This federal contract opportunity announcement solicits proposals for the construction of a B-21 Weapon Loader Training Facility at Ellsworth Air Force Base in South Dakota. Key details include a solicitation number of W9128F23R0012, with a response due date of June 6, 2023 at 2:00pm Central Time. The project magnitude is between $25-100 million. The soliciting agency is the Department of the Army Corps of Engineers Omaha District. Offerors must register in the System for Award Management and download solicitation documents from the Contract Opportunities site. Questions should be submitted through the Bidder Inquiry system in ProjNet.

View the file

Other files for this federal contract opportunity

Other files attached to B-21 Weapon Loader Training Facility, newest first.
File Type Posted
Am 0006 - B-21 WLT - 24 Jul 23.pdf PDF
Amendment 0005.pdf PDF
Am 0004 - B-21 WLT - 13 Jun 23.pdf PDF
Am-0004_W9128F23R0012_Attachments.pdf PDF
Am-0003_W9128F23R0012_Attachments.pdf PDF
Am 0003 - B-21 WLT - 09 June 23.pdf PDF
Am 0002 - 02 Jun 23.pdf PDF
Am-0002_W9128F23R0012_Attachments.pdf PDF
Am 0001 - 24 May 23.pdf PDF
WLT Sign in.pdf PDF
Solicitation - B-21 WLT - W9128F23R0012.pdf PDF
B-21 WLT_RTA_Drawings_Vol 1of 2_20230428.pdf PDF
B-21 WLT_RTA_Drawings_Vol 2 of 2_20230428.pdf PDF
SPECS_W9128F23R0012.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B-21: Weapons Loader Training (WLT) Facility, (FY23) - Ellsworth ELA6

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 29

SUSTAINABILITY REQUIREMENTS AND REPORTING

02/21

PART 1 GENERAL

1.1 REFERENCES

1.2 SUMMARY

1.3 SUBMITTALS

1.4 GUIDING PRINCIPLES VALIDATION (GPV)

1.4.1 Sustainability Action Plan

1.4.2 Calculations

1.5 SUSTAINABILITY SUBMITTALS

1.5.1 High Performance Sustainable Building (HPSB) Checklist

1.5.1.1 HPSB Checklist Submittals

1.5.2 Sustainability eNotebook

1.5.2.1 Sustainability eNotebook Format

1.5.2.2 Sustainability eNotebook Submittal Schedule

1.6 DOCUMENTATION REQUIREMENTS

1.6.1 Commissioning (Cx)

1.6.2 Energy Efficient Products

1.6.3 Building-level Power Metering

1.6.3.1 Construction Submittal Documentation

1.6.4 Indoor Water Use

1.6.5 Indoor Water Metering

1.6.5.1 Construction Submittal Documentation

1.6.6 Moisture Control

1.6.6.1 Construction Submittal Documentation

1.6.7 Reduce Volatile Organic Compounds (VOC) (Low-Emitting

Materials)

1.6.8 Indoor Air Quality During Construction

1.6.9 Recycled Content

1.6.9.1 Construction Submittal Documentation

1.6.10 Bio-Based Products

1.6.11 Waste Material Management (Recycling – Construction)

1.6.12 Additional Sustainability Requirements

1.6.12.1 Third Party Certification (TPC) Documentation

1.6.12.1.1 TPC Registration

1.6.12.2 Third Party Certification (TPC) Documentation

1.6.12.2.1 TPC Already Registered

1.6.12.2.2 TPC Management and Certification

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 SUSTAINABILITY COORDINATION

3.2 THIRD PARTY CERTIFICATION CERTIFICATE, ASSESSMENT, OR VALIDATION

AND COMPLIANCE REPORT

SECTION 01 33 29 Page 1Am #0001

3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING

MATERIALS) REQUIREMENTS

-- End of Section Table of Contents --

SECTION 01 33 29 Page 2Am #0001

SECTION 01 33 29

SUSTAINABILITY REQUIREMENTS AND REPORTING

02/21

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

COUNCIL ON ENVIRONMENTAL QUALITY (CEQ) (WHITE HOUSE)

HPSB Guiding Principles (2016) Guiding Principles for Sustainable Federal Buildings and Determining Compliance with the Guiding Principles for Sustainable Federal Buildings

GREEN BUILDING INITIATIVE (GBI)

GBI DOD GP Compliance (2017) GBI Department of Defense Guiding Principles Compliance Program for New Construction

INTERNATIONAL CODE COUNCIL (ICC)

ICC IgCC (2021) International Green Construction Code

U.S. DEPARTMENT OF AGRICULTURE (USDA)

FSRIA 9002 Farm Security and Rural Investment Act Section 9002 (USDA BioPreferred Program)

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 1-200-02 (2020; with Change 1, 2020; Change 2, 2022) High Performance and Sustainable Building Requirements

UFC 3-600-01 (2016; with Change 6, 2021) Fire Protection Engineering for Facilities

U.S. DEPARTMENT OF ENERGY (DOE)

Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials

SECTION 01 33 29 Page 3Am #0001

1.2 SUMMARY

This section includes requirements for Sustainability documentation and reporting submittals per the federally mandated High Performance and Sustainable Building (HPSB) or HPSB "Guiding Principles" (GP), and Third Party Certification (TPC) requirements, in accordance with UFC 1-200-02 High Performance and Sustainable Building Requirements, and other identified requirements.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Preliminary High Performance and Sustainable Building Checklist; G

Sustainability Action Plan; G

Preliminary Sustainability eNotebook; G

SD-11 Closeout Submittals

Final High Performance and Sustainable Building Checklist; G

Final Sustainability eNotebook; G

Amended Final Sustainability eNotebook; G

Amended Final High Performance and Sustainable Building Checklist;

G

Third Party Certification Certificate, Assessment, or Validation and Compliance Report; G

[*Am-1]The Sustainability eNotebook shall include all relevant documentation pertaining to HPSB and TPC compliance including, but not limited to:

Commissioning Reports Energy Efficient Products Indoor Water Use Low Emitting Materials Bio-Based Products Recycled Content Certification of EPA Designated Items Certification of USDA Designated Items Construction Waste Management Sustainability Submittals[**Am-1]

1.4 GUIDING PRINCIPLES VALIDATION (GPV)

Provide the following sustainability activities and documentation to verify achievement of HPSB Guiding Principles Validation (GPV):

SECTION 01 33 29 Page 4Am #0001

[*Am-1]The Sustainability eNotebook shall include all relevant documentation pertaining to HPSB and TPC compliance including, but not limited to:

Commissioning Reports Energy Efficient Products Indoor Water Use Low Emitting Materials Bio-Based Products Recycled Content Certification of EPA Designated Items Certification of USDA Designated Items Construction Waste Management Sustainability Submittals[**Am-1]

a. Analysis of each Guiding Principle Requirement and how project complies. Include final government approved narrative(s) in the HPSB Checklist submittal. Multiple checklists indicate multiple buildings that require individual HPSB Checklist tracking.

b. No changes to the HPSB Checklist are allowed without approval from the Contracting Officer, in accordance with Section 01 33 00 SUBMITTAL REQUIREMENTS. Immediately bring to the attention of the Contracting Officer any project changes that impact meeting the approved HPSB Guiding Principles Requirements for this project. Demonstrate the change will not increase the life-cycle cost and maintains or improves the building performance.

c. Documentation of all work required to incorporate the applicable HPSB Guiding Principles requirements indicated on the HPSB Checklist and in this contract.

d. Sustainability Action Plan.

e. Construction related documentation for the project Sustainability eNotebook and keep updated with regularly-scheduled Construction Quality Control Meetings. Include construction related documentation containing the following components:

(1) HPSB Checklist(s)

(2) Sustainability Action Plan

(3) Documentation illustrating HPSB Guiding Principles Requirements compliance

1.4.1 Sustainability Action Plan

Include the following information in the Sustainability Action Plan:

a. Analysis of each HPSB Guiding Principles Requirement and how project will comply. Final government approved narrative(s) must be included in the HPSB Checklist submittal.

b. Name and contact information for: Contractor's Point of Contact (POC) ensuring sustainability goals are accomplished and documentation is assembled. For TPC that include on-site visit by third party representative, provide list of required attendees.

c. Indoor Air Quality plan.

1.4.2 Calculations

Provide all calculations, product data, labels and product certifications required in this specification to demonstrate compliance with the HPSB Guiding Principles Requirements.

1.5 SUSTAINABILITY SUBMITTALS

Provide HPSB Checklist and other documentation in the Sustainability eNotebook to indicate compliance with the sustainability requirements of the project.

SECTION 01 33 29 Page 5Am #0001

1.5.1 High Performance Sustainable Building (HPSB) Checklist

Provide construction documentation that provides proof of, and supports compliance with, the completed HPSB Checklist.

1.5.1.1 HPSB Checklist Submittals

Submit updated HPSB Checklist, Attachment 1 at the end of this section, with each Sustainability eNotebook submittal. Include the final HPSB Checklist(s) with the interim DD1354 Real Property Record Submittal.

1.5.2 Sustainability eNotebook

The Sustainability eNotebook is an electronic organizational file that serves as a repository for all required sustainability submittals. To support documentation of compliance with an approved HPSB and TPC checklist Attachment 2 at the end of this section, provide and maintain a comprehensive and current Sustainability eNotebook. Include all required data in Sustainability eNotebook, to support full compliance with the HPSB Guiding Principles Requirements, including:

a. HPSB checklist

b. Sustainability Action Plan

c. Calculations

d. Labels

e. Certifications, assessments, or validations and compliance report

f. TPC documentation required in paragraph THIRD PARTY CERTIFICATION

(TPC).

1.5.2.1 Sustainability eNotebook Format

Provide Sustainability eNotebook in the form of an Adobe PDF file;

bookmark each HPSB Guiding Principles Requirement, TPC requirement, and sub-bookmark at each document. Match format to HPSB Guiding Principles numbering system indicated herein. Maintain up-to-date information, such as spreadsheets, templates, with each current submittals. For TPC projects, provide a second Table of Contents using TPC numbering system, for maintaining documentation unique to TPC.

Contracting Officer may deduct from the monthly progress payment accordingly if Sustainability eNotebook information is not current and on track per project goals.

1.5.2.2 Sustainability eNotebook Submittal Schedule

Provide Sustainability eNotebook Submittals at the following milestones of the project:

a. Preliminary Sustainability eNotebook

Submit preliminary Sustainability eNotebook with updated Preliminary High Performance and Sustainable Building Checklist and TPC checklist at the first post award meeting.

SECTION 01 33 29 Page 6Am #0001

b. Construction Quality Control Meetings.

Provide up-to-date GP and TPC documentation in the Sustainability eNotebook and TPC Online tool for each meeting.

c. Final Sustainability eNotebook

Submit updated Sustainability eNotebook with updated Final High Performance and Sustainable Building Checklist with TPC Checklist at Beneficial Occupancy Date (BOD). Final progress payment retainage may be held by Contracting Officer until Final Sustainability construction phase documentation is complete.

d. Amended Final Sustainability eNotebook

Amend and resubmit the Amended Final Sustainability eNotebook with Amended Final High Performance and Sustainable Building Checklist and amended TPC Checklist, to include post-occupancy corrections, updates, and requirements. Final progress payment retainage may be held by Contracting Officer until amended final sustainability documentation is complete. Submit the Amended Final Sustainability eNotebook Submittal on DVDs to the Contracting Officer no later than 30 days after final GP, TPC determination.

1.6 DOCUMENTATION REQUIREMENTS

a. Incorporate each of the following HPSB Guiding Principles requirements into project and provide documentation that proves compliance with each listed requirement. Items below are organized by HPSB Guiding Principles. For life-cycle cost analysis requirements, one document with all analyses is acceptable, with Contracting Officer approval.

b. For each of the following paragraphs that require the use of products listed on Government-required websites, provide documentation of the process used to select products, or process used to determine why listed products do not meet project performance requirements.

1.6.1 Commissioning (Cx)

Develop and incorporate Commissioning requirements into the documents, in accordance with Section 01 91 00.15 10 TOTAL BUILDING COMMISSIONING.

1.6.2 Energy Efficient Products

Provide only energy-using products that are Energy Star rated or have Federal Energy Management Program (FEMP) recommended efficiency. Where Energy Star or FEMP recommendations have not been established, provide most efficient products that are life-cycle cost-effective. Provide only energy using products that meet FEMP requirements for low standby power consumption. Energy efficient products can be found at:

https://www.energy.gov/eere/femp/federal-energy-management-program and http://www.energystar.gov/.

For construction submittal documentation, provide proof that product is labeled energy efficient and complies with the cited requirements.

SECTION 01 33 29 Page 7Am #0001

1.6.3 Building-level Power Metering

Provide building-level meters for electricity, natural gas, and steam where applicable.

1.6.3.1 Construction Submittal Documentation

Provide manufacturer's data validating compatibility with base-wide system and component advanced meter requirements.

1.6.4 Indoor Water Use

Provide Construction Documentation proof that fixtures are labeled EPA WaterSense, for products available with EPA WaterSense labeling; for all other fixtures, proof they comply with EPA WaterSense efficiency requirements.

1.6.5 Indoor Water Metering

Provide building-level meters for potable water use. Provide the requirements cited in the following paragraphs:

1.6.5.1 Construction Submittal Documentation

Provide manufacturer's data validating compatibility with base-wide system and component advanced meter requirements.

1.6.6 Moisture Control

Provide the following:

1.6.6.1 Construction Submittal Documentation

Ensure construction materials are separated and protected in accordance with other sections in this contract document, with adequate humidity controls during construction. In accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA, includes plan for ongoing building moisture control.

Coordinate with the moisture control requirements of Section 01 45 00.00 10

QUALITY CONTROL.

1.6.7 Reduce Volatile Organic Compounds (VOC) (Low-Emitting Materials)

Meet the requirements of Table 3-1 at the end of this specification.

For Construction submittal documentation, provide certifications or labels that demonstrate compliance with cited requirements, based on the attached

TABLE 3-1.

1.6.8 Indoor Air Quality During Construction

Prior to construction, create indoor air quality plan. Develop and implement an IAQ construction management plan during construction and flush building air before occupancy.

For new construction and for renovation of unoccupied existing buildings, meet the requirements of ICC IgCC 1001.3.1.5 (10.3.1.4) Indoor Air Quality (IAQ) Construction Management.

SECTION 01 33 29 Page 8Am #0001

Provide documentation showing that after construction ends and prior to occupancy, HVAC filters were replaced and building air was flushed out in accordance with the cited standard.

1.6.9 Recycled Content

Comply with 40 CFR 247. Refer to:

https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for assistance identifying products cited in 40 CFR 247. Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation and must meet performance requirements.

1.6.9.1 Construction Submittal Documentation

a. Provide manufacturers' documents stating the recycled content by material, or written justification for claiming one of the exceptions allowed on the cited website.

b. Substitutions: Submit for Government approval for proposed alternative products or systems that provide equivalent performance and appearance and have greater contribution to project recycled content requirements. For all such proposed substitutions, submit with the Sustainability Action Plan accompanied by product data demonstrating equivalence.

[*Am-1]c. In order to complete compliance with FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items and FAR 52-223-17 Affirmative Procurement of EPA designated items in Service and Construction Contracts, submit the Certification of EPA Designated Items as part of the Final Sustainability eNotebook.

Include on the certification form the following information: project name, project number, Contractor name, license number, Contractor address, and certification. The certification will read as follows and be signed and dated by the Contractor. "I hereby certify the information provided herein is accurate and that the requisition/procurement of all materials listed on this form comply with current EPA standards for recycled/recovered materials content.

The following exemptions may apply to the non-procurement of recycled/recovered content materials:

(1) The product does not meet appropriate performance standards;

(2) The product is not available within a reasonable time frame;

(3) The product is not available competitively (from two or more sources);

(4) The product is only available at an unreasonable price (compared with a comparable non-recycled content product)."

Record each product used in the project that has a requirement or option of containing recycled content, noting total price, total value of post-industrial recycled content, total value of post-consumer recycled content, exemptions (1), (2), (3), or (4), as indicated, and comments.

Recycled content values may be determined by weight or volume percent, but must be consistent throughout.[**Am-1]

SECTION 01 33 29 Page 9Am #0001

[*Am-1]c. In order to complete compliance with FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items and FAR 52-223-17 Affirmative Procurement of EPA designated items in Service and Construction Contracts, submit the Certification of EPA Designated Items as part of the Final Sustainability eNotebook.

Include on the certification form the following information: project name, project number, Contractor name, license number, Contractor address, and certification. The certification will read as follows and be signed and dated by the Contractor. "I hereby certify the information provided herein is accurate and that the requisition/procurement of all materials listed on this form comply with current EPA standards for recycled/recovered materials content.

The following exemptions may apply to the non-procurement of recycled/recovered content materials:

(1) The product does not meet appropriate performance standards;

(2) The product is not available within a reasonable time frame;

(3) The product is not available competitively (from two or more sources);

(4) The product is only available at an unreasonable price (compared with a comparable non-recycled content product)."

Record each product used in the project that has a requirement or option of containing recycled content, noting total price, total value of post-industrial recycled content, total value of post-consumer recycled content, exemptions (1), (2), (3), or (4), as indicated, and comments.

Recycled content values may be determined by weight or volume percent, but must be consistent throughout.[**Am-1]

1.6.10 Bio-Based Products

Provide products and materials composed of the highest percentage of bio-based materials (including rapidly renewable resources and certified sustainably harvested products), consistent with FSRIA 9002 USDA BioPreferred Program, to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user and when available at a reasonable cost. Use only supplies and materials of a type and quality that conform to applicable specifications and standards.

Comply with FSRIA 9002 USDA BioPreferred Program. Refer to www.biopreferred.gov for the product categories and BioPreferred Catalog.

Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation and must meet performance requirements.

Provide the following documentation:

a. USDA BioPreferred label for each product; for bio-based products used on project but not listed with BioPreferred program, provide bio-based content and percentage.

[*Am-1]b. In order to complete compliance with FAR 52.223-1 Biobased Product Certification, refer to submittal requirement for biobased products in FSRIA 9002.[**Am-1]

1.6.11 Waste Material Management (Recycling – Construction)

Divert demolition and construction debris in accordance with Section

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.

1.6.12 Additional Sustainability Requirements

Provide the additional sustainability requirements cited in this paragraph.

1.6.12.1 Third Party Certification (TPC) Documentation

Third Party Certification certificate, assessment, or validation, and compliance report requirements are in addition to all requirements under header above GUIDING PRINCIPLES VALIDATION (GPV).

1.6.12.1.1 TPC Registration

This project has been designed for, and must be constructed to achieve GBI DOD GP Compliance. Project is already registered with the TPC Organization. Provide construction related sustainability documentation, in the format required by the TPC Organization, to the Contracting Officer for approval, and for final approval by the TPC organization. Third Party Certification is met when Government receives TPC organization certificate, assessment, or validation and compliance report. Execute the following:

a. Refer to TPC Checklist at the end of this specification section.

(Multiple checklists indicate multiple buildings that require TPC.)

b. Immediately bring to the attention of the Contracting Officer any project changes that impact meeting the approved TPC Requirements for this project. Demonstrate the change will not increase the life-cycle cost and maintains or improves the building performance.

SECTION 01 33 29 Page 10Am #0001

[*Am-1]b. In order to complete compliance with FAR 52.223-1 Biobased Product Certification, refer to submittal requirement for biobased products in FSRIA 9002.[**Am-1]

c. Complete all work required to incorporate the applicable TPC Requirements.

d. Maintain the construction related information in the Sustainability eNotebook pertaining to additions and changes to the approved sustainability requirements. Maintain the Sustainability eNotebook in electronic format. For more explanation, refer to paragraph SUSTAINABILITY eNOTEBOOK. Provide the following components in the Sustainability eNotebook, in addition to the GPV components above:

(1) TPC Checklist

(2) Provide construction documentation required to achieve third party certification

e. Provide the following information in the Sustainability Action Plan.

Provide this TPC information in addition to the GPV Action Plan items above:

(1) Planned method to achieve each TPC requirement.

(2) For each TPC requirement that is attempted but not achieved, provide narrative explaining how mission or activity precludes achieving specific sustainability requirement or goal. Provide analysis of particular requirement and level to which project is able to comply.

(3) Provide name and contact information for: Sustainability Point of Contact (POC) and other names of sustainability professionals responsible for ensuring TPC sustainability goals are accomplished and documentation is assembled. Sustainability POCs are also responsible for ensuring GPV required in paragraph GUIDING PRINCIPLES VALIDATION (GPV) above.

f. Bear all costs associated with construction changes that affect sustainability design requirements, constructing, demonstrating, and documenting that project complies with approved TPC requirements, including but not limited to:

(1) TPC coordination with Government's AE and other consultants, TPC website requirements, and management for construction related documentation.

(2) Construction work required to incorporate TPC requirements.

(3) Submittals required to demonstrate compliance with Government approved TPC checklists.

(4) Documentation illustrating compliance with TPC requirements and additional documentation required by the TPC.

g. Provide all calculations, product data, and certifications, assessments, or validations required in this contract to demonstrate compliance with the TPC Requirements of this section.

1.6.12.2 Third Party Certification (TPC) Documentation

Third Party Certification certificate, assessment, or validation, and compliance report requirements are in addition to all requirements under

SECTION 01 33 29 Page 11Am #0001 header above GUIDING PRINCIPLES VALIDATION (GPV).

1.6.12.2.1 TPC Already Registered

Project is already registered with TPC organization to achieve GBI DOD GP Compliance. When applicable, request TPC online access turnover from Government. Manage and provide all documentation for requirements of TPC and obtain Final Certification or validation. Third Party Certification is met when Government receives TPC organization certificate, assessment, or validation and compliance report.

1.6.12.2.2 TPC Management and Certification

Execute the following TPC Certification, assessment, or validation requirements:

a. Refer to TPC Checklist at the end of this specification section.

(Multiple checklists indicate multiple buildings that require TPC.)

b. Immediately bring to the attention of the Contracting Officer any project changes that impact meeting the approved TPC Requirements for this project. Demonstrate the change will not increase the life-cycle cost and maintains or improves the building performance.

c. Complete all work required to incorporate the applicable TPC Requirements.

d. Maintain the construction related information in the Sustainability eNotebook pertaining to additions and changes to the approved sustainability requirements. When construction changes are made that affect design sustainability requirements, provide all required updates to affected design requirements and update in the Sustainability eNotebook. Maintain the Sustainability eNotebook in electronic format. For more explanation, refer to paragraph SUSTAINABILITY eNOTEBOOK. Provide the following components in the Sustainability eNotebook, in addition to the GPV components above:

(1) TPC Checklist

(2) Completed TPC forms. Transmit by the method required by the TPC organization.

(3) Copy of all correspondence with the TPC organization including proof of TPC registration

(4) Documentation illustrating compliance with TPC requirements and additional documentation as requested by the TPC

(5) TPC Award Certificate, assessment, or validation and compliance report.

e. Provide the following information in the Sustainability Action Plan.

Provide this TPC information in addition to the Sustainability Action Plan items above:

(1) Planned method to achieve each TPC requirement.

(2) For each TPC requirement that is attempted but not achieved, provide narrative explaining how mission or activity precludes

SECTION 01 33 29 Page 12Am #0001 achieving specific sustainability requirement or goal. Provide analysis of particular requirement and level to which project is able to comply.

(3) Provide name and contact information for: Sustainability point of contact (POC) and other names of sustainability professionals responsible for ensuring TPC sustainability goals are accomplished and documentation is assembled. Sustainability POCs are also responsible for ensuring GPV required in paragraph GUIDING PRINCIPLES VALIDATION (GPV) above.

f. Bear all costs associated with construction changes that affect sustainability design requirements, constructing, demonstrating, and documenting that project complies with approved TPC requirements, including but not limited to:

(1) Final TPC review, certification, assessment, or validation fees.

(2) Online (or offline with secure facilities) TPC management and documentation.

(3) Obtaining TPC certification or validation based on Government-approved sustainability goals.

(4) Construction work required to incorporate TPC requirements.

(5) Submittals required to demonstrate compliance with Government approved TPC checklists.

g. Provide all calculations, product data, and certifications, assessments, or validations required in this specification to demonstrate compliance with the TPC Requirements.

h. Provide all TPC management and documentation. Transmit TPC requirements by the method required by TPC organization.

i. Provide all required responses to third party organization.

j. Facilitate and participate in required TPC site visit. Coordinate with the Contract Officer to determine participating team members.

Include Commissioning provider on applicable projects.

k. Provide TPC Certificate, assessment, or validation. Provide TPC compliance report that includes level achieved and reasons for non-compliance or not applicable elements. Use format below to create the Certificate, assessment or validation, compliance report, and Letter of Congratulations (when provided). Forward to parties designated by Contracting Officer:

(1) Certificate, Assessment or Validation:

Project Title, first line: P-(X); Form DD1391 Project Name).

Project Title, second line: UIC (Installation code)

(2) Letter Congratulations (when provided):

Address letter to Facility's Installation Commander Name. Address the letter to an individual person.

SECTION 01 33 29 Page 13Am #0001

(3) Compliance Report:

Title page must cite Project title: P-(X); (1391 Project Name);

Final Building Name if known; UIC (installation code); Owner Service; User organization if known; date of compliance.

Include TPC scoresheet if applicable.

l. Once Final Certification is achieved, turn over Administrative rights to online TPC to the Base Civil Engineer or designee, contact information provided by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 SUSTAINABILITY COORDINATION

Provide sustainability focus and coordination at all meetings to achieve sustainability goals. Coordinate meeting requirements with other UFGS Sections meeting requirements in this project. Ensure the designated TPC accredited sustainability professional responsible for GP and TPC documentation participates in these meetings to coordinate documentation completion. Review GP and TPC sustainability requirements, HPSB Checklist and TPC documentation, Sustainability Action Plan, and completeness status of Sustainability eNotebook, and TPC status at the following meetings:

a. Pre-Construction Conference

b. Construction Quality Control Meetings

c. Facility Turnover Meetings

Conduct review no later than 60 days before final turnover and identify any outstanding issues that affect correct completion of all documentation and final TPC certification, assessment or validation, and actions that will achieve requirements. Conduct corrective actions prior to turnover, to ensure all requirements are achieved.

3.2 THIRD PARTY CERTIFICATION CERTIFICATE, ASSESSMENT, OR VALIDATION AND

COMPLIANCE REPORT

Finalize the process requirements and obtain the TPC Certificate, assessment, or validation, and compliance report, indicating completion of the project's sustainability goals. Include TPC compliance report with final TPC scoresheet as applicable.

SECTION 01 33 29 Page 14Am #0001

3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING MATERIALS)

REQUIREMENTS

TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Adhesives and Sealants

CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Adhesives (carpet, resilient, wood flooring; base cove; ceramic tile; drywall and panel; primers) Sealants (acoustical;

firestop; HVAC Air duct; primers) Caulks

SCAQMD Rule 1168 (Use "other" category for HVAC duct sealant) (for firestop adhesive, UFC 3-600-01 overrides conflicting requirements)

Aerosol adhesives Section 3 of Green Seal Standard GS-36 (except:

cleaners, solvent cements, and primers used with plastic piping and conduit in plumbing, fire suppression, and electrical systems; HVAC air duct sealants when the application space air temp is less than 40 F (4.5 C).

SECTION 01 33 29 Page 15Am #0001

TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Flat and nonflat, nonflat high-gloss, specialty, basement specialty, fire-resistive, floor, low-solids, rust preventative, wood, reflective wall coatings;

concrete/masonry sealers; primers;

sealers;

undercoaters;

shellacs (clear and opaque);

stains; varnishes;

conjugated oil varnish; lacquer;

clear brushing lacquer

Green Seal Standard GS-11

SECTION 01 33 29 Page 16Am #0001

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Concrete curing compounds; dry fog, faux finishing, graphic arts (sign paints), industrial maintenance, mastic texture, metallic pigmented, multicolor, recycled coatings;

pretreatment wash primers, reactive penetrating sealers; specialty primers, wood preservatives, and zinc primers

California Air Resources Board (CARB) Suggested Control Measure for Architectural Coatings or SCAQMD Rule 1113r

Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or High-temperature coatings; stone consolidants;

swimming-pool coatings; tub- and tile-refining coatings; and waterproofing membranes

California Air Resources Board (CARB) Suggested Control Measure for Architectural Coatings

SECTION 01 33 29 Page 17Am #0001

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Floor Covering Materials

For carpet, all locations:

CDPH/EHLB/Standard Method V1.1 (California Section 01350) or label for Section 9 of CDPH/EHLB/Standard Method V1.1 (California Section 01350) none none

Insulation CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) none none

SECTION 01 33 29 Page 18Am #0001

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Composite Wood, Wood Structural Panel, and Agrifiber Products, no added urea-formaldehyde resins including laminating adhesives for composite wood and agrifiber assemblies -particleboard, medium density fiberboard (MDF), wheatboard, strawboard, panel substrates, door cores

Third-party certification (approved by CARB) of California Air Resource Board's (CARB) regulation, Airborne Toxic Control Measure to Reduce Formaldehyde Emissions from Composite Wood Products or none CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) (except:

Structural panel components such as plywood, particle board, wafer board, and oriented strand board identified as "EXPOSURE 1," "EXTERIOR," or

"HUD-APPROVED"

are considered acceptable for interior use.)

Office Furniture Systems and Seating installed prior to occupancy

ANSI/BIFMA X7.1

ANSI/BIFMA X7.1:

(95-percent of installed office furniture system workstations and seating units)

Section 7.6.2 of ANSI/BIFMA e3 (50-percent of office furniture system workstations and seating units) none none

SECTION 01 33 29 Page 19Am #0001

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Ceiling and Wall assemblies and systems including:

acoustical treatments;

ceiling panels and tiles; tackable wall panels and coverings; wall coverings; wall and ceiling paneling and planking

CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) none none

-- End of Section --

SECTION 01 33 29 Page 20Am #0001

Air Force Sustainability Requirements Scoresheet HPSB COMPLIANCE (Updated Jan 2017) * required entry

General Information FXBMTBD Project ID (e.g. ABCD12345) 000000000000000000 Real Property Unique ID (RPUID) B7504 Facility Number B-21:Weapons Loader Training Facility (WLT #1) Building Name

Ellsworth AFB Installation Rapid City City SD State Yes CONUS

ACC MAJCOM

USACE Construction Agent TBD AFCEC DM/CM (Last Name, First Name)

$15,000,000.00 PA

35,434 Building Size (SF) 2023 Program Year (FY####) Design Complete Project Phase 08/06/21 Design Started (MM/DD/YY)

04/28/23 BOD (MM/DD/YY)

GBI GP Guiding Principles Compliance Certification Method

100% HPSB Compliant 21% Energy Efficiency Achieved (% below ANSI/ASHRAE/IESNA

Standard 90.1-2013) 2017V1 Scoresheet version

Federal Requirements

Complete

03/06/2023 Date Project Registered (MM/DD/YY)

Date Project Certified (MM/DD/YY)

4/25/2023 1 Am #0001 01 33 29AT1 Page 1 of 4

RoskelA Text Box Attachment 1

Color Coding: See Instructions Tab for more detail Yes or N/A No Recommended not Required

90.1-2013 HPSB I: Employ Integrated Design Principles (UFC 1-200-02 para 2-2) Total Points 2 Possible Points 2

Yes HPSB I.1 Integrated Design 1 Yes HPSB I.2 Commissioning 1

HPSB II: Optimize Energy Performance (UFC 1-200-02 para 2-3) Total Points 5 Possible Points 5

N/A HPSB II.1 Energy Efficiency 1

N/A Reduce energy use 30% below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, or if not - achieve maximum energy efficiency that is lifecycle cost effective

20.7% Insert percentage below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, in terms of energy use (e.g. 32)

TBD Insert building energy intensity (kBtu/yr-sqft) calculated IAW 10 CFR

N/A Roof Attributes (Recommended) Select roof types (Check below)

Energy Efficient Products 1 Yes

N/A HPSB II.2 On-site Renewable Energy 1

N/A Installed renewable energy elements or projects were not lifecycle cost effective Renewable energy types (check below)

0.0 Insert generation capacity (kW)

0.0% Insert percentage of total building

N/A HPSB II.3 On-site Renewable Energy - Solar Hot Water Heater System 1

N/A Installed solar hot water heater system or found installation not lifecycle cost effective

0.0 Insert generation capacity (MMBtu/yr)

0.0% Insert percentage of demand

Yes HPSB II.4 Metering 1 Yes Electric Metering: Select N/A if no service Yes Natural Gas Metering: Select N/A if no service N/A Steam Metering: Select N/A if no service

HPSB III: Protect and Conserve Water (UFC 1-200-02 para 2-4) Total Points 6 Possible Points 6

Yes HPSB III.1 Indoor Water 1 Yes Indoor Water Metering 1 N/A HPSB III.2 Outdoor Water 1 N/A Outdoor Water Metering 1 N/A HPSB III.3 Alternative Water 1 N/A HPSB III.4 Stormwater Management (LID Documentation per UFC 3-210-10) 1

0.0 Change in Impervious Area (SF)

$0.00 Pre-Award Cost Estimate ($)

N/A Project addressed EISA 438 EISA Technical Constraints

0.0%

Percent Increase in Stormwater Runoff for 95 Percentile Storm (%) -or- Percent Increase in Stormwater Runoff from continuous simulation model, published data, studies, or other established tools (Reference UFC 3-210-10 Figure 2-1 Implementation of EISA Section 438)

Off-Site LID Features Locations 0 Integrated Management Practices Employed

Drop-Down Box No Entry Required Custom Entry

Solar PV

Solar CP

Solar Thermal Electric

Geothermal

GSHP Wind

Hydro Waste to Energy

Renewables were not lifecycle cost effective

Cool roof

Green roof

Solar electric

Solar thermal

Solar Passive

Retaining stormwater impact receving water flow

Site too small to infiltrate significant volume

State or local restrict water harvesting

Shallow bedrock, contaminated soil, high ground water table, underground utilities Non-potable water demand to small Structural, plumbing, and other mods not feasible

Soil infiltration capacity limited

State or local restrict use of green Other

4/25/2023 2 Am #0001 01 33 29AT1 Page 2 of 4

$0.00 Final LID Construction Cost ($) 0 Post Construction Analysis (Name of DOR)

HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02 para 2-5) Total Points 8 Possible Points 8

Yes HPSB IV.1 Thermal Comfort 1 Yes HPSB IV.2 Ventilation 1 N/A HPSB IV.3 Daylighting 1 Yes HPSB IV.4 1 Yes HPSB IV.5 Low Emitting Materials 1 Yes HPSB IV.6 Protect Indoor Air Quality during Construction 1 Yes HPSB IV.7 Environmental Tobacco Smoke Control 1 Yes HPSB IV.8 Occupant Health and Wellness 1

HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02 para 2-6) Total Points 5 Possible Points 5

Yes HPSB V.1 Recycled Content 1 Yes HPSB V.2 Biologically-based Products 1 Yes HPSB V.3 Ozone Depleting Substances 1 Yes HPSB V.4 Waste and Materials Management - Recycling 1 Yes HPSB V.5 Waste and Materials Management - Divert 60% from Disposal 1

Yes 60% or greater diverted 60.0% Insert percentage diverted from landfill

HPSB VI: Address Climate Change Risk (UFC 1-200-02 para 2-7) Total Points 1 Possible Points 1

Yes HPSB VI.1 Address Climate Change Risk 1 Possible Points 27

27 Federal Requirements - Yes or N/A 0 Federal Requirements - No

100% Percentage of Federal Requirements Met

Moisture Control

Bio-Retention

Infiltration Trench

Soil Amendments

Dry Wells Inlet Pollution Removal Device

Permeable Pavement/Pavers

Filter Strips Grassed Swells

Rain Barrels/Cisterns

Tree Box Filters Vegetated Buffers Vegetated Roof

Other

4/25/2023 3 Am #0001 01 33 29AT1 Page 3 of 4

Federal Requirements for High Performance and Sustainable Buildings (HPSB) & UFC 1-200-02 Instructions: Provide a common or project specific justification for an element to be non-applicable, when completed, the Scoresheet tab will allow an N/A response.

Justification for Non-Applicable Answers Common Justification Project Specific Justification Complete?

HPSB I: Employ Integrated Design Principles (UFC 1-200-02, 2-2) HPSB I.1 Integrated Design Applicable HPSB I.2 Commissioning Applicable HPSB II: Optimize Energy Performance (UFC 1-200-02, 2-3) HPSB II.1 Energy Efficiency Mission preclusion / Scope of work Yes HPSB II.1 Energy Efficient Products Applicable

HPSB II.2 On-site Renewable Energy Mission Preclusion and Building/site issue Yes

HPSB II.3 On-site Renewable Energy - Solar Hot Water Heater System Not LCCE Yes HPSB II.4 Metering HPSB II.4 Electric Metering: Select N/A if no service Applicable HPSB II.4 Natural Gas Metering: Select N/A if no service Applicable HPSB II.4 Steam Metering: Select N/A if no service Location conditions Yes HPSB III: Protect and Conserve Water (UFC 1-200-02, 2-4) HPSB III.1 Indoor Water Applicable HPSB III.1 Indoor Water Metering: Select N/A if no service Applicable HPSB III.2 Outdoor Water Mission preclusion Yes HPSB III.2 Outdoor Water Metering: Select N/A if no service Mission preclusion Yes HPSB III.3 Alternative Water Location Conditions Yes HPSB III.4 Stormwater Management HPSB III.4 Project addressed EISA 438 Mission preclusion Yes HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02, 2-5) HPSB IV.1 Thermal Comfort Applicable HPSB IV.2 Ventilation Applicable HPSB IV.3 Daylighting Mission preclusion Yes HPSB IV.4 Moisture Control Applicable HPSB IV.5 Low Emitting Materials Applicable HPSB IV.6 Protect Indoor Air Quality during Construction Applicable HPSB IV.8 Occupant Health and Wellness Applicable HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02, 2-6) HPSB V.1 Recycled Content Applicable HPSB V.2 Biologically based products Applicable HPSB V.3 Ozone Depleting Substances Applicable HPSB V.4 Waste and Materials Management - Recycling Applicable HPSB V.5 Waste and Materials Management - Divert 60% from Disposal Applicable HPSB VI: Adress Climate Change Riskd (UFC 1-200-02, 2-7) HPSB VI.1 Address Climate Change Risk Applicable

Am #0001 01 33 29AT1 Page 4 of 4

DOD GPC NC Scoping Checklist v1.4 © 2015-2022 GREEN BUILDING INITIATIVE, INC. ALL RIGHTS RESERVED.

“the requirement is compliant to the greatest degree possible, based on LCCE (e.g., SDHW serves only 20% of water use, per LCCE); mission restriction (e.g., 24/7 operation);

location/regional restriction (e.g., availability of high-efficiency equipment service); or locale restriction (e.g., proximity of existing buildings restricts daylighting), or safety (example: building orientation restriction for anti-terrorism due to existing infrastructure), and is marked ‘Yes’ with justification.”

"Not Applicable" ("N/A") is to be used only when:

Mission precludes the element (e.g. facility mission prohibits the use of windows);

Location of installation restricts or precludes achievement of element (e.g. there is no local recycling);

Location conditions mean that the element is not part of the project (e.g. there is no meter for steam because there is no steam);

Safety (e.g. building orientation restriction for anti-terrorism due to existing infrastructure); or LCCA does not support any compliance with this requirement.

Unless otherwise noted, all line items must be indicated. If a choice has not been selected, include a note. The project's achievement from third-party assessment will not be negatively impacted as a result of indicating "N/A," or where LCCA supports partial compliance (with percentages) or no compliance to a requirement. The intent is for the project team to determine during the design stage if any of the Guiding Principles (UFC 1-200-02 requirements) are not applicable, and that the remaining requirements must be fully met including partial compliance with LCCA.

*Comprehensive replacement to a building includes significant opportunities for improvement in: energy and water efficiency (such as HVAC, lighting, building envelope, and other building components); indoor air quality, other requirements in UFC 1-200-02; and additions that are part of the comprehensive replacement.

Total cost for comprehensive replacement includes addition, operations and maintenance, sustainment, restoration, and modernization associated with an existing building comprehensive replacement.

To inquire about an existing building project, please contact GBI at (503) 274-0448 or info@thegbi.org to determine eligibility.

Answer Selections:

"Yes" means an element will be fully achieved, or highest resource efficiency achieved, with Life-Cycle Cost Analysis (LCCA) supporting documentation (when applicable).

Per UFC 1-200-02, “partially compliant” means:

Justification must be provided during third-party assessment for each element marked "N/A", including any LCCA supporting partial compliance (based on a percentage) or no compliance to a requirement.

Department of Defense Guiding Principles Compliance for

New Construction & Comprehensive Replacement Scoping Checklist

Instructions

This DOD GPC NC Scoping Checklist is for use during the planning stage to identify all goals for the project to meet the requirements set forth in UFC 1-200-02 High Performance and Sustainable Building Requirements and the Guiding Principles for Sustainable Federal Buildings.

Refer to UFC 1-200-02 for the full text of each element. After identifying requirements that are not applicable to the project (see Answer Selections below), the remaining elements must all be met, including partial compliance (with percentages) and non-applicables.

This DOD review is in alignment with UFC 1-200-02 for the purposes of this validation. "Guiding Principles" are met when the requirements of UFC 1-200-02 are met.

UFC Applicability UFC 1-200-02 High Performance and Sustainable Building Requirements is effective for all projects. To obtain the latest version of UFC 1-200-02, visit the Whole Building Design Guide's web page:

http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-02

Projects that have a delay - either planned or unintentional - of more than 18 months between design completion and the solicitation of offers for construction must be re-evaluated to determine if any design revision is necessary due to changes in criteria (including codes and standards) or site infrastructure (e.g. water supply for fire department vehicle access).

DOD GPC NC Program Applicability

GBI’s DOD GPC NC program applies to new construction and comprehensive replacement that require addition of Third Party Certification (TPC) (as described in UFC 1-200- 02, Table 1-1) per one of the following:

New building or stand-alone addition ≥10,000 GSF, with construction cost >$3M.

OR

Comprehensive replacement* in an existing building that is ≥10,000 GSF, with total cost >$3M, and 50% or more enhanced replacement cost (ERC). Note that all three thresholds must be met to require TPC for a comprehensive replacement project.

Am #0001 01 33 29AT2 Page 1 of 4

RoskelA Text Box Attachment 2

Link Yes

Link Yes

Link Yes

Link Yes

Link Yes

Link Yes

Link Yes

Link Yes

Link Yes

Link Not Applicable - Mission Preclusion and Building/site issue

Link Yes

Link Yes

Link Not Applicable - Mission Preclusion

Link Yes

Link Not Applicable - Air Force project

Link Not Applicable - Air Force project

Link Yes

Link Yes

Link Yes

Link Yes

Link Not Applicable - Air Force project

Link Not Applicable - Air Force project

Notes and Justifications

Partially Partially not Applicable - Mission Preclusion and Building/site issue

Notes and Justifications

Yes

Yes

Yes

Not Applicable Not Applicable - Site is already selected per the 1391

Yes

1.a.2 UFC 1-200-02: Integrated Planning

1.a.3 UFC 1-200-02: Evaluation for Design Strategies

1.a.4 UFC 1-200-02: Evaluation of the Site

1.a.5 UFC 1-200-02: Site Integration and Design of the Building i.a.1 UFC 1-200-02: Life-Cycle Cost Analysis (LCCA)

1 EMPLOY INTEGRATED DESIGN PRINCIPLES

1.a Integrated Design

1.a.1 UFC 1-200-02: Integrated Design i.a LCCA Format

UFGS 23 08 00.00 20 Commissioning of Mechanical [And Plumbing] Systems

UFGS 01 33 29 Sustainability Requirements and Reporting

UFGS 01 78 00 Closeout Submittals

UFGS 01 74 19 Construction Waste Management and Disposal

i. LIFE-CYCLE COST ANALYSIS (LCCA)

Army/USACE executed projects: UFGS 01 91 00.15 10 Total Building Commissioning

Navy/NAVFAC executed projects: UFGS 01 91 00.15 20 Total Building Commissioning

UFGS 01 78 23 Operation and Maintenance Data

ARMY/USACE executed projects: UFGS 01 45 00.00 10 Quality Control

Navy/NAVFAC executed projects: UFGS 01 45 00.00 20 Quality Control

UFC 3-440-01 Facility-Scale Renewable Energy Systems

UFC 3-530-01 Interior and Exterior Lighting Systems and…