This document provides a solicitation for the Generator Air and Thrust Bearing Oil Cooler and Supply Piping Replacement project at Gavins Point Dam in Yankton, South Dakota. The U.S. Army Corps of Engineers, Omaha District is seeking proposals to install new generator air coolers, thrust bearing oil coolers, raw water strainers, and associated supply piping at the dam. Contractors must visit the site by June 1st and submit proposals through the ProjNet system by the deadline specified in the solicitation. The work is to be conducted under a full and open competition contract with an estimated value between $1,000,000 and $5,000,000. The primary NAICS code for the project is 238220 for plumbing, heating, and air conditioning contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W59XQG81972643
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
- Update the Bidder Inquiry Key in Section 00 21 00, "Instrucions to Offerors".
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jun-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F22R0061
X 9B. DATED (SEE ITEM 11)
25-May-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jun-2022
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F22R0061
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
INSTRUCTIONS TO OFFERORS
SECTION 00 21 00
INSTRUCTIONS TO OFFERORS (RFP)
1. SOLICITATION RESTRICTIONS
1.1. GENERAL CONTRACTOR
This solicitation is unrestricted and open to both large and small business participation.
1.2. ESTIMATED CONSTRUCTION COST
The estimated construction cost of this project is between $1,000,000 and $5,000,000.
1.3. SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS
See FAR 52.215-1 INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISTION, subparagraph "(c) Submission, modification, revision, and withdrawal of proposals." below for acceptable methods.
1.4. SUBMISSION DEADLINE
Contractors shall submit their proposals via email to the following individuals by no later than the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recently issued SF 30 as applicable:
Daniel Monahan, Contract Officer: Daniel.D.Monahan@usace.army.mil Timothy Boyte, Contract Specialist: Timothy.B.Boyte@usace.army.mil
Each email shall contain the following information: Solicitation No. W9128F22R0061
Proposals received after the date and time stated within Block 13 of the SF1442, or Block 14 of the most recently issued SF 30 as applicable, will be considered late and will not be considered for award. To avoid rejection of a proposal, the offeror must make every effort to ensure its electronic submission is virus-free.
Proposals, or portions thereof, submitted with the presence of a virus.
Proposals should enter a description for every file submitted. For files over 20 megabytes (MB) the Contractor shall break the file into smaller files sent via separate emails with each email marked to identify which number the email is relative to the total number of emails submitted (i.e., "email one of four"). Once all the emails submitted have been received the Government will confirm receipt via responsive email.
Do not assume submission will be instantaneous. File size and number of files submitted shall be considered. Contractor/Teammate/Subcontractors should allow adequate time for submission completion because the entire proposal (i.e., Contractor's submission and all teammate/subcontractor(s) independent submissions) must be received by the due date and time specified in Block 13 of SF 1442, or SF 30 as applicable.
2. COPIES OF SOLICITATION DOCUMENT AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the U.S. General Services Administration website at:
https://sam.gov/
It shall be the Contractor's responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
A list of interested vendors (potential offerors and subcontractors) is available on the beta.sam.gov web site listed above (registration required).
3. OFFEROR'S QUESTIONS AND COMMENTS
3.1. SITE VISIT
The clauses at 52.236-2, Differing Site Conditions, and 52.236-3,Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
a. A site visit is scheduled for 1 JUN 2022 at 10:00am (CST) Contractors interested in attending the site must make a reservation with Michael (Moose) Welch by e-mail at Michael.V.Welch@usace.army.mil. Contractors are to meet at the Gavins Point Power Plant.
Contact Moose if directions are needed.
3.2. BIDDER INQUIRY
Solicitation questions and/or comments must be submitted via Bidder Inquiry in ProjNet at:
https://www.projnet.org/projnet/. All Bidder Inquiries must be submitted no later than ten (10) calendar days before the proposal due date in order for inquiries to be given consideration or actions taken prior to the receipt of offers. All timely questions and approved answers will be made available through ProjNet.
The Bidder Inquiry system is to be used to ask and receive answers to all non-proprietary questions. In the event the Bidder Inquiry method is unavailable and issue resolution is unsuccessful, inquiries may be submitted via email to the Contract Specialist listed below. Inquiries considered proprietary by the prospective vendor may also be submitted via email.
Contract Specialist – Primary POC:
Timothy Boyte Timothy.B.Boyte@usace.army.mil 402-995-2589 (Telephone)
To submit and review Bidder Inquiries, prospective vendors will need to use the Bidder Inquiry Key and instructions listed below. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via ProjNet email notification after an answer to the comment/question has been processed by our technical team.
The Solicitation Number is: W9128F22R0061
The Bidder Inquiry Key is: QS35KC-KF5GKB
b. Registration for ProjNet Bidder Inquiry Access
If you are already registered, go to Entering Bidder Inquiries in ProjNet Bidder Inquiry System below.
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
c. Entering Bidder Inquiries in ProjNet Bidder Inquiry System
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
8. Follow online screen instructions to enter specific bidder inquiries for the project.
d. Offerors are requested to review the specification in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
4. PLAN HOLDER'S LIST
For Viewing a List of Interested Vendors (i.e. planholders List) and Receiving Notifications or e-mail of changes regarding a solicitation, U.S. General Services Administration has these features available (https:// sam.gov/). For this solicitation, go to https://sam.gov/ and register as a vendor or enter username and password to login.
If you wish for General Contractors, Subcontractors, Suppliers, Plan Rooms or Print Shops to have the ability to contact you, click on the "Add me to Interested Vendors" for the solicitation.
5. GENERAL DESCRIPTION OF WORK
Scope of project includes all work required for the Generator Air and Thrust Bearing Oil Cooler, and Supply Piping Replacement at Gavins Point Dam, NE. Work shall be in accordance with Request for Proposal documents issued with this solicitation.
6. PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION, AND CONTRACT AWARD
The Contracting Officer has established a Source Selection Board to conduct an evaluation of each proposal received in response to this Solicitation. The evaluation will be based exclusively on the merits and content of the proposal and any subsequent discussion required. The identities of the SSB personnel are confidential, and any attempt by the proposers to contact these individuals is prohibited.
See Section 00 22 00, SUPPLEMENTARY INSTRUCTIONS, PROPOSAL SUBMISSION, AND
EVALUATION.
7. FEDERAL, STATE AND LOCAL TAXES
It is the Contractor's responsibility to investigate applicable federal, state, and local taxes as well as any specific exemptions that may exist. This includes any applicable Value-Added Taxes (VAT), sales, use, and excise taxes. See General Conditions (Contract Clause) 52.229-3 FEDERAL, STATE, AND LOCAL
TAXES.
(1) Subcontracting plans are required to be approved prior to Contract Award. The approved subcontracting plan (to include goals) will become a material part of the contract.
f. Failing to Submit an Acceptable Subcontracting Plan. An apparent successful offeror failing to submit a subcontracting plan which demonstrates a reasonable effort to meet the goals listed above or provide an explanation why lesser goals are proposed (upon request), will be considered as non-responsive and not considered eligible for award of the contract.
g. Questions or Assistance Needed in Developing Subcontracting Plan. For any questions or assistance needed in developing the subcontracting plan, contact the Contract Specialist or District's Deputy for Small Business (See paragraph: OFFEROR'S QUESTIONS AND COMMENTS. Please contact the Contract Specialist listed or the District's Deputy for Small Business your inquiries to 402-995-2919).
-- End of Section --
(End of Summary of Changes)