Attachment 4.pdf

PDF 188 KB Posted

Attached to
NC3 Alert Campus, Offutt AFB, NE Federal contract opportunity
Solicitation number
W9128F21R0062
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document contains details for a federal contract solicitation to design and construct facilities at Offutt Air Force Base in Nebraska. The solicitation seeks proposals to design and build a multi-story alert force facility totaling 13,292 square meters, including a watch floor, controlled space, crew quarters, dining areas, fitness areas, classrooms, an auditorium, mechanical and electrical rooms, a loading area, elevator, simulator high bay, and support space. Proposals are also sought to design and construct a 472 square meter family visitation facility with family rooms, a kitchen, multi-use room, and in-processing center, along with an attached communication hut. Additionally, the solicitation requests the design and build of a 2,128 square meter low-rise aircraft maintenance and spares storage building with offices, work areas, repair bays, storage, and outdoor layout space. Supporting facilities such as paving, walkways, lighting, fencing, recreational areas, utilities, and stormwater mitigation are included. The solicitation was issued by the U.S. Army Corps of Engineers Omaha District.

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00 22 00 - ATTACHMENT 4

COMPANY SPECIALIZED EXPERIENCE

DESIGN FIRM OR IN-HOUSE DESIGN CAPABILITY

Provide the following information to show examples of projects your company designed that have subsequently been constructed within the last seven years indicating experience with projects of similar type and scope. Use one form per project.

(a) Type of Facility and Construction Represented ____________________________________

(b) Your Firm’s Name __________________________________________________________

(c) Name of Project_____________________________________________________________

(d) Location of Project __________________________________________________________

(e) Owner/Customer ____________________________________________________________

(f) General Scope of Construction Project ____________________________________________

(g) Summary of Your Role in Design of this Project, including “Secure Area” (in accordance with UFC 4-010-05 and ICD/ICS 705) design

(h) Identify Estimated (“E”) or Actual (“A”) Construction Cost

(i) Extent (%) and Type of Work You Subcontracted Out _______________________________

(j) Dates Design: Began__________ Completed __________

(k) Dates Construction: Began__________ Completed __________

(l) Your Performance Evaluation by Owner, if known __________________________________

(m) Were You Terminated or Assessed Liquidated Damages? ____________________________

(If either is “Yes”, attach an Explanation)

(n) Owner’s Point of Contact for Reference (Name and Company) ________________________

(o) Current Telephone Number & Email of Reference POC ______________________________

File details come from the government source that posted it. Updated .