This federal solicitation amendment modifies requirements for the Construct Ground Based Strategic Deterrence (GBSD) Missile Handling Complex (MHC) project. The amendment removes several clauses and provisions, adds clause 52.222-1, updates contract line item numbers 0005 through 0010, and modifies drawings and specifications. Products and services required include construction of two buildings, site work, utilities, pavements, cybersecurity equipment, and power supply. Optional items include furniture, UPS equipment, and electronic security systems. Proposals are due by October 4, 2023. The award is a firm fixed-price contract scheduled for 800 calendar days after notice to proceed. The soliciting agency is the Department of the Army Corps of Engineers Omaha District.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is as follow s: 1) Remove the follow ing clauses/provisions: 52.207-1, 52.215-22, 52.215-23, 52.232-16 (Dev), 252.216-7009, 252.232-7004 (Dev), and 252.225-7974 (Dev). 2) Add clause 52.222-1. 3) Update/Change Contract Line Item Numbers (CLINs) 0005 - 0010. 4) Further changes identified in the summary of changes of this amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Sep-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F23R0026
X 9B. DATED (SEE ITEM 11)
18-Aug-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Sep-2023
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F23R0026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 1 SUMMARY OF CHANGES
19 September 2023 Solicitation No. W9128F23R0026
Date of Issue: 18 AUG 2023 Date of Receiving Proposals: 04 OCT 2023
SUBJECT: Amendment No. 0001 to Request for Proposal Solicitation Package for Construction of GBSD MISSILE HANDLING COMPLEX, F.E. WARREN AIR FORCE BASE, WYOMING
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.) See SF 30
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.
For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.
Pages or Sections Deleted Pages or Sections Substituted or Added 01 91 00.15 10 01 91 00.15 10 01 91 00.15 10AT-B 01 91 00.15 10AT-B Appendix B – Basis of
Design 09 29 00 09 29 00 23 35 16.17 23 35 16.17
c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.
Volume 1 Site:
1. Sheet CD100, OVERALL REMOVAL PLAN
2. Sheet CD101, REMOVAL PLAN TSAF
3. Sheet CD102, REMOVAL PLAN MHF
4. Sheet CU100, OVERALL UTILITY PLAN
Volume 2 MHF:
5. Sheet S-615, JOIST LOADING DIAGRAM
6. Sheet AE202, EAST AND WEST ELEVATIONS
7. Sheet AE313, ENLARGED ELEVATIONS
8. Sheet AE501, PLAN DETAILS
9. Sheet AE601, PARTITION TYPES AND SCHEDULE
10. Sheet AE605, WINDOW SCHEDULE AND TYPES
11. Sheet MH103, FIRST FLOOR HVAC PLAN -AREA -B
12. Sheet MH404, MECHANICAL ROOM 202, 301 AND 302 SECTIONS
13. Sheet MH601, MECHANICAL EQUIPMENT SCHEDULE
14. Sheet MH602, MECHANICAL EQUIPMENT SCHEDULE
15. Sheet M-503, MECHANICAL DETAILS
16. Sheet MG006, MECHANICAL AND PLUMBING LEGENDS AND ABBREVIATIONS SHEET 6
Volume 3 TSAF:
17. Sheet S-615, JOIST LOADING DIAGRAM
18. Sheet AE103, FIRST FLOOR PLAN - AREA – B
19. Sheet AE312, WALL SECTIONS
20. Sheet AE601, PARTITION TYPES AND SCHEDULE
21. Sheet P-113, FIRST FLOOR PLUMBING PLAN -AREA -B
22. Sheet MH103, FIRST FLOOR HVAC PLAN -AREA -B
23. Sheet MH602, MECHANICAL EQUIPMENT SCHEDULE
24. Sheet M-503, MECHANICAL DETAILS
25. Sheet MG006, MECHANICAL AND PLUMBING LEGENDS AND ABBREVIATIONS SHEET 6
26. Sheet E-506, MISCELLANEOUS DETAILS
27. Sheet E-701, PANEL SCHEDULES
28. Sheet EL103, FIRST FLOOR LIGHTING PLAN -AREA -B
29. Sheet EP103, FIRST FLOOR POWER PLAN -AREA -B
30. Sheet T-103, FIRST FLOOR TELECOMMUNICATION PLAN -AREA -B
31. Sheet T-402, ENLARGED TELECOMMUNICATION PLAN
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposals. Provide proposals via the instructions provided in the Request for Proposal.
4. Offers will be received until 2:00 p.m. CDT on 04 OCT 2023.
Attachments (under separate cover):
Geotech Report (For Information Only) Specifications listed in 1.b. above Drawings listed in 1.c. above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
19 SEP 2023
nep/2160
CLIN SCHEDULE - AMENDMENT 1
CONTRACT LINE-ITEM PRICING SCHEDULE
ITEM
NO.
DESCRIPTION QTY UNIT UNIT
PRICE
AMOUNT
BASIC ITEMS
Entire work complete for construction of TSAF Building as indicated in the RFP drawings and specification complete to the five-foot line, excluding items separately listed below.
Job
XXX
Entire work complete for construction of MHF Building as indicated in the RFP drawings and specification complete to the five-foot line, excluding items separately listed below.
Entire work complete for Construction of Sitework, Utilities, and Pavements from five-foot line to the limits of MHC area, including all required site demolition, excluding items listed separately below.
Entire work complete for Construction of Sitework, Utilities, and Pavements from MHC area to BLDG 34, including all required site demolition, and site restoration, excluding items listed separately below.
Entire work complete for cybersecurity equipment, devices, firmware, and software to satisfy cybersecurity requirements.
Entire work to supply Power to the project site (power is provided by High West Energy) excluding items listed below.
$__________909,477.42_
Entire work complete as shown on drawings in Vol 4 – Bldg 34.
TOTAL BASIC AMOUNT $_____________________________
OPTION ITEMS
[Option]
Entire work complete for Procurement and Installation of Furniture, Fixtures & Equipment, (FF&E). O&M funded
Installation of UPS Equipment. O&M funded
Installation of Electronic Security Equipment, including all access control systems, detection systems, CCTV systems and all necessary head end equipment for proper function. O&M funded
TOTAL OPTIONS AMOUNT $_________________________________
TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________
SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
CLIN 0005
The CLIN description has changed from Cybersecurity documentation & alteration to Cybersecurity Equipment.
The CLIN extended description has changed from:
Entire work complete for cybersecurity documentation, and alterations to commercial equipment, devices, firmware, and software to satisfy cybersecurity requirements.
To:
Entire work complete for cybersecurity equipment, devices, firmware, and software to satisfy cybersecurity requirements.
CLIN 0006
The CLIN description has changed from Construct Power and Lighting to Power to the Site.
The CLIN extended description has changed from:
Entire work complete to Construct Power and Lighting Site Work in cooperation with High West Energy, excluding items listed below.
Entire work to supply Power to the project site (power is provided by High West Energy), excluding items listed below.
CLIN 0007
The CLIN description has changed from Furniture, Fixtures & Equipment to Vol 4 - Bldg 34.
The CLIN extended description has changed from:
Entire work complete for Procurement and Installation of Furniture, Fixtures & Equipment, (FF&E). O&M funded
Entire work complete as shown on drawings in Vol 4 - Bldg 34.
The option status has changed from Option to No Status.
CLIN 0008
The CLIN description has changed from UPS Equipment to Furniture, Fixtures & Equipment.
Entire work complete for Procurement and Installation of UPS Equipment. O&M funded
Entire work complete for Procurement and Installation of Furniture, Fixtures & Equipment, (FF&E). O&M funded
CLIN 0009
The CLIN description has changed from Electronic Security Equipment to UPS Equipment.
The CLIN extended description has changed from:
Entire work complete for Procurement and Installation of Electronic Security Equipment, including all access control systems, detection systems, CCTV systems and all necessary head in equipment for proper function. O&M
Entire work complete for Procurement and Installation of UPS Equipment. O&M funded
CLIN 0010
The CLIN description has changed from Communications & IT Equipment to Electronic Security
Equipment.
Entire work complete for Procurement and Installation of all Communications & IT Equipment. O&M funded
Entire work complete for Procurement and Installation of Electronic Security Equipment, including all access control systems, detection systems, CCTV systems and all necessary head end equipment for proper function. O&M
The following have been modified:
PRICING & SCHEDULE NOTES
OFFEROR'S NAME: ____________________________
TOTAL BASIC AMOUNT (CLINs 0001 – 0007): ____________________________
TOTAL OPTION AMOUNT (CLINs 0008 – 0010): ___________________________
TOTAL PRICE (BASE PLUS OPTIONS): ___________________________________
Proposed Contract Duration in Calendar Days After the Notice to Proceed is Received (See Note No. 3) ____________ DAYS
NOTES:
1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS for evaluation of options. The Government reserves the right to exercise options within 540 days of Notice to Proceed. Abbreviations: Military Construction (MILCON), Operations & Maintenance (O&M).
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted.
3. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to
Proceed (NTP) is received by the Contractor. The proposed duration shall become the required contract duration. The benchmark requirement is to complete the requirement no later than 800 calendar days after receipt of the NTP. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means.
Day number 1 is the day after the date of receipt of the NTP. See Section 00 73 00, paragraph 1.1:
COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK.
SECTION 00 21 00 - INSTRUCTIONS
The following have been deleted:
52.207-1 Notice Of Standard Competition MAY 2006 52.215-22 Limitations on Pass-Through Charges--Identification of
Subcontract Effort
OCT 2009
SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS
252.225-7974 (Dev) Representation Regarding Business Operations with the
Maduro Regime (DEVIATION 2020-O0005)
FEB 2020
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been added by reference:
52.222-1 Notice To The Government Of Labor Disputes FEB 1997
52.215-23 Limitations on Pass-Through Charges JUN 2020 52.232-16 (Dev) Progress Payments (DEVIATION 2020-O0010) NOV 2021 252.232-7004 (Dev) DoD Progress Payment Rates (DEVIATION 2020-O0010) MAR 2020
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
DBA - WY20230023, BLDG,
WAGE DETERMINATIONS
Davis-Bacon Act WD # WY20230023
Modification # Construction Building Last Revised Date Apr 07, 2023
State
Wyoming
Counties Laramie "General Decision Number: WY20230023 04/07/2023
Superseded General Decision Number: WY20220023
State: Wyoming
Construction Type: Building
County: Laramie County in Wyoming.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023 1 01/13/2023 2 01/27/2023 3 04/07/2023
ELEV0025-003 01/01/2023
Rates Fringes
ELEVATOR MECHANIC................$ 51.94 37.335
FOOTNOTE:
a: Vacation Pay: 8% with 5 or more years of service based on regular hourly rate for all hours worked, 6% under 5 years service based on hourly rate for all hours worked. b: Paid holidays: New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day
IRON0732-016 06/01/2021
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 29.54 24.06
PLUM0192-006 01/01/2023
Rates Fringes
PIPEFITTER (Excluding HVAC Pipe Installation)...............$ 34.88 22.44
SFWY0669-002 01/01/2023
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 36.93 25.12
* SHEE0103-011 07/01/2022
Rates Fringes
SHEET METAL WORKER (Including HVAC System Installation (Excluding HVAC Duct Installation))...................$ 31.30 19.83
* SUWY2011-020 01/11/2011
Rates Fringes
CARPENTER (Form Work Only).......$ 17.18 3.20
CARPENTER, Excludes Form Work....$ 21.55 6.15
CEMENT MASON/CONCRETE FINISHER...$ 17.40 2.46
ELECTRICIAN (Low Voltage Wiring and Installation of Alarms)..........................$ 23.34 1.11
ELECTRICIAN (Low Voltage Wiring and Installation of HVAC/Temperature Controls).......$ 22.25 1.70
ELECTRICIAN, Includes Low Voltage Wiring for Computers and Phones (Excluding Low Voltage Wiring and Installation of Alarms and HVAC/Temperature Controls).......$ 25.24 2.17
GLAZIER..........................$ 21.69 2.63
HVAC MECHANIC (HVAC Pipe Installation)....................$ 32.00 2.83
INSTALLER - SIGN.................$ 17.39 2.17
LABORER: Common or General......$ 12.83 ** 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 15.13 ** 1.41
PLUMBER, Excludes HVAC Pipe Installation.....................$ 21.45 13.35
ROOFER...........................$ 16.92 0.00
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 22.50 12.88
TRUCK DRIVER: Dump Truck........$ 15.99 ** 1.79
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"