W9128F23R0026 Conformed thru Amd 6 - 13 Oct 2023.pdf

PDF 2 MB Posted

Attached to
Construct Ground Based Strategic Deterrence (GBSD) Missile Handling Complex (MHC)
Solicitation number
W9128F23R0026
Issued by

About this file

This is a request for proposal for the construction of a Ground Based Strategic Deterrence Missile Handling Complex at F.E. Warren Air Force Base in Cheyenne, Wyoming. The project includes constructing two large structures - a Missile Handling Facility and a combined Transporter Storage and Administrative Facility. The estimated cost is between $25-100 million. Proposals are due by 2:00pm on October 26, 2023 and will be evaluated based on past performance, project management plan, key personnel, small business participation, and price. The award will be made using a best value tradeoff process, with non-price factors approximately equal to price.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCT_GBSD MISSILE HANDLING COMPLEX

F.E. WARREN AIR FORCE BASE, WYOMING

RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.

THIS SOLICITATION IS UNRESTRICTED, i.e., OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPITATION.

BRANDON P LANDIS 402-995-2056

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

18-Aug-2023

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________800 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________26 Oct 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9128F23R0026 146

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W9128F23R0026

Section SF 30 - BLOCK 14 CONTINUATION PAGE

AMENDMENT 1 SUMMARY OF CHANGES

19 September 2023 Solicitation No. W9128F23R0026

Date of Issue: 18 AUG 2023 Date of Receiving Proposals: 04 OCT 2023

SUBJECT: Amendment No. 0001 to Request for Proposal Solicitation Package for Construction of GBSD MISSILE HANDLING COMPLEX, F.E. WARREN AIR FORCE BASE, WYOMING

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.) See SF 30

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.

For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.

Pages or Sections Deleted Pages or Sections Substituted or Added 01 91 00.15 10 01 91 00.15 10 01 91 00.15 10AT-B 01 91 00.15 10AT-B Appendix B – Basis of

Design 09 29 00 09 29 00 23 35 16.17 23 35 16.17

c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.

Volume 1 Site:

1. Sheet CD100, OVERALL REMOVAL PLAN

2. Sheet CD101, REMOVAL PLAN TSAF

3. Sheet CD102, REMOVAL PLAN MHF

4. Sheet CU100, OVERALL UTILITY PLAN

Volume 2 MHF:

5. Sheet S-615, JOIST LOADING DIAGRAM

6. Sheet AE202, EAST AND WEST ELEVATIONS

7. Sheet AE313, ENLARGED ELEVATIONS

8. Sheet AE501, PLAN DETAILS

9. Sheet AE601, PARTITION TYPES AND SCHEDULE

10. Sheet AE605, WINDOW SCHEDULE AND TYPES

11. Sheet MH103, FIRST FLOOR HVAC PLAN -AREA -B

12. Sheet MH404, MECHANICAL ROOM 202, 301 AND 302 SECTIONS

13. Sheet MH601, MECHANICAL EQUIPMENT SCHEDULE

14. Sheet MH602, MECHANICAL EQUIPMENT SCHEDULE

15. Sheet M-503, MECHANICAL DETAILS

16. Sheet MG006, MECHANICAL AND PLUMBING LEGENDS AND ABBREVIATIONS SHEET 6

Volume 3 TSAF:

17. Sheet S-615, JOIST LOADING DIAGRAM

18. Sheet AE103, FIRST FLOOR PLAN - AREA – B

19. Sheet AE312, WALL SECTIONS

20. Sheet AE601, PARTITION TYPES AND SCHEDULE

21. Sheet P-113, FIRST FLOOR PLUMBING PLAN -AREA -B

22. Sheet MH103, FIRST FLOOR HVAC PLAN -AREA -B

23. Sheet MH602, MECHANICAL EQUIPMENT SCHEDULE

24. Sheet M-503, MECHANICAL DETAILS

25. Sheet MG006, MECHANICAL AND PLUMBING LEGENDS AND ABBREVIATIONS SHEET 6

26. Sheet E-506, MISCELLANEOUS DETAILS

27. Sheet E-701, PANEL SCHEDULES

28. Sheet EL103, FIRST FLOOR LIGHTING PLAN -AREA -B

29. Sheet EP103, FIRST FLOOR POWER PLAN -AREA -B

30. Sheet T-103, FIRST FLOOR TELECOMMUNICATION PLAN -AREA -B

31. Sheet T-402, ENLARGED TELECOMMUNICATION PLAN

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in the Request for Proposal.

4. Offers will be received until 2:00 p.m. CDT on 04 OCT 2023.

Attachments (under separate cover):

Geotech Report (For Information Only) Specifications listed in 1.b. above Drawings listed in 1.c. above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

19 SEP 2023

nep/2160

AMENDMENT 3 SUMMARY OF CHANGES

22 September 2023 Solicitation No. W9128F23R0026

Date of Issue: 18 AUG 2023 New Date of Receiving Proposals: 20 OCT 2023

SUBJECT: Amendment No. 0003 to Request for Proposal Solicitation Package for Construction of GBSD MISSILE HANDLING COMPLEX, F.E. WARREN AIR FORCE BASE, WYOMING

TO: Prospective Offerors and Others Concerned

2. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

c. Specifications. (Descriptive Changes.) See SF 30

d. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.

For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.

Pages or Sections Deleted Pages or Sections Substituted or Added 05 50 13 05 50 13 21 13 13 21 13 13 21 13 18 21 13 18 21 30 00 21 30 00 28 31 70 28 31 70 28 31 76 28 31 76

c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.

Volume 2 MHF:

32. Sheet S-003, STRUCTURAL GENERAL NOTES

33. Sheet S-101, OVERALL FOUNDATION PLAN

34. Sheet S-102, FOUNDATION PLAN -AREA -A

35. Sheet S-103, FOUNDATION PLAN -AREA -B

36. Sheet S-202, FRAMING ELEVATIONS

37. Sheet S-501, TYPICAL FOUNDATION DETAILS

38. Sheet S-502, FOUNDATION -SECTIONS & DETAILS

39. Sheet S-521, MASONRY DETAILS

Volume 3 TSAF:

40. Sheet S-003, STRUCTURAL GENERAL NOTES

41. Sheet S-101, OVERALL FOUNDATION PLAN

42. Sheet S-102, FOUNDATION PLAN -AREA -A

43. Sheet S-103, FOUNDATION PLAN -AREA -B

44. Sheet S-501, TYPICAL FOUNDATION DETAILS

45. Sheet S-502, FOUNDATION -SECTIONS & DETAILS

46. Sheet IN531, SIGNAGE DETAILS

47. Sheet IN532, SIGNAGE DETAILS remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in the Request for Proposal.

4. Offers will be received until 2:00 p.m. CST on 20 OCT 2023.

Attachments (under separate cover):

Specifications listed in 1.b. above Drawings listed in 1.c. above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

22 SEP 2023

AMENDMENT 4 SUMMARY OF CHANGE

02 October 2023 Solicitation No. W9128F23R0026

Date of Issue: 18 AUG 2023 Date of Receiving Proposals: 20 OCT 2023

SUBJECT: Amendment No. 0004 to Request for Proposal Solicitation Package for Construction of GBSD MISSILE HANDLING COMPLEX, F.E. WARREN AIR FORCE BASE, WYOMING

TO: Prospective Offerors and Others Concerned

3. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

e. Specifications. (Descriptive Changes.) See SF 30

f. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.

For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.

Pages or Sections Deleted Pages or Sections Substituted or Added 01 30 00.24 01 30 00.24 07 42 63 07 42 63 08 45 23 08 45 23 12 51 00.00 23 12 51 00.00 23 12 51 00.00 23AT – FF&E pgs 22 & 25 12 51 00.00 23AT – FF&E pgs 22 & 25 22 00 00 22 00 00

c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.

Volume 1 Site:

1) Sheet CI102, EXPLOSIVES AREA PLAN

2) Sheet CS101, SITE PLAN TSAF

3) Sheet CS104, GEOMETRY PLAN TSAF

4) Sheet CS503, FE6 CHAINLINK SECURITY FENCE DETAILS

5) Sheet CP201, PAVEMENT UNDERDRAIN PLAN

6) Sheet CG101, GRADING PLAN TSAF

7) Sheet CG202, FINAL EROSION AND SEDIMENT CONTROL PLAN TSAF

8) Sheet CU101, UTILITY PLAN TSAF

9) Sheet CU102, UTILITY PLAN MHF

10) Sheet CU207, WATER LINE NO. 1 PLAN AND PROFILE 7

11) Sheet CU605, TELECOMM PLAN AND PROFILE 4

12) Sheet CU606, TELECOMM PLAN AND PROFILE 5

13) Sheet TS501, TELECOMMUNICATION DETAILS

14) Sheet TS502, TELECOMMUNICATION DETAILS

15) Sheet TS534, TELECOMMUNICATION DETAIL

16) Sheet TS535, TELECOMMUNICATION DETAIL

17) Sheet TS536, TELECOMMUNICATION DETAIL

18) Sheet TS537, TELECOMMUNICATION DETAIL

Volume 2 MHF:

19) Sheet IN132, SIGNAGE PLAN -FIRST FLOOR -AREA-A

20) Sheet IN133, SIGNAGE PLAN -FIRST FLOOR -AREA-B

21) Sheet IN602, INTERIOR FINISH SCHEDULE

22) Sheet PP503, COMPRESSED AIR RISER DIAGRAM

23) Sheet MH602, MECHANICAL EQUIPMENT SCHEDULE

24) Sheet T-401, TELECOMMUNICATION ENLARGED PLAN

25) Sheet T-501, TELECOMMUNICATION DETAILS

26) Sheet T-502, TELECOMMUNICATION DETAILS

27) Sheet T-601, TELECOMMUNICATIONS ONE-LINE DIAGRAM

Volume 3 TSAF:

28) Sheet AE103, FIRST FLOOR PLAN -AREA -B

29) Sheet AE601, PARTITION TYPES AND SCHEDULE

30) Sheet IF101, FIRST FLOOR FURNITURE PLAN -AREA -B

31) Sheet PP503, COMPRESSED AIR ISOMETRIC RISER DIAGRAM

32) Sheet E-003, ELECTRICAL LEGENDS AND NOTES

33) Sheet T-103, FIRST FLOOR TELECOMMUNICATION PLAN -AREA -B

34) Sheet T-401, ENLARGED TELECOMMUNICATION PLAN

35) Sheet T-402, ENLARGED TELECOMMUNICATION PLAN

36) Sheet T-501, TELECOMMUNICATION DETAILS

Volume 4 BLDG 34:

37) Sheet T-401, ENLARGE FLOOR PLANS

d. Drawings (New). The following new drawings dated as indicated in the border are hereby added to the request for proposal drawings and are issued with this amendment.

Volume 3 TSAF:

1) Sheet T-601, TELECOMMUNICATIONS ONE-LINE DIAGRAM

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in the Request for Proposal.

4. Offers will be received until 2:00 p.m. Central on 20 OCT 2023.

Attachments (under separate cover):

Specifications listed in 1.b. above Drawings listed in 1.c. and 1.d. above

Omaha, Nebraska 68102-4901

02 OCT 2023

CLIN SCHEDULE - AMENDMENT 1

CONTRACT LINE-ITEM PRICING SCHEDULE

ITEM

NO.

DESCRIPTION QTY UNIT UNIT

PRICE

AMOUNT

BASIC ITEMS

Entire work complete for construction of TSAF Building as indicated in the RFP drawings and specification complete to the five-foot line, excluding items separately listed below.

Job

XXX

Entire work complete for construction of MHF Building as indicated in the RFP drawings and specification complete to the five-foot line, excluding items separately listed below.

Entire work complete for Construction of Sitework, Utilities, and Pavements from five-foot line to the limits of MHC area, including all required site demolition, excluding items listed separately below.

Entire work complete for Construction of Sitework, Utilities, and Pavements from MHC area to BLDG 34, including all required site demolition, and site restoration, excluding items listed separately below.

Entire work complete for cybersecurity equipment, devices, firmware, and software to satisfy cybersecurity requirements.

$__________909,477.42_

Entire work to supply Power to the project site (power is provided by High West Energy) excluding items listed below.

Entire work complete as shown on drawings in Vol 4 – Bldg 34.

TOTAL BASIC AMOUNT $_____________________________

OPTION ITEMS

[Option]

Entire work complete for Procurement and Installation of Furniture, Fixtures & Equipment, (FF&E). O&M funded

Installation of UPS Equipment. O&M funded

Installation of Electronic Security Equipment, including all access control systems, detection systems, CCTV systems and all necessary head end equipment for proper function. O&M funded

TOTAL OPTIONS AMOUNT $_________________________________

TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________

AMENDMENT 5 SUMMARY OF CHANGES

10 October 2023 Solicitation No. W9128F23R0026

Date of Issue: 18 AUG 2023 Date of Receiving Proposals: 20 OCT 2023

SUBJECT: Amendment No. 0005 to Request for Proposal Solicitation Package for Construction of GBSD MISSILE HANDLING COMPLEX, F.E. WARREN AIR FORCE BASE, WYOMING

TO: Prospective Offerors and Others Concerned

4. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

g. Specifications. (Descriptive Changes.) See SF 30

h. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.

For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.

Pages or Sections Deleted Pages or Sections Substituted or Added 26 20 00 26 20 00 26 32 15.00 26 32 15.00 28 10 05 28 10 05

c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.

Volume 1 Site:

38) Sheet CS101, SITE PLAN TSAF

39) Sheet EP101, SITE / BASE POWER PLANS

40) Sheet ES111, SITE PLAN, STREET IMPROVEMENTS

41) Sheet ES502, SITE ELECTRICAL DETAILS

42) Sheet ES511, SITE ELECTRICAL AND TELECOMMUNICATION DETAILS

43) Sheet ES512, LIGHT POLE AND LED LIGHT FIXTURE DETAILS

44) Sheet ES513, LIGHTING POLE, DUCT BANK CONNECTION, AND GROUNDING

SECTION DETAILS

Volume 2 MHF:

45) Sheet S-002, STRUCTURAL GENERAL NOTES

46) Sheet S-003, STRUCTURAL GENERAL NOTES

47) Sheet S-511, TYPICAL FOUNDATION DETAILS

48) Sheet AE511, WALL DETAILS

49) Sheet AE601, PARTITION TYPES AND SCHEDULE

50) Sheet IN602, INTERIOR FINISH SCHEDULE

51) Sheet P-601, PLUMBING SCHEDULES

52) Sheet E-002, ELECTRICAL LEGENDS AND NOTES

53) Sheet EL102, FIRST FLOOR LIGHTING PLAN -AREA -A

54) Sheet EL103, FIRST FLOOR LIGHTING PLAN -AREA -B

55) Sheet EP103, FIRST FLOOR POWER PLAN -AREA -B

56) Sheet E-401, EQUIPMENT PLATFORM LIGHTING PLAN

57) Sheet E-402, SITE TRANSFORMER AND GENERATOR ENLARGED GROUNDING AND

POWER PLAN

58) Sheet EP401, ENLARGED POWER PLANS

59) Sheet E-506, MISCELLANEOUS DETAILS

60) Sheet EG502, GROUNDING DETAILS -SHEET 2

61) Sheet E-601, MISSILE HANDLING FACILITY CONCEPT ONE-LINE DIAGRAM

62) Sheet E-701, PANEL SCHEDULES

63) Sheet E-702, PANEL SCHEDULES

64) Sheet E-703, PANEL SCHEDULES

65) Sheet E-704, PANEL SCHEDULES

Volume 3 TSAF:

66) Sheet S-002, STRUCTURAL GENERAL NOTES

67) Sheet S-003, STRUCTURAL GENERAL NOTES

68) Sheet S-511, TYPICAL FOUNDATION DETAILS

69) Sheet AE103, FIRST FLOOR PLAN -AREA -B

70) Sheet AE401, ENLARGED FLOOR PLANS

71) Sheet AE501, PLAN DETAILS

72) Sheet AE511, WALL AND ROOF DETAILS

73) Sheet AE601, PARTITION TYPES AND SCHEDULE

74) Sheet IN601, INTERIOR FINISH SCHEDULE

75) Sheet E-001, ELECTRICAL ABBREVIATIONS

76) Sheet E-002, ELECTRICAL LEGEND AND NOTES

77) Sheet E-003, ELECTRICAL LEGENDS AND NOTES

78) Sheet E-004, SECURITY LEGENDS

79) Sheet E-101, OVERALL FIRST FLOOR ELECTRICAL PLAN

80) Sheet EG102, FIRST FLOOR GROUNDING PLAN -AREA -A

81) Sheet EG103, FIRST FLOOR GROUNDING PLAN -AREA -B

82) Sheet EG112, ROOF LIGHTNING PROTECTION PLAN -AREA -A

83) Sheet EG113, ROOF LIGHTING PROTECTION PLAN -AREA -B

84) Sheet EL102, FIRST FLOOR LIGHTING PLAN -AREA -A

85) Sheet EL103, FIRST FLOOR LIGHTING PLAN -AREA -B

86) Sheet EP102, FIRST FLOOR POWER PLAN -AREA -A

87) Sheet EP103, FIRST FLOOR POWER PLAN -AREA -B

88) Sheet EP201, SWITCHBOARD ELEVATIONS

89) Sheet E-401, EQUIPMENT PLATFORM POWER, GROUNDING, AND LIGHTING

PLAN

90) Sheet EP401, ENLARGED ELECTRICAL PLAN

91) Sheet E-506, MISCELLANEOUS DETAILS

92) Sheet E-507, MISCELLANEOUS DETAILS

93) Sheet EG501, GROUNDING DETAILS -SHEET 1

94) Sheet EG502, GROUNDING DETAILS -SHEET 2

95) Sheet EG503, GROUNDING DETAILS -SHEET 3

96) Sheet E-601, TRANSPORTER STORAGE AND ADMINISTRATIVE FACILITY

CONCEPT ONE-LINE DIAGRAM

97) Sheet EL610, LIGHTING FIXTURE SCHEDULE

98) Sheet E-701, PANEL SCHEDULES

99) Sheet E-702, PANEL SCHEDULES

100) Sheet E-703, PANEL SCHEDULES

101) Sheet T-102, IRST FLOOR TELECOMMUNICATION PLAN -AREA -A

102) Sheet T-103, IRST FLOOR TELECOMMUNICATION PLAN -AREA -B

103) Sheet T-401, ENLARGED TELECOMMUNICATION PLAN

104) Sheet T-402, ENLARGED TELECOMMUNICATION PLAN

105) Sheet T-501, TELECOMMUNICATION DETAILS

106) Sheet T-502, TELECOMMUNICATION DETAILS

107) Sheet T-601, TELECOMMUNICATIONS ONE-LINE DIAGRAM

108) Sheet TY102, FIRST FLOOR SECURITY PLAN -AREA -A

109) Sheet TY103, FIRST FLOOR SECURITY PLAN -AREA -B

110) Sheet TY501, SECURITY DOOR DETAILS

111) Sheet TY502, SECURITY DOOR DETAILS

112) Sheet TY511, SECURITY STANDARD DETAILS

113) Sheet TY601, SECURITY RISER DIAGRAM

114) Sheet TY602, SECURITY RISER DIAGRAMS remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in the Request for Proposal.

4. Offers will be received until 2:00 p.m. Central on 20 OCT 2023.

Attachments (under separate cover):

Specifications listed in 1.b. above Drawings listed in 1.c. and 1.d. above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

10 OCT 2023

AMENDMENT 6 SUMMARY OF CHANGES

13 October 2023 Solicitation No. W9128F23R0026

Date of Issue: 18 AUG 2023 Date of Receiving Proposals: 26 OCT 2023

SUBJECT: Amendment No. 0006 to Request for Proposal Solicitation Package for Construction of GBSD MISSILE HANDLING COMPLEX, F.E. WARREN AIR FORCE BASE, WYOMING

TO: Prospective Offerors and Others Concerned

5. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

i. Specifications. (Descriptive Changes.) See SF 30

j. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.

For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.

Pages or Sections Deleted Pages or Sections Substituted or Added 05 50 13 05 50 13 08 71 00 08 71 00 23 35 16.17 10 23 35 16.17 10 28 10 05 28 10 05 33 82 00 33 82 00

c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.

Volume 1 Site:

115) Sheet CU602, TELECOMM PLAN AND PROFILE 1

116) Sheet CU603, TELECOMM PLAN AND PROFILE 2

117) Sheet CU604, TELECOMM PLAN AND PROFILE 3

118) Sheet ES111, SITE PLAN, STREET IMPROVEMENTS

119) Sheet ES501, SITE ELECTRICAL

120) Sheet TS503, TELECOMMUNICATION DETAILS

121) Sheet TS538, TELECOMMUNICATION DETAIL

Volume 2 MHF:

122) Sheet S-004, STRUCTURAL GENERAL NOTES

123) Sheet S-111, OVERALL FIRST FLOOR FRAMING PLAN

124) Sheet S-113, FIRST FLOOR FRAMING PLAN -AREA -B

125) Sheet S-301, BUILDING SECTIONS

126) Sheet S-401, ENLARGED PLANS

127) Sheet S-502, FOUNDATION -SECTIONS & DETAILS

128) Sheet S-503, FOUNDATION -SECTIONS & DETAILS

129) Sheet AE201, NORTH AND SOUTH ELEVATIONS

130) Sheet AE202, EAST AND WEST ELEVATIONS

131) Sheet AE301, BUILDING SECTIONS

Volume 3 TSAF:

132) Sheet S-004, STRUCTURAL GENERAL NOTES

133) Sheet S-111, OVERALL FIRST FLOOR FRAMING PLAN

134) Sheet S-112, FIRST FLOOR FRAMING PLAN -AREA -A

135) Sheet S-113, FIRST FLOOR FRAMING PLAN -AREA -B

136) Sheet S-301, BUILDING SECTIONS

137) Sheet S-401, ENLARGED PLAN

138) Sheet S-502, FOUNDATION -SECTIONS & DETAILS

139) Sheet AE201, NORTH AND SOUTH ELEVATIONS

140) Sheet AE202, EAST AND WEST ELEVATIONS

141) Sheet IN132, SIGNAGE PLAN -FIRST FLOOR -AREA-A

142) Sheet IN133, SIGNAGE PLAN -FIRST FLOOR -AREA-B

d. Drawings (New). The following new drawings dated as indicated in the border are hereby added to the request for proposal drawings and are issued with this amendment.

Volume 1 Site:

2) Sheet ES112, SITE PLAN, STREET IMPROVEMENTS

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in the Request for Proposal.

4. Offers will be received until 2:00 p.m. Central on 26 OCT 2023.

Attachments (under separate cover):

Specifications listed in 1.b. above Drawings listed in 1.c. and 1.d. above

Omaha, Nebraska 68102-4901

13 OCT 2023

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Construct TSAF Building

FFP

Entire work complete for construction of TSAF Building as indicated in the RFP drawings and specification complete to the five-foot line, excluding items separately listed below.

FOB: Destination

PSC CD: Y1JZ

NET AMT

0002 1 Job Construction of MHF Building

FFP

Entire work complete for construction of MHF Building as indicated in the RFP drawings and specification complete to the five-foot line, excluding items separately listed below.

0003 1 Job Construction of Sitework, etc - 5ft line

FFP

Entire work complete for Construction of Sitework, Utilities, and Pavements from five-foot line to the limits of MHC area, including all required site demolition, excluding items listed separately below.

0004 1 Job Construction - Sitework, etc. to Bldg 34

FFP

Entire work complete for Construction of Sitework, Utilities, and Pavements from MHC area to BLDG 34, including all required site demolition, and site restoration, excluding items listed separately below.

0005 1 Job Cybersecurity Equipment

FFP

Entire work complete for cybersecurity equipment, devices, firmware, and software to satisfy cybersecurity requirements.

0006 1 Job Power to the Site

FFP

Entire work to supply Power to the project site (power is provided by High West Energy), excluding items listed below.

0007 1 Job Vol 4 - Bldg 34

FFP

Entire work complete as shown on drawings in Vol 4 - Bldg 34.

0008 1 Job OPTION Furniture, Fixtures & Equipment

FFP

Entire work complete for Procurement and Installation of Furniture, Fixtures & Equipment, (FF&E). O&M funded

0009 1 Job OPTION UPS Equipment

FFP

Entire work complete for Procurement and Installation of UPS Equipment. O&M funded

0010 1 Job OPTION Electronic Security Equipment

FFP

Entire work complete for Procurement and Installation of Electronic Security Equipment, including all access control systems, detection systems, and all necessary head end equipment for proper function. O&M funded

PRICING & SCHEDULE NOTES

OFFEROR'S NAME: ____________________________

TOTAL BASIC AMOUNT (CLINs 0001 – 0007): ____________________________

TOTAL OPTION AMOUNT (CLINs 0008 – 0010): ___________________________

TOTAL PRICE (BASE PLUS OPTIONS): ___________________________________

Proposed Contract Duration in Calendar Days After the Notice to Proceed is Received (See Note No. 3) ____________ DAYS

NOTES:

1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS for evaluation of options. The Government reserves the right to exercise options within 540 days of Notice to Proceed. Abbreviations: Military Construction (MILCON), Operations & Maintenance (O&M).

2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted.

3. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to

Proceed (NTP) is received by the Contractor. The proposed duration shall become the required contract duration. The benchmark requirement is to complete the requirement no later than 800 calendar days after receipt of the NTP. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means.

Day number 1 is the day after the date of receipt of the NTP. See Section 00 73 00, paragraph 1.1:

COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK.

Section 00 21 00 - Instructions

00 21 00 INSTRUCTIONS

SECTION 00 21 00

INSTRUCTIONS TO OFFERORS (RFP)

1. SOLICITATION RESTRICTIONS

1.1 GENERAL CONTRACTOR

This solicitation is unrestricted and open to both large and small business participation.

1.2 ESTIMATED CONSTRUCTION COST

The estimated construction cost of this project is between $25,000,000 and $100,000,000.

1.3 SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS

See FAR 52.215-1 INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISTION, subparagraph "(c) Submission, modification, revision, and withdrawal of proposals."

below for acceptable methods. Note: Electronic commerce or facsimile are not acceptable methods, unless indicated otherwise.

1.4 SUBMISSION DEADLINE

Contractors shall submit their proposals via email to the following individuals by no later than the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recently issued SF 30 as applicable:

Jeffrey Wyant Contract Officer: jeffrey.w.wyant@usace.army.mil Brandon Landis, Contract Specialist: brandon.p.landis@usace.army.mil

Proposals received after the date and time stated within Block 13 of the SF1442, or Block 14 of the most recently issued SF 30 as applicable, will be considered late and will not be considered for award. To avoid rejection of a proposal, the offeror must make every effort to ensure its electronic submission is virus-free.

Proposals should enter a description for every file submitted. For files over 20 megabytes (MB) the Contractor shall break the file into smaller files sent via separate emails with each email marked to identify which number the email is relative to the total number of emails submitted (i.e., "email one of four"). Once all the emails submitted have been received the Government will confirm receipt via responsive email.

Do not assume submission will be instantaneous. File size and number of files submitted shall be considered. Contractor/Teammate/Subcontractors should allow adequate time for submission completion because the entire proposal (i.e., Contractor's submission and all teammate/subcontractor(s) independent submissions) must be received by the due date and time specified in Block 13 of SF 1442, or SF 30 as applicable.

1.5. FILE SUBMISSION

Offerors must submit a Volume I (Technical) proposal in order to submit a Volume II (Pricing) proposal. Offerors shall assume that revisions to Volume I (Technical) proposals will not be allowed, accepted, or evaluated after formal Volume I submission on the requested date – unless requested by the Government by amendment or other formal correspondence.

Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description. Offerors shall us the following example for file descriptions:

Volume I, Technical Proposal, shall be submitted as the following separate files:

W9128F23R0026_FIRMNAME_REQD_DOCS

W9128F23R0026_FIRMNAME_FACTORS1_thru_4 W9128F23R0026_FIRMNAME_Appendix_Schedule

Volume II, Price Proposal, shall be submitted as the following separate files:

W9128F23R0026_FIRMNAME_REQD_DOCS

W9128F23R0026_FIRMNAME_SUBCONTRACTING_PLAN

W9128F23R0026_FIRMNAME_PRICE

(Note: Company name may be abbreviated) Proposal Format Reference 00 22 00 EVALUATION CRITERIA for page limitations and format.

1.6. RETURN ADDRESS REQUIREMENTS

Offeror(s) must ensure ALL mail sent to Omaha District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bid guarantees, bonds, correspondence, etc., will be REJECTED by the U.S. Army Corps of Engineers mail room facility located at 1616 Capitol Avenue, Omaha, Nebraska 68102-4901 if it does not contain a return mailing address. THERE WILL BE NO EXCEPTIONS.

1.7. CAD AND ELECTRONIC DESIGN FILES (PROVIDED)

If provided, the CAD survey files, and other electronic design files are provided on an as-is basis. Any Government-provided survey, and the other electronic design files are provided to assist the Contractor in preparing their proposal using their own commercially purchased software. The Contractor shall take all professionally prudent and reasonable actions to verify the accuracy of the data provided and shall assume all liability from the use of these files. The Contractor shall be responsible for obtaining any other software necessary to view the files provided. No other CAD design files will be provided for proposal preparation other than those provided at the time of RFP issuance. No assistance with the files will be provided.

1.7.1. USE OF PROJNET PLANROOM

Due to file size limitations associated with SAM.gov, CAD/BIM files have been posted to a ProjNet plan room at www.projnet.org. On the ProjNet login page, provide email address and enter the quick key in the key access section and check the box "I agree to the privacy & Security Notice". Make sure the Managing Agency is "USACE."

Quick Key: 6HGQ5E-I4IIK2

CAD/BIM files are CUI. Follow the requirements listed below in Paragraph 2, a.

2. COPIES OF SOLICITATION DOCUMENT AND AMENDMENTS

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the U.S. General Services Administration website at:

https://sam.gov/

It shall be the Contractor's responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.

A list of interested vendors (potential offerors and subcontractors) is available on the sam.gov web site listed above (registration required).

Specifications and Drawings are CUI and must be requested to be sent via DoD SAFE.

**Contact Timothy Howland, Contract Specialist: timothy.j.howland@usace.army.mil for the solicitation and amendment documents through 4 October 2023.

**Contact Brandon Landis, Contract Specialist: brandon.p.landis@usace.army.mil for the solicitation and amendment documents after 4 October 2023

a. Dissemination and Control of CUI Reference 32 CFR 2002 and Presidential Policy Directive 21 for document dissemination and control.

3. OFFEROR'S QUESTIONS AND COMMENTS

Questions and/or comments relative to these documents should be submitted via Bidder Inquiry as indicated below. See instructions on when e-mail or mailing is appropriate. Mailing address is shown on the Standard Form SF 1442, Item 8, unless directed otherwise.

Questions and/or comments relative to these bidding (proposal) documents that is proprietary in nature or if Bidder Inquiry system (See Below) is out of service should be submitted to the Contract Specialist:

Contract Specialist - Primary POC:

Brandon Landis, brandon.p.landis@usace.army.mil

(402) 995-2056

3.1. BIDDER INQUIRY

Technical inquiries and questions relating to technical requirements, proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at: https://www.projnet.org/projenet/ no later than ten (10) calendar days before due date of proposals, in order that they may be given consideration or actions taken prior to receipt of offers. The Bidder Inquiry system is to be used to ask and receive answer to all non-proprietary questions.

To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.

All timely questions and approved answers will be made available through ProjNet.

The Solicitation Number is: W9128F23R0026

The Bidder Inquiry Key is: MVJB6M-UBHZPX

a. Registration for ProjNet Bidder Inquiry Access

If you are already registered, go to Entering Bidder Inquiries in ProjNet Bidder Inquiry System below.

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret

Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

b. Entering Bidder Inquiries in ProjNet Bidder Inquiry System

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

8. Follow online screen instructions to enter specific bidder inquiries for the project.

c. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

d. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago).

The telephone number for the Call Center is 800-428-HELP.

e. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

4. PLAN HOLDER'S LIST

For Viewing a List of Interested Vendors (i.e. plan holders List) and Receiving Notifications or e-mail of changes regarding a solicitation, U.S. General Services Administration has these features available (https:// sam.gov/). For this solicitation, go to https://sam.gov/ and register as a vendor or enter username and password to login. If you wish for General Contractors, Subcontractors, Suppliers, Plan Rooms or Print Shops to have the ability to contact you, click on the "Add me to Interested Vendors" for the solicitation.

5. GENERAL DESCRIPTION OF WORK

The Missile Handling Complex includes a single story, Missile Handling Facility, a single-story Transporter Storage and Missile Handling Administrative Combined Facility, and an expansion to two existing dangerous cargo pads. Site work improvements include clearing, grubbing, grading, paving walkways, and storm drainage.

The Missile Handling Facility is a steel structure containing three missile bays and a staging area connected to a steel structure transporter/trailer storage component. The missile bays and staging area are situated on an elevated concrete platform for each bay. Each missile bay requires steel rails and space for a winching system for loading/unloading of boosters from transporter trailers.

Transporter Storage Facility is an open steel structure with six transporter storage bays allowing pull through capability. Equipment storage, restroom, and facility support spaces are constructed of low-rise steel structures directly attached to the Transporter storage bays.

The Missile Handling Administrative Facility is a one-story steel structure with private offices, open work areas, conferences rooms, locker rooms, break rooms, storage/supply rooms, and a space built to applicable ICD-705 criteria.

The project consists of concrete foundations, electrical/mechanical service and distribution components/systems, water and sewer, fire protection, lightning protection, vehicle exhaust systems, compressed air system, security systems, and communications systems. The expansion of the cargo pads and lightning protection systems will support the increased size of the special purpose vehicles utilized within the Complex area. The complex is located within a secure boundary.

This project is authorized a generator, per AFI 32-1062. The facilities are designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01. This project will comply with Department of Defense Antiterrorism/Force Protection requirements per Unified Facilities Criteria 4-010-01.

6. EVALUATION AND CONTRACT AWARD

See Section 00 22 00 Evaluation Criteria

7. SOURCE SELECTION EVALUATION BOARD

The Contracting Officer has established a Source Selection Evaluation Board (SSEB) to conduct an evaluation of each proposal received in response to this solicitation. The evaluation will be based exclusively on the merits and content of the proposal and any subsequent discussion required. The identities of the SSEB personnel are confidential, and any attempt by the proposers to contact these individuals is prohibited.

8. FEDERAL, STATE, AND LOCAL TAXES

It is the Contractor's responsibility to investigate applicable federal, state, and local taxes as well as any specific exemptions that may exist. This includes any applicable Value-Added Taxes (VAT), sales, use, and excise taxes. See General Conditions (Contract Clause) 52.229-3 FEDERAL, STATE, AND LOCAL TAXES.

9. WYOMING SALES AND USE TAXES

The Contractor and subcontractors (as defined by Section 39 6 601 of Wyoming Law) will obtain Wyoming sales and use tax license specific for each county in which work will be performed. Except as otherwise provided by applicable state law, all purchases of materials shall be reported on a Wyoming license, and taxes shall be remitted under the applicable county license in which the work was performed. Each Contractor and subcontractor will report their sales and use tax payments by license number to the Department of Revenue and Taxation. They will also provide written permission authorizing the Wyoming Department of Revenue and Taxation to release gross county tax payment information on the contract to the Peacekeeper Working Group which is comprised of various state and Federal representatives. Telephone: (307) 777-7011 (General Information).

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.211-2 Availability of Specifications, Standards, and Data Item

Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)

JUL 2021

52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.222-12 Contract Termination-Debarment MAY 2014 52.222-56 Certification Regarding Trafficking in Persons Compliance

Plan.

OCT 2020

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.215-7008 Only One Offer DEC 2022 252.215-7010 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data

JAN 2023

252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors

JAN 2023

252.215-7016 Notification to Offerors--Postaward Debriefings DEC 2022

CLAUSES INCORPORATED BY FULL TEXT

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be X DX rated order; certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]

(End of provision)

52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)

(a) Definitions. As used in this provision--

“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.

“In writing or written” means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.

Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show--

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, revision, and withdrawal of proposals.

(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .