B-21 WLT_RTA_Drawings_Vol 2 of 2_20230428.pdf

PDF 26 MB Posted

Attached to
B-21 Weapon Loader Training Facility Federal contract opportunity
Solicitation number
W9128F23R0012
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This solicitation requests proposals for the construction of the B-21 Weapon Loader Training Facility at Ellsworth Air Force Base in South Dakota. The solicitation will close on June 6, 2023 at 2:00 PM CST. Construction costs are estimated to be between $25-100 million. Interested parties must register in the System for Award Management and search for solicitation number W9128F23R0012 on the Contract Opportunities page to access the solicitation documents and submit any bidder inquiries through the ProjNet website. Proposals must address building a training facility for weapon loaders to support the B-21 bomber program. The solicitation is issued by the U.S. Army Corps of Engineers Omaha District on behalf of the Department of the Army.

View the file

Other files for this federal contract opportunity

Other files attached to B-21 Weapon Loader Training Facility, newest first.
File Type Posted
Am 0006 - B-21 WLT - 24 Jul 23.pdf PDF
Amendment 0005.pdf PDF
Am-0004_W9128F23R0012_Attachments.pdf PDF
Am 0004 - B-21 WLT - 13 Jun 23.pdf PDF
Am 0003 - B-21 WLT - 09 June 23.pdf PDF
Am-0003_W9128F23R0012_Attachments.pdf PDF
Am 0002 - 02 Jun 23.pdf PDF
Am-0002_W9128F23R0012_Attachments.pdf PDF
WLT Sign in.pdf PDF
Am 0001 - 24 May 23.pdf PDF
Am-0001_W9128F23R0012_Attachments.pdf PDF
B-21 WLT_RTA_Drawings_Vol 1of 2_20230428.pdf PDF
SPECS_W9128F23R0012.pdf PDF
Solicitation - B-21 WLT - W9128F23R0012.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS PROJECT WAS DESIGNED BY THE OMAHA DISTRICT OF THE US ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES

AND REGISTRATION DESIGNATION OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR

EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.

SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL OF DRAWINGS IN THE SET.

CHIEF,

ENGINEERING DIVISION, P.E.

DATE

PROJECT COORD.

SUBMITTED BY:

CADD

CHIEF: SECTION

PE

GEOT

SUBMITTED BY:

CHIEF: SECTION

PE

SUBMITTED BY:

CHIEF,

ENGINEERING DIVISION, P.E.

DATE

STRUCT

CHIEF: SECTION

PE

MECH

SUBMITTED BY:

CHIEF: SECTION

PE

SUBMITTED BY:

CHIEF,

ENGINEERING DIVISION, P.E.

DATE

ENVR

CHIEF: SECTION

PE

ELECT

SUBMITTED BY:

CHIEF: SECTION

PLA

SUBMITTED BY:

CHIEF, GEOTECHNICAL

ENGINEERING & SCIENCES BRANCH

DATE

CIVIL

CHIEF: SECTION

RA

SUBMITTED BY:

ARCH

CIVIL

ENGINEER OF RECORD:

STRUCTURAL

ENGINEER OF RECORD: ARCHITECT OF RECORD:

PLUMBING & MECHANICAL

ENGINEER OF RECORD:

FIRE PROTECTION

ENGINEER OF RECORD:

ELECTRICAL

ENGINEER OF RECORD:

A/E STAMPS

INTERIORS

DESIGNER OF RECORD:

COMMUNICATIONS

ENGINEER OF RECORD:

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T EUS Army Corps of Engineers ®

SOLICITATION NO.:

ISSUE DATE:

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

IC

T

O M

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D E

R

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

Jacobs Project No.: D3558802

ADVERTISEMENT - 100% DESIGN

N B

O Y

E R

M H

E M

M E

R

R Y

A W

C:\Users\Public\_Revit_Local_Models\2021\FXBM231802_ARCH_v21_natalie.boyer.rvt

4/24/2023 3:48:04 PM

G-001

C O

V E

R S

H E

E T

OMAHA DISTRICT

ELLSWORTH AIR FORCE BASE, SD

B21: WEAPONS LOADER TRAINING FACILITY (WLT #1)

W9128F23R0012

28 APRIL 2023

PROJECT NUMBER: FXBM231802, FY 2023

F X

B M

G

-0

VOLUME 2 OF 2

& SECURITY

KATHYRIYA H. KENNEDY

9824498244

05/21/2020 04/28/23

04-28-23

04-28-2023

04/28/2023

04/28/23

ABRAHAM ABEL AVALOS

OF TEX

A

S

S T

ATE

ALNOI

S

S E

F O

R P

EN

G

IN

E

E R

NSEDECI

L 114070

04/24/2023

SHEET INDEX - VOLUME I SHEET INDEX - VOLUME II

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

ADVERTISEMENT - 100% DESIGN

N B

O Y

E R

M H

E M

M E

R

R Y

A W

G-002

S H

E E

T I

N D

E X

F X

B M

G

-0

SHEET NO. SHEET NAME

ELECTRICAL

E-001 GENERAL NOTES AND LEGENDS

ED101 OVERALL DEMOLITION PLAN - LEVEL 01

ED111 OVERALL DEMOLITION PLAN - EQUIPMENT PLATFORM 01

ED601 DEMOLITION ONE LINE DIAGRAM

EG101a OVERALL GROUNDING PLAN - LEVEL 01 - BASE BID

EG101b OVERALL GROUNDING PLAN - LEVEL 01 - BID OPTION

EP101 OVERALL POWER PLAN - LEVEL 01

EP102 PARTIAL POWER PLAN - LEVEL 01 - AREA A

EP103a PARTIAL POWER PLAN - LEVEL 01 - AREA B - BASE BID

EP103b PARTIAL POWER PLAN - LEVEL 01 - AREA B - BID OPTION

EP111 OVERALL POWER PLAN - EQUIPMENT PLATFORM 01

EP121 OVERALL POWER PLAN - EQUIPMENT PLATFORM 02

EP152a PARTIAL EQUIPMENT PLAN - LEVEL 01 - AREA A - BASE BID

EP152b PARTIAL EQUIPMENT PLAN - LEVEL 01 - AREA A - BID OPTION

EP153a PARTIAL EQUIPMENT PLAN - LEVEL 01 - AREA B - BASE BID

EP153b PARTIAL EQUIPMENT PLAN - LEVEL 01 - AREA B - BID OPTION

EP501 DETAILS

EP502 DETAILS

EP601 EQUIPMENT SCHEDULE

EP610 PANEL SCHEDULES

EP611 PANEL SCHEDULES

EP612 PANEL SCHEDULES

EP613 PANEL SCHEDULES

EP614 PANEL SCHEDULES

EL101 OVERALL LIGHTING PLAN - LEVEL 01

EL102 PARTIAL LIGHTING PLAN - LEVEL 01 - AREA A

EL103a PARTIAL LIGHTING PLAN - LEVEL 01 - AREA B - BASE BID

EL103b PARTIAL LIGHTING PLAN - LEVEL 01 - AREA B - BID OPTION

EL104 PARTIAL LIGHTING PLAN - LEVEL 01 - AREA C

EL105 PARTIAL LIGHTING PLAN - LEVEL 01 - AREA D

EL111 OVERALL LIGHTING PLAN - EQUIPMENT PLATFORM 01

EL121 OVERALL LIGHTING PLAN - EQUIPMENT PLATFORM 02

EL131 OVERALL LIGHTING PLAN - PLATFORM 03

EL132 PARTIAL LIGHTING PLAN - PLATFORM 03 - AREA A

EL133a PARTIAL LIGHTING PLAN - PLATFORM 03 - AREA B - BASE BID

EL133b PARTIAL LIGHTING PLAN - PLATFORM 03 - AREA B - BID OPTION

EL501 DETAILS

EL502 DETAILS

EL503 DETAILS

EL601 LUMINAIRE SCHEDULE

E-401 ENLARGED PLANS

E-402 ENLARGED PLANS

E-403 ENLARGED PLANS

E-404 ENLARGED PLANS

E-405 ENLARGED PLANS

E-601 ONE LINE DIAGRAM

E-602 GROUNDING RISER DIAGRAM

COMMUNICATIONS

T-001 LEGENDS, NOTES, AND ABBREVIATIONS

T-101 OVERALL TELECOMMUNICATIONS PLAN- LEVEL 01

T-102 PARTIAL TELECOMMUNICATIONS PLAN - LEVEL 01 - AREA A

T-103a PARTIAL TELECOMMUNICATIONS PLAN - LEVEL 01 - AREA B

T-103b PARTIAL TELECOMMUNICATIONS PLAN - LEVEL 01 - AREA B - BID

OPTION

T-201 CABINET ELEVATIONS

T-202 CABINET ELEVATIONS

T-401 ENLARGED PLANS

T-501 DETAILS

T-502 DETAILS

T-503 DETAILS

T-504 DETAILS

T-505 DETAILS

T-601 TELECOMMUNICATIONS ONE LINE DIAGRAM

SECURITY

TY001 ELECTRONIC SECURITY SYSTEM LEGENDS, NOTES, AND SCHEDULES

TY101 OVERALL ELECTRONIC SECURITY SYSTEM PLAN - LEVEL 01

TY102 PARTIAL ELECTRONIC SECURITY SYSTEM PLAN - LEVEL 01 - AREA A

TY103a PARTIAL ELECTRONIC SECURITY SYSTEM PLAN - LEVEL 01 - AREA B

TY103b PARTIAL ELECTRONIC SECURITY SYSTEM PLAN - LEVEL 01 - AREA B -

BID OPTION

TY111 OVERALL ELECTRONIC SECURITY SYSTEM PLAN - EQUIPMENT

PLATFORM 01

TY121 OVERALL ELECTRONIC SECURITY SYSTEM PLAN - EQUIPMENT

PLATFORM 02

TY401 ENLARGED SECURITY PLANS

TY501 DETAILS

TY502 DETAILS

SHEET NO. SHEET NAME

GENERAL

G-004 COVER SHEET

G-005 SHEET INDEX

PLUMBING

P-001 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

PD101 OVERALL DEMOLITION PLUMBING PLAN - LEVEL 01

PD102 PARTIAL DEMOLITION PLUMBING PLAN - AREA A

PD103b PARTIAL DEMOLITION PLUMBING PLAN - AREA B BID OPTION

P-101 OVERALL SANITARY WASTE/VENT PLAN - LEVEL 01

P-102 PARTIAL SANITARY WASTE/VENT PLAN - LEVEL 01 - AREA A

P-103a PARTIAL SANITARY WASTE/VENT PLAN - LEVEL 01 - AREA B

P-111 OVERALL DOMESTIC WATER & GAS PLAN - LEVEL 01

P-112 PARTIAL DOMESTIC WATER & GAS PLAN - LEVEL 01 - AREA A

P-113b PARTIAL DOMESTIC WATER & GAS PLAN - LEVEL 01 - AREA B BID

OPTION

P-121 OVERALL FLOOR PLAN - EQUIPMENT PLATFORM 01

P-122 PARTIAL FLOOR PLAN - EQUIPMENT PLATFORM 01 - AREA A

P-123b PARTIAL FLOOR PLAN - EQUIPMENT PLATFORM 01 - BID OPTION

P-131 OVERALL FLOOR PLAN - EQUIPMENT PLATFORM 02

P-132 PARTIAL FLOOR PLAN - EQUIPMENT PLATFORM 02 - AREA A

P-133b PARTIAL FLOOR PLAN - EQUIPMENT PLATFORM 02 - BID OPTION

P-401 PLUMBING ENLARGED PLANS

P-402 PLUMBING ENLARGED PLANS - BASE BID

P-403 PLUMBING ENLARGED PLANS - BID OPTION

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-701 RISER DIAGRAMS

P-702 RISER DIAGRAMS

P-703 RISER DIAGRAMS

P-704 RISER DIAGRAMS

P-801 PLUMBING SCHEMATICS

P-802 CONTROLS DIAGRAMS

MECHANICAL

M-001 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

MD101 OVERALL HVAC DEMOLITION PLAN - LEVEL 01

MD111 OVERALL HVAC DEMOLITION PLAN - EQUIPMENT PLATFORMS

MD112a PARTIAL HVAC DEMOLITION PLAN - EQUIPMENT PLATFORMS - AREA A

MD112b PARTIAL HVAC DEMOLITION PLAN - EQUIPMENT PLATFORMS - BID

OPTION

MH101 OVERALL HVAC PLAN - LEVEL 01

MH102 PARTIAL HVAC PLAN - LEVEL 01 - AREA A

MH103a PARTIAL HVAC PLAN - LEVEL 01 - AREA B - BASE BID

MH103b PARTIAL HVAC PLAN - LEVEL 01 - AREA B - BID OPTION

MH111 OVERALL HVAC PLAN - EQUIPMENT PLATFORMS

MH112 PARTIAL HVAC PLAN - EQUIPMENT PLATFORMS - AREA A

MH113a PARTIAL HVAC PLAN - EQUIPMENT PLATFORMS - AREA B - BASE BID

MH113b PARTIAL HVAC PLAN - EQUIPMENT PLATFORMS - AREA B - BID OPTION

MP101 OVERALL HVAC PIPING PLAN - LEVEL 01

MP102 PARTIAL PIPING PLAN - LEVEL 01 - AREA A

MP103a PARTIAL PIPING PLAN - LEVEL 01 - AREA B - BASE BID

MP103b PARTIAL PIPING PLAN - LEVEL 01 - AREA B - BID OPTION

MP111 OVERALL HVAC PIPING PLAN - EQUIPMENT PLATFORMS

MP112 PARTIAL PIPING PLAN - EQUIPMENT PLATFORMS - AREA A

MP113a PARTIAL PIPING PLAN - EQUIPMENT PLATFORMS - AREA B - BASE BID

MP113b PARTIAL PIPING PLAN - EQUIPMENT PLATFORMS - AREA B - BID

OPTION

M-401 HVAC ENLARGED PLANS - BASE BID

M-403a HVAC ENLARGED PLANS - BASE BID

M-403b HVAC ENLARGED PLAN - BID OPTION

M-404 HVAC SECTIONS

M-405 HVAC SECTIONS

M-501 HVAC DETAILS

M-502 HVAC DETAILS

M-503 HVAC DETAILS

M-504 HVAC DETAILS

M-505 HVAC DETAILS

M-506 AHU DETAILS

M-601 SCHEDULES

M-602 SCHEDULES

M-603 SCHEDULES

M-701 HEATING WATER FLOW DIAGRAM

M-702 HEATING WATER FLOW DIAGRAM

M-703 AIRFLOW DIAGRAMS

M-704 AIRFLOW DIAGRAMS

M-801 CONTROL SYSTEMS SYMBOLS, ABBREVIATIONS, & NOTES

M-802 CONTROLS DIAGRAMS

M-803 CONTROLS DIAGRAMS

M-804 CONTROLS DIAGRAMS

M-805 CONTROLS DIAGRAMS

M-806 POINT SCHEDULES

M-807 POINT SCHEDULES

M-808 POINTS SCHEDULE

M-809 POINT SCHEDULES

M-810 POINT SCHEDULES

M-811 SEQUENCES OF OPERATION

M-812 SEQUENCES OF OPERATION

M-813 POINTS SCHEDULE INSTRUCTIONS

SHEET NO. SHEET NAME

INTERIORS

I-001 GENERAL NOTES, ABBREVIATIONS & SYMBOLS

IN101 OVERALL FINISH & SIGNAGE PLAN - LEVEL 01 - BASE BID

IN102 PARTIAL FINISH & SIGNAGE PLAN - LEVEL 01 - AREA A

IN103a PARTIAL FINISH & SIGNAGE PLAN - AREA B

IN103b PARTIAL FINISH & SIGNAGE PLAN - AREA B BID OPTION

IF101 OVERALL FURNITURE PLAN - LEVEL 01

IF102 PARTIAL FURNITURE PLAN - LEVEL 01 - AREA A

IF103a PARTIAL FURNITURE PLAN - LEVEL 1 - AREA B

IF103b PARTIAL FURNITURE PLAN - LEVEL 01 - AREA B BID OPTION

IF500 FF&E TYPICALS

I-401 ENLARGED FLOOR PLANS

I-411 INTERIOR ELEVATIONS

I-412 INTERIOR ELEVATIONS

I-501 CASEWORK SECTIONS & DETAILS

I-502 INTERIOR DETAILS

I-601 FINISH MATERIAL LEGEND

I-602 ROOM FINISH SCHEDULE - BASE BID

I-603 SIGNAGE SCHEDULE - BASE BID

I-604 SIGNAGE DETAILS

I-605 SIGNAGE SCHEDULE - BID OPTION

I-606 ROOM FINISH SCHEDULE - BID OPTION

FIRE SUPPRESSION

FP001 FIRE SPRINKLER GENERAL NOTES, SYMBOLS, AND LEGENDS

FP101a FIRE PROTECTION PLAN - OVERALL - BASE BID

FP101b FIRE PROTECTION PLAN - OVERALL - BID OPTION

FP102a FIRE PROTECTION PLAN - AREA A - BASE BID

FP102b FIRE PROTECTION PLAN - AREA A - BID OPTION

FP103a FIRE PROTECTION PLAN - AREA B - BASE BID

FP103b FIRE PROTECTION PLAN - AREA B - BID OPTION

FP131 FIRE PROTECTION PLAN - EQUIPMENT PLATFORMS

FP301 FIRE SUPPRESSION SECTIONS

FP401 ENLARGED FIRE PUMP ROOM

FP501 FIRE SUPPRESSION DETAILS

FIRE ALARM

FA001 FIRE ALARM/MASS NOTIFICATION GENERAL NOTES AND SYMBOLS

FA101a FIRE ALARM/MASS NOTIFICATION PLAN - OVERALL - BASE BID

FA101b FIRE ALARM/MASS NOTIFICATION PLAN - OVERALL - BID OPTION

FA102a FIRE ALARM/MASS NOTIFICATION PLAN - AREA A - BASE BID

FA102b FIRE ALARM/MASS NOTIFICATION PLAN - AREA A - BID OPTION

FA103a FIRE ALARM/MASS NOTIFICATION PLAN - AREA B - BASE BID

FA103b FIRE ALARM/MASS NOTIFICATION PLAN - AREA B - BID OPTION

FA111a FIRE ALARM/MASS NOTIFICATION PLAN - EQUIPMENT PLATFORMS -

BASE BID

FA111b FIRE ALARM/MASS NOTIFICATION PLAN - EQUIPMENT PLATFORMS -

BID OPTION

FA501 FIRE ALARM/MASS NOTIFICATION DETAILS

FA502 FIRE ALARM/MASS NOTIFICATION DETAILS

SHEET NO. SHEET NAME

S-200a BRACE FRAME ELEVATION - BASE BID

S-200b BRACE FRAME ELEVATION - BID OPTION

S-201a BRACE FRAME ELEVATION - BASE BID

S-201b BRACE FRAME ELEVATION - BID OPTION

S-201c BRACE FRAME ELEVATION - BID OPTION

S-202 BRACE FRAME ELEVATION

S-203 BRACE FRAME ELEVATION

S-300 PARTIAL PLANS

S-301a PARTIAL PLAN - EXIST. SLAB-ON-GRADE AVAILABLE ANCHOR

LOCATIONS FOR SPECIAL DEVICE - BASE BID

S-301b PARTIAL PLAN - EXIST. SLAB-ON-GRADE AVAILABLE ANCHOR

LOCATIONS FOR SPECIAL DEVICE - BID OPTION

S-400 TYPICAL CONCRETE DETAILS

S-410 TYPICAL FOUNDATION DETAILS AND SECTIONS

S-420 PILE CAP DETAILS

S-500 TYPICAL STEEL FRAMING DETAILS

S-501 TYPICAL STEEL FRAMING DETAILS

S-502 TYPICAL STEEL FRAMING DETAILS

S-503 TYPICAL STEEL FRAMING DETAILS

S-504 TYPICAL STEEL FRAMING DETAILS

S-505 FRAMING SECTIONS AND DETAILS

S-510 BASE PLATE DETAILS AND SCHEDULE

S-521 FRAMING SECTIONS AND DETAILS

S-522 FRAMING SECTIONS AND DETAILS

S-523 FRAMING SECTIONS AND DETAILS

S-600 TYPICAL MASONRY DETAILS

S-601 CONCRETE MASONRY DETAILS

S-602 TYPICAL MASONRY DETAILS

S-700a COLUMN SCHEDULE - BASE BID

S-700b COLUMN SCHEDULE - BID OPTION

ARCHITECTURE

AD101 OVERALL DEMOLITION FLOOR PLAN - LEVEL 01

AD111 OVERALL DEMOLITION FLOOR PLAN - EQUIPMENT PLATFORM 01

AD201 DEMOLITION NORTH ELEVATIONS

AD202 DEMOLITION EAST AND WEST ELEVATIONS

AE101a OVERALL FLOOR PLAN - LEVEL 01 - BASE BID

AE101b OVERALL FLOOR PLAN - LEVEL 01 - BID OPTION

AE102 PARTIAL FLOOR PLAN - LEVEL 01 - AREA A

AE103a PARTIAL FLOOR PLAN - LEVEL 01 - AREA B BASE BID

AE103b PARTIAL FLOOR PLAN - LEVEL 01 - AREA B BID OPTION

AE111a OVERALL FLOOR PLAN - EQUIPMENT PLATFORM 01- BASE BID

AE111b OVERALL FLOOR PLAN - EQUIPMENT PLATFORM 01- BID OPTION

AE121a OVERALL FLOOR PLAN - EQUIPMENT PLATFORM 02 - BASE BID

AE121b OVERALL FLOOR PLAN - EQUIPMENT PLATFORM 02 - BID OPTION

AE131a OVERALL FLOOR PLAN - PLATFORM 03 - BASE BID

AE131b OVERALL FLOOR PLAN - PLATFORM 03 - BID OPTION

AE151a OVERALL REFLECTED CEILING PLAN - LEVEL 01 - BASE BID

AE151b OVERALL REFLECTED CEILING PLAN - LEVEL 01 - BID OPTION

AE152 PARTIAL REFLECTED CEILING PLAN - LEVEL 01 - AREA A

AE153a PARTIAL REFLECTED CEILING PLAN - LEVEL 01 - AREA B - BASE BID

AE153b PARTIAL REFLECTED CEILING PLAN - LEVEL 01 - AREA B - BID OPTION

AE171a OVERALL REFLECTIVE CEILING PLAN - EQUIPMENT PLATFORM 02 AND

PLATFORM 03 - BASE BID

AE171b OVERALL REFLECTIVE CEILING PLAN - EQUPMENT PLATFORM 02 AND

PLATFORM 03 - BID OPTION

A-201 NORTH ELEVATION

A-202 EAST AND WEST ELEVATIONS

A-301 BUILDING SECTIONS

A-302 BUILDING SECTIONS

A-311 WALL SECTIONS

A-312 WALL SECTIONS

A-401 ENLARGED PLANS AND REFLECTED CEILING PLANS

A-411 INTERIOR ELEVATIONS

A-431 VERTICAL CIRCULATION PLANS AND SECTIONS

A-432 VERTICAL CIRCULATION PLANS AND SECTIONS

A-511 WALL SECTION AND ENLARGED PLAN DETAILS

A-571 INTERIOR DETAILS

A-572 INTERIOR DETAILS

A-601 DOOR SCHEDULE AND DETAILS

A-611 WINDOW AND LOUVER TYPES AND DETAILS

A-621 DOOR DETAILS

A-622 DOOR DETAILS

A-701 PARTITION TYPES AND DETAILS

A-702 PARTITION TYPES

SHEET NO. SHEET NAME

GENERAL

G-001 COVER SHEET

G-002 SHEET INDEX

G-003 GENERAL NOTES AND SYMBOLS

GC101 LOCATION AND VICINITY MAP

GI001 LIFE SAFETY CODE ANALYSIS

GI002 LIFE SAFETY CODE ANALYSIS

GI101a LIFE SAFETY PLAN - OVERALL - BASE BID

GI101b LIFE SAFETY PLAN - OVERALL - BID OPTION

GI102a LIFE SAFETY PLAN - AREA A - BASE BID

GI102b LIFE SAFETY PLAN - AREA A - BID OPTION

GI103a LIFE SAFETY PLAN - AREA B - BASE BID

GI103b LIFE SAFETY PLAN - AREA B - BID OPTION

GI111 LIFE SAFETY PLAN - EQUIPMENT PLATFORM 01

GI121a LIFE SAFETY PLAN - EQUIPMENT PLATFORM 02 - BASE BID

GI121b LIFE SAFETY PLAN - EQUIPMENT PLATFORM 02 - BID OPTION

GI131a LIFE SAFETY PLAN - EQUIPMENT PLATFORM 03 - BASE BID

GI131b LIFE SAFETY PLAN - EQUIPMENT PLATFORM 03 - BID OPTION

GI701 LIFE SAFETY CALCULATIONS

G-101 AIR BARRIER DIAGRAMS

SURVEY / MAPPING

V-101 EXISTING CONDITIONS SITE PLAN

GEOTECHNICAL

B-101 BORING LOCATIONS

B-102 BORING LOGS

CIVIL

C-001 GENERAL NOTES AND ABBREVIATIONS

CD101 OVERALL DEMOLITION SITE PLAN

C-101 HAUL ROUTE

C-102 CONSTRUCTION SAFETY AND PHASING PLAN

CS101 SITE AND GRADING PLAN

CG101 EROSION CONTROL PLAN

CU101 UTILITY PLAN

CU201 UTILITY PROFILES

CS501 SITE DETAILS

CG501 EROSION CONTROL DETAILS

CU501 UTILITY DETAILS

STRUCTURAL

S-001 STRUCTURAL ABBREVIATIONS, LEGENDS AND SYMBOLS

S-002 STRUCTURAL NOTES

S-003 STRUCTURAL NOTES

S-101a OVERALL FOUNDATION PLAN - BASE BID

S-101b OVERALL FOUNDATION PLAN - BID OPTION

S-102 PARTIAL FOUNDATION PLAN - AREA A

S-103a PARTIAL FOUNDATION PLAN - AREA B - BASE BID

S-103b PARTIAL FOUNDATION PLAN - AREA B - BID OPTION

S-111a OVERALL EQUIPMENT PLATFORM 01 - BASE BID

S-111b OVERALL FRAMING PLAN - PLATFORM 01 - BID OPTION

S-112 PARTIAL FRAMING PLAN EQUIPMENT PLATFORM 01 - AREA A

S-113b PARTIAL FRAMING PLAN EQUIPMENT PLATFORM 01 - AREA B - BID

OPTION

S-121a OVERALL FRAMING PLAN - PLATFORM 02 - BASE BID

S-121b OVERALL FRAMING PLAN - PLATFORM 02 - BID OPTION

S-122 PARTIAL FRAMING PLAN - EQUIPMENT PLATFORM PLAN 02 - AREA A

S-123a PARTIAL FRAMING PLAN - EQUIPMENT PLATFORM PLAN 02 - AREA B -

BASE BID

S-123b PARTIAL FRAMING PLAN - EQUIPMENT PLATFORM PLAN 02 - AREA B -

BID OPTION

S-131a OVERALL FRAMING PLAN - PLATFORM 03 - BASE BID

S-131b OVERALL FRAMING PLAN - PLATFORM 03 - BID OPTION

S-132 PARTIAL FRAMING PLAN - PLATFORM 03 - AREA A

S-133a PARTIAL FRAMING PLAN - PLATFORM 03 - AREA B - BASE BID

S-133b PARTIAL FRAMING PLAN - EQUIPMENT PLATFORM 03 - AREA B - BID

OPTION

G-001

G-002

G-001

G-002

S

DRAWING ABBREVIATIONS LEGEND

PIPING SYMBOLS

GENERAL NOTES

THE ESTIMATED CONNECTED SANITARY DRAINAGE LOAD IS 75 DFU OR

APPROXIMATELY 38 GPM.

EXISTING TO BE

REMOVED

NEW EQUIPMENT

EQUIPMENT

CLEARANCE

EQUIPMENT SYMBOLS

PITCH DOWN IN DIRECTION OF ARROW

DIRECTION OF FLOW

BRANCH - TOP CONNECTION

BRANCH - SIDE CONNECTION

CONCENTRIC REDUCER

RISER UP (ELBOW)

CAPPED PIPE

BRANCH - BOTTOM

CONNECTION

RISE OR DROP IN PIPE

RISER DOWN (ELBOW)

PUMP

LINE/WALL CLEANOUT

PIPING TYPES

A. REFER TO SPECIFICATIONS FOR MATERIALS AND METHODS FOR

CONSTRUCTION.

B. COORDINATE THE EXACT LOCATION OF FLOOR DRAINS WITH THE

ARCHITECTURAL DRAWINGS AND MECHANICAL EQUIPMENT LOCATIONS

PRIOR TO INSTALLATION OF DRAINS. PROVIDE A RADIUS AROUND THE FLOOR

DRAIN THAT SLOPES TOWARD THE FLOOR DRAIN FROM THE FINISHED FLOOR

ELEVATION TO A TOP OF DRAIN ELEVATION BETWEEN 1/2" AND 3/4" BELOW

FINISHED FLOOR, UNLESS OTHERWISE NOTED ON THE DRAWINGS. THE

RADIUS AND RATE OF SLOPE IS TO BE FIELD COORDINATED.

C. FURNISH ACCESS DOORS FOR INSTALLATION IN WALLS AND CEILINGS WHERE

ACCESS IS REQUIRED TO CONCEALED PLUMBING EQUIPMENT, VALVES,

CONTROLS, AND OTHER DEVICES.

D. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,

AMENDMENTS OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,

CODES, OR REGULATIONS OF FEDERAL, STATE AND LOCAL AUTHORITIES

HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.

E. WHERE APPROVAL CODES HAVE BEEN ESTABLISHED BY OSHA,

UNDERWRITERS LABORATORY, AMERICAN CODES, ANSI, ASME, ASPE, ASA,

ASSE, ASHRAE, ASTM, ARI, NEC, NFPA, SMACNA, OR THE STATE FIRE

INSURANCE REGULATORY BODY, FOLLOW THESE STANDARDS WHETHER OR

NOT INDICATED ON THE DRAWINGS.

F. COORDINATE WORK WITH ARCHITECTURAL FEATURES AND COORDINATE

WORK SUCH THAT INTERFERENCES BETWEEN PIPING, DUCTWORK,

EQUIPMENT, HVAC WORK, FIRE PROTECTION WORK, ELECTRICAL WORK, AND

BUILDING STRUCTURE WILL BE AVOIDED.

G. PROVIDE THE ENTIRE SYSTEM AND ITS COMPONENT ITEMS OF EQUIPMENT IN

OPERATING CONDITION WITHOUT OBJECTIONABLE VIBRATION OR NOISE.

PROVIDE WATER HAMMER ARRESTORS AT RESTROOM PLUMBING CHASES.

NOISE LEVELS IN OFFICES SHALL BE MAINTAINED AT OR BELOW NC35.

H. PROVIDE ALL WIRING AND ELECTRICAL CONTROLS IN ACCORDANCE WITH

NFPA 70 (NEC).

I. VERIFY AND DOCUMENT EXISTING CONDITIONS AND DIMENSIONS ON THE JOB

SITE PRIOR TO STARTING ANY WORK.

J. DO NOT SCALE THESE DRAWINGS FOR CONSTRUCTION PURPOSES.

K. INSTALL PIPING TO PROVIDE THE MAXIMUM POSSIBLE CLEAR HEIGHT

UNDERNEATH. MAINTAIN A MINIMUM OF 6 INCHES ABOVE FINISHED CEILING

TO PROVIDE CLEARANCE FOR LIGHTING FIXTURES.

L. CONTRACTOR TO MAKE ALL FINAL CONNECTIONS TO EQUIPMENT.

M. VENT TERMINALS SHALL EXTEND A MINIMUM OF 12" ABOVE THE FINISHED

ROOF AND SHALL BE LOCATED A MINIMUM OF 10 FEET HORIZONTALLY FROM

ANY DOOR, OPERABLE WINDOW, OR OTHER AIR INTAKE OF THE BUILDING OR

ADJACENT BUILDING UNLESS THE VENT TERMINAL IS AT LEAST 2 FEET ABOVE

THE TOP OF SUCH OPENING.

N. ALL VENT LINES ARE TO RISE VERTICALLY (45 DEG. ANGLE OR GREATER FROM

HORIZONTAL) TO MINIMUM OF 6" ABOVE THE HIGHEST FLOOD LEVEL RIM OF

THE HIGHEST FIXTURE SERVED BY VENT.

O. TO PREVENT FROST CLOSURE, ALL VENT EXTENSIONS THROUGH ROOF OR

WALL SHALL BE A MINIMUM OF 3 INCHES IN DIAMETER. ANY INCREASE IN THE

SIZE OF THE VENT SHALL BE MADE INSIDE THE STRUCTURE A MINIMUM OF 1

FOOT BELOW THE ROOF OR INSIDE THE WALL.

DRAWING/DETAIL REFERENCE KEY

RE : A2 / P-201

REFER TO

DRAWING/DETAIL

NUMBER

SHEET NUMBER ON

WHICH DETAIL IS

DRAWN A2

P-201

SANITARY SEWER

SANITARY VENT (V)

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

COMPRESSED AIR

NATURAL GAS

CONDENSATE DRAIN

TEPID WATER SUPPLY

NON POTABLE WATER

TRAP PRIMER

SS

DHW

TS

TP

G

CD

A

NPW

COMPRESSED AIR DROP - "#"

DENOTES TYPE

P

CLEANOUT

HOSE BIBB, WALL HYDRANT

FLOOR DRAIN, FLOOR SINK

P-TRAP

PLUMBING FIXTURES AND

EQUIPMENT

METER

BACKFLOW PREVENTER

RISER DESIGNATION DENOTING

ASSOCIATED SANITARY OR DOMESTIC

WATER RISER DIAGRAM

PROCESS VACUUM

CONNECTION

BREATHING AIR CONNECTION

PROCESS COMPRESSED AIR

CONNECTION

DEBRIS VACUUM CONNECTION

KEYNOTE REFERENCE

POINT OF CONNECTION

TO EXISTING

WATER HAMMER ARRESTOR

DEBRIS VACUUM (CLEANING)

STORM DRAINSD

OD OVERFLOW DRAIN

VAC

DV

VACUUM

WATER SERVICE FLOW TEST DATA

WATER PIPE SIZES ARE BASED ON A MINIMUM WORKING PRESSURE OF 90 PSIG

AT A FLOW RATE OF 70 GPM AT THE BUILDING ENTRANCE.

VALVE SYMBOLS

FS

PS

PIPE GUIDE

PIPE ANCHOR

BLIND FLANGE

PRESSURE GAGE WITH COCK

UNION (SCREWED)

ORIFICE UNION

FLANGED CONNECTION

STRAINER WITH BLOWDOWN VALVE

TEMPERATURE & PRESSURE PORT

THERMOMETER

FLOW SWITCH

FLEX CONNECTION

FLEX PIPE

PRESSURE SWITCH

X

DESIGN CRITERIA

STORM DRAINAGE DATA

THE PRIMARY STORM DRAINAGE IS VIA SCUPPERS WITH DOWNSPOUTS.

DOWNSPOUTS WILL DISCHARGE BELOW GRADE TO THE STORM SEWER RE:

ARCHITECTURE AND CIVIL. RAINFALL RATE 2.5"/HR.

NATURAL GAS DATA

NATURAL GAS IS SUPPLIED TO THE SITE AT 45 PSIG. GAS PIPE SIZES ARE BASED

ON A PRESSURE OF 2.0 PSI AFTER THE REGULATOR AND METER STATION, A

MAXIMUM PRESSURE DROP OF 1.0 PSI AND A HEATING VALUE OF 1000 BTU PER

CUBIC FOOT.

SANITARY DRAINAGE

X=W FOR WATER, X=G FOR GAS

POINT OF DISCONNECTION

FROM EXISTING

FLANGED ORIFICE

TEPID WATER RETURNTR

DHWR

DCW

V

NOTES

THE PLUMBING EQUIPMENT IN THESE DRAWINGS ARE IN COMPLIANCE WITH

THE 2018 INTERNATIONAL PLUMBING CODE AND 2018 INTERNATIONAL ENERGY

CONSERVATION CODE.

CODE COMPLIANCE

PUMP DISCHARGEPD

INDUSTRIAL WASTEIW

COMBINATION WASTE AND VENT SV

SUBSOIL DRAIN SSD

RADON VENTRV

CHECK VALVE (NON SLAM)

GLOBE VALVE

GATE VALVE

PRESSURE REDUCING VALVE

BALL VALVE

BUTTERFLY VALVE

VENTURI FLOW METER

NEEDLE VALVE

VALVE IN DROP

VALVE IN RISE

VALVE IN CENTER DROP

GATE VALVE W/ 3/4" HOSE THREAD

ADAPTER

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

SOLENOID VALVE

SAFETY VALVE OR

PRESSURE RELIEF VALVE

MANUAL BALANCING VALVE

AUTOMATIC BALANCING VALVE

TEMPERATURE WELL

FLANGED VALVE

(GATE VALVE

SHOWN)

PLUG VALVE

GAS PRESSURE REGULATOR VALVE

1 DEMO KEYNOTE REFERENCE

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

ADVERTISEMENT - 100% DESIGN

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

P-001

G E

N E

R A

L N

O T

E S

S

Y M

B O

L S

A N

D A

B B

R E

V

IA

T

IO

N S

F X

B M

P

-0

K

K CONDUCTIVITY (BTU/SF/IN)

KW KILOWATT

KWH KILOWATT-HOUR

L

L, LAV LAVATORY

LI LINT INTERCEPTOR

LVR LOUVER

M

MECH MECHANICAL

MFR MANUFACTURER

MS MOP SINK

N

NC NORMALLY CLOSED, NOISE CRITERIA

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CNTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

O

OA OVERALL, OUTDOOR AIR

OD OUTSIDE DIAMETER, OVERFLOW DRAIN

ODN OVERFLOW DRAIN NOZZLE

OSHA OCCUPATIONAL SAFETY AND HEALTH

ADMINISTRATION

P

PD PRESSURE DROP

PERF PERFORATED

PLBG PLUMBING

PROVIDE FURNISH AND INSTALL

PSI POUNDS PER SQUARE INCH

Q

QTY QUANTITY

R

RA RETURN AIR

RD ROOF DRAIN

RE:, REF REFERENCE, REFER TO

REC RECESSED

REQ REQUIRED

REV REVISED, REVISION

RTN RETURN

S

S SINK

SA SUPPLY AIR

SD STORM DRAIN

SF SQUARE FOOT (FEET)

SH SHOWER

SMACNA SHEET METAL AND AIR CONDITIONING

CONTRACTORS NATIONAL ASSOCIATION

SPEC SPECIFICATION

SS SANITARY SEWER

ST STAIRS

STD STANDARD

SV COMBINATION WASTE AND VENT

T

TD TRENCH DRAIN

TP TRAP PRIMER

TR TEPID RETURN

TS TEPID SUPPLY

TYP TYPICAL

U

U URINAL

UF UNDERFLOOR

UL UNDERWRITERS LABORATORIES, INC.

UON UNLESS OTHERWISE NOTED

V

V VENT

VTR VENT THROUGH ROOF

W

W WATT

WB WALL BOX

WC WATER CLOSET

WCO WALL CLEANOUT

WD WALL DRAIN

WH WATER HEATER

A

ABV ABOVE

AC AIR COMPRESSOR

AD AIR DEVICE

ADA AMERICANS WITH DISABILITIES ACT

ADMIN ADMINISTRATION

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR HANDLING UNIT

ANSI AMERICAN NATIONAL STANDARDS

INSTITUTE

ARCH ARCHITECT, ARCHITECTURAL

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATING AND AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY OF PLUMBING

ENGINEERS

ASSY ASSEMBLY

ASTM AMERICAN SOCIETY OF TESTING AND

MATERIALS

AWS AIRCRAFT WASH SYSTEM

B

BFF BELOW FINISH FLOOR

BFP BACKFLOW PREVENTER

BOP BOTTOM OF PIPE

BOS BOTTOM OF STEEL

BTU BRITISH THERMAL UNIT

C

CD CONDENSATE DRAIN

CFH CUBIC FEET PER HOUR

CIRC CIRCULATING

CLG CEILING

CO CLEAN OUT

CP CIRCULATING PUMP

D

DBL DOUBLE

DCO DOUBLE CLEANOUT

DCW DOMESTIC COLD WATER

DFU DRAINAGE FIXTURE UNIT(S)

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DN DOWN

DWG DRAWING

E

EA EACH, EXHAUST AIR

EF EXHAUST FAN

EFW EYE/FACE WASH

EL ELEVATION

ELEC ELECTRICAL

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EX EXHAUST

F

FA FROM ABOVE

FB FROM BELOW

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FLA FULL LOAD AMPS

FLEX FLEXIBLE

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FS FLOW SWITCH, FLOOR SINK

FT FEET

G

G NATURAL GAS

GALS GALLONS

GCO GROUND CLEANOUT

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPRV GAS PRESSURE REGULATOR VALVE

GV GATE VALVE

H

HB HOSE BIBB

HD HUB DRAIN

HPW HIGH PRESSURE WATER

HTG HEATING

I

IE INVERT ELEVATION

IN INCH

IN WC INCHES OF WATER COLUMN

IPC INTERNATIONAL PLUMBING CODE

J

JAN JANITOR

A

RS

S

T

T

HQ.1 Q P A.1BN M L J CDEFG

Q.0 A.0

AREA NOT

IN SCOPE

PD103b

A1_______________

PD102

A1

GENERAL SHEET NOTES

1. REFER TO SHEET P-001 FOR PLUMBING LEGEND AND GENERAL NOTES.

2. REFER TO CIVIL FOR CONTINUATION OF SERVICES OUT OF THE FACILITY.

3. REFER TO P-401, P-402 AND P-403 FOR ENLARGED PLANS.

4. REFER TO P-601 FOR PLUMBING SCHEDULES.

5. INVERT ELEVATIONS ARE RELATIVE TO FIRST FLOOR AT THE ELEVATION

OF 100'-0".

SHEET KEYNOTES

60'0

SCALE: 1"=20'

10' 20' 40'

PLAN

NORTH

TRUE N

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

KEY PLAN

OVERALL

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

PD101

O V

E R

A L L D

E M

O L

IT

IO

N

P L U

M B

IN

G

P L A

N

L E

V E

L

F X

B M

P

D

1" = 20'-0"A1

OVERALL DEMOLITION FLOOR PLAN - LEVEL 01

RS

S

T

T

Q.1 Q P N M L J

Q.0

2" NG (E)

2" NG (E)

2" NG (E)

2" NG (E)

AREA NOT IN

SCOPE

RE: A1/PD103b FOR

CONTINUATION.

GENERAL SHEET NOTES

1. REFER TO SHEET P-001 FOR PLUMBING LEGEND AND GENERAL NOTES.

2. REFER TO CIVIL FOR CONTINUATION OF SERVICES OUT OF THE FACILITY.

3. REFER TO P-401, P-402 AND P-403 FOR ENLARGED PLANS.

4. REFER TO P-601 FOR PLUMBING SCHEDULES.

5. INVERT ELEVATIONS ARE RELATIVE TO FIRST FLOOR AT THE ELEVATION

OF 100'-0".

SHEET KEYNOTES

PLAN

NORTH

TRUE N

32'0

SCALE: 3/32"=1'-0"

4' 8' 16'

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

ADVERTISEMENT - 100% DESIGN

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

PD102

P A

R T

IA

L D

E M

O L

IT

IO

N

P L U

M B

IN

G

P L A

N

A R

E A

A

F X

B M

P

D

3/32" = 1'-0"A1

PARTIAL DEMOLITION PLUMBING PLAN - AREA A

101 DEMOLISH SECTION OF 6" SS PIPING INDICATED TO BELOW SLAB. CUT, CAP

AND ABANDON UPSTREAM SANITARY LINE BELOW SLAB AND PREPARE

REMAINING PIPING FOR NEW CONNECTION WITH CLEAN OUT. RE: A1/P-102

FOR NEW CONNECTION.

102 DEMOLISH ENTIRE UPSTREAM 6" SS MAIN TO BELOW SLAB AND PREPARE

REMAINING PIPING FOR CONNECTION TO NEW 4" SS MAIN. RE: A1/P-401 FOR

NEW RESTROOM CONNECTION.

103 CUT, CAP AND ABANDON ALL SANITARY BRANCH CONNECTIONS FOR

FIXTURES TO 6" SS MAIN BEING DEMOLISHED.

104 DEMOLISH EXISTING ELECTRIC WATER HEATER INCLUDING ALL

ASSOCIATED HOT WATER PIPING ABOVE CEILING AND BRANCH PIPING TO

ALL PLUMBING FIXTURES.

105 DISCONNECT COLD WATER PIPING AT POINT INDICATED AND DEMOLISH ALL

PIPING DOWNSTREAM INCLUDING ALL ABOVE CEILING AND BRANCH PIPING

TO PLUMBING FIXTURES.

106 EXISTING 2 1/2" DCW PIPE UP TO EQUIPMENT PLATFORM 02 SERVING RR

GROUP IN AREA C.

107 REMOVE ALL VENT PIPING FROM FIXTURES AND ABOVE CEILING IN ITS

ENTIRETY. FIELD VERIFY LOCATION OF EXISTING VENTS THROUGH WALLS

AND REMOVE. PATCH EXISTING WALL OPENING.

108 DEMOLISH ALL PLUMBING FIXTURES IN RESTROOM AND ALL PIPING IN

WALL. CUT SANITARY PIPING BELOW SLAB, CAP, AND ABANDON LINE IN

PLACE.

109 DISCONNECT AND REMOVE EXISTING 2" NG PIPING BETWEEN POINTS

INDICATED AND BACK TO DISCHARGE OUTLET OF GAS METER AT BUILDING

EXTERIOR. EXISTING GAS METER AND REGULATOR ASSEMBLY TO REMAIN.

PREPARE REMAINING PIPING FOR NEW CONNECTION. PATCH EXISTING

WALL OPENING.

110 DISCONNECT EXISTING NATURAL GAS BRANCH PIPING FROM RADIANT

HEATERS AND REMOVE PIPING BACK TO MAIN AND CAP. REMOVE ALL

PRESSURE REGULATORS AND EXISTING APPURTENANCES OF DEMOLISHED

RADIANT HEATERS IN ITS ENTIRETY. RE: MECH FOR MORE INFORMATION.

111 DEMOLISH ALL PLUMBING FIXTURES IN RESTROOM AND ALL PIPING IN WALL

TO BELOW SLAB.

AREA A

KEY PLAN

A B

DC

H A.1BCDEFG A.0

2" NG (E)

AREA NOT IN

SCOPE

2" NG (E) 2" NG (E)

RE: A1/PD102 FOR

CONTINUATION.

GENERAL SHEET NOTES

1. REFER TO SHEET P-001 FOR PLUMBING LEGEND AND GENERAL NOTES.

2. REFER TO CIVIL FOR CONTINUATION OF SERVICES OUT OF THE FACILITY.

3. REFER TO P-401, P-402 AND P-403 FOR ENLARGED PLANS.

4. REFER TO P-601 FOR PLUMBING SCHEDULES.

5. INVERT ELEVATIONS ARE RELATIVE TO FIRST FLOOR AT THE ELEVATION

OF 100'-0".

SHEET KEYNOTES

PLAN

NORTH

TRUE N

32'0

SCALE: 3/32"=1'-0"

4' 8' 16'

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

AREA B

KEY PLAN

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

PD103b

P A

R T

IA

L D

E M

O L

IT

IO

N

P L U

M B

IN

G

P L A

N

A R

E

B

B

ID

O P

T

IO

N

F X

B M

P

D b

3/32" = 1'-0"A1

PARTIAL DEMOLITION FLOOR PLAN - AREA B BID OPTION

110 DISCONNECT EXISTING NATURAL GAS BRANCH PIPING FROM RADIANT

HEATERS AND REMOVE PIPING BACK TO MAIN AND CAP. REMOVE ALL

PRESSURE REGULATORS AND EXISTING APPURTENANCES OF DEMOLISHED

RADIANT HEATERS IN ITS ENTIRETY. RE: MECH FOR MORE INFORMATION.

112 EXISTING RADIANT HEATER TO BE RELOCATED. DISCONNECT EXISTING

PRESSURE REGULATORS FOR THIS RADIANT HEATER ONLY AND STORE ON

SITE FOR RELOCATION. RE: MECH FOR MORE INFORMATION.

RST HQ.1 Q P A.1BN M L K J CDEFG

Q.0 A.0

ABAA AC AD AE AF AH

N8

N7

N6

N5

N4

N3

N2

N1

NA NB NC ND NE

NG NH NI NJ NK

P-102

A1

P-103a

A1

AREA NOT

IN SCOPE

60'0

SCALE: 1"=20'

10' 20' 40'

PLAN

NORTH

TRUE N

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

KEY PLAN

OVERALL

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

P-101

O V

E R

A L L S

A N

IT

A

R Y

W A

S T

E /V

E N

T P

L A

N

L E

V E

L

F X

B M

P

-1

OVERALL SANITARY WASTE/VENT PLAN - LEVEL 01

WEAPONS

LOADING

TRAINER #1

VEST

CORRIDOR

SECURE

VESTIBULE

RESTROOM

MOTHER'S ROOM

WING MGR

VEST

LOBBY

STORAGE

1005CONFERENCE

TRAINING ROOM

MECHANICAL

LSC SUITE

WS SUPER

CORRIDOR

SLC SUITE

BREAK RM

CORRIDOR

JANITOR

MEN

WOMEN

CORRIDOR

COMM

CONTRACTOR

SUPPORT

ELECTRICAL

STAIR

2" SS 3" SS

4" SS

IE = 6'-4" BFF

RE: CIVIL FOR CONT.

FS-2

4" IW

P-401

A1

P-402

A1

M A

T C

H L

IN

E

A

P -1 a

DCO

WCO

4" SS

4" SS

FCO

4" SS

RST Q.1 Q P N M L K J

Q.0

ABAA AC AD AE AF

N8

N7

N6

N5

N4

N3

N2

N1

NA NB NC ND NE

AREA NOT IN

SCOPE

6" SS (E)

RE: CIVIL FOR

CONTINUATION

6" SS (E)

RE: CIVIL FOR

CONTINUATION

FCO

L-1

WC-1

S-21 1/2" V

1" CD

1 1/2" CD FCO

4" IW 3" V

2" V

4" SS

WCO

2" V

202 3" SS

GENERAL SHEET NOTES

1. REFER TO SHEET P-001 FOR PLUMBING LEGEND AND GENERAL NOTES.

2. REFER TO CIVIL FOR CONTINUATION OF SERVICES OUT OF THE FACILITY.

3. REFER TO P-401, P-402 AND P-403 FOR ENLARGED PLANS.

4. REFER TO P-601 FOR PLUMBING SCHEDULES.

5. INVERT ELEVATIONS ARE RELATIVE TO FIRST FLOOR AT THE ELEVATION

OF 100'-0".

SHEET KEYNOTES

PLAN

NORTH

TRUE N

32'0

SCALE: 3/32"=1'-0"

4' 8' 16'

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

AREA A

KEY PLAN

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

P-102

P A

R T

IA

L S

A N

IT

A

R Y

W A

S T

E /V

E N

T P

L A

N

L E

V E

L

A R

E A

A

F X

B M

P

-1

3/32" = 1'-0"A1

PARTIAL SANITARY WASTE/VENT PLAN - LEVEL 01 - AREA A

201 CONNECT NEW 6" SS PIPING AT POINT INDICATED AND TERMINATE AT

FLOOR CLEAN OUT.

202 3" SS FROM ABOVE. RE: A1/P-122 FOR CONTINUATION.

203 4" SS UNDER 2" V.

204 COMBINE 1 1/2" V FROM MOTHERS ROOM SINK (S-2) WITH 2" V FROM

RESTROOM 1003 AND ROUTE 2" V UP. RE: A1/P-122 FOR CONTINUATION.

205 COMBINE 1" CONDENSATE DRAIN LINES AND ROUTE ABOVE CEILING.

TERMINATE 1 1/2" CD AT FLOOR SINK (FS-1) IN MECHANICAL ROOM WITH A 3"

AIR GAP. RE: A1/P-402.

206 3" V UP. RE: P-122 FOR CONTINUATION.

SECURE COMM

SECURE

VESTIBULE

CORRIDOR

SMALL WLT

ELECTRICAL

FIRE

M A

T C

H L

IN

E

A

P -1

FS-2

4" IW

4" IW

4" IW

4" IW

IE = 6'-9" BFF

RE: CIVIL FOR CONT.

DCO

FCO

A

H A.1BCDEFG A.0

AF AH

N8

N7

N6

N5

N4

N3

N2

N1

NG NH NI NJ NK

AREA NOT IN SCOPE

4" IW

FCO

3/4" CDWD-1

2" IW

2" IW

IE = 6'-6" BFF

RE: CIVIL FOR CONT.

DCO

3" SD

3" SD

3/4" CD

2" V

FCO

HD-1

GENERAL SHEET NOTES

1. REFER TO SHEET P-001 FOR PLUMBING LEGEND AND GENERAL NOTES.

2. REFER TO CIVIL FOR CONTINUATION OF SERVICES OUT OF THE FACILITY.

3. REFER TO P-401, P-402 AND P-403 FOR ENLARGED PLANS.

4. REFER TO P-601 FOR PLUMBING SCHEDULES.

5. INVERT ELEVATIONS ARE RELATIVE TO FIRST FLOOR AT THE ELEVATION

OF 100'-0".

SHEET KEYNOTES

PLAN

NORTH

TRUE N

32'0

SCALE: 3/32"=1'-0"

4' 8' 16'

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

AREA B

KEY PLAN

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

P-103a

P A

R T

IA

L S

A N

IT

A

R Y

W A

S T

E /V

E N

T P

L A

N

L E

V E

L

A R

E A

B

F X

B M

P

-1 a

3/32" = 1'-0"A1

PARTIAL SANITARY WASTE/VENT PLAN - LEVEL 01 - AREA B

207 TERMINATE 3/4" CD FROM SPLIT SYSTEM (SSAC-2) IN WALL BOX DRAIN

(WD-1).

208 ROUTE NEW 2" VENT ALONG WALL AND TERMINATE AT A MINIMUM OF 10' 0"

AFF. RE: A4/P-501 FOR SIDEWALL VENT DETAIL.

209 ROUTE 3/4" CONDENSATE FROM SPLIT SYSTEM ALONG WALL AND DOWN TO

HUB DRAIN (HD-1). TERMINATE WITH A MINIMUM 2" AIR GAP. SECURE PIPE

TO WALL AS REQUIRED.

RS

S

T

T

HQ.1 Q P A.1BN M L K J CDEFG

Q.0 A.0

ABAA AC AD AE AF AH

N8

N7

N6

N5

N4

N3

N2

N1

NA NB NC ND NE

NG NH NI NJ NK

P-112

A1

P-113a

A1

P-113b

A1

AREA NOT IN

SCOPE

60'0

SCALE: 1"=20'

10' 20' 40'

PLAN

NORTH

TRUE N

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

KEY PLAN

OVERALL

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

P-111

O V

E R

A L L D

O M

E S

T

IC

W A

T E

R

G A

S P

L A

N

L E

V E

L

F X

B M

P

-1

OVERALL DOMESTIC WATER & GAS PLAN - LEVEL 01

VEST

STORAGE

CONFERENCE

LOBBY

CORRIDOR

WEAPONS

LOADING

TRAINER #1

TRAINING ROOM

WING MGR

MOTHER'S ROOM

RESTROOM

ELECTRICAL

STAIR

MECHANICAL

LSC SUITE

WS SUPER

SLC SUITE

BREAK RM

1025 CORRIDOR

JANITOR

MEN

CORRIDOR

CORRIDOR

COMM

CONTRACTOR

SUPPORT

B1 PARTS

STORAGE

X-1100

VEST

SECURE

VESTIBULE

P-401

A5

EEW

3/4" DCW

EEW

3/4" DCW

EEW

3/4" DCW

2" DCW

3/4" DHWR

2 1/2" DCW

P-402

A5

IWH-2

IWH-1

IWH-3

M A

T C

H L

IN

E

A

P -1 a

L-1

WC-1

3/4" DHWR

3/4" DHW

3/4" DHWR

1" DHW

1" DHW

2 1/2" DCW

RST Q.1 Q P N M L K J

Q.0

ABAA AC AD AE AF

N8

N7

N6

N5

N4

N3

N2

N1

NA NB NC ND NE

AREA NOT IN

SCOPE

2121" DHW

2" DCW

1 1/2" DCW

1" DHW

1" DHW

2" DCW

S-2

GENERAL SHEET NOTES

1. REFER TO SHEET P-001 FOR PLUMBING LEGEND AND GENERAL NOTES.

2. REFER TO P-401, P-402 AND P-403 FOR ENLARGED PLANS.

3. REFER TO P-601 FOR PLUMBING SCHEDULES.

4. REFER TO ARCHITECTURE FOR PENETRATION DETAILS THROUGH THE

BUILDING ENVELOPE.

5. PROVIDE CLEARANCES FOR ALL ELECTRICAL AND CONTROL PANELS

PER NEC.

6. REFER TO SECURITY DRAWINGS FOR LOCATIONS OF WALLS

CONSTRUCTED TO ICD 705 REQUIREMENTS AND SPECIAL

CONSTRUCTION FOR PROTECTION OF PENETRATIONS.

SHEET KEYNOTES

PLAN

NORTH

TRUE N

32'0

SCALE: 3/32"=1'-0"

4' 8' 16'

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

AREA A

KEY PLAN

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

P-112

P A

R T

IA

L D

O M

E S

T

IC

W A

T E

R

G A

S P

L A

N

L E

V E

L

A R

E A

A

F X

B M

P

-1

3/32" = 1'-0"A1

PARTIAL DOMESTIC WATER & GAS PLAN - LEVEL 01 - AREA A

210 ROUTE 1 1/2" DCW BELOW SECURE BOUNDARY AND ENTER WLT AT 9' 0"

AFF.

211 1 1/2" DCW UP. RE: A1/P-122 FOR CONTINUATION.

212 PROVIDE UL LISTED DIELECTRIC PIPE BREAK WITH NO. 4 WIRE (0.2043

DIAMETER COPPER WIRE) AT PIPE ENTRANCE TO SECURE AREA.

213 3/4" DCW FROM ABOVE. RE: A1/P-122 FOR CONTINUATION.

FIRE

SECURE

VESTIBULE

ELECTRICAL

M A

T C

H L

IN

E

A

P -1

EEW

EEW

EEW

IWH-6

IWH-5

IWH-4

3/4" DCW

3/4" DCW

3/4" DCW

A

H A.1BCDEFG A.0

AF AH

N8

N7

N6

N5

N4

N3

N2

N1

NG NH NI NJ NK

AREA NOT IN SCOPE

SMALL WLT

SECURE COMM

VEST

CORRIDOR

GENERAL SHEET NOTES

1. REFER TO SHEET P-001 FOR PLUMBING LEGEND AND GENERAL NOTES.

2. REFER TO P-401, P-402 AND P-403 FOR ENLARGED PLANS.

3. REFER TO P-601 FOR PLUMBING SCHEDULES.

4. REFER TO ARCHITECTURE FOR PENETRATION DETAILS THROUGH THE

BUILDING ENVELOPE.

5. PROVIDE CLEARANCES FOR ALL ELECTRICAL AND CONTROL PANELS

PER NEC.

6. REFER TO SECURITY DRAWINGS FOR LOCATIONS OF WALLS

CONSTRUCTED TO ICD 705 REQUIREMENTS AND SPECIAL

CONSTRUCTION FOR PROTECTION OF PENETRATIONS.

SHEET KEYNOTES

PLAN

NORTH

TRUE N

32'0

SCALE: 3/32"=1'-0"

4' 8' 16'

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

AREA B

KEY PLAN

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

P-113b

P A

R T

IA

L D

O M

E S

T

IC

W A

T E

R

G A

S P

L A

N

L E

V E

L

A R

E A

B B

ID

O

P T

IO

N

F X

B M

P

-1 b

3/32" = 1'-0"A1

PARTIAL DOMESTIC WATER & GAS PLAN - LEVEL 01 - AREA B BID OPTION

214 3/4" DCW FROM ABOVE. RE: A1/P-123b FOR CONTINUATION.

EQUIPMENT

PLATFORM

EQUIPMENT

PLATFORM

P-402

A5

A

RST HQ.1 Q P A.1BN M L K J CDEFGQ.0 A.0

ABAA AC AD AE AF AH

N8

N7

N6

N5

N4

N3

N2

N1

NA NB NC ND NE

NG NH NI NJ NK

AREA NOT IN

SCOPE

P-122

A1

P-123b

A1

60'0

SCALE: 1"=20'

10' 20' 40'

PLAN

NORTH

TRUE N

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

KEY PLAN

OVERALL

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

P-121

O V

E R

A L L F

L O

O R

P L A

N

E Q

U

IP

M E

N T

P L A

T F

O R

M

F X

B M

P

-1

OVERALL FLOOR PLAN - EQUIPMENT PLATFORM 01

RST Q.1 Q P N M L K J

Q.0

ABAA AC AD AE AF

N8

N7

N6

N5

N4

N3

N2

N1

NA NB NC ND NE

EQUIPMENT

PLATFORM

3" SS

P-402

A5

3/4" DCW

3/4" DCW

2" DCW (E) 228

1" CD

1" CD

3" SS 3" SS

3" SS

3" SS

1 1/2" DCW

3" V 3" V

217218

229 229

227 226

3" V

AREA NOT IN

SCOPE

2" V

GENERAL SHEET NOTES

1. REFER TO SHEET P-001 FOR PLUMBING LEGEND AND GENERAL NOTES.

2. REFER TO P-401, P-402 AND P-403 FOR ENLARGED PLANS.

3. REFER TO P-601 FOR PLUMBING SCHEDULES.

4. REFER TO ARCHITECTURE FOR PENETRATION DETAILS THROUGH THE

BUILDING ENVELOPE.

5. PROVIDE CLEARANCES FOR ALL ELECTRICAL AND CONTROL PANELS

PER NEC.

6. REFER TO SECURITY DRAWINGS FOR LOCATIONS OF WALLS

CONSTRUCTED TO ICD 705 REQUIREMENTS AND SPECIAL

CONSTRUCTION FOR PROTECTION OF PENETRATIONS.

SHEET KEYNOTES

PLAN

NORTH

TRUE N

32'0

SCALE: 3/32"=1'-0"

4' 8' 16'

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

AREA A

KEY PLAN

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

P-122

P A

R T

IA

L F

L O

O R

P L A

N

E Q

U

IP

M E

N T

P L A

T F

O R

M

A R

E A

A

F X

B M

P

-1

3/32" = 1'-0"A1

PARTIAL PLUMBING FLOOR PLAN - EQUIPMENT PLATFORM 01 - AREA A

215 3/4" DCW FROM ABOVE. RE: A1/P-132 FOR CONTINUATION.

216 1 1/2" DCW UP. RE: A1/P-132 FOR CONTINUATION.

217 3" V FROM BELOW. RE: A1/P-401 FOR CONTINUATION.

218 INSTALL NEW 3" SIDEWALL VENT AT 11' 10" AFF. RE: A4/P-501 FOR VENT PIPE

PENETRATION DETAIL.

219 ROUTE 1" CD THROUGH EQUIPMENT PLATFORM 1 FINISHED FLOOR TO

ABOVE CEILING OF LEVEL 1. RE: P-102 FOR PIPE CONTINUATION.

220 3" SS FROM FLOOR SINK (FS-1) ABOVE. RE: A1/P-132 FOR CONTINUATION.

221 3" SS FROM ABOVE. RE: A1/P-132 FOR CONTINUATION.

222 3" SS FROM FLOOR CLEAN OUT (FCO) ABOVE. RE: A1/P-132 FOR

CONTINUATION.

223 2" V FROM BELOW. RE: A1/P-102 FOR CONTINUATION.

224 2" V UP. RE: A1/P-102 FOR CONTINUATION.

225 3" SS DOWN. RE: A1/P-102 FOR CONTINUATION.

226 ROUTE 4" V THROUGH WALL AT 16' 0" AFF THEN UP TO EQUIPMENT

PLATFORM 2. RE: A1/P-131a FOR CONTINUATION. RE: P-701 FOR RISER

DIAGRAM.

227 3" V FROM BELOW. RE: A1/P-102 FOR CONTINUATION.

228 EXISTING 2" DCW ROUTED IN EQUIPMENT PLATFORM 01 TO REMAIN.

229 ROUTE 3" SS MAIN BELOW EQUIPMENT PLATFORM 2 DECK.

230 INSTALL NEW 2" SIDEWALL VENT AT 12' 6" AFF. RE: A4/P-501 FOR VENT PIPE

PENETRATION DETAIL.

3/4" DCW

3/4" DCW

3/4" DCW

A

H A.1BCDEFG A.0

AF AH

N8

N7

N6

N5

N4

N3

N2

N1

NG NH NI NJ NK

3/4" DCW

3/4" DCW

AREA NOT IN

SCOPE

EQUIPMENT

PLATFORM

WEAPONS

LOADING

TRAINER #2

GENERAL SHEET NOTES

1. REFER TO SHEET P-001 FOR PLUMBING LEGEND AND GENERAL NOTES.

2. REFER TO P-401, P-402 AND P-403 FOR ENLARGED PLANS.

3. REFER TO P-601 FOR PLUMBING SCHEDULES.

4. REFER TO ARCHITECTURE FOR PENETRATION DETAILS THROUGH THE

BUILDING ENVELOPE.

5. PROVIDE CLEARANCES FOR ALL ELECTRICAL AND CONTROL PANELS

PER NEC.

6. REFER TO SECURITY DRAWINGS FOR LOCATIONS OF WALLS

CONSTRUCTED TO ICD 705 REQUIREMENTS AND SPECIAL

CONSTRUCTION FOR PROTECTION OF PENETRATIONS.

SHEET KEYNOTES

60'0

SCALE: 1"=20'

10' 20' 40'

PLAN

NORTH

TRUE N

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

AREA B

KEY PLAN

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

P-123b

P A

R T

IA

L F

L O

O R

P L A

N

E Q

U

IP

M E

N T

P L A

T F

O R

M

B

ID

O P

T

IO

N

F X

B M

P

-1 b

3/32" = 1'-0"A1

PARTIAL PLUMBING FLOOR PLAN - EQUIPMENT PLATFORM 01 - AREA B BID OPTION

231 3/4" DCW FROM ABOVE. RE: A1/P-133b FOR CONTINUATION.

232 ROUTE 3/4" DCW MAIN AT 18' 0" AFF TIGHT TO WLT BAY WALL. OFFSET

AROUND LOW WALL EXHAUST DUCTWORK AS SHOWN. SECURE PIPING TO

WALL AS REQUIRED.

233 ROUTE 3/4" DCW DOWN TO INSTANTANEOUS WATER HEATER (IHW-5). RE:

A1/P-113b FOR CONTINUATION.

234 3/4" DCW UP. RE: A1/P-133b FOR CONTINUATION.

RST HQ.1 Q P A.1BN M L K J CDEFG

Q.0 A.0

ABAA AC AD AE AF AH

N8

N7

N6

N5

N4

N3

N2

N1

NA NB NC ND NE

NG NH NI NJ NK

AREA NOT IN

SCOPE

P-123b

A1

P-132

A1

60'0

SCALE: 1"=20'

10' 20' 40'

PLAN

NORTH

TRUE N

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

KEY PLAN

OVERALL

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

P-131

O V

E R

A L L F

L O

O R

P L A

N

E Q

U

IP

M E

N T

P L A

T F

O R

M

F X

B M

P

-1

OVERALL FLOOR PLAN - EQUIPMENT PLATFORM 02

RST Q.1 Q P N M L K J

Q.0

ABAA AC AD AE AF

N8

N7

N6

N5

N4

N3

N2

N1

NA NB NC ND NE

FS-1

FS-1

1 1/2" DCW

3/4" DCW

1 1/2" DCW

3" V

1" CD 1" CD

1" CD

1" CD

2" V

3" SS

FCO

3" SS

2" V

3/4" DCW

3/4" DCW

240240

3" V

3" V

3" V

1" DCW

1" DCW

AREA NOT IN

SCOPE

3/4" DCW

M A

T C

H L

IN

E

A

P -1 b

EQUIPMENT

PLATFORM

2" NG(E)

2" NG(E)

2" NG(E)

3" V

GENERAL SHEET NOTES

1. REFER TO SHEET P-001 FOR PLUMBING LEGEND AND GENERAL NOTES.

2. REFER TO P-401, P-402 AND P-403 FOR ENLARGED PLANS.

3. REFER TO P-601 FOR PLUMBING SCHEDULES.

4. REFER TO ARCHITECTURE FOR PENETRATION DETAILS THROUGH THE

BUILDING ENVELOPE.

5. PROVIDE CLEARANCES FOR ALL ELECTRICAL AND CONTROL PANELS

PER NEC.

6. REFER TO SECURITY DRAWINGS FOR LOCATIONS OF WALLS

CONSTRUCTED TO ICD 705 REQUIREMENTS AND SPECIAL

CONSTRUCTION FOR PROTECTION OF PENETRATIONS.

SHEET KEYNOTES

PLAN

NORTH

TRUE N

32'0

SCALE: 3/32"=1'-0"

4' 8' 16'

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

AREA A

KEY PLAN

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

P-132

P A

R T

IA

L F

L O

O R

P L A

N

E Q

U

IP

M E

N T

P L A

T F

O R

M

A R

E A

A

F X

B M

P

-1

3/32" = 1'-0"A1

OVERALL FLOOR PLAN - EQUIPMENT PLATFORM 02 - BASE BID

235 3/4" DCW DOWN. OFFSET IN VERTICAL PIPE AROUND EXHAUST DUCT AS

NECESSARY. RE: A1/P-122 FOR CONTINUATION.

236 ROUTE 1 1/2" DCW MAIN AT 20' 0" AFF TIGHT TO WLT BAY WALL. OFFSET

AROUND LOW WALL EXHAUST DUCTWORK AS SHOWN. SECURE PIPING TO

WALL AS REQUIRED.

237 1 1/2" DCW FROM BELOW. RE: A1/P122 FOR CONTINUATION.

238 3/4" DCW UP. INSTALL RPZ-1 VERTICALLY PER THE MANUFACTURER'S

RECOMMENDATIONS AT A MINIMUM HEIGHT OF 35' 0" AFF. OFFSET AROUND

EXHAUST DUCT AS NECESSARY.

239 PROVIDE AND INSTALL 3/4" CW LINE WITH VALVE AND CAP FOR

CONNECTION BY DEVICE VENDOR TO SERVE HUMIDIFIER ON THE

SELF-CONTAINED DEVICE HVAC UNIT. RE: A1/P133b FOR CONTINUATION.

240 3" SS DOWN. RE:A1/P-122 FOR CONTINUATION.

241 ROUTE 2" VENT UP AND TIGHT ALONG WALL. SECURE PIPE TO WALL AS

REQUIRED.

242 INSTALL NEW 3" SIDEWALL VENT AT 27' 6" AFF. RE: A4/P-501 FOR VENT PIPE

PENETRATION DETAIL.

243 3" V UP THROUGH EQUIPMENT PLATFORM 2 DECK. ROUTE TIGHT TO WALL

AND SECURE AS REQUIRED. RE: A1/P-122 FOR CONTINUATION.

244 ADD VALVE AND CAP FOR CONNECTION TO BID OPTION WORK. RE: A1/P133b

FOR CONTINUATION.

245 ROUTE 2" SANITARY VENT UNDER 3" INDUSTRIAL WASTE VENT. ROUTE

TIGHT TO WALL AND SECURE AS REQUIRED.

247 EXISTING TO REMAIN 2" NATURAL GAS FROM BELOW. RE: A5/P-402.

3/4" DCW

3/4" DCW

A

H A.1BCDEFG A.0AF AH

N8

N7

N6

N5

N4

N3

N2

N1

NG NH NI NJ NK

3/4" NG

1" DCW

3/4" DCW

3/4" DCW

2" NG(E)

2" NG(E)

3/4" NG

249 251

AREA NOT IN

SCOPE

3/4" DCW

1" DCW

3/4" DCW 3/4" DCW

3/4" DCW

M A

T C

H L

IN

E

A

P -1

WEAPONS

LOADING

TRAINER #2

2" NG(E)

GPRV-6

GPRV-6

GPRV-6

GENERAL SHEET NOTES

1. REFER TO SHEET P-001 FOR PLUMBING LEGEND AND GENERAL NOTES.

2. REFER TO P-401, P-402 AND P-403 FOR ENLARGED PLANS.

3. REFER TO P-601 FOR PLUMBING SCHEDULES.

4. REFER TO ARCHITECTURE FOR PENETRATION DETAILS THROUGH THE

BUILDING ENVELOPE.

5. PROVIDE CLEARANCES FOR ALL ELECTRICAL AND CONTROL PANELS

PER NEC.

6. REFER TO SECURITY DRAWINGS FOR LOCATIONS OF WALLS

CONSTRUCTED TO ICD 705 REQUIREMENTS AND SPECIAL

CONSTRUCTION FOR PROTECTION OF PENETRATIONS.

SHEET KEYNOTES

60'0

SCALE: 1"=20'

10' 20' 40'

PLAN

NORTH

TRUE N

US Army Corps of Engineers Omaha District ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

D R

A W

IN

G

C O

D E

-W

F

R

A

P R

IL

B D

Y S

O N

F

IL

E N

A M

E

O M

A H

A D

IS

T

R

A H

A

N E

B R

A S

K A

E L L S

W O

R T

H A

IR

F

O R

C E

B A

S E

S

D D

E S

IG

N

B -2

W E

A P

O N

S L

O A

D

A

IN

IN

G

F A

C

IL

IT

Y

P R

O J E

C T

N U

M B

E R

F

X B

M

H

IG

H

L A

N D

S P

L A

Z A

D R

W

E S

T S

U

IT

E

S T

L O

U

IS

M

IS

S

O U

R I

AREA B

KEY PLAN

ADVERTISEMENT - 100% DESIGN

A B

DC

GRAPHIC SCALE

K R

H O

T E

N

K R

H O

T E

N

J S

T A

M P

E R

P-133b

P A

R T

IA

L F

L O

O R

P L A

N

E Q

U

IP

M E

N T

P L A

T F

O R

M

B

ID

O P

T

IO

N

F X

B M

P

-1 b

3/32" = 1'-0"A1

OVERALL FLOOR PLAN - EQUIPMENT PLATFORM 02 - BID OPTION

248 CONNECT BID OPTION 1" DCW MAIN TO BASE BID DCW MAIN AND ROUTE AT

20' 0" AFF TIGHT TO WLT BAY WALL. OFFSET AROUND LOW WALL EXHAUST

DUCTWORK AS SHOWN. SECURE PIPING TO WALL AS REQUIRED.

249 3/4" DCW DOWN. OFFSET IN VERTICAL PIPE AROUND EXHAUST DUCT AS

NECESSARY. RE: A1/P-123b FOR CONTINUATION.

250 3/4" DCW UP. INSTALL RPZ-2 VERTICALLY PER THE MANUFACTURER'S

RECOM…