Am-0004_W9128F23R0012_Attachments.pdf
PDF 863 KB Posted
- Attached to
- B-21 Weapon Loader Training Facility Federal contract opportunity
- Solicitation number
- W9128F23R0012
About this file
This federal solicitation requests proposals for the construction of a B-21 Weapon Loader Training Facility at Ellsworth Air Force Base in South Dakota. Proposals are due by June 6, 2023 at 2:00pm CST. Offerors must be registered in the System for Award Management. Construction costs are estimated between $25-100 million. The solicitation and any amendments will be posted on SAM.gov. Questions must be submitted through Bidder Inquiry on ProjNet. The selected contractor will be responsible for demolishing existing electrical equipment and infrastructure according to the drawings provided and installing a new electrical system, including transformers, switchboards, panelboards, feeders, and other components as specified in the documents. An electronic security system will also be installed per the drawings and device and cable schedules.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Am 0006 - B-21 WLT - 24 Jul 23.pdf | ||
| Amendment 0005.pdf | ||
| Am 0004 - B-21 WLT - 13 Jun 23.pdf | ||
| Am-0003_W9128F23R0012_Attachments.pdf | ||
| Am 0003 - B-21 WLT - 09 June 23.pdf | ||
| Am 0002 - 02 Jun 23.pdf | ||
| Am-0002_W9128F23R0012_Attachments.pdf | ||
| WLT Sign in.pdf | ||
| Am 0001 - 24 May 23.pdf | ||
| Am-0001_W9128F23R0012_Attachments.pdf | ||
| B-21 WLT_RTA_Drawings_Vol 1of 2_20230428.pdf | ||
| B-21 WLT_RTA_Drawings_Vol 2 of 2_20230428.pdf | ||
| SPECS_W9128F23R0012.pdf | ||
| Solicitation - B-21 WLT - W9128F23R0012.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
R
ST
HQ.1 Q P A.1BN M L K J CDEFG
Q.0 A.0
4C-R2
208Y/120V, 1600A SWBD
75 KVA XFMR
LT
HT
8-R2
480Y/277V, 1600A SWBD
480Y/277V, 1600A SWBD
8-R1
S8A1 R
NOT IN SCOPE.
REMOVE ALL EXISTING ELECTRICAL EQUIPMENT, LIGHTING,
AND RECEPTACLES. DEMOLISH RELATED CONDUIT AND
CABLING BACK TO SOURCE, UNLESS OTHERWISE NOTED.
RE-FEED EXISTING LOADS AS NOTED ON THE POWER
SHEETS. REFER TO PANEL SCHEDULES.
DEMOLITION LEGEND
HATCH DESCRIPTION
GENERAL SHEET NOTES - DEMOLITION
SHEET KEYNOTES
60'0
SCALE: 1"=20'
10' 20' 40'
PLAN
NORTH
TRUE N
US Army Corps of Engineers Omaha District ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D x
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
D R
A W
IN
G
C O
D E
-W
F
R
A
P R
IL
B D
Y S
O N
F
IL
E N
A M
E
O M
A H
A D
IS
T
R
IC
T
O M
A H
A
N E
B R
A S
K A
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D D
E S
IG
N
B -2
W E
A P
O N
S L
O A
D E
R
A
IN
IN
G
F A
C
IL
IT
Y
P R
O J E
C T
N U
M B
E R
F
X B
M
H
IG
H
L A
N D
S P
L A
Z A
D R
W
E S
T S
U
IT
E
S T
L O
U
IS
M
IS
S
O U
R I
KEY PLAN
OVERALL
ADVERTISEMENT - 100% DESIGN
A B
DC
A G
A R
D N
E R
C K
O H
R M
A N
N
K H
O G
A N
GRAPHIC SCALE
ED101
O V
E R
A L L D
E M
O L
IT
IO
N
P L A
N
L E
V E
L
F X
B M
E
D
1" = 20'-0"A1
OVERALL DEMOLITION FLOOR PLAN - LEVEL 01
1 REMOVE CIRCUITS ASSOCIATED WITH HVAC EQUIPMENT FOR IN SCOPE
AREAS. COORDINATE DEMOLITION WITH MECHANICAL CONTRACTOR TO
ENSURE EXISTING TO REMAIN EQUIPMENT IS NOT ALTERED WITH THE
EXCEPTION OF REMOVAL OF EXISTING CABLING AND CONDUITS.
2 ABANDON IN PLACE CONDUITS EMBEDDED IN THE FLOOR, BURIED
OUTSIDE, OR IN EXISTING TO REMAIN WALLS. REMOVE CONDUCTORS.
3 EXISTING ELECTRICAL COMPONENT LOCATION AND QUANTITY ARE
SHOWN FOR REFERENCE ONLY. FIELD VERIFY EXACT QUANTITY AND
LOCATION.
144 PANEL "B" IS EXISTING TO REMAIN. RE: E-601 FOR NEW FEEDER
INFORMATION.
145 PROTECT IN PLACE FUEL ISLAND EQUIPMENT INSTALLED AS PART OF A
SEPARATE PROJECT.
164 REMOVE MULTIPLE SERVICE ENTRANCE IDENTIFICATION PLAQUE.
165 DEMOLISH EXISTING EXIT SIGN FOR BID OPTION ONLY.
169 EXISTING OBSTRUCTION LIGHT ON ROOF. DEMOLISH ALL EXISTING
OBSTRUCTION LIGHTS.
A
M E
N D
M E
N T
J U
N E
LDP1, RM 1043
208Y/120V, 3ɸ, 4W
600A, 42,000 SCCR600 AF
600 AT
3P
100% RATED
100 AF
100 AT
3P
100 4
LRP1
PANEL
RM 1043
100 AF
100 AT
3P
100 4
LLP1
PANEL
RM 1043
225 AF
225 AT
3P
225 4
LPP2
PANEL
RM 1043
100 AF
100 AT
3P
100 4
LTP1
PANEL
RM 1043
T-PRIDE
12470V:480Y/277V
750 KVA, 3ɸ , 60HZ
45A
MSE, RM 1048
480Y/277V, 3ɸ, 4W, 1200A
22000 SCCR, NEMA 11200 AF
1200 AT
3P
100 AF
100 AT
3P
225 AF
200 AT
3P
200 4
LRP2
PANEL
RM 1043
225 AF
200 AT
3P
200 4
LMP1
PANEL
RM 1043
60 AF
60 AT
3P
60 4
LPP1
PANEL
RM 1000A
RELAY PANEL
LIGHTING
RM 1043
100 AF
100 AT
3P
LLP2
PANEL
RM 1100
SPD
SPD
SPD
SPD
SPD
PANEL
EXISTING
B
400 AF
400 AT
3P
225 KVA
480:208Y/120V
TLDP1
RM 1043
100 AF
100 AT
3P
100 4
HLP1
PANEL
RM 1048
HMP1
PANEL
RM 1015
30 KVA
480:208Y/120V
TLMP2
RM 1015
LMP2
PANEL
RM 1015
600 AF
600 AT
3P
600 4
100 AF
100 AT
3P
100 4
100 AF
100 AT
3P
100 4
100 AF
100 AT
3P
100 4
400 AF
400 AT
3P
112.5 KVA
480:208Y/120V
TLDP2
RM 1034
LRP4
PANEL
RM 1034
LTP2
PANEL
RM 1030
LTP3
PANEL
RM 1041
150 AF
125 AT
3P
XXXX X
100 AF
100 AT
3P
100 4
HLP2
PANEL
RM 1048
SPD SPD
HDP1, RM 1015
480Y/277V, 3ɸ, 4W, 600A
22,000 SCCR600 AF
600 AT
3P
100 AF
100 AT
3P
100 4
400 AF
400 AT
3P
400 4
HLP3
PANEL
RM 1015
SPD
SPD SPD SPD
250 AF
175 AT
3P
75 KVA
480:208Y/120V
TB
RM 1048
100 AF
60 AT
3P
MAIN FA
PANEL
RM 1048
100 AF
50 AT
3P
30 KVA
480:208Y/120V
TMFA
RM 1048
FA1
PANEL
RM 1043
SPD
SPD
EXISTING SWITCH S8A1
250 AF
3P
100 AF
100 AT
3P
100 AF
100 AT
3P
HDP2, RM 1034
480Y/277V, 3ɸ, 4W, 600A
22,000 SCCR600 AF
600 AT
3P
LSIG
100 AF
100 AT
3P
100 4
HLP4
PANEL
RM 1034
SPD
100 AF
50 AT
3P
30 KVA
480:208Y/120V
TLRP3
RM 1015
LRP3
PANEL
RM 1015
SPD
100 AF
100 AT
3P
100 4
LRP5
PANEL
RM 1034
SPD
HMP2
PANEL
RM 3000
400 AF
400 AT
3P
400 4
100 AF
100 AT
3P
100 4
LMP3
PANEL
RM 1034
LDP2, RM 1034
208Y/120V, 3ɸ, 4W, 400A
10,000 SCCR
225 KVA
480:208Y/120V
TLPP3
RM 1034
400 AF
400 AT
3P
LPP3
PANEL
RM 1034
SPD
600 AF
600 AT
3P
600 4
FIRE PUMP
CONTROLLER
150HP FIRE
PUMP
SPD
SPD
M
N G
SPARE
240V/3P/30A
RM 1043
200E
200E
SWITCH S7XA2
SWITCH S8A2
FUTURE
B-21 PARTS
SPARE SPARE
600V/3P/400A
RM 1043
R
R
R
SHEET KEYNOTES
GENERAL SHEET NOTES - ONE LINE
US Army Corps of Engineers Omaha District ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D x
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
D R
A W
IN
G
C O
D E
-W
F
R
A
P R
IL
B D
Y S
O N
F
IL
E N
A M
E
O M
A H
A D
IS
T
R
A H
A
N E
B R
A S
K A
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D D
E S
IG
N
B -2
W E
A P
O N
S L
O A
D
A
IN
IN
G
F A
C
IL
IT
Y
P R
O J E
C T
N U
M B
E R
F
X B
M
H
IG
H
L A
N D
S P
L A
Z A
D R
W
E S
T S
U
IT
E
S T
L O
U
IS
M
IS
S
O U
R I
ADVERTISEMENT - 100% DESIGN
A G
A R
D N
E R
C K
O H
R M
A N
N
K H
O G
A N
E-601
O N
E L
IN
E
D
IA
G R
A M
F X
B M
E
-6
FEEDER SCHEDULE
FEEDER
MARK
PHASE
&NEUTRAL GROUND # OF SET
CONDUIT SIZE
3C+G 4C+G
15 12 12 1 3/4" 3/4"
20 12 12 1 3/4" 3/4"
30 10 10 1 3/4" 3/4"
40 8 10 1 3/4" 3/4"
50 6 10 1 3/4" 1"
60 4 10 1 1" 1 1/4"
70 4 8 1 1" 1 1/4"
80 3 8 1 1 1/4" 1 1/4"
90 2 8 1 1 1/4" 1 1/2"
100 1 8 1 1 1/2" 1 1/2"
110 1 6 1 1 1/2" 1 1/2"
125 1 6 1 1 1/2" 2"
150 1/0 6 1 1 1/2" 2"
175 2/0 6 1 2" 2"
200 3/0 6 1 2" 2 1/2"
225 4/0 4 1 2" 2 1/2"
250 250 4 1 2 1/2" 3"
300 350 4 1 3" 3"
350 500 2 1 3" 4"
400 3/0 2 2 2" 2"
450 4/0 2 2 2" 2 1/2"
500 250 2 2 2 1/2" 3"
600 350 1/0 2 3" 3"
700 500 1/0 2 3" 4"
800 300 1/0 3 2 1/2" 3"
1000 400 2/0 3 3" 3"
1200 350 3/0 4 3" 3"
1600 400 4/0 5 3" 3 1/2"
2000 500 250 6 3 1/2" 4"
FEEDER SCHEDULE NOTES
1 THIS SCHEDULE IS BASED ON INTERNAL AREA OF EMT, RGS, OR
SCHEDULE 40 PVC CONDUIT AND THE AMPACITIES FOR THHN OR THWN
INSULATION.
2 FEEDER MARK " " INDICATES FEEDER RATING AND NUMBER OF
PHASE CONDUCTORS INCLUDING NEUTRAL. PROVIDE GROUND AS
INDICATED ON FEEDER SCHEDULE.
3 UNDERGROUND SERVICE ENTRANCE FEEDERS CONSIST OF THREE
PHASE WIRES AND NEUTRAL. NUMBER OF CONDUCTORS PER PHASE ARE
CALCULATED VALUES BASED ON SPECIFIC DUCT BANK ARRANGEMENTS,
LOAD FACTORS, AND SOIL CONDITIONS.
4 SECONDARY FEEDERS ARE AS SCHEDULED UON.
1 PROVIDE ARC FLASH WARNING SIGNS ON THE SWITCHBOARDS,
SWITCHGEAR, PANELBOARDS, INDUSTRIAL CONTROL PANELS, METER
SOCKET ENCLOSURES, AND MOTOR CONTROL CENTERS AS REQUIRED
PER NFPA 70 (NEC) ARTICLE 110.16. REFERENCE NFPA 70 ARTICLE 110.16;
NFPA 70E ARTICLE 130.3; AND UFC 3-560-01, ELECTRICAL SAFETY, O & M.
2 ONE-LINE DIAGRAMS DEPICT INTERCONNECTION OF ELECTRICAL
INFRASTRUCTURE. COORDINATE WITH PANEL SCHEDULES FOR THE
BALANCE OF ADDITIONAL CONNECTIONS AND DEVICES.
3 PROVIDE EQUIPMENT WITH FULLY BUSSED SPACE FOR FUTURE DEVICES.
4 FOR SPDS, PROVIDE BREAKER AND WIRE SIZED PER SPD
MANUFACTURER'S RECOMMENDATION. LENGTH OF WIRE FROM BUS TO
SPD SHOULD BE KEPT TO A MINIMUM AND MAY NOT EXCEED 3FT. SPD
MUST BE EXTERNALLY INSTALLED IN A SEPARATE NEMA 1 ENCLOSURE.
604 PROVIDE (3) #1/0 15KV ALUMINUM, (1) #2G 600V IN EXISTING CONDUIT. IF
EXISTING CONDUIT IS NOT IN GOOD CONDITION, PROVIDE WIRING IN 5"C
WITH (1) 5"C SPARE.
605 RE-CONNECT FIRE PUMP CONTROLLER TO TRANSFORMER. WIRES
SHOULD NOT BE SPLICED. RE-PULL NEW WIRE IF THE EXISTING WIRES
ARE NOT LONG ENOUGH TO RE-CONNECT TO NEW TRANSFORMER.
606 PROVIDE 4 SETS OF [(4) 350 KCMIL IN 3"C] AND (1) 3"C SPARE.
607 PROVIDE 2 SETS OF [(4) 500 KCMIL, 3/0G IN 3"C].
NTSA1
ONE LINE DIAGRAM
TRANSFORMER SCHEDULE
KVA
PRIMARY (480V) SECONDARY (208/120V)
CB FEEDER CB FEEDER
15 30/3 3#10, 1#10G, 3/4" C 50/3 4#6, 1#10G, 1" C
30 50/3 3#6, 1#10G, 1" C 100/3 4#1, 1#8G, 1-1/2" C
45 70/3 3#4, 1#8G, 1" C 150/3 4#1/0, 1#6G, 1-1/2" C
75 125/3 3#1/0, 1#6G, 1-1/2" C 225/3 4#4/0, 1#2G, 2-1/2" C
112.5 175/3 3#2/0,1 #6G, 2" C 400/3 (2) SETS OF 4#3/0, #2G, 2" C
225 400/3 (2) SETS OF 3#3/0, 1#2G, 2"C 600/3 (2) SETS OF 4#350KCMIL, #1G, 3" C
R
A
M E
N D
M E
N T
M A
Y
A
M E
N D
M E
N T
J U
N E
LEGEND
HSS HIGH SECURITY SWITCH (PROVIDED BY DIV. 8)
EL
24 VDC ELECTRIC LOCK WITH INTEGRAL REQUEST-TO-EXIT
(REX) SENSOR (PROVIDED BY DIV. 8)
X10 DIAL COMBINATION LOCK (PROVIDED BY DIV. 8)
ACP INTELLIGENT FIELD CONTROLLER PANEL
PANORAMIC PIR
KP ALARM KEYPAD
DEVICE NUMBER#
J
HID RP40 CARD READER
HID RPK40 CARD READER WITH KEYPAD
120VAC POWER (PROVIDED BY DIV. 26)
DATA CONNECTION (PROVIDED BY DIV. 27)
CR
DIB DOOR INTERFACE BOX
WKS WORKSTATION
IDS PREMISE CONTROL UNIT
SECURED SPACE BOUNDARY
GENERAL NOTES
1. CONTRACTOR MUST FIELD VERIFY EQUIPMENT LOCATIONS PRIOR TO
THE START OF INSTALLATION. ANY CONFLICTS MUST BE IMMEDIATELY
BROUGHT TO THE ATTENTION OF THE ARCHITECT.
2. MINIMUM CONDUIT SIZE MUST BE 3/4" WITH THE EXCEPTION OF "DROP
CONDUITS" AT DOOR LOCATIONS, WHICH MAY BE 1/2". ALL CONDUITS
MUST BE EMT; EXCEPTIONS INCLUDE:
1. RIGID STEEL FOR EXPOSED AREAS OR AREAS ACCESSIBLE TO
UNSCREENED PERSONS
2. PVC FOR BURIED OR CAST-IN-PLACE CONDUITS
3. GALVANIZED RIGID STEEL FOR EXTERIOR CONDUITS
4. FLEXIBLE CONDUIT FOR CONCEALED DROPS TO DOOR DEVICES
3. CONDUIT FILL MUST NOT EXCEED 40%. INSTALLATION OF CONDUIT AND
WIRING MUST BE IN COMPLIANCE WITH NATIONAL ELECTRICAL CODE
(NEC). ALL WIRING MUST BE HOMERUN, UNLESS OTHERWISE NOTED.
ANY SPLICES MUST BE APPROVED BY THE DESIGNER.
4. SECURITY CONTROL CONDUCTORS MUST BE SHIELDED COPPER AND
MINIMUM 18 AWG, UNLESS OTHERWISE NOTED. SECURITY CONDUCTORS
MUST NOT SHARE CONDUIT WITH CONDUCTORS OF OTHER TRADES.
SECURITY CONTRACTOR MUST BE RESPONSIBLE FOR ENSURING THAT
HIGH VOLTAGE (120 VAC) POWER CONDUCTORS ARE NOT ROUTED
WITHIN 12 INCHES OF SECURITY CONTROL WIRING. ALL CONDUCTORS
MUST BE COLOR CODED AND TAGGED AS DESCRIBED IN THE WRITTEN
SPECIFICATIONS AND APPROVED BY THE DESIGNER.
5. THE CONTRACTOR MUST INSTALL ALL COMPONENTS USING
MANUFACTURER'S RECOMMENDED INSTALLATION PROCEDURES. ALL
MATERIALS MUST BE NEW AND UNUSED.
6. CONDUITS PENETRATING FIRE RATED WALLS OR FLOORS MUST USE U.L.
APPROVED DEVICES IN ORDER TO MAINTAIN FIRE & ICD -705 RATING OF
THE WALL OR FLOOR.
7. ALL CABLING MUST BE INSTALLED IN CONDUIT WITH THE EXCEPTION OF
CABLING INSTALLED IN CABLE TRAYS/LADDER RACKS AND WITHIN COMM
ROOMS.
8. THE CONTRACTOR MUST MAINTAIN ALL CABLE MINIMUM BENDING RADII
ACCORDING TO THE CABLE MANUFACTURER.
9. THE CONTRACT DOCUMENTS REFLECT THE FIELD CONDITIONS
OBSERVED/VERIFIED AT THE TIME OF OUR SITE AND BUILDING SURVEYS;
THERE MAY BE DIFFERING FIELD CONDITIONS AT THE START OF
CONSTRUCTION AND/OR BID PHASE. CONTRACTOR MUST BE
RESPONSIBLE TO FIELD VERIFY ALL EXISTING CONDITIONS OF BUILDING
SYSTEM AND PHYSICAL CHARACTERISTICS OF THE BUILDING/FACILITY
PRIOR TO START OF WORK TO ENSURE THERE ARE NO CONFLICTS WITH
THE CONSTRUCTION DOCUMENTS AND THE EXISTING FIELD
CONDITIONS.
10. THE CONTRACTOR MUST COORDINATE THE WORK OF THEIR TRADE
WITH THAT OF THE OTHER TRADES ON THE JOB. CONFLICTS WITH
OTHER TRADES MUST BE BROUGHT TO THE ATTENTION OF THE
GOVERNMENT PRIOR TO INSTALLATION. WORK MUST ALSO BE
COORDINATED AROUND PORTABLE AND MOBILE EQUIPMENT.
11. ALL WORK MUST COMPLY WITH ALL APPLICABLE CODES, AMENDMENTS,
RULES, REGULATIONS, ORDINANCES, LAWS, ORDERS, APPROVALS, ETC.
THAT ARE REQUIRED BY PUBLIC AUTHORITIES. IN THE EVENT OF
CONFLICT, THE MOST STRINGENT REQUIREMENTS MUST GOVERN.
12. THE CONTRACTOR MUST SUPERVISE AND DIRECT THE WORK USING HIS
BEST SKILL AND ATTENTION. HE MUST BE SOLELY RESPONSIBLE FOR ALL
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND
PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK
UNDER THE CONTRACT.
13. ALL PERSONNEL PERFORMING PROCUREMENT, INSTALLATION, AND
COMMISSIONING OF ESS (TO INCLUDE ELECTRONIC ACCESS CONTROL
SYSTEMS, INTRUSION DETECTION SYSTEMS, AND CLOSED-CIRCUIT
TELEVISION SYSTEMS) AS DEFINED BY THE RESPECTIVE BID OPTIONS IN
THIS RFP MUST BE US CITIZENS AND MEET THE REQUIREMENTS FOR
ACCESS TO THE PROJECT SECURE AREA AS DEFINED BY SECTION
01 14 00 WORK RESTRICTIONS.
2.1.
2.2.
2.3.
2.4.
R
US Army Corps of Engineers Omaha District ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D x
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
D R
A W
IN
G
C O
D E
-W
F
R
A
P R
IL
B D
Y S
O N
F
IL
E N
A M
E
O M
A H
A D
IS
T
R
A H
A
N E
B R
A S
K A
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D D
E S
IG
N
B -2
W E
A P
O N
S L
O A
D
A
IN
IN
G
F A
C
IL
IT
Y
P R
O J E
C T
N U
M B
E R
F
X B
M
H
IG
H
L A
N D
S P
L A
Z A
D R
W
E S
T S
U
IT
E
S T
L O
U
IS
M
IS
S
O U
R I
ADVERTISEMENT - 100% DESIGN
C T
IN
K
E R
R C
R A
IG
J H
IM
E
S
TY001
E L E
C T
R O
N
IC
S E
C U
R
IT
Y S
Y S
T E
M L E
G E
N D
S
N O
T E
S
A N
D S
C H
E D
U L E
S
F X
B M
T
Y
SECURITY DEVICE SCHEDULE
DEVICE
NUMBER
DOOR
NUMBER
ROOM
NUMBER PANEL
DETAIL
NUMBER AREA BID OPTION
R12 1002B 1002 D9 A1/TY501 A
R15 1039B 1039 D13 A1/TY501 B
S3 1037C 1037 D6/TY501 A
S3 1037C 1037 D6/TY501 B
S8 1038 1038 A1/TY501 B
S12 1013 1013 D3 A1/TY501 A
S15 1025 1025 D6 A1/TY501 A
S16 1030 1030 D6 A1/TY501 A
S17 1040 1040 D7 D1/TY501 B
S17 1040 1040 D7 D1/TY501 B
S19 1041 1041 D7 A1/TY501 B
S20 1002A 1002 D9 A1/TY501 A
S21 1002B 1002 A1/TY501 A
S28 1039A 1039 D13 A1/TY501 B
S29 1039B 1039 D7 A1/TY501 B
S30 2000 2000 D1/TY501 A
S30 2000 2000 D1/TY501 A
SECURITY DEVICE SCHEDULE
DEVICE
NUMBER
DOOR
NUMBER
ROOM
NUMBER PANEL
DETAIL
NUMBER AREA BID OPTION
ACP1 1030 C6/TY502 A
ACP2 1030 C6/TY502 A
ACP3 1040 C6/TY502 B
IDS1 1030 A
IDS2 1030 A
IDS3 1040 B
M1 1045 A1/TY502 A
M1 1045 A1/TY502 A
M1 1045 A1/TY502 A
M1 1045 A1/TY502 A
M1 1045 A1/TY502 A
M1 1045 A1/TY502 A
M1 1045 A1/TY502 A
M1 1045 A1/TY502 A
M1 1045 A1/TY502 A
M1 1045 A1/TY502 A
M1 1045 A1/TY502 A
M1 1045 A1/TY502 A
M1 1045 A1/TY502 A
M1 1045 A1/TY502 A
M1 1046 A1/TY502 B BID OPTION
M1 1046 A1/TY502 B BID OPTION
M1 1046 A1/TY502 B BID OPTION
M1 1046 A1/TY502 B BID OPTION
M1 1046 A1/TY502 B BID OPTION
M1 1046 A1/TY502 B BID OPTION
M1 1046 A1/TY502 B BID OPTION
M1 1046 A1/TY502 B BID OPTION
M1 1046 A1/TY502 B BID OPTION
M1 1046 A1/TY502 B BID OPTION
M1 1046 A1/TY502 B BID OPTION
M2 1040 E6/TY502 B
M2 1040 E6/TY502 B
M2 1041 E6/TY502 B
M3 1031 E6/TY502 A
M3 1020 E6/TY502 A
M3 1020 E6/TY502 A
M3 1023 E6/TY502 A
M3 1023 E6/TY502 A
M3 1023 E6/TY502 A
M3 1025 E6/TY502 A
M3 1025 E6/TY502 A
M3 1027 E6/TY502 A
M3 1028 E6/TY502 A
M3 1029 E6/TY502 A
M3 1022 E6/TY502 A
M3 1021 E6/TY502 A
M3 1021 E6/TY502 A
M3 1012 E6/TY502 A
M3 1012 E6/TY502 A
M3 1011 E6/TY502 A
M3 1010 E6/TY502 A
M3 1042 E6/TY502 A
M3 1042 E6/TY502 A
M3 1006 E6/TY502 A
M3 1006 E6/TY502 A
M3 1006 E6/TY502 A
M3 1037 E6/TY502 A
M3 1037 E6/TY502 A
M3 1038 E6/TY502 B
M3 1038 E6/TY502 B
M3 1031 E6/TY502 A
M3 1030 E6/TY502 A
M3 1006 E6/TY502 A
R7 1013 1013 D3 A1/TY501 A
R10 1030 1030 D6 A1/TY501 A
R11 1041 1041 D7 A1/TY501 B
DIB SCHEDULE
DIB NUMBER
DOOR
NUMBER PANEL
DETAIL
NUMBER
D9 1002A C6/TY501
D3 1013 C6/TY501
D6 1030 C6/TY501
D13 1039A C6/TY501
D7 1041 C6/TY501
A
M E
N D
M E
N T
J U
N E
DIB HSS
5355 CARD
READER
ELECTRIC LOCKING
MECHANISM
CARD READER POWER
TO ACP
D
L
D
J
J
L
F
D
REQUEST TO
EXIT SENSOR
STRIKE POWER
L
5455 CARD
READER
HSS
FDJ
A
CABLE SCHEDULE
CABLE TYPE DESCRIPTION USE
B
C
D
E
F
G
H
J
K
L
M
N
O
P
* OR EQUIVALENT
4 COND. 22 GA.
2 PAIR 24 AWG
2 PAIR 18 AWG
6-22 AWG
2 COND. 20 AWG
3 COND. 20 AWG
#20-4c
2 COND. 18 AWG
22 AWG
3-18 AWG
2 COND. 16 AWG
3 COND. 12 AWG
PLENUM 12F, SINGLE-MODE
PLENUM 6F, 62.5um MULTIMODE
CAT5e CABLE, 4 PAIR
DOOR INTERFACE BOX
RS485
OSDP
CARD READER
TAMPER
REX
SENSOR
TAMPER
HSS
SENSOR
LOW VOLTAGE POWER
120 VAC
COMMUNICATION
COMMUNICATION
CAMERA
3/4-INCH FLEX CONDUIT
CEILING
FINISHED FLOOR
TO PCU
A
F F
M A
X
FINISHED FLOOR
CABLE TRAY
ACP
NEMA 4
36" x 30"
ENCLOSURE
2" CONDUIT
IDS
NEMA 4
16" x 16"
ENCLOSURE
REFER TO
ARCHITECTURAL AND
STRUCTURAL DRAWINGS
FOR WALL OR BEAM TYPE
3/4-INCH CONDUIT
10'-0" AFF
BACK BOX
1/2-INCH CONDUIT
360 DEGREE
MOTION SENSOR
FINISHED FLOOR
US Army Corps of Engineers Omaha District ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D x
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
D R
A W
IN
G
C O
D E
-W F
R
A
P R
IL
B D
Y S
O N
F
IL
E N
A M
E
O M
A H
A D
IS
T
R
A H
A
N E
B R
A S
K A
E L L S
W O
R T
H A
IR
F
O R
C E
B A
S E
S
D
D E
S
IG
N B
-2
W E
A P
O N
S L
O A
D
A
IN
IN
G
F A
C
IL
IT
Y
P R
O J E
C T
N U
M B
E R
F
X B
M
H
IG
H
L A
N D
S P
L A
Z A
D R
W
E S
T S
U
IT
E
S T
L O
U
IS
M
IS
S
O U
R I
ADVERTISEMENT - 100% DESIGN
C T
IN
K
E R
R C
R A
IG
J H
IM
E
S
TY502
D E
T A
IL
S
F X
B M
T
Y
NOT TO SCALEF1
ACS DOOR BLOCK DIAGRAM
NOT TO SCALEE6
CEILING MOUNTED MOTION SENSOR
NOT TO SCALEC6
IDS/ACP ELEVATION
NOT TO SCALEA1
WALL MOUNTED MOTION SENSOR
R
A
M E
N D
M E
N T
J U
N E
| Drawings (Revised) |
| ED101 - OVERALL DEMOLITION PLAN LEVEL 01 |
| E-601 - ONE LINE DIAGRAM |
| TY001 - ELECTRONIC SECURITY SYSTEM LEGENDS, NOTES, AND SCHEDULES |
| TY502 - DETAILS |
File details come from the government source that posted it. Updated .