1 of 4 - W9128F22R0061.pdf
PDF 1 MB Posted
- Solicitation number
- W9128F22R0061
About this file
This federal solicitation advertisement seeks proposals for a Generator Air and Thrust Bearing Oil Cooler and Supply Piping Replacement project at Gavins Point Dam in Yankton, South Dakota. The project includes installing new generator air coolers, thrust bearing oil coolers, raw water strainers, and associated supply piping. The estimated construction cost is between $1,000,000 to $5,000,000. The primary NAICS code is 238220 for plumbing, heating, and air conditioning contractors with a small business size standard of $16.5 million. A site visit will be held on June 1, 2022 and proposals are due by June 27, 2022. Questions regarding this solicitation should be directed to the Contract Specialist Timothy Boyte by email.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W59XQG81972643
The Offeror hearby agrees to do all w ork described in the documents entitled:
Generator Air Coolers, Gavins Point Dam
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), AND SECTION 00 45 00. Electronic copies of Offer are acceptable.
THIS SOLICITATION IS FULL AND OPEN COMPETITION
All bids must be submitted electronically. See Section 00 21 00 INSTRUCTION TO OFFERORS, "General Bidding Information" for instructions on submitting bids.
TIMOTHY B BOYTE 402-995-2589
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
25-May-2022
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________450 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________27 Jun 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
ARMY CORPS OF ENGINEERS
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W9128F22R0061 85
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 3 of 85
Section Supplies or Services and Price
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Mobilization and Demobilization
FFP
Mobilization and Demobilization FOB: Destination
MILSTRIP: W59XQG81972643
PURCHASE REQUEST NUMBER: W59XQG81972643
PSC CD: J012
NET AMT
0002 1 Job Furnish and Install Generator Air Cooler
FFP
Furnish and Install Generator Air Cooler Supply and Discharge Piping - 3 Units FOB: Destination
MILSTRIP: W59XQG81972643
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 4 of 85
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
0003 1 Job Furnish & Install Thrust Bearing Oil
FFP
Furnish and Install Thrust Bearing Oil Cooler Supply and Discharge Piping - 3 Units FOB: Destination
0004 1 Job Furnish and Install New Main Unit Raw
FFP
Furnish and Install New Main Unit Raw Water Strainers - 3 Units FOB: Destination
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 5 of 85
0005 1 Job OPTION Furnish and Install Generator Air Cooler
FFP
Furnish and Install Generator Air Coolers - 3 Units FOB: Destination
0006 1 Job OPTION Furnish and Install Thrust Bearing
FFP
Furnish and Install Thrust Bearing Oil Coolers - 3 Units FOB: Destination
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 6 of 85
0007 1 Job OPTION Furnish Generator Air Cooler and Thrust
FFP
Furnish Generator Air Cooler and Thrust Bearing Cooler - Spares FOB: Destination
PRICE SCHEDULE
GA and TBO Cooler Replacement, Gavins Point, SD
SECTION 00 10 00
Pricing Schedule
CLIN Description Quantity Unit
Measure Unit Price
Amount
BASE ITEMS
0001 Mobilization and Demobilization 1 Job XXX $______________
0002 Furnish and Install Generator Air
Cooler Supply and Discharge Piping - 3 Units
1 Job XXX $______________
0003 Furnish and Install Thrust Bearing
Oil Cooler Supply and Discharge Piping - 3 Units
0004 Furnish and Install New Main Unit
Raw Water Strainers - 3 Units
SUB-TOTAL BASE (Items 0001 thru 0004) $______________
OPTIONAL ITEMS
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 7 of 85
0005 Furnish and Install Generator Air
Coolers - 3 Units
0006 Furnish and Install Thrust Bearing
Oil Coolers - 3 Units
0007 Furnish Generator Air Cooler and
Thrust Bearing Cooler - Spares
SUB-TOTAL OPTION (Items 0005 thru 0007) $______________
NOTES:
1 See SECTION 00 21 00, INSTRUCTIONS, CONDITIONS, & NOTICES TO BIDDERS for evaluation of options.
The Government may exercise an option by written notice to the Contractor commencing from the date of contract award thru the date the contract is closed, unless otherwise specified herein.
2 Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the Job (lump sum) prices and the total amount, the lump sum prices will be considered the price submitted.
3 A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item Nos. 0001 thru 0009.
4 See SECTION 00 21 00, INSTRUCTIONS, CONDITIONS, & NOTICES TO BIDDERS for evaluation of options.
The Government may exercise an option by written notice to the Contractor commencing from the date of contract award thru the date the contract is closed, unless otherwise specified herein.
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 8 of 85
Section 00 21 00 - Instructions
INSTRUCTIONS TO OFFERORS
SECTION 00 21 00
INSTRUCTIONS TO OFFERORS (RFP)
1. SOLICITATION RESTRICTIONS
1.1. GENERAL CONTRACTOR
This solicitation is unrestricted and open to both large and small business participation.
1.2. ESTIMATED CONSTRUCTION COST
The estimated construction cost of this project is between $1,000,000 and $5,000,000.
1.3. SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS
See FAR 52.215-1 INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISTION, subparagraph "(c) Submission, modification, revision, and withdrawal of proposals." below for acceptable methods.
1.4. SUBMISSION DEADLINE
Contractors shall submit their proposals via email to the following individuals by no later than the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recently issued SF 30 as applicable:
Daniel Monahan, Contract Officer: Daniel.D.Monahan@usace.army.mil Timothy Boyte, Contract Specialist: Timothy.B.Boyte@usace.army.mil
Each email shall contain the following information: Solicitation No. W9128F22R0061
Proposals received after the date and time stated within Block 13 of the SF1442, or Block 14 of the most recently issued SF 30 as applicable, will be considered late and will not be considered for award. To avoid rejection of a proposal, the offeror must make every effort to ensure its electronic submission is virus-free.
Proposals, or portions thereof, submitted with the presence of a virus.
Proposals should enter a description for every file submitted. For files over 20 megabytes (MB) the Contractor shall break the file into smaller files sent via separate emails with each email marked to identify which number the email is relative to the total number of emails submitted (i.e., "email one of four"). Once all the emails submitted have been received the Government will confirm receipt via responsive email.
Do not assume submission will be instantaneous. File size and number of files submitted shall be considered. Contractor/Teammate/Subcontractors should allow adequate time for submission completion because the entire proposal (i.e., Contractor's submission and all teammate/subcontractor(s) independent submissions) must be received by the due date and time specified in Block 13 of SF 1442, or SF 30 as applicable.
2. COPIES OF SOLICITATION DOCUMENT AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 9 of 85 documents will be posted to the U.S. General Services Administration website at:
https://sam.gov/
It shall be the Contractor's responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
A list of interested vendors (potential offerors and subcontractors) is available on the beta.sam.gov web site listed above (registration required).
3. OFFEROR'S QUESTIONS AND COMMENTS
3.1. SITE VISIT
The clauses at 52.236-2, Differing Site Conditions, and 52.236-3,Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
a. A site visit is scheduled for 1 JUN 2022 at 10:00am (CST) Contractors interested in attending the site must make a reservation with Michael (Moose) Welch by e-mail at Michael.V.Welch@usace.army.mil. Contractors are to meet at the Gavins Point Power Plant.
Contact Moose if directions are needed.
3.2. BIDDER INQUIRY
Solicitation questions and/or comments must be submitted via Bidder Inquiry in ProjNet at:
https://www.projnet.org/projnet/. All Bidder Inquiries must be submitted no later than ten (10) calendar days before the proposal due date in order for inquiries to be given consideration or actions taken prior to the receipt of offers. All timely questions and approved answers will be made available through ProjNet.
The Bidder Inquiry system is to be used to ask and receive answers to all non-proprietary questions. In the event the Bidder Inquiry method is unavailable and issue resolution is unsuccessful, inquiries may be submitted via email to the Contract Specialist listed below. Inquiries considered proprietary by the prospective vendor may also be submitted via email.
Contract Specialist – Primary POC:
Timothy Boyte Timothy.B.Boyte@usace.army.mil 402-995-2589 (Telephone)
To submit and review Bidder Inquiries, prospective vendors will need to use the Bidder Inquiry Key and instructions listed below. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via ProjNet email notification after an answer to the comment/question has been processed by our technical team.
The Solicitation Number is: W9128F22R0061
The Bidder Inquiry Key is: 7MCV9E-99SMY5
b. Registration for ProjNet Bidder Inquiry Access
If you are already registered, go to Entering Bidder Inquiries in ProjNet Bidder Inquiry System below.
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 10 of 85 screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
c. Entering Bidder Inquiries in ProjNet Bidder Inquiry System
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
8. Follow online screen instructions to enter specific bidder inquiries for the project.
d. Offerors are requested to review the specification in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
4. PLAN HOLDER'S LIST
For Viewing a List of Interested Vendors (i.e. planholders List) and Receiving Notifications or e-mail of changes regarding a solicitation, U.S. General Services Administration has these features available (https:// sam.gov/). For this solicitation, go to https://sam.gov/ and register as a vendor or enter username and password to login.
If you wish for General Contractors, Subcontractors, Suppliers, Plan Rooms or Print Shops to have the ability to contact you, click on the "Add me to Interested Vendors" for the solicitation.
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 11 of 85
5. GENERAL DESCRIPTION OF WORK
Scope of project includes all work required for the Generator Air and Thrust Bearing Oil Cooler, and Supply Piping Replacement at Gavins Point Dam, NE. Work shall be in accordance with Request for Proposal documents issued with this solicitation.
6. PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION, AND CONTRACT AWARD
The Contracting Officer has established a Source Selection Board to conduct an evaluation of each proposal received in response to this Solicitation. The evaluation will be based exclusively on the merits and content of the proposal and any subsequent discussion required. The identities of the SSB personnel are confidential, and any attempt by the proposers to contact these individuals is prohibited.
See Section 00 22 00, SUPPLEMENTARY INSTRUCTIONS, PROPOSAL SUBMISSION, AND
EVALUATION.
7. FEDERAL, STATE AND LOCAL TAXES
It is the Contractor's responsibility to investigate applicable federal, state, and local taxes as well as any specific exemptions that may exist. This includes any applicable Value-Added Taxes (VAT), sales, use, and excise taxes. See General Conditions (Contract Clause) 52.229-3 FEDERAL, STATE, AND LOCAL
TAXES.
(1) Subcontracting plans are required to be approved prior to Contract Award. The approved subcontracting plan (to include goals) will become a material part of the contract.
f. Failing to Submit an Acceptable Subcontracting Plan. An apparent successful offeror failing to submit a subcontracting plan which demonstrates a reasonable effort to meet the goals listed above or provide an explanation why lesser goals are proposed (upon request), will be considered as non-responsive and not considered eligible for award of the contract.
g. Questions or Assistance Needed in Developing Subcontracting Plan. For any questions or assistance needed in developing the subcontracting plan, contact the Contract Specialist or District's Deputy for Small Business (See paragraph: OFFEROR'S QUESTIONS AND COMMENTS. Please contact the Contract Specialist listed or the District's Deputy for Small Business your inquiries to 402-995-2919).
-- End of Section --
ATTACHEMENTS
Specificaitons and Drawings
The following Specifications and Drawings are incorporated as part of this Requirement:
- W9128F22R0061 Specs – GP Generator Air Coolers Replacement
- Final-GP_Generator Air Cooler Replacement - Contract Drawings
- Final-GP_Generator Air Cooler Replacement - Reference Drawings
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 12 of 85
52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.215-1 Instructions to Offerors--Competitive Acquisition DEC 2021 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
CLAUSES INCORPORATED BY FULL TEXT
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site Visit details can be found in 00 21 00 Instructions to Offorors (RFP) Paragraph 3.1
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://acquisition.gov http://www.acq.osd.mil/dpap/dars/dfarspgi/current/
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 13 of 85
(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (DFARS) (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.211-7002 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS, STANDARDS, PLANS,
DRAWINGS, DATA ITEM DESCRIPTIONS, AND OTHER PERTINENT DOCUMENTS (DEC. 1991)
The specifications, standards, plans, drawings, data item descriptions, and other pertinent documents cited in this solicitation are not available for distribution but may be examined at the following location:
(a) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(1) ASSIST (https://assist.dla.mil/online/start/);
(2) Quick Search (http://quicksearch.dla.mil/);
(3) ASSISTdocs.com (http://assistdocs.com).
(b) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by-
(1) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);
(2) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or
(3) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 14 of 85
Section 00 22 00 - Supplementary Instructions
PROPOSAL INSTRUCTIONS
SECTION 00 22 00
PROPOSAL INSTRUCTIONS,
SUBMISSION REQUIREMENTS AND EVALUATION
1. WHO MAY SUBMIT
This solicitation is for Full and Open Competition.
All Offerors, including joint ventures, must be registered in the System for Award Management (SAM).
There will be no public opening. All proposals submitted will become, upon receipt, the property of the U.S.
Government and will not be returned. After evaluation of proposals, the original will be retained for the official contract file. Electronic copies of the awardees’ proposal will be submitted to the Field and Area Offices in support of their contract administration functions.
2. GENERAL REQUIREMENTS
In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information sufficiently detailed to clearly indicate compliance with the proposal submission requirements.
3. BIDDER INQUIRY
Reference BIDDER INQUIRY (Section 00 21 00) for bidder question instructions and procedures.
4. FORMAT SIZE OF SUBMISSIONS
All portions (other than an organization chart, Gantt charts or drawings (if provided)) shall be in 8-1/2" x 11" format.
5. PROPOSAL SUBMITTAL INSTRUCTIONS
In an effort to reduce paperwork and cost, all proposals shall be submitted electronically via email directly to:
Tim Boyte: Timothy.B.Boyte@usace.army.mil
Daniel Monahan: Daniel.D.Monahan@usace.army.mil All submissions shall be in Adobe PDF format with Optical Character Recognition (OCR) applied to all documents that will enable word searches to be conducted using Adobe-compatible PDF software. The two (2) volumes listed below shall be submitted as “SEPARATE” single files. Offerors may use compression utilities such as 7-Zip, WinZip or PKZip to reduce file size and facilitate transmission. Offerors are encouraged to send both files in the same email, if possible.
6. Proposal Submittals Each submittal must contain Volume 1 and Volume 2 files named and structured as outlined below. Note the company name may be abbreviated.
Volume 1: Technical Proposal and Past Performance Information FILE NAME: W9128F22R0061_Company Name_Volume_1_Technical_Proposal
CONTENTS:
Table 1- Proposal Submittals
Location Description Vol. 1. TAB A Factor 1 – PAST PERFORMANCE
Vol. 1. TAB B Factor 2 – TECHNICAL APPROACH
Vol. 1. TAB C Factor 3 – PERSONNEL QUALIFICATIONS
AND EXPERIENCE
Vol. 1 TAB D Factor 4 – SMALL BUSINESS
PARTICIPATION
Volume 2: Price Proposal, Cost Information and Representations, Certifications, and Other Statements of Offerors FILE NAME: W9128F22R0061_Company Name_Volume_2_Price_Proposal
CONTENTS:
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 15 of 85
Table 2: Price Proposal Requirements
Location Description Vol. 2 TAB A Factor 5 - PRICE (Standard Form
1442, Proposal Data Sheet And Contract Line Item Schedule)
Vol. 2 TAB B Evidence of Bondability
Vol. 2 TAB C Required Pre-Award Information
7. Late Submissions For the purposes of determining whether the proposal was received “late”, in accordance with FAR 15.208, the date and time the file(s) are received via email by the Contract Specialist(s) will be the time and date the Government received the proposal.
8. SUBMISSION DEADLINE
Electronic proposals shall be received by the USACE Contracting Activity no later than the time and date specified in Block 13 of Standard Form 1442. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
9. PROPOSAL CRITERIA
Offerors shall submit a proposal that meets or exceeds the minimum requirements of these Specifications through the replacement, modification or refurbishment of components identified in 00 10 00, PRICING SCHEDULE, of this solicitation.
10. EVALUATION OF PROPOSALS
11. Basis for Evaluation All proposals and documentation which have been properly submitted will be evaluated. Proposals will be evaluated on the basis of the factors stated in the solicitation to select the responsible Offeror whose proposal is most advantageous to the Government. Because of the number of proposals anticipated, uniformity of all proposals is essential to assure fair and accurate evaluation. All proposals must comply with the instructions in the solicitation.
Proposals that do not generally conform to the RFP requirements may be considered to have a “deficiency”, i.e. a defect that cannot be remedied by exchanges and/or permitted proposal revisions. If a proposal is suspected of having a deficiency, it will be brought to the immediate attention of the appropriate authority who will determine if there is a deficiency. If the determination is made that a deficiency exists, the proposal will not be evaluated further and will be eliminated from further consideration. The affected Offeror shall be promptly notified of the decision. Properly conforming proposals will be forwarded to the Source Selection Evaluation Board (SSEB) for evaluation. If, after award, the key personnel or subcontractors identified in the proposal are replaced, replacement personnel or sub-contractors with similar skills and experience equal to those presented in the proposal shall be presented to the Contracting Officer for approval. The Contractor shall obtain the Contracting Officer’s written consent before making any substitutions for these designated personnel or subcontractors.
Information obtained from owners, contract administrators, or other points of contact provided by the Offeror may affect the evaluation rating given for the factors related to the information provided.
Evaluations will be conducted in accordance with the Tradeoff Process, FAR 15.101-1. Volume 1, Factor 1 will be a rated IAW paragraph 8.4 of this section, and Factors 2, 3 & 4 will be rated using a color and adjectival methodology with a narrative assessment. Volume 2 (Factor 5 - Price) will be evaluated after consensus scoring Factors 1 through
3. Proposal evaluation is an assessment of the proposal and the Offeror's ability to perform the resultant contract successfully. Proposals will be evaluated to determine ratings supported by narratives, and to identify strengths, weaknesses, and deficiencies of the proposed approach in each proposal.
12. Evaluation Definitions
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 16 of 85
12.1.1. Strength
A substantive aspect, attribute, or specific item in the proposal that exceeds the solicitation requirements and enhances the probability of successful contract performance.
12.1.2. Weakness
A flaw in the proposal that increases the risk of unsuccessful contract performance.
12.1.3. Significant Weakness
A significant weakness in the proposal is a flaw that appreciably increases the risk.
12.1.4. Deficiency
A material failure of a proposal to meet a government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
12.1.5. Omission
A failure to provide information required by the solicitation and depending on the nature and extent of the omission it may be evaluated as a weakness, a significant weakness or a deficiency.
12.1.6. Clarification
Clarifications are limited exchanges between the Government and Offerors that may occur when award without discussions is contemplated. If award without discussions is anticipated, Offerors may be given the opportunity to clarify certain aspects of their proposals or to resolve minor or clerical errors.
12.1.7. Communications
Communications are exchanges between the Government and Offerors after receipt of proposals, leading to establishment of the competitive range.
12.1.8. Discussions
Discussions are negotiations conducted in a competitive acquisition and take place after establishment of the competitive range. Discussions are tailored to each Offeror's proposal and shall be conducted by the Contracting Officer with each Offeror within the competitive range.
13. Combined Technical/Risk Rating The application of a scale of colors and adjectival description will be used in conjunction with narrative to denote the degree to which the proposal has met the standard for Factors 2, 3 & 4. Ratings will be applied at the factor level, as appropriate for this solicitation. If, at any factor level, an Offeror’s proposal is evaluated as not meeting a minimum requirement (that is, below the level of “Marginal”), this fact must be included in the rating and narrative assessment at that level. The following ratings will be used to evaluate Factors 2, 3 & 4:
Combined Technical/Risk Ratings
Color Rating Description Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 17 of 85
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
14. Past Performance Rating The past performance evaluation results in an assessment of the Offeror’s probability of meeting the solicitation requirements. The past performance evaluations result in two (2) ratings: relevancy and overall confidence. The past performance evaluation considers each offeror’s demonstrated recent and relevant record of performance in construction activities that are needed to meet the contract’s requirements. The Past Performance factor submission requirements and the method that the Government will use to evaluate the Offeror’s past performance is detailed in Factor 1 -Past Performance description below.
There are three (3) aspects to past performance: recency, relevancy (including context of data), and quality (including general trends in contractor performance and source of information). While relevancy is also evaluated individually, all past performance aspects will be used to develop an overall confidence assessment rating for the Past Performance factor.
As an example of a past performance rating, a proposal evaluated as meeting the solicitation past performance criteria may be assessed ratings of “Relevant” and “Satisfactory Confidence.”
14.1.1. Recency
The first aspect is to evaluate the recency of the Offeror’s past performance. With respect to recency, more recent past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than less recently completed projects. Recency criteria related to this solicitation is outlined in the Past Performance Submission Requirements section.
14.1.2. Relevancy
The relevancy element focuses on evaluating the applicability of the Offeror’s previous work in relation to the solicitation requirements. Consideration shall be given to the features of an Offeror’s contract history that best demonstrates the Offeror’s ability to satisfy the current procurement requirements. Common aspects of relevancy include similarity of service/support, complexity, dollar value, contract type, and degree of subcontract/teaming. With respect to relevancy, more relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance. There are four (4) levels of relevancy as shown in the Table below.
Rating Definition Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
14.1.3. Quality
The third past performance aspect is quality. The Quality evaluation will examine how well Offerors have performed on previous projects considering such criteria as workmanship, timeliness, safety, customer service, adherence to budget, subcontractor management (timely payment to subs or suppliers), relations between owner and contractor, as well as the level of support provided for As-built documentation, O&M manuals, training, correcting construction
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 18 of 85 errors, and warranty work. The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. The Offeror will be rated on its own performance. The Government may ask for Owners/References.
The past performance information required in this solicitation shall be provided by the Offeror. Past performance information may also be obtained from questionnaires. At the Government’s discretion, past performance information shall be obtained from any other sources available to the Government, to include, but not limited to, the Contractors Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency.
14.1.4. Performance Confidence Assessment
A final performance confidence assessment rating will be based on the evaluation of recent and relevant past performance information and the assessment of the quality of past performance on prior contract efforts. The Government will review the past performance information to determine the quality and usefulness as it applies to the performance confidence assessment. In conducting a performance confidence assessment, each offeror shall be assigned one of the ratings using the Table below.
Rating Description Substantial Confidence Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available, or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will be able to successfully perform the required effort.
No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
For Past Performance, an Unknown Confidence (Neutral) rating will be awarded when no past performance records are available. Per Federal Acquisition Regulation (FAR) 15.305(a)(2)(iv), “In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available, the Offeror may not be evaluated either favorably or unfavorably on past performance." On the recommendation of the Source Selection Advisory Council, the Source Selection Authority may determine that a “Substantial Confidence” or “Satisfactory Confidence” past performance rating is rated more favorably than a “Neutral Confidence” past performance rating in a best value tradeoff as long as the determination is consistent with stated solicitation criteria.
15. EVALUATION FACTORS FOR AWARD
Evaluation of the factors listed below will be the basis for award. The requirements specified in the solicitation are considered minimum requirements. A more favorable evaluation rating may be given for exceeding the minimum requirements. Note: Volume 1 Factors level of importance are noted below. Volume 2 (Price) is significantly less important than all of the combined Factor elements contained in Volume 1.
Basis for Award – Volume 1 Technical Factors 1 – 4 when combined are significantly more important than Volume 2 Factor 5, Price.
VOLUME 1 – TECHNICAL FACTORS
Factor/ Subfactor Location Description Relative Importance
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 19 of 85
FACTOR 1 Vol. 1. TAB A PAST PERFORMANCE Most Important Factor
FACTOR 2 Vol. 1. TAB B TECHNICAL APPROACH 2nd Most Important Factor (less important than Factor 1)
FACTOR 3 Vol. 1. TAB C PERSONNEL QUALIFICATIONS
AND EXPERIENCE
Equal to Factor 2
FACTOR 4 Vol 1. TAB D SMALL BUSINESS
PARTICIPATION
Less important than Factors 1-3
VOLUME 2 – PRICE AND PRO FORMA INFORMATION
Factor/Subfactor Location Description Relative Importance FACTOR 5 Vol. 2 TAB A PRICE (Standard Form 1442, Proposal Data Sheet And Contract Line Item Schedule)
All evaluation factors, other than price, when combined, are considered significantly more important than price. Price is the least important factor.
Note: An “Unacceptable” evaluation rating for any factor, or combination of different factors, may cause the proposal to be evaluated as “Unacceptable”. Volume 2 - Price will be evaluated in accordance the requirements listed in paragraph 15, Volume 2, Factor 5 - PRICE.
16. VOLUME 1 - PROPOSAL REQUIREMENTS AND SUBMISSION FORMAT
Offerors shall submit the original of their Volume 1 file containing the following factors:
Factor 1 – Past Performance Factor 2 – Technical Approach Factor 3 – Personnel Qualifications and Experience Factor 4 – Small Business Participation
17. VOLUME 2 - PRICE AND PRO FORMA INFORMATION
Offerors shall submit their price proposal, along with the other information requested in Paragraph 13.1, in their Volume 2 file.
Volume 2 shall include a cover letter stating that the proposal complies completely with all terms, conditions, and specifications contained in the solicitation. A proposal that does not comply with all terms, conditions, and specifications in the solicitation will be automatically rejected and not considered for award.
Volume 2 shall contain the Solicitation/Contract Form and Pricing Schedule (Section 00 10 00), Representations, Certifications and Other Statements of Offerors (Section 00 45 00), Pre-Award Survey Information and Small Business Information.
Please Note: The Government will not pay for the provision of any information nor compensate any Offeror for the development of the required information outlined in the solicitation required for inclusion in the Offeror’s proposal.
All proposals shall contain the information stated herein. Proposal clarity, organization (as defined in this solicitation) and cross-referencing is mandatory. No material (information not part of the proposal) shall be incorporated by reference.
Note: Offerors that do not want the data submitted below disclosed by the Government must follow the procedure specified in Section 00 21 00 INSTRUCTIONS TO OFFERORS—COMPETETIVE ACQUISITION. Please note, portions of the winning proposal will be incorporated into the contract and are subject to disclosure notwithstanding restrictive markings.
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 20 of 85
18. FACTOR 1 – PAST PERFORMANCE
This factor is designed to verify the past performance of the Offeror having been regularly engaged in mechanical industrial installations similar in nature to this project. Emphasis should also be placed on demonstrating successful work history of planning and executing work on existing systems while minimizing outages.
19. Submission Requirements
19.1.1. Project Narratives
The Offeror should submit a minimum of three (3) and a maximum of five (5) narratives for projects completed or substantially complete within the past six (6) years that best illustrate the Offeror’s performance on projects of similar function, scope, complexity, and size as this project. Each project narrative shall be no more than two (2) pages detailing the project and providing specifics as noted herein. Project narratives will include the following information:
a. Contract number and Offeror’s and/or major subcontractor’s specific role in the project.
b. Project name.
c. Project cost.
d. Project description must include:
i. Location.
ii. Description of work performed demonstrating Mechanical Industrial Installation experience.
iii. Total contract value.
iv. Specific mechanical installation experience relating to the project.
v. Date of completion.
vi. Name of customer, agency, or firm.
vii. Point of Contact (POC) information for the customer, agency, or firm, including name, title, email, and telephone number.
If the past performance of a subcontractor is used to meet the minimum requirements, at least two (2) of the submitted narratives should demonstrate that subcontractor’s past performance. A binding Letter of Commitment between the prime and subcontractor must be included and contain the following:
1. A statement of commitment as to the performance and utilization of the identified entity’s resources on the project.
2. Signatures of both the Offeror and subcontracting entity.
A maximum of five (5) projects will be evaluated. If an offeror disregards these instructions and submits more than five projects, only the first five (5) projects will be evaluated. Offerors should describe each project with enough detail to ensure that the Government can meaningfully assess the projects against the evaluation criteria described in the RFP. Substantially complete is defined as being 50% construction progress completed by the date that proposals are due. If an offeror submits a project that it represents as “substantially complete,” the offeror must reasonably explain why the project is considered at least 50% construction progress complete. If an Offeror submits an ongoing project without providing an accompanying reasonable explanation that explains how the project is at least 50% complete, the Government reserves the right to reject the project.
For evaluation purposes, “similar” is defined as work performed in a powerhouse or industrial facility for the following areas of work. A submitted project does not need to address all areas of work to be considered relevant, but when combined, the submitted projects must address ALL of the following:
a. Piping Fabrication
1) Performance of welding stainless-steel piping, including the development, and management of welding procedures.
2) Performance of coating pipe assemblies.
Generator Cooler Replacement and Associated Piping Redesign, Gavins Point Dam, NE GP73
Gavins Point Generator Cooler Replacement Page 21 of 85
3) Performance of adequately supporting newly installed pipe assemblies.
4) Performance of removing and installing pipe assemblies in confined spaces near existing equipment.
b. Surface Air Cooler and Thrust Bearing Oil Cooler Development and Fabrication
1) The fabricator of the coolers must submit project narratives that include the manufacturing of surface air coolers and thrust bearing oil coolers for hydroelectric generating units.
2) Surface air cooler and thrust bearing oil cooler fabricator has produced coolers that utilized finned stainless-steel tubing that is of the type specified in this solicitation.
3) Demonstrate ownership of, or access to, equipment that can be used to perform the shop pressure testing of the new coolers that is required in this solicitation. Include a signed Letter of Commitment between the prime and proposed surface air cooler fabrication subcontractor.
c. The total cost of one (1) of the projects must be valued at more than $250,000.00.
Contractor shall provide a copy of the Joint Venture agreement if offeror proposes to use a Joint Venture.
19.1.2. Performance Appraisals
The past performance information required in this solicitation shall be provided by the Offeror. Past performance information may also be obtained from questionnaires. At the Government’s discretion, past performance information shall be obtained from any other sources available to the Government, to include, but not limited to, the Contractors Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency.
20. Contractor Performance Assessment Reports System (CPARS) For projects constructed for other Government or commercial entities, submit the performance appraisal sheets used by the respective Government or commercial entity. For each project that may be private industry work or other Government entity not covered in the CPARS database, submit Form PPQ-0 (Attachment 1) completed by an owner or owner’s representative not affiliated with the Offeror’s firm. Offeror should explain any past performance resulting in significant cost and/or time growth.
The Government reserves the right to obtain copies of all CPARS records contained in the CPARS database. Firms are requested to retrieve their past performance information directly from CPARS at https://www.cpars.gov.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .