Tamper; Bin Wall Installer; Chain Saw Operator (clearing & grubbing); Concrete Saw (all types);

Dump Man; Form Setter (paving); Hand Operated Vibratory Roller; High Scaler; Jackhammer & Pavement Breaker;

Landscaper, Landscape Laborer; Maintainer (traffic control);

Mortar Man on Stone Riprap; Nozzle Man (air, water, gunite & sandblasting); Painter (brush & spray); Pipe Setter (all pipe types); Tamper Operator (pneumatic, electric, gas & similar) GROUP 3: Drill Doctor, Form Setter and Mover, Spader, Spilling and/or Caisson Worker; Miner (driller), Machine Man, Timber Man; Powderman, Blaster, Tender; Wagon Drill, Air-Trac.

(diamond and other drills for blasting powder or grouting).

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 23.92 9.61

GROUP 2.....................$ 24.70 9.61

GROUP 3.....................$ 27.83 9.61

POWER EQUIPMENT OPERATOR CLASSIFCATIONS

ALL ELECTRICAL WORK IS EXCLUDED. FOR ELECTRICAL WORK, USE

EQUIPMENT OPERATOR CLASSIFICATION LISTED UNDER ELECTRICAL

CONSTRUCTION

GROUP 1: Air Compressor (all types); Backhoes & Excavators (to 5CY.); Batch Bin Weighman, Sissorman or Hopper; Broom Operator (all types); Chip Spreader Operator; Conveyor Belt Operator;

Crusher Oiler; Form Grader Operator; Joint Machine Operator;

Longitudinal Float Operator; Oiler, Utility; Power Loader (belt & bucket type); Pump Operator; Roller Operator, self-propelled (Dirt); Skid Steer (all attachments); Tire Repairman (large construction equip. tires); Tractor Operator (farm with or w/o power attachments); Tugger (all types).

GROUP 2: Articulated Rock Truck (all capacity); Asphalt Plant Operator; Backhoe, Excavator & Shovel (6 CY. & larger); Batch Plant Operator; Bituminous Laydown Machine Operator; Concrete Batch Plant Operator; Concrete Finish Machine Operator;

Concrete Spreader & Paver Operator; Concrete Multi Blade Span Saw (Hunt process); Crusher Operator; Dozer Operator (all sizes & power attachments); Draglines, Cranes, Piledriver & Truck Mounted Cranes (Mfg. Rating: less than 3.5 CY., and /or less than 50 Tons, all attachments); Drilling Machine, Integrated (all types); Front End Loaders (1.5 to and including 10 CY.); Hydro-type Crane (to 50 tons); Mixer Operator, Concrete (over 1yd.); Motor Patrol Operator (all excluding finish); Mulching Machine Operator; Oiler (crane & shovels); Pavement Breaker, Hydro-Tamper & similar; Roller Operators, Asphalt (steel & pneumatic); Roto-Milling Machine (under 8 ft. wide); Scraper Equipment (all types and sizes);

Screed Operator; Trenching Machine Operator.

GROUP 3: Draglines, Cranes, Piledrivers & Truck Mounted Cranes (Mfg. Rating: 3.5 CY. or larger and/or 50 tons & larger, all attachments); Front End Loaders (over 10 CY.); Heavy Duty Mechanic, Machine Doctor; Hoist Operator (two or more drums, shafts, or raises); Mixer Operator (dual drum); Motor Patrol Operator (finish); Roto-Milling Machine (8 ft. & larger).

TRUCK DRIVER

GROUP 1.....................$ 19.67 9.61

GROUP 2.....................$ 24.40 9.61

GROUP 1: ?A? Frame Truck Driver; Coring Machine (self propelled); Dump Truck Driver (to and including 13 CY.); Flat Rack Material Truck Driver (to 5 tons); Fuel Service Truck Driver; Gang Truck Driver; Gravel Spreader;

Greaseman, Tireman, Serviceman; Oil Distributor Driver (to & including 3,600 gal.); Snow Plow Driver (the CY. rate of the truck); Transit Mix or Wet Mix Truck Driver;

Utility Winch Truck Driver; Water Truck Driver (to & including 3,600 gal.).

GROUP 2: Dump Truck Driver (14 to 45 CY.); Flat Rack Material Truck Driver (over 5 tons); Low Boy & Tandem Axle Float Driver; Multiple Axle Type Truck (semi); Oil Distributor Driver (over 3,600 gal); Truck Mechanics; Water Truck Driver (over 3,600 gal.); Winch Trailer Truck Driver.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"

(End of Summary of Changes)