Pricing Schedule Worksheet.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Ft. Randall Janitorial Service Federal contract opportunity
- Solicitation number
- W9128F20Q0027
About this file
This document contains a pricing schedule worksheet and details of a federal contract opportunity for janitorial services at Fort Randall Dam. The pricing schedule worksheet provides pricing requirements for various janitorial tasks in both the powerhouse and outside maintenance areas at different frequencies, to be completed for base and option year periods. The federal contract opportunity is a small business set-aside solicitation seeking janitorial services at Fort Randall Dam, including furnishing labor, equipment, supplies and performance of cleaning tasks. The solicitation number is W9128F20Q0027 and will close on March 12, 2020. The primary NAICS code is 561720 for janitorial services. Offerors should register in SAM and check for solicitation documents and amendments on beta.sam.gov using the provided number. The point of contact for any questions is Timothy Boyte at the U.S. Army Corps of Engineers Omaha District.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amd 01 W9128F20Q0027 Janitorial Services at Ft. Randall Dam SD.PDF | ||
| Site Visit Questions and Answers.pdf | ||
| Site Visit Sign in Sheet.pdf | ||
| _Pre-Bid MEETING AGENDA.PDF | ||
| W9128F20Q0027, Janitorial Services at Ft. Randall Dam, SD.PDF |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Janitorial Services at Fort Randall Dam |
| Price Schedule Worksheet |
| Price includes all costs associated with providing janitorial services under this PWS, i.e. labor, equipment, materials and supplies |
| Task Description | Frequency | Price Per Cleaning | Base Year | |
| 4/1/20- 3/31/21 CLIN 0001 | Price Per Cleaning | Option Year #1 | ||
| 4/1/21 - 3/31/22 CLIN 1001 | Price Per Cleaning | Option Year #2 | ||
| 4/1/22 - 3/31/23 CLIN 2001 | Price Per Cleaning | Option Year #3 |
4/1/23 - 3/31/24 CLIN 3001
| Powerhouse Tasks | ||||
| 5.2.1.1.1 All restrooms | 198 | |||
| 5.2.1.1.2 Administration Office Areas | 198 | |||
| 5.2.1.1.3 Service Bay Floor | 198 | |||
| 5.2.1.1.4 Locker Room, Entry and Corridor (Elevation 1258) | 198 | |||
| 5.2.1.1.5 Break Rooms | 198 | |||
| 5.2.1.1.6 Elevator | 198 | |||
| 5.2.1.1.7 Stairways "A", "B", "C", and associated landings and corridors in Powerhouse. | 198 | |||
| 5.2.1.1.8 Mechanical and Electrical Shops (Elevation 1258). | 198 | |||
| 5.2.1.2.1 Admin Office Area Mats and Dusting | 52 | |||
| 5.2.1.2.2 Ice Machine in Powerhouse | 52 | |||
| 5.2.1.2.3 Erection Bay and Rubber Mat (Elevation 1273) Damp Mop. | 52 | |||
| 5.2.1.2.4 Locker Room (Elevation 1258) (includes Restroom and Shower Areas). | 52 | |||
| 5.2.1.2.5 Telephone Room, Relay & Meter Test Room, First Aid Room, and Supply Rooms (Elevation 1273). | 52 | |||
| 5.2.1.2.6 Main and Employees Entrances in Powerhouse. | 52 | |||
| 5.2.1.2.7 Elevator Damp Mop | 52 | |||
| 5.2.1.2.8 All restrooms in Powerhouse. | 52 | |||
| 5.2.1.2.9 Public Reception Room, Lobby, and Control Room (Elevation 1273). | 52 | |||
| 5.2.1.2.10 Stairway "D", 3 each, and associated landings in Powerhouse. | 52 | |||
| 5.2.1.2.11 Throw rugs and rubber mats (Elevations 1244, 1258, 1262, 1273, 1291, and 1307) | 52 | |||
| 5.2.1.2.12 Restrooms in Generator Bays #2, #4, & #6 (Elevation 1262). | 52 | |||
| 5.2.1.2.13 Service Bay (1273), Control Room, Corridor #1, Restroom, Kitchen, Entry, Elevator, Lobby, Hallway, and Stairway “A” (Elevation 1273). Public Reception Room | 52 | |||
| 5.2.1.2.14 All other areas of the Powerhouse waste containers | 52 | |||
| 5.2.1.2.15 All Powerhouse areas, Intake Structure, Spillway Control Building, and Untanking House. | 26 | |||
| 5.2.1.2.16 Intake Structure, Spillway Control Building, and Untanking House. | 26 | |||
| 5.2.1.2.17 Physical fitness equipment area by Unit #8 (Elevation 1273). | 52 | |||
| 5.2.1.3.1 All Restrooms wipe partitions and doors | 12 | |||
| 5.2.1.3.2 Administration Office Area windows (inside surface) (Elevation 1291); glass in all bookcases and bulletin boards, various locations, Dusting. | 12 | |||
| 5.2.1.3.3 Generator Bays (Elevations 1244, 1262, and 1273); Erection Bay (Elevations 1244 and 1258); Service Bay (Elevation 1307); Pump and Compressor Room, Heavy Storage Room, Elevator, Lobby, Corridor, and Service Bay (Elevation 1244); Vent & Air Conditioning Room (Elevation 1291); Steps and Landing to Power Tunnel by Units #4 & #8 (Elevation 1244). | 12 | |||
| 5.2.1.3.4 Fan Room | 12 | |||
| 5.2.1.3.5 Stairways "A", "B", and "C" and adjacent landings and corridors. Telephone Room, Relay & Meter Test Room, First Aid Room, Supply Rooms, Erection Bay and Generator Bays #1 & #2 (Elevation 1273 | 12 | |||
| 5.2.1.3.6 Exterior side of windows in Administration Office Areas (Elevation 1291). | 12 | |||
| 5.2.1.4.1 Restrooms, Stairway "B" and Landings (Elevation 1291); Control Room, Restroom, Kitchen, Corridor #1 & Corridor #2, Entry, Lobby, Hallway, and Stairway "A" and Landings (Elevation 1273); Elevator Corridor (Elevation 1258); and Elevator Floor. | 4 | |||
| 5.2.1.4.2 Break Room (Elevation 1258); Break Room and Administration Office Area and Hallways | 4 | |||
| 5.2.1.4.3 Eye Wash Stations in Sewage Treatment Room (Elevation 1244), Battery Room (Elevation 1258) and First Aid Room(Elevation 1273). | 4 | |||
| 5.2.1.4.4 Damp Mop Rubber mat in Erection Bay | 4 | |||
| 5.2.1.5.1 All quarry tile floors including cove bases (includes Erection Bay) (Elevation 1273); Generator Bays #1 & #2 (Elevation 1273); Stairway “A”, adjacent Landings and Corridors; all Public Areas (Elevation 1273); Stairway "D" (3 each) and associated Landings. Damp Mop Generator Decks (8) | 2 | |||
| 5.2.1.5.2 All ceramic tile floors including cove bases (includes Restroom, Locker Room, Shower Room and Corridor) (Elevation 1258); Public Restrooms (Elevation 1273); Restrooms on 1262 Floor (3 each) (Elevation 1262). | 2 | |||
| 5.2.1.5.3 All asphalt/rubber tile floors, including cove bases (includes Electric Shop) (Elevation 1258); Guardroom, First Aid Room, Relay & Meter Test Room, Telephone Room (Elevation 1273). | 2 | |||
| 5.2.1.5.4 All tile walls in Service Bay (includes Stairway "B" and Corridor, First Aid Room, Control Room, Kitchen, Restroom, Public Area and Restrooms) (Elevation 1273); Restrooms and Breakroom (Elevation 1291); Toilet, Locker Room (including lockers), Shower Room and Corridor (Elevation 1258). | 2 | |||
| 5.2.1.5.5 All sealed concrete floors, including gutters and cove bases, Erection and Service Bays (Elevations 1244 and 1258); Generator Bays (Elevations 1244 and 1262); Steps and Landings to Power Tunnel by Units #4 & #8 (Elevation 1244); Service Bay including Lube Oil Storage Room, (Elevation 1244); Electric Shop (Service Bay Elevation 1258). | 2 | |||
| 5.2.1.5.6 Heating and Ventilating Equipment Rooms, Fan Rooms and Stairways (Service Bay Elevations 1273, 1291, and 1307); Heavy Parts Storage Room, C02 Equipment Room, High Pressure Oil Equipment Room, Sewage Treatment Room, Air Conditioning Equipment Room (Service Bay Elevation 1244); Station Service Area, Water Treatment Room, Battery and M.G. Rooms (Service Bay Elevation 1258). | 2 | |||
| 5.2.1.5.7 Exterior of Main Entrance to Powerhouse (including marble and limestone panels, granite step and doors) and the exterior of the Employees Entrance. | 2 | |||
| 5.2.1.5.8 Plenum Rooms for Fans S4B & C (Elevation 1244), Plenum Rooms for Fans S3 &S3A (Elevation 1291), and Plenum Rooms for Fans S4A, B & C (Elevation 1307). | 2 | |||
| 5.2.1.6.1 Control Cable Tunnel, complete including Switchyard Terminal. Power Cable Tunnel, complete including Switchyard Terminal Building. | 1 | |||
| 5.2.1.6.2 Untanking House, including high bay windows. | 1 | |||
| 5.2.1.6.3 Spillway Control Buildings and connecting Gallery. | 1 | |||
| 5.2.1.6.4 Intake Structure. | 1 | |||
| 5.2.1.6.5 Regulating Gatehouse | 1 | |||
| 5.2.1.6.6 Quarry tile floor including cove bases, Generator Bays #3 through #8 (Elevation 1273 | 1 | |||
| 5.2.1.6.7 Tile walls (wainscot), Erection Bay and Generator Bays #1 through #8 (Elevation 1273). | 1 | |||
| 5.2.1.6.8 Tile walls in Machine Shop, Tool Room, and in Electric Shop (Elevation 1258). | 1 | |||
| 5.2.1.6.9 All heating and air conditioning air supply and return grilles and diffusers; and ceiling light fixtures (Elevations 1244, 1258, 1262, 1273, 1291 and 1307). | 1 | |||
| 5.2.1.6.10 Inspection Gallery, including Draft Tube and Scroll Case Access Stairway and two circular Stairways (Elevations 1244 to 1206). | 1 | |||
| 5.2.1.6.11 Draft Tube Deck (Elevation 1266). | 1 | |||
| 5.2.1.6.12 Wood block floors in Machine Shop and Tool Room (Elevation 1258). | 1 | |||
| 5.2.1.6.13 Erection Bay and Generator Bays #1 - #8, including overhead crane area, high bay windows, and ceiling (Elevations 1273 and 1291). | 1 | |||
| 5.2.1.6.14 Elevator light panels. | 1 | |||
| 5.2.1.6.15 Operator’s chairs in Control Room (Quantity 5) (Elevation 1273). | 1 | |||
| 5.2.1.7.1 Snow and ice removal from the five entrance areas to the Powerhouse | 25 | |||
| 5.2.1.7.2 Accidental spills such as soda pop, water, oil, broken glass, muddy footwear, etc | 50 | |||
| 5.2.1.7.3 Miscellaneous janitorial work in addition to schedule, | 100 | |||
| TOTAL | ||||
| Task Description | Frequency | Price Per Cleaning | Base Year | |
| 4/1/20- 3/31/21 CLIN 0002 | Price Per Cleaning | Option Year #1 | ||
| 4/1/21 - 3/31/22 CLIN 1002 | Price Per Cleaning | Option Year #2 | ||
| 4/1/22 - 3/31/23 CLIN 2002 | Price Per Cleaning | Option Year #3 |
4/1/23 - 3/31/24 CLIN 3002
| Outside Maintenance Tasks | |
| 5.2.2.1.1 Main Entrance, Natural Resources Office and Conference Room | 198 |
| 5.2.2.1.2 Maintenance and Mechanic Offices and Plumbing/Electrical Shop. | 198 |
| 5.2.2.1.3 Restrooms and Shower Areas. | 198 |
| 5.2.2.1.4 Break Room. | 198 |
| 5.2.2.1.5 Copier/Corridor Area. | 198 |
| 5.2.2.1.6 Maintenance Bay Area (Hand Wash Center). | 198 |
| 5.2.2.1.7 Consolidated Storage | 198 |
| 5.2.2.1.8 Fort Randall Chapel Restroom (May thru October) | 130 |
| 5.2.2.2.1 Natural Resources Office, Conference Room, Maintenance and Mechanic Offices, Break Room. | 52 |
| 5.2.2.2.2 Carpentry Shop, Paint Room, Welding Shop, Maintenance Bay Area, and Consolidated Storage. | 52 |
| 5.2.2.2.3 Mezzanine Level (located above the Maintenance Bay Area). | 52 |
| 5.2.2.2.4 Main and Employees Entrances. | 52 |
| 5.2.2.2.5 All areas of Maintenance Facility. | 52 |
| 5.2.2.3.1. Damp wipe Shower and Restrooms walls | 12 |
| 5.2.2.3.2 Natural Resources Office, Conference Room, Maintenance and Mechanic Offices, Break Room Dust and Chair Mats | 12 |
| 5.2.2.3.3 All heating and air conditioning air supply and return grilles, diffusers, blowers and vents, and baseboard, cove, and infrared heaters in Maintenance Facility. | 12 |
| 5.2.2.4.1 All sealed concrete floors Restrooms, Maintenance Office, Break Room, and Carpenter Shop Area (includes Vestibules, Copier/Corridor Area, Locker and Shower Areas). | 4 |
| 5.2.2.4.2 Eye Wash Stations in Pesticide Room and Maintenance Bay Area. | 4 |
| 5.2.2.4.3 Pesticide Room and Flammable Storage Room. | 4 |
| 5.2.2.4.4 Venetian Blinds | 4 |
| 5.2.2.4.5 Interior and exterior side of windows in Maintenance Facility. | 4 |
| 5.2.2.5.1 Mechanical Room. | 2 |
| 5.2.2.5.4 Ceiling light fixtures and exit lights in the Maintenance Facility. | 2 |
| 5.2.2.5.5 Maintenance Bay Area (Hand Wash Center). | 2 |
| 5.2.2.5 .6 Natural Resources Office and Conference Room. | 2 |
| 5.2.2.5.7 Cold Storage Building and Lean Too. | 2 |
| 5.2.2.5.8 Visitor Center. | 2 |
| 5.2.2.7 Unscheduled Requirements: Snow and ice removal from the seven entrance areas to the Outside Maintenance | 25 |
| TOTAL |
File details come from the government source that posted it. Updated .