W9128F23R0026-0005 - 10 Oct 2023.pdf
PDF 491 KB Posted
- Attached to
- Construct Ground Based Strategic Deterrence (GBSD) Missile Handling Complex (MHC) Federal contract opportunity
- Solicitation number
- W9128F23R0026
About this file
This amendment modifies a solicitation for the construction of a Ground Based Strategic Deterrence Missile Handling Complex at F.E. Warren Air Force Base in Wyoming. The solicitation is seeking proposals to construct missile handling facilities and support structures, with revised specifications provided for site plans, structural details, interior finishes, mechanical and electrical systems. Proposals are due by 2:00 PM Central on October 20, 2023. The Army Corps of Engineers District in Omaha issued the amendment and provided updated drawings and specifications to incorporate revisions. Offerors must acknowledge any amendments as part of their proposal submissions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F23R0026-0007- 20 Oct 2023.pdf | ||
| W9128F23R0026 Conformed thru Amd 6 - 13 Oct 2023.pdf | ||
| W9128F23R0026-0006- 13 Oct 2023.pdf | ||
| W9128F23R0026-0004 - 02 Oct 2023.pdf | ||
| W9128F23R0026 Conformed thru Amd 3 - 22 Sep 2023.pdf | ||
| W9128F23R0026-0003 - 22 Sep 2023.pdf | ||
| W9128F23R0026-0002 - 19 Sep 2023.pdf | ||
| W9128F23R0026-0001 - 19 Sep 2023.pdf | ||
| GBSD MHC Sign In Sheet.pdf | ||
| CECT-NWO-23-27 - JA_Brandname Fire Alarm Control Panels_W9128F23R0026_Posting Version_Redacted.pdf | ||
| CECT-NWO-23-28 - JA_Brandname Generators_W9128F23R0026_Posting_Redacted.pdf | ||
| W9128F23R0026 - 18 Aug 2023.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment being issued to reflect revised specif ications and draw ings (see SF30 - AM-0005 Summary of Changes). The proposed due date remains 2:00 PM Central on 20 October 2023.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Oct-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F23R0026
X 9B. DATED (SEE ITEM 11)
18-Aug-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Oct-2023
CODE
ARMY CORPS OF ENGINEERS
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F23R0026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 5 SUMMARY OF CHANGES
10 October 2023 Solicitation No. W9128F23R0026
Date of Issue: 18 AUG 2023 Date of Receiving Proposals: 20 OCT 2023
SUBJECT: Amendment No. 0005 to Request for Proposal Solicitation Package for Construction of GBSD MISSILE HANDLING COMPLEX, F.E. WARREN AIR FORCE BASE, WYOMING
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.) See SF 30
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.
For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.
Pages or Sections Deleted Pages or Sections Substituted or Added 26 20 00 26 20 00 26 32 15.00 26 32 15.00 28 10 05 28 10 05
c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border and reissued with this amendment.
Volume 1 Site:
1) Sheet CS101, SITE PLAN TSAF
2) Sheet EP101, SITE / BASE POWER PLANS
3) Sheet ES111, SITE PLAN, STREET IMPROVEMENTS
4) Sheet ES502, SITE ELECTRICAL DETAILS
5) Sheet ES511, SITE ELECTRICAL AND TELECOMMUNICATION DETAILS
6) Sheet ES512, LIGHT POLE AND LED LIGHT FIXTURE DETAILS
7) Sheet ES513, LIGHTING POLE, DUCT BANK CONNECTION, AND GROUNDING
SECTION DETAILS
Volume 2 MHF:
8) Sheet S-002, STRUCTURAL GENERAL NOTES
9) Sheet S-003, STRUCTURAL GENERAL NOTES
10) Sheet S-511, TYPICAL FOUNDATION DETAILS
11) Sheet AE511, WALL DETAILS
12) Sheet AE601, PARTITION TYPES AND SCHEDULE
13) Sheet IN602, INTERIOR FINISH SCHEDULE
14) Sheet P-601, PLUMBING SCHEDULES
15) Sheet E-002, ELECTRICAL LEGENDS AND NOTES
16) Sheet EL102, FIRST FLOOR LIGHTING PLAN -AREA -A
17) Sheet EL103, FIRST FLOOR LIGHTING PLAN -AREA -B
18) Sheet EP103, FIRST FLOOR POWER PLAN -AREA -B
19) Sheet E-401, EQUIPMENT PLATFORM LIGHTING PLAN
20) Sheet E-402, SITE TRANSFORMER AND GENERATOR ENLARGED GROUNDING AND
POWER PLAN
21) Sheet EP401, ENLARGED POWER PLANS
22) Sheet E-506, MISCELLANEOUS DETAILS
23) Sheet EG502, GROUNDING DETAILS -SHEET 2
24) Sheet E-601, MISSILE HANDLING FACILITY CONCEPT ONE-LINE DIAGRAM
25) Sheet E-701, PANEL SCHEDULES
26) Sheet E-702, PANEL SCHEDULES
27) Sheet E-703, PANEL SCHEDULES
28) Sheet E-704, PANEL SCHEDULES
Volume 3 TSAF:
29) Sheet S-002, STRUCTURAL GENERAL NOTES
30) Sheet S-003, STRUCTURAL GENERAL NOTES
31) Sheet S-511, TYPICAL FOUNDATION DETAILS
32) Sheet AE103, FIRST FLOOR PLAN -AREA -B
33) Sheet AE401, ENLARGED FLOOR PLANS
34) Sheet AE501, PLAN DETAILS
35) Sheet AE511, WALL AND ROOF DETAILS
36) Sheet AE601, PARTITION TYPES AND SCHEDULE
37) Sheet IN601, INTERIOR FINISH SCHEDULE
38) Sheet E-001, ELECTRICAL ABBREVIATIONS
39) Sheet E-002, ELECTRICAL LEGEND AND NOTES
40) Sheet E-003, ELECTRICAL LEGENDS AND NOTES
41) Sheet E-004, SECURITY LEGENDS
42) Sheet E-101, OVERALL FIRST FLOOR ELECTRICAL PLAN
43) Sheet EG102, FIRST FLOOR GROUNDING PLAN -AREA -A
44) Sheet EG103, FIRST FLOOR GROUNDING PLAN -AREA -B
45) Sheet EG112, ROOF LIGHTNING PROTECTION PLAN -AREA -A
46) Sheet EG113, ROOF LIGHTING PROTECTION PLAN -AREA -B
47) Sheet EL102, FIRST FLOOR LIGHTING PLAN -AREA -A
48) Sheet EL103, FIRST FLOOR LIGHTING PLAN -AREA -B
49) Sheet EP102, FIRST FLOOR POWER PLAN -AREA -A
50) Sheet EP103, FIRST FLOOR POWER PLAN -AREA -B
51) Sheet EP201, SWITCHBOARD ELEVATIONS
52) Sheet E-401, EQUIPMENT PLATFORM POWER, GROUNDING, AND LIGHTING
PLAN
53) Sheet EP401, ENLARGED ELECTRICAL PLAN
54) Sheet E-506, MISCELLANEOUS DETAILS
55) Sheet E-507, MISCELLANEOUS DETAILS
56) Sheet EG501, GROUNDING DETAILS -SHEET 1
57) Sheet EG502, GROUNDING DETAILS -SHEET 2
58) Sheet EG503, GROUNDING DETAILS -SHEET 3
59) Sheet E-601, TRANSPORTER STORAGE AND ADMINISTRATIVE FACILITY
CONCEPT ONE-LINE DIAGRAM
60) Sheet EL610, LIGHTING FIXTURE SCHEDULE
61) Sheet E-701, PANEL SCHEDULES
62) Sheet E-702, PANEL SCHEDULES
63) Sheet E-703, PANEL SCHEDULES
64) Sheet T-102, IRST FLOOR TELECOMMUNICATION PLAN -AREA -A
65) Sheet T-103, IRST FLOOR TELECOMMUNICATION PLAN -AREA -B
66) Sheet T-401, ENLARGED TELECOMMUNICATION PLAN
67) Sheet T-402, ENLARGED TELECOMMUNICATION PLAN
68) Sheet T-501, TELECOMMUNICATION DETAILS
69) Sheet T-502, TELECOMMUNICATION DETAILS
70) Sheet T-601, TELECOMMUNICATIONS ONE-LINE DIAGRAM
71) Sheet TY102, FIRST FLOOR SECURITY PLAN -AREA -A
72) Sheet TY103, FIRST FLOOR SECURITY PLAN -AREA -B
73) Sheet TY501, SECURITY DOOR DETAILS
74) Sheet TY502, SECURITY DOOR DETAILS
75) Sheet TY511, SECURITY STANDARD DETAILS
76) Sheet TY601, SECURITY RISER DIAGRAM
77) Sheet TY602, SECURITY RISER DIAGRAMS
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposals. Provide proposals via the instructions provided in the Request for Proposal.
4. Offers will be received until 2:00 p.m. Central on 20 OCT 2023.
Attachments (under separate cover):
Specifications listed in 1.b. above Drawings listed in 1.c. and 1.d. above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
10 OCT 2023
nep/2160
(End of Summary of Changes)
File details come from the government source that posted it. Updated .