Abstract of Bids W9128F22B0011 FR Bank Stabilization.pdf

PDF 206 KB Posted

Attached to
Fort Randall Bank Stabilization - RM 886 and East Dude Ranch
Solicitation number
W9128F22B0011
Issued by

About this file

This abstract of bids document summarizes five offers received in response to Solicitation Number W9128F22B0011 issued by the US Army Corps of Engineers Omaha District for the Fort Randall Bank Stabilization project located in Lyman and Charles Mix Counties, South Dakota. The offers propose pricing for thirteen line items including earthwork, placement of government and contractor furnished stone, geotextile fabric, mobilization and demobilization of equipment, site access improvements and restoration, and all remaining work. The estimated costs range from $867,013.94 to $2,271,675.00. The solicitation closed on September 9th, 2022 and this abstract was certified on September 12th, 2022. The primary NAICS code for this requirement is 237990 for other heavy and civil engineering construction with a small business size standard of $39.5M.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED3. DATE DUE

9-Aug-22 9-Sep-22

I CERTIFY THAT I HAVE OPENED, READ

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

12-Sep-22

Unique ID: ZGEMX6BMP4A3 Unique ID: LJSZRADBDNA5 Unique ID: S4YJDJU16GT6 Unique ID: EVBUYJTMKL45 Unique ID: NDYAQKP9KL16

AMENDMENTS

7A 7B 7C D. E. F.

ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUUNIT PRICE ESTIMATED AMOUNUNIT PRICE ESTIMATED AMOUNTUNIT PRICE ESTIMATED AMOUNUNIT PRICE ESTIMATED AMOUNTUNIT PRICE ESTIMATED AMOUNT

0001 Place stone (Government Furnished) 3621 Tons $27.44 $99,360.24 $45.00 $162,945.00 $41.80 $151,357.80 $48.53 $175,727.13 $50.00 $181,050.00 $25.87 $93,675.27

0002 Earthwork 1 Job $11,650.00 $15,420.00 $60,322.98 $39,550.00 $77,000.00 $22,710.00

0003 Place Geotextile 2428 SY $4.59 $11,144.52 $5.00 $12,140.00 $3.00 $7,284.00 $10.00 $24,280.00 $10.00 $24,280.00 $4.00 $9,712.00

0004 Mobilization and Demobilization of Equipment 1 Job $9,800.00 $70,000.00 $45,624.04 $40,000.00 $50,000.00 $15,000.00

0005 Site Access Improvements, Subsequent Removal, and Restoration

1 Job $79,150.00 $45,000.00 $34,819.93 $132,600.00 $270,200.00 $32,000.00

0006 All remaining work 1 Job $19,150.00 $75,000.00 $15,121.11 $60,000.00 $174,685.00 $25,000.00

0007 Place stone (Government Furnished) 1 Job $3,830.00 $7,140.00 $15,893.64 $9,900.00 $10,000.00 $5,274.00

0008 Place stone (Contractor Furnished) 8172 Tons $67.30 $549,975.60 $65.00 $531,180.00 $52.33 $427,640.76 $87.00 $710,964.00 $105.00 $858,060.00 $46.80 $382,449.60

0009 Earthwork 1 Job $15,920.00 $19,280.00 $32,905.76 $97,000.00 $96,400.00 $15,500.00

Place Geotextile 6000 SY $4.59 $27,540.00 $5.00 $30,000.00 $3.00 $18,000.00 $10.00 $60,000.00 $10.00 $60,000.00 $4.00 $24,000.00

Mobilization and Demobilization of Equipment 1 Job $9,800.00 $70,000.00 $10,048.24 $40,000.00 $30,000.00 $15,000.00

Site Access Improvements, Subsequent Removal, and Restoration 1 Job $101,780.00 $53,980.00 $31,633.10 $200,000.00 $350,000.00 $30,000.00

All remaining work 1 Job $36,440.00 $75,000.00 $16,362.58 $50,000.00 $90,000.00 $27,500.00

Total Basic Total $975,540.36 Total $1,167,085.00 Total $867,013.94 Total $1,640,021.13 Total $2,271,675.00 Total $697,820.87

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

9. OFFERS

TO THIS SOLICITATION

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Jessica R. Jackson

NO. 1 NO. 2

ABSTRACT OF PROPOSALS

1. SOLICITATION NUMBER

W9128F22B0011

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE5. PROJECT TITLE

A. OFFEROR A. OFFEROR

205 N 4TH AVE 601 E Wyandotte ST

A. HIRED LABOR

RP&H Inc. Mammoth Sports Construction, LLC

Reliance, South Dakota 57569 Meriden, Kansas 66512-9169 CAGE Code: 07KC4 B. REASONABLE CONTRACT

SAM Exclusion: NO

CAGE Code: 99MF4

SAM Exclusion: NO (Without Profit) POC: Gale Raymond

C. AMENDMENTS ACKNOWLEDGED: N/A

POC: Shane Myers

C. AMENDMENTS ACKNOWLEDGED: N/A

6. NUMBER OF AMENDMENTS ISSUED - 0

Fort Randall Bank Stabilization - RM 886 and East Dude Ranch

SAM Exclusion: NO POC: Kelly Connor

C. AMENDMENTS ACKNOWLEDGED: N/A

NO. 3

A. OFFEROR

Fenton Construction Inc.

1800 3RD ST

Sioux City, Iowa 51101-2101 CAGE Code: 8EX50 CAGE Code: 97TF3

SAM Exclusion: NO

NO. 4

A. OFFEROR

Kovilic Construction Company Inc.

3721 N. Carnation ST Franklin Park, Illinois 60131-1233 CAGE Code: 0RBX9

POC: Daniel Evangelista

C. AMENDMENTS ACKNOWLEDGED: N/A

SAM Exclusion: NO POC: Nikola Kovilic

C. AMENDMENTS ACKNOWLEDGED: N/A

NO. 5

A. OFFEROR

Site Development & Construction, Inc.

120 N Summit AVE Sioux Falls, South Dakota 57104-2935

PAGE1

2022-09-12T09:43:09-0500
JACKSON.JESSICA.R.1016540583

File details come from the government source that posted it. Updated .